The Bihar Irrigation, Flood Management and Drainage Rules, 2003
The Bihar Irrigation, Flood Management and Drainage Rules, 2003
Sections
1. Short title, extent and commencement.
Section 12. Definitions.
Section 23. Irrigation Rules.
Section 34. Flood Management Rules.
Section 41. Concerned Chief Engineer.
Section 12. Adjacent another Chief Engineer
Section 23. One Superintending Engineer from headquarter.
Section 31. Regime plan of the river wherein location of erosion of previous years are marked
Section 12. Probing chart of the site.
Section 23. Details of flood protection work executed in the previous years and their outcome.
Section 34. Details of flood fighting works executed during the previous years.
Section 45. Discharge data and Gauge readings of the nearest gauge stations.
Section 56. Details of works and its estimated cost as proposed by the Field Officers.
Section 67. Any other related information, if any, or the one which the Subcommittee desires.
Section 71. Rainfall
Section 12. Gauge reading of rivers at different sites.
Section 23. Tendency of the river
Section 34. Name of the breach sites, cause of breaches, steps taken to check the flood water and closer of the breaches
Section 45. Losses and other matter related to it.
Section 55. Drainage Rules. - 5.1 Notice regarding prohibition of obstructions.
Section 55. Drainage Rules.
Section 56. Repeal and Saving.
Section 6
the-bihar-irrigation-flood-management-and-drainage-rules-2003.json
•
22 Sections
•
Bihar
{
"id": 15825,
"slug": "the-bihar-irrigation-flood-management-and-drainage-rules-2003",
"title": "The Bihar Irrigation, Flood Management and Drainage Rules, 2003",
"short_title": "The Bihar Irrigation, Flood Management and Drainage Rules, 2003",
"act_number": "Published vide Notification S.O. No. Yo. & Mo, 19-",
"act_year": 2003,
"act_type": "STATE",
"location": "Bihar",
"law_status": "unknown",
"enactment_date": null,
"description": "The Bihar Irrigation, Flood Management and Drainage Rules, 2003",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "1. Short title, extent and commencement.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "2",
"title": "2. Definitions.",
"chapter": null,
"content": "(a) The \"Act\" means, the \"Bihar Irrigation Act, 1997 (Bihar Act 11,1998)\".\n(b) \"Section\" means, the section of this Act.\n(c) \"Proforma\" means any proforma under Annexure of this Rule.\n(d) \"System Level Committee\" means the highest level committee of Water Users' Association in which there shall be representation from whole command area of canal system viz Distributary/Sub-distributary/Minor, transferred to Water Users' Association.\n(e) \"Village Level Committee\" means the lowest level committee of Water Users' Association, constituted in each village of the whole command area of the canal system transferred to the Water Users' Association.",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
{
"number": "3",
"title": "3. Irrigation Rules.",
"chapter": null,
"content": "3.1.\n3.1.1.\n3.1.2.\n3.1.3\n3.1.4\n3.2 Water supply.\n3.2.1\n3.2.2\n(b) Such declaration shall be widely published as per sub-section (2) of Section 50. The name of land owner, plot number and Khesra shall be indicated in the declaration.\n(c) if any discrepancy in plot No and khesra is found by any land owner he shall inform the same to the Canal Officer through the concerned Junior Engineer for its rectification within a week of such declaration.\n(d) If any objection regarding the name of land owner, plot no. and khesra is raised, the Canal Officer shall do necessary verification and report the same to the Divisional Canal Officer. The Divisional Canal Officer shall take appropriate action, if he feels the necessity of rectification in the Notification.\n(e) After declaration by the Section Officer in-charge a map shall be prepared showing assured irrigable command area and probable irrigable command area on village map for each village. Later on, if any alteration in such declared areas is made by Government Notification the same shall also be rectified in the map.\n3.2.3\n3.2.4\n3.2.5\n3.2.6\n3.2.7\n3.2.8\n3.2.9\n3.3 Opening of canal outlet.\n3.3.1\n3.3.2\n(b) The Section Officer, without written order of Canal Officer, shall neither remove or make any alteration in the present outlets nor provide any additional outlet.\n(c) Right of cutting of canal or channels, obstruction/alteration of flow, change of size and place of outlets shall vest in the Government and any encroachment on these rights by the users shall be a punishable offence under the Section 82 of the Bihar Irrigation Act, 1997 (Bihar Act 11,1998)\n3.3.3\n3.3.4\n3.3.5\n3.3.6\n3.3.7\n(b) If the Canal Officer is in a position to provide water, he will issue permission as Form-3 to this effect to the interested applicant.\n3.3.8\n3.3.9\n3.4 Assessment and collection of water charges.\n3.4.1\n3.4.2\n3.4.3\n3.4.4\n3.4.5\n3.4.6\n3.4.7\n3.4.8\n3.4.9\n3.4.10\n(b) Normally, the last date for sending the Khatian shall be as follows:-\nKharif\n- upto 30th November\nRabbi\n- upto 30th April\nHot weather crops\n- upto 15th June\n3.4.11\n3.4.12\n3.5 Remissions and Alterations of Demand\n3.5.1\n(b) While such loss is proved, the Divisional Canal Officer shall, if he is satisfied that loss in probable irrigable command area or the area permitted for irrigation by the Canal Officer :-\n(i) exceeds two-third of the value of the normal irrigated crop, remit the whole of the water rate on such area.\n(ii) exceeds one third and is less than two-thirds of such value, remit one half of water rate.\n(c) While such a loss, in any area included in assured irrigable command area, is proved, the Divisional Canal Officer shall :-\n(i) If he is satisfied that the loss in any area in kharif crop exceeds one third of the value of normal irrigated crop, remit the three fourths of the annual water charge in case of kharif crop and no additional water rate for the coming rabbi crop, grown on the same field on which kharif was grown, shall be levied.\n(ii) Remit the one fourth of the annual water charges in case of rabbi and hot weather crops, if he is satisfied that the loss in any area exceeds one third of the normal value of irrigated crops and no kharif crop has been grown on the area in which the said rabbi and hot weather crop is being grown.\n(d) Save as provided in clause (b) & (c) no remission of water charges under Section 54(2) shall be granted.\n3.5.2\n(ii) As far as possible such discharge measurement shall be made at all controlling points in Government canals and village channels.\n3.5.3\n3.5.4\n3.5.5\n3.5.6\n3.5.7\n3.5.8\n3.6 Regarding transfer of the management of canal systems to Water Users' Association.\n3.6.1\nForm-5\n(b) Water Resources Department will sign a memorandum of understanding with competent Association in the prescribed Form 7 .\nForm 7\n3.6.2\n3.6.3\n3.6.4\n3.6.5\n3.6.6\n(b) The concerned farmer, after receiving the demand, shall have to make payment to the System Level Committee within the stipulated time fixed by the System Level Committee.\n(c) The receipt book to be issued to the farmers at the time of collection of Water-rent-demand will be the same as issued to the general farmers in the State. Aforesaid receipt book shall be issued to the Secretary of Farmer's Association through Canal Officer by the Revenue Wing of Water Resources Department.\n3.6.7\n3.6.8\n3.6.9\n(b) Every year, the System Level Committee shall deposit the aforesaid share of water charges for kharif before 31st March and for rabbi before 30th June in Government treasury as per proper procedures and the same shall be intimated to the Divisional Canal Officer.\n(c) After each five years, the Government shall reconsider the average irrigated area and decision shall be taken on average irrigated area.\n3.6.10\n3.6.11\n3.6.12\n3.6.13\n3.6.14\n3.7 Miscellaneous :-\n3.7.1\n3.7.2\n3.7.3\n3.7.4\n3.7.5\n3.7.6 Water supply for the purposes other than irrigation use.\n3.7.6.1\n3.7.6.2\n3.7.6.3\n(i) The person/persons/firms being authorised to get water, shall use the water supplied only for the purpose for which the permit is issued.\n(ii) The person/persons/firms receiving the water shall deposit the sum of the bill prepared on the basis of water rates fixed by the Government from time to time in the treasury of the Divisional Canal Officer within fifteen days of the receipt of the bill.\n(iii) After preparing the bill for the water supplied in the previous month, the Divisional Canal Officer shall transmit it to the water users/persons/firms through special messenger/registered post/fax, latest by the 10th date of the succeeding month.\n(iv) It shall also be the responsibility of the person/persons/firms receiving water to get the bill collected from the office of the Divisional Canal Officer by the 10th date of every month, and ensure payment of the bill within stipulated period.\n(v) In case of failure of payment of the bill within stipulated period, the permit issued to them shall automatically be cancelled within a period of 15 days of the due date of payment and water supply to the concerned party shall be stopped.\n(vi) In case of cancellation of permit, all the sum due to the party, who has received water, shall be payable with penalty as decided by the Department and only after realisation of full amount, his/her/their application for re-issue of permit, if he/she/they desire so, shall qualify for consideration.\nForm-1\nForm-1\n( See Rule 3.3.7(a))\nApplication for irrigation\nApplication for irrigation\n(Name of Crop) ...........................\nVillage .................... Block ..................... Water course ..................... Outlet No. ................\nThe following are the boundaries of the holding. -\nNorth\nSouth\nEast\nWest\nSchedule\nName of Cultivator\nDetail of crop\nPlot No of land to be irrigated\nArea in acres\nSignature of cultivator\nSignature of witness\nRemarks\n1\n2\n3\n4\n5\n6\n7\nSignature of Applicant\nN.B.\nForm-2\nForm-2\n(See Section 57 & Rule-3.7.6.1)\nApplication for supply of water for works other than Irrigation.\nApplication for supply of water for works other than Irrigation.\nLocation of outlet\nName\nAddress of the applicant\nPurpose of water supply\nPeriod of water supply\nRate and quantum of water supply\nName of source.\n1\n2\n3\n4\n5\n6\nSignature of Applicant\n(Name)\nForm-3\nForm-3\n( See Rule 3.3.7 (b)\nPermit for irrigation of...................\nPermit no. ......................................................................\nApplicant's Name .........................................................\nNumbers, of Application Form and Date ..................\nName of village and Block: .........................................\nArea to be irrigated .....................................................\nName of water course .....................RD......................\nOutlet Number ..............................................................\nPeriod for irrigation .....................................................\nWater charges payable ...............................................\nDate of payment (Within 15 days of the receipt of Demand) ..........................\nSignature of Canal Officer\nSeal\nForm-4\nForm-4\n( See Section-57 & Rule-3.7.6.2)\nPermit for use of water for the purposes other than irrigation.\nPermit for use of water for the purposes other than irrigation.\nApplication No. and Date ............................\nPurpose of Water Supply ............................\nName of Village ...........................................\nName of Block .............................................\nName of Canal/Water course ...................../River/Head works .....................\nLocation of supply .......................................\nPeriod of water supply ................................\nRate and quantum of water supply.............\nDate of payment (within fifteen days of the receipt of the bill)\nSignature of Canal Officer\nSeal\nForm-5\nForm-5\n( See Rule 3.6.1(a))\nApplication for Lease by Water Users' Association\nApplication for Lease by Water Users' Association\nNote : Water rate for irrigation fixed by the Government shall be applicable.\nNote :\nSignature of President/Secretary\nSeal of Association\n(2) A copy of registration of Association\n(3) Certificate of election/nomination of the applicant\nDetails of Area to be irrigated\nDetails of Area to be irrigated\nName of villages\nRevenue Thana No.\nTotal area of village in Ha.\nArea of irrigable land of villages in Ha.