8. Scheme of prospecting.

(a) particulars of the area;
(b) the scale of the plan and the area of geological mapping;
(c) the number of pits, trenches, and bore-holes which he proposes to put in the area and the locations thereof;
(d) the particulars of the machines to be used;
(e) the details of exploratory mining to be undertaken;
(f) the number of samples proposed to be drawn and tested;
(g) baseline information of prevailing environmental conditions before the beginning of the prospecting operations;
(h) any other matter relevant for the preparation of a scheme of prospecting, as directed by the State Government or any person so authorised from time to time by a general or specific order.