{
    "id": 11904,
    "slug": "the-granite-conservation-and-development-rules-1999",
    "title": "The Granite Conservation And Development Rules, 1999",
    "short_title": "The Granite Conservation And Development Rules, 1999",
    "act_number": "Published vide Notification G.S.R. 398(E), dated 1",
    "act_year": 1999,
    "act_type": "CENTRAL",
    "location": "India (Central)",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "The Granite Conservation And Development Rules, 1999",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "1",
            "title": "1. Short title and commencement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "2",
            "title": "2. Application.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 1
        },
        {
            "number": "3",
            "title": "3. Definitions.",
            "chapter": null,
            "content": "(a) \"Act\" means the Mines and Minerals [(Development and Regulation)] Act, 1957 (67 of 1957);\n(b) \"agent\" when used in relation to a quarry, means any person whether appointed as such or not, who acts as the representative of the owner in respect of the management of the quarry or any part thereof;\n(c) \"development\" means removing overburden or unproductive or waste materials as preparatory to mining;\n(d) \"drilling\" means the penetration of alluvial material, rocks or formations by holes for obtaining geological information and for drawing samples therefrom;\n(e) \"environment\" and \"environmental pollution\" shall have the same meanings, assigned respectively to these terms in the Environment (Protection) Act, 1986 (29 of 1986);\n(f) \"Form\" means a Form set forth in Schedule to these rules;\n(g) \"geologist\" means a person appointed in writing by the prospecting licensee, owner or agent to perform the duties of a geologist under these rules;\n(h) \"granite\" means dolerites, granite geneisses, migmatities, gabbros, anorthosites, rhyolites, syenites, leptynites, charnockites and any other igneous and orthometamorphic rock types which are-\n(i) amenable to be recovered a dimensional stone;\n(ii) capable of taking polish; and\n(iii) commercially exploitable;\n(i) \"lease\" means a lease granted for the purpose of undertaking mining or quarrying operations for granite;\n(j) \"manager\" when used in relation to a mine or a quarry, means any person appointed by the owner or agent and includes the owner or the agent if he appoints himself to be such manager, under section 17 of the Mines Act, 1952 (35 of 1952);\n(k) \"mining engineer\" means a person appointed in writing by the owner or agent to perform the duties of a mining engineer under these rules;\n(l) \"prospect\" means an area where existence of granite has been established;\n(m) \"prospecting license\" means a license granted for the purpose of undertaking any operation for the purpose of exploring, locating or proving granite deposits;\n(n) \"quarry\" means an open-cast working as defined in Mines Act, 1952 (35 of 1952);\n(o) \"recognised person\" means a qualified person granted recognition by the competent authority under these rules to prepare mining plan;\n(p) \"sheet rock\" means massive granite bodies but does not include boulders;\n(q) \"year\" means the twelve months period beginning from the first day of April and ending on the thirty-first day of March of the following year.\nChapter II\nProspecting And Mining Of Granite\nProspecting And Mining Of Granite",
            "footnote": "",
            "is_definition": true,
            "sort_order": 2
        },
        {
            "number": "4",
            "title": "4. Prospecting to precede mining operations.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "5",
            "title": "5. Period for which prospecting license may be granted or renewed.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "6",
            "title": "6. Period for which leases may be granted or renewed.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "7",
            "title": "7. Minimum and maximum area for grant of a mining lease.",
            "chapter": null,
            "content": "Chapter III\nProspecting Operations\nProspecting Operations",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "8",
            "title": "8. Scheme of prospecting.",
            "chapter": null,
            "content": "(a) particulars of the area;\n(b) the scale of the plan and the area of geological mapping;\n(c) the number of pits, trenches, and bore-holes which he proposes to put in the area and the locations thereof;\n(d) the particulars of the machines to be used;\n(e) the details of exploratory mining to be undertaken;\n(f) the number of samples proposed to be drawn and tested;\n(g) baseline information of prevailing environmental conditions before the beginning of the prospecting operations;\n(h) any other matter relevant for the preparation of a scheme of prospecting, as directed by the State Government or any person so authorised from time to time by a general or specific order.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "9",
            "title": "9. Modification of scheme of prospecting.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "10",
            "title": "10. Prospecting operations to be carried out in accordance with scheme of prospecting.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "11",
            "title": "11. Report of prospecting operations.",
            "chapter": null,
            "content": "Chapter IV\nMining Plan\nMining Plan",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "12",
            "title": "12. Mining plan as a pre-requisite to the grant of lease.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "13",
            "title": "13. Mining plan to be prepared by a recognised person.",
            "chapter": null,
            "content": "(i) a degree in mining engineering or a post-graduate degree in geology granted by a university established or incorporated by or under an Act of Parliament or any institution recognised by the University Grants Commission established under section 4 of the University Grant Commission Act, 1956 (3 of 1956) or any qualification equivalent thereto; and\n(ii) professional experience of five years of working in a supervisory capacity in the field of mining or mineral administration after obtaining a degree or qualification required under clause (i).",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "14",
            "title": "14. Grant recognition by State Government.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        },
        {
            "number": "15",
            "title": "15. Approval and submission of mining plan.",
            "chapter": null,
            "content": "(i) the plan of the precise area showing the nature and extent of the granite body; spot or spots where the excavation is to be done in the first year and its extent; a detailed cross-section and detailed plan of spots of excavation based on the prospecting data gathered by the applicant; a tentative scheme of mining for the first five years of the lease;\n(ii) details of the geology and lithology of the precise area including granite reserves of the area;\n(iii) the extent of manual mining or mining by the use of machinery and mechanical devices on the precise area;\n(iv) the plan of the precise area showing natural water courses, limits of reserved and other forest areas and density of trees, if any assessment of impact of mining activity on forest, land surface and environment including air and water pollution; details of scheme for restoration of the area by afforestation, land reclamation, use of pollution control devices and of such other measures as may be directed by the Central or the State Government from time to time;\n(v) annual programme and plan for excavation on the precise area from year to year for five years;\n(vi) any other matter which the State Government or any person so authorised may require the applicant to provide in the mining plan.\nChapter V\nMining Operations\nMining Operations",
            "footnote": "",
            "is_definition": false,
            "sort_order": 14
        },
        {
            "number": "16",
            "title": "16. Mining plan as a pre-requisite to the commencement of mining operations.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 15
        },
        {
            "number": "17",
            "title": "17. Mining plan to be submitted by the existing lessee.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 16
        },
        {
            "number": "18",
            "title": "18. Review of mining plan.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 17
        },
        {
            "number": "19",
            "title": "19. Mining operations to be in accordance with mining plan.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 18
        },
        {
            "number": "20",
            "title": "20. Prospecting and mining operations.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 19
        },
        {
            "number": "21",
            "title": "21. System of working.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 20
        },
        {
            "number": "22",
            "title": "22. Separate stacking of non-saleable granite.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 21
        },
        {
            "number": "23",
            "title": "23. Notice for opening of a mine and intimation of existence of a mine.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 22
        },
        {
            "number": "24",
            "title": "24. Abandonment or surrender of quarries.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 23
        },
        {
            "number": "25",
            "title": "25. Notice of temporary discontinuance of work in quarries.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 24
        },
        {
            "number": "26",
            "title": "26. Intimation of reopening of a quarry.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 25
        },
        {
            "number": "27",
            "title": "27. Copies of plans and sections to be submitted.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 26
        },
        {
            "number": "28",
            "title": "28. Preparation of plans.",
            "chapter": null,
            "content": "Chapter VI\nSystematic And Scientific Mining\nSystematic And Scientific Mining",
            "footnote": "",
            "is_definition": false,
            "sort_order": 27
        },
        {
            "number": "29",
            "title": "29. Protection of environment.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 28
        },
        {
            "number": "30",
            "title": "30. Removal and utilisation of top soil.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 29
        },
        {
            "number": "31",
            "title": "31. Storage of overburden, waste rock, etc.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 30
        },
        {
            "number": "32",
            "title": "32. Reclamation and rehabilitation of lands.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 31
        },
        {
            "number": "33",
            "title": "33. Precaution against air pollution.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 32
        },
        {
            "number": "34",
            "title": "34. Discharge of effluents.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 33
        },
        {
            "number": "35",
            "title": "35. Precaution against noise.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 34
        },
        {
            "number": "36",
            "title": "36. Permissible limits and standard.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 35
        },
        {
            "number": "37",
            "title": "37. Restoration of flora.",
            "chapter": null,
            "content": "Chapter VII\nEmployment Of Qualified Persons\nEmployment Of Qualified Persons",
            "footnote": "",
            "is_definition": false,
            "sort_order": 36
        },
        {
            "number": "38",
            "title": "38. Employment of mining engineer.",
            "chapter": null,
            "content": "(a) in the case of a mechanised granite quarry, a whole-time mining engineer qualifications, possessing the following, namely:-\n(i) Degree in mining engineering with minimum one year's experience of working in mines including granite quarries, or\n(ii) Post Graduate degree in geology with First Class Metalliferous Mines Manager's Certificate or Post Graduate Degree in geology with minimum three years' experience of working in supervisory capacity in mines including granite quarries, or\n(iii) Diploma in Mining with First Class Metalliferous Mines Manager's Certificate or Diploma in Mining with three year's experience in supervisory capacity in mines including granite quarries, or\n(iv) First Class Metalliferous Mines Manager's Certificate with minimum two year's experience of working in mines including granite quarries after obtaining the certificate.\n(b) in the case of a granite quarry lease other than the mechanised granite quarry lease,-\n(i) a part-time mining engineer possessing qualification as prescribed under clause (a) above; or\n(ii) a part-time mining engineer, possessing a post graduate degree in geology or Second Class Metalliferous Mines Manager's Certificate, or\n(iii) a whole-time mining engineer possessing Secondary School Leaving Certificate and mine Foreman Certificate with minimum five years' experience of working as Mines Foreman or Mate in mines including granite quarries.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 37
        },
        {
            "number": "39",
            "title": "39. Duties of mining engineer.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 38
        },
        {
            "number": "40",
            "title": "40. Supply of materials, appliances and facilities.",
            "chapter": null,
            "content": "Chapter VIII\nNotices And Returns\nNotices And Returns\n[41. Half yearly and annual returns.\n(a) a half yearly return in Form F for every half year ending 30th September and 31st March before the 15th of the following month for the preceding half yearly period;\n(b) an annual return in Form G which shall be submitted before the 1st July of each year for the preceding year:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 39
        },
        {
            "number": "42",
            "title": "42. Notice of certain appointments.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 40
        },
        {
            "number": "43",
            "title": "43. Records of bore-holes.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 41
        },
        {
            "number": "44",
            "title": "44. Transfer of records of transferees.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 42
        },
        {
            "number": "45",
            "title": "45. Copies of notices and returns to be maintained.",
            "chapter": null,
            "content": "Chapter IX\nRevision And Penalty\nRevision And Penalty",
            "footnote": "",
            "is_definition": false,
            "sort_order": 43
        },
        {
            "number": "46",
            "title": "46. Revision.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 44
        },
        {
            "number": "47",
            "title": "47. Penalty.",
            "chapter": null,
            "content": "Chapter X\nMiscellaneous\nMiscellaneous",
            "footnote": "",
            "is_definition": false,
            "sort_order": 45
        },
        {
            "number": "48",
            "title": "48. Facilities for undertaking research or training.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 46
        },
        {
            "number": "49",
            "title": "49. Territorial jurisdiction.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 47
        },
        {
            "number": "50",
            "title": "50. Obligation to supply other information.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 48
        },
        {
            "number": "51",
            "title": "51. Provisions of these rules to be applicable to Government.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 49
        },
        {
            "number": "52",
            "title": "52. Applicability of the provisions of Minor Mineral Concession Rules framed by the State Government.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 50
        },
        {
            "number": "53",
            "title": "53. Delegation of powers.",
            "chapter": null,
            "content": "Schedule\nForm A\nForm A\nYearly Report Of Prospecting Operations Carried Out\n[See rule 11(1) and 11(2)]\nImportant",
            "footnote": "",
            "is_definition": false,
            "sort_order": 51
        },
        {
            "number": "1",
            "title": "1. Type of the granite for which prospecting operations has been granted : (a) (b) 2. Name and address of the license : 3. Particulars of the prospecting license : (i)  Date of execution.................. (ii)  Period :\nYears........ From.........  to............. (iii) Area under license...............Hectares (iv)  No. and date assigned by State Government to Prospecting License. No...............Date.................",
            "chapter": null,
            "content": "(i) Topo Sheet Number :\n(ii) Cadastral Survey or Khasra Number:\n(iii) Village.........Taluka/Tehsil.........District.......State......\n(iv) Post Office..........Police Station ...........\n(v) Nearest railway station.......Distance..............v (vi) Nearest Rest House/Dak Bungalow 5. Particulars of the Geologist or mining Engineer employed optionally, if any, for the prospecting licenced area\n(vi) Nearest Rest House/Dak Bungalow\n(i) Name and address\n(ii) Qualification\n(iii) Date of appointment\n(iv) Status of employment : Whole time : Part-time 6. Status of Prospecting Operation: In Progress : (Please tick (√) mark one of the boxes whichever is applicable) Completed : Abandoned\na. Geological mapping Area in Hectare Scale b. Pitting (i) No. of Pits (ii) Grid Pattern (iii) Depth (Mts.) Average Maximum Minimum c. Trenching (i) No. of trenches (with interval) (ii) Length (Mts.) Average Maximum Minimum\nArea in Hectare\nScale\n(d) No. and size of samples\n(e) Drilling\n(i) No. of boreholes completed during the year (with size of core)\n(ii) No. of boreholes in progress\n(iii) Total yearly drilling (Mts.)\n(f) Particulars of drilling machines,  Type,   Make,   Capacity,   No. of drills\n(g) Details of samples tested\n(i) No. of samples tested\n(ii) Complete report\nSignature............................................................\nName in full........................................................\nDesignation.......................................................\nNote.\nForm B\nForm B\nNotice Of Intimation Of Opening Of Mine/Quarry\n(See rule 23)\nImportant\n(ii) Name of other mineral(s) worked, if any\n(a) Public sector\n(b) Joint Sector\n(c) Private Sector\n(In case of Joint sector, specify percentage share of each company)\n(i) Date of execution\n(ii) Period:   Years..........From...........to............\n(iii) Area under licence..............Hectares\n(i) Topo-Sheet Number\n(ii) Cadastral Survey or Khasra Number\n(iii) Village.........Taluka/Tehsil.......District......State......\n(iv) Post Office..........Police Station............\n(v) Nearest railway station............Distance............\n(vi) Nearest Rest House/Dak Bungalow\n(a) Name and address\n(b) Date of appointment\n(a) Name and address\n(b) Qualifications\n(c) Date of appointment\n(d) Status of employment Whole time Part time :\n(d) Status of employment\n(a) Name and Address\n(b) Date of appointment\nSignature............................................................\nName in full........................................................\nDesignation.......................................................\nForm C\nForm C\nNotice Of Intention Of Abandonment/surrender Of Mine/Quarry Or Part Of The Mine/Quarry\n[(See rule 24(2) and rule 24(4)]\nMine/Quarry Code:.....................................\n(ii) Name of other mineral(s) worked, if any\n(i) Date of execution\n(ii) Period:   years.........from.........to................\n(iii) Area under lease.........................Hectares\n(i) Topo Sheet Number\n(ii) Cadastral Survey of Khasra Number\n(iii) Village.......Taluka/Tehsil......District........State.......\n(iv) Post Office............Police Station...........\n(v) Nearest railway station...........Distance.............\n(vi) Nearest Rest House/Dak Bungalow\n(a) Name and Address\n(b) Qualifications\nExhaustion of granite Lack of Demand: Uneconomic operations Non availability of labour: Land slide Flooding of quarry: Other calamity (specify) Other reasons (specify):",
            "footnote": "",
            "is_definition": false,
            "sort_order": 52
        },
        {
            "number": "11",
            "title": "11. Reserves of the mineral proved in the area. (a) Proved (b) Probable (c) Possible",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 53
        },
        {
            "number": "13",
            "title": "13. Number of workers employed in the Quarry Male Female Company Labour (Direct) Contract Labour Place............. Signature........................................... Date.............. Name in full......................................... Designation Owner/Agent/Mining Engineer/Manager",
            "chapter": null,
            "content": "Male\nFemale\nSignature...........................................\nName in full.........................................\nDesignation Owner/Agent/Mining Engineer/Manager\nNote.\nForm D\nForm D\nNotice Of Temporary Dis-Continuance Of Quarry/Mine\n(See rule 25)\nMine/Quarry Code :........................................\nImportant\n(ii) Name of other mineral(s) worked, if any\n(i) Date of execution\n(ii) Period:  Years.........from..........to...........\n(iii) Area under lease......................Hectares\n(i) Topo Sheet Number\n(ii) Cadastral Survey of Khasra Number\n(iii) Village.......Taluka/Tehsil........District......State.......\n(iv) Post Office...........Police Station...........\n(v) Nearest railway station............Distance...........\n(vi) Nearest Rest House/Dak Bungalow\nSignature...................................................\nName in full................................................\nDesignation : Owner/Agent/Mining Engineer/Manager\nForm E\nForm E\nNotice Of Intimation Of Reopening Of Quarry/Mine\n(See rule 26)\nMine/Quarry Code:........................................\nImportant\n(ii) Name of other mineral(s) worked, if any\n(i) Date of execution:\n(ii) Period :  Years...........from.............to.........\n(iii) Area under lease....................Hectares\n(i) Topo Sheet Number\n(ii) Cadastral Survey or Khasra Number\n(iii) Village.........Taluka/Tehsil.......District.......State.....\n(iv) Post Office.............Police Station................\n(v) Nearest railway station.............Distance..............\n(vi) Nearest Rest House/Dak Bungalow\n(a) Abandoned\n(b) Discontinued\nSignature...................................................\nName in full................................................\nDesignation : Owner/Agent/Mining Engineer/Manager\n[ Form F ]\nForm F\nHalf Yearly Return\n[See rule 41(l)(a)]\nMine/Quarry Code : ......................................\n(i) Type of the granite work:\n(ii) Name(s) of other mineral(s), if any:\nArea in hectares: Date of execution: Period (years): Date of starting mining operations:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 54
        },
        {
            "number": "5",
            "title": "5. Indicate reason(s) for work stoppage due to strike, lockout, monsoon, non availability of labour, less demand, etc., and number of days of work stoppage for each of these factors. Reasons No.\nof days",
            "chapter": null,
            "content": "Reasons\nNo.\nof days\nItems Total Weight-wise/Size-wise break up (a) Opening Stock (b) Production (c) Despatches (i) Direct Exports (ii) Domestic sale (d) Closing stock (e) Pit's Mouth Value (Rs.)\nTotal\nWeight-wise/Size-wise break up\nItem During the half year (a) Quantity of waste generated as overburden (b) Quantity of waste generated incidental to mining or raw blocks (c) Quantity of waste generated as rejected blocks and dressing rejects (d) Despatches of waste and rejects (in accordance with above classification)\nDuring the half year\nType of Machinery No.\nof units Engine Horse Power of each unit worked No.\nof hours (a) (b) (c) (d)\nType of Machinery\nNo.\nof units\nEngine Horse Power of each unit worked\nNo.\nof hours\n(a)\n(b)\n(c)\n(d)\nQuantity (in MT): Value (in Rs.): 11. Domestic Sale of Dimensional Blocks: During the half yearly period: Value (in Rs.): Quantity (in MT):\nSignature...................................................\nName in full................................................\nDesignation : Owner/Agent/Mining Engineer/Manager\n[ Form G ]\nForm G\nAnnual Return\n[See rule 41(1)(b)]\nMine/Quarry Code: ........................................\n(For the year 1st April, 20.................to 31st March, 20........\n(i) Type of the granite work:\n(ii) Name(s) of other mineral(s), if any:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 55
        },
        {
            "number": "1",
            "title": "1. Name and Location of the Quarry/\nMine Name of Mine/Quarry: Village: Post Office: Taluka/Tehsil : District: State: 2. Name and address of the Lessee/Mine/Quarry Owner: 3. Lease details Area in hectares: Date of execution: Period (years): 4. No. of days the Quarry/Mine worked during the year: 5. Indicate reason(s) for work stoppage due to strike, lockout, monsoon, non availability of labour, less demand, etc. and number of days of work stoppage for each of these factors. Reasons No. of days",
            "chapter": null,
            "content": "Description Fully employed Partly employed (a) Graduate Mining Engineer (b) Diploma Mining Engineer (c) Geologist (d) Other administrative, clerical and technical supervisory staff 6.2 Labour Employment: Male Female (a) Average daily employment (b) Wages (Rs.) 7. Production, despatches, stocks and Pit's Mouth Value : 7.1 Production of Rew sizes blocks during the year (Unit: Cu. M): Items Total Size-wise breakup (a) Opening stock (b) Production (c) Despatches (i) Direct exports (ii) Domestic sale (d) Closing stock (e) Pit's Mouth Value (Rs.) 7.2 Cumulative production: (since opening of quarry in Cu.M/tonnes) 7.3 Waste and Rejects (Unit:Cu.M/tonnes) Item During the year Cumulative total (a) Quantity of waste generated as overburden (b) Quantity of waste generated incidental to mining or raw blocks (c) Quantity of waste generated as rejected blocks and dressing rejects (d) Despatches of waste and rejects (in accordance with above classification) 8. Mining Machinery used during the year\nDescription\nType of Machinery No.\nof units Engine Horse Power of each unit worked No.\nof hours (a) (b) (c) (d)\nType of Machinery\nNo.\nof units\nEngine Horse Power of each unit worked\nNo.\nof hours\n(a)\n(b)\n(c)\n(d)\nQuantity Cost (Rs.) (i) Fuel (Lt.) : (ii) Electricity (KWH) : (iii) Other materials :\nQuantity\nCost (Rs.)\n(i) Fuel (Lt.) :\n(ii) Electricity (KWH) :\n(iii) Other materials :\nSignature...................................................\nName in full................................................\nDesignation : Owner/Agent/Mining Engineer/Manager\nNote.\n(b) Average daily employment is obtained by dividing the number of mandays worked by the number of working days.\n(c) Wage includes all cash payments including bonuses. Employers' contributions to provident funds, welfare activities, etc., concessions in kind should not be included in wages.\n(d) The Pit's Mouth Value should represent the sale value of the granite at the pit head. In case of sales effected on F.O.R. or F.O.B. or any other basis, pit head sale value should be arrived at after deducting all the expenses incurred from quarry/mine to railway station or port or other point of sale, as the case may be (such as expenses on transportation, loading and unloading charges, railway freight, sampling and analysis, port handling, export duty and cess).]\nForm H\nForm H\nNotice Of Certain Appointment/Resignation/Termination/Change Of Address\n(See rule 42)\nMine/Quarry Code: .......................................\nImportant\n(i) Topo-sheet Number\n(ii) Cadastral Survey or Khasra Number\n(iii) Village......Taluka/Tehsil........District........State......\n(iv) Post Office................Police Station..........\n(v) Nearest Railway Station...............Distance...............\n(vi) Nearest Rest House/Dak Bungalow...............................\n(i) Date of execution.............. (ii) Period..........Years............from.............to.......... (iii) Area under Quarry Lease/Prospecting license (Hectare) 6. Please indicate whether notice is given in respect of:\n(ii) Period..........Years............from.............to..........\n(iii) Area under Quarry Lease/Prospecting license (Hectare)\n(i) New appointment\n(ii) Resignation/termination of employment\n(iii) Change of address\n(i) Name\n(ii) Designation\n(iii) Address\n(iv) Qualifications\n(v) University/Institution from which passed\n(vi) Date of appointment\n(i) Whether appointment is whole-time/part-time\n(Please tick mark whichever is applicable)\n(ii) Names, locations and ownership of all other Quarry/prospecting license which he will supervise. 9. In case of resignation/termination of employment of Agent/Mining Engineer/Geologist/Manager, please indicate:\nQuarry/prospecting license which he will supervise.\n(i) Name\n(ii) Designation\n(iii) Date of resignation/termination of employment\n(in case the vacancy so created has been filled in please furnish the particulars of the same in columns 6 and 7).\n(i) Name\n(ii) Designation\n(iii) Present address\n(iv) Date of change of address\nSignature..................................\nName in full................................\nDesignation : Owner/License\nForm I\nForm I\nParticulars To Be Recorded In A Durable Bound Paged Book In Respect Of Each Bore-Hole/Pit\n(See rule 43)\n(i) Topo Sheet Number\n(ii) Cadastral Survey of Khasra Number\n(iii) Village........Taluka/Tehsil.........District.......State.......\n(iv) Post Office....................Police Station...................\n(v) Nearest Railway Station ............Distance..................\n(vi) Nearest Rest House/Dak Bungalow .................................\n(a) Reduced levels at the collar of the borehole/pit\n(b) Inclination and bearing of the hole\n(c) Altitude of the formation\n(a) Date of commencement\n(b) Date of completion\n(a) Run Details To (Mt.) Form\n(Mt.) True Width (Mt.) Width\n(Mt.)\n(a) Run Details\n(a) Run Details\nTo (Mt.)\nForm\n(Mt.)\nForm\n(Mt.)\nTrue Width (Mt.)\nWidth\n(Mt.)\nWidth\n(Mt.)\n(b) Size of corepit\n(c) Percentage recovery of core\n(d) Lithology\n(e) Details of test carried out\n(indicate physical properties and stone quality)\nSignature...................................................\nName in full................................................\nDesignation : Owner/Agent/Mining Engineer/Manager",
            "footnote": "",
            "is_definition": false,
            "sort_order": 56
        }
    ],
    "metadata": {
        "Act ID": "16/750",
        "Act Number": "Published vide Notification G.S.R. 398(E), dated 1.6.1999, published in the Gazette of India, Extraordinary, Part 2, Section 3(i), dated 1.6.1999.",
        "Enactment Date": "",
        "Act Year": "1999",
        "Short Title": "The Granite Conservation And Development Rules, 1999",
        "Type": "CENTRAL",
        "Location": "India (Central)"
    },
    "updated_at": "2026-09-29 21:55:17"
}