\nName and Address of President of Water Users'\n\t\t\t\tAssociation\nSignature of the President of Water Users'\n\t\t\t\tAssociation\n1\n2\n3\n4\n5\n6\nForm-6\nForm-6\n( See Rule 3.6.1 (a)\nPermission of lease to Water Users' Association\nPermission of lease to Water Users' Association\nUpto 30th June for Rabi and\nUpto 31st March of next Year for kharif & Garma .\nSignature\nDivisional Canal Officer.\nForm-7\nForm-7\n( See Rule 3.6.1 (b)\nMemorandum of Understanding for execution of different activities of Water\nMemorandum of Understanding for execution of different activities of Water\nManagement by Water Users' Association such as Operation and Maintenance of Canal, Assessment and Collection of Water rent of irrigation\n(b) A Status report on the actual conditions of the canals of the distribution system, its structures, trees, etc. shall be prepared after conducting a joint survey by the Association and the concerned Executive Engineer/Sub-divisional Officer/Junior Engineer in-charge of Water Resources Department. This status report shall constitute a part of this memorandum of understanding. Complete safety/security and maintenance of these assets shall be the responsibilities of the Association.\nSignature Secretary ….....Water Users'\n\t\t\t\tAssociation\nSignature Executive Engineer .......\n\t\t\t\tDivision Water Resources Department, Patna. Bihar.",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "4",
"title": "4. Flood Management Rules.",
"chapter": null,
"content": "4.1\n4.1.1\n4.1.2\n(a) Risk Category \"A\" : -\n(a) Risk Category \"A\" :\nThis category shall include such locations of embankments and structures where the river erosion has started affecting structure toe or slope of the embankment and as a result of which, damage to the structure/embankment and consequent danger is apprehended.\nAny erosion on sites under this category shall be immediately inspected by the Chief Engineer who, while giving directions for carrying out necessary flood protection works, shall instantly intimate the headquarters. Also, he shall take action to depute there a Special Team \"A\" to have vigilance all round the clock.\nThe Special Team under this category would consist of an officer of the rank of Superintending Engineer supported by three Executive Engineers and six Assistant Engineers/Junior Engineers. A team of two Assistant Engineers/Junior Engineers headed by an Executive Engineer shall work on such sites in shifts of 8 hours' duration. The flood fighting works shall be carried out under the supervision of Chief Engineer/Superintending Engineer and daily information shall be communicated to the headquarters. In case of the flood fighting works continuing for more than three days, the Team 'A' constituted at the headquarters shall proceed immediately to such sites.\n(b) Risk Category \"B\" : -\n(b) Risk Category \"B\" :\nThis category shall include such location of embankments and structures where it is felt that though the river is at some distance from the structure/embankment, but the intensity of erosion is such that if not checked immediately it may soon be close to structure/embankment and may endanger the situation.\nOn any site under this category, if the pressure due to river increases, the Superintending Engineer shall immediately inspect the site, issue instructions for flood fighting works as required, and intimate the Chief Engineer and the headquarter immediately. He shall also take action to depute a Special Team 'B' for vigilance of the site all round the clock. The Special Team under this category shall consist of an Officer of the rank of Executive Engineer supported by three Assistant Engineers and six Junior Engineers. A team of two Junior Engineers headed by one Assistant Engineer shall work on such site in shifts of eight hours duration. The flood fighting works shall be carried out under the supervision of Superintending Engineer/Executive Engineer, and daily information shall be communicated to Chief Engineer/Headquarter. In case the flood fighting works on such sites continue for more than three days, the Chief Engineer shall himself inspect the site and undertake the control of the works as required. In the event of the flood fighting works continuing for more than seven days the Team 'B' constituted at the Headquarter shall immediately proceed for the site.\n(c) Risk Category \"C\" : -\n(c) Risk Category \"C\" :\nThis category includes such sites where though presently the river is at a considerable distance from the structure/embankment but the erosion is continuing and though there appears no danger at present, however, this needs to be checked so that the site may be protected by carrying out ordinary flood fighting works.\nIn case of an increasing pressure due to the river on a vulnerable site under this category, the Executive Engineer shall immediately inspect the site and if feels issuing necessary directions for flood fighting works on a small scale he shall immediately intimate the\nSuperintending Engineer/Chief Engineer/Headquarter. Also, in order to have vigil at the sites a Special Team consisting of three Assistant Engineers and six Junior Engineers so that two Junior Engineers under an Assistant Engineer may be deputed at site in 8 hourly shift. In case of the flood fighting works continuing for more than 2 days, the Superintending Engineer shall immediately inspect the site and take direct control of the flood fighting works under intimation to Chief Engineer/Headquarter. In the event of the flood fighting works continuing for more than five days the Chief Engineer shall inspect the site, take direct control of the flood fighting works under intimation to the headquarter. In case the need arises the Team 'B' constituted at the Chief Engineer level shall be deputed at the site to keep a continuous watch over the flood fighting works.\nAccordingly, the above three special teams constituted at the Chief Engineer's Headquarter shall be available for the entire flood season to provide assistance to the Executive Engineers incharge of the embankment in the emergency situations which, as soon as receives instructions from the competent authority, shall proceed to the specific site requiring their emergency services. Each Special Team shall have a jeep exclusively at its disposal so that the member of the Special Team may rush to the work site immediately after receiving the information. Similarly, one each of special Team 'A' and Special Team 'B' shall be constituted at the departmental headquarter which as per the needs and direction of the competent authority shall be sent to the specific site.\n4.1.3.\n4.2 Patrolling :\n4.2.1\n4.2.2\n4.2.3\n4.2.4\n4.2.5\n4.3 Transmission of Information :\n4.3.1\n4.3.2\n4.3.3\nStatus Report...................(Name of embankment.)\nName of river...................\nName of bank..................................... (left bank or right bank)\n4.3.4\n4.3.5\n4.3.6\n4.3.7\n4.3.8\n4.3.9\n4.3.10\n4.3.11\n4.3.12\n4.4 Control Room :\n4.4.1\n4.4.2\n4.4.3\n4.4.4\n4.5 Flood-Fighting-Materials :\n4.6 Weekly Report :\n4.6.1\n4.6.2\n4.6.3\n4.7 Assistance to be given by district administration during flood period.\n4.7.1\n4.7.2\n4.7.3\n4.8 Patrolling work and security arrangement for vigilance during floods.\n4.8.1\n1.\nDistrict Magistrate -\nChairman\n2.\nSuperintendent of Police -\nMember\n3.\nExecutive Engineer (concerned with Flood control works) -\nMember\n4.\nConcerned District Level Officer of the Relief Department -\nMember\n4.8.2\n4.8.3\n4.8.4\n4.8.5\n4.8.6\n4.8.7\n4.8.8\n4.9 Flood Protection Works :\n4.9.1\n4.9.2",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "1",
"title": "1. Concerned Chief Engineer.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "2",
"title": "2. Adjacent another Chief Engineer",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "3",
"title": "3. One Superintending Engineer from headquarter.",
"chapter": null,
"content": "4.9.3\n1.\nChief Engineer, Central Design Organisation, Water Resources\n\t\t\t\tDepartment Patna\nChairman\n2.\nChairman Ganga Flood Control Commission, Patna\nMember\n3.\nChief Engineer, W.R.D. Darbhanga\nMember\n4.\nChief Engineer, W.R.D. Siwan\nMember\n5.\nChief Engineer, W.R.D. Valmikinagar\nMember\n6.\nChief Engineer, W.R.D. Purnia\nMember\n7.\nChief Engineer, W.R.D. Samastipur\nMember\n8.\nChief Engineer, W.R.D. Muzaffarpur\nMember\n9.\nChief Engineer, Hydrology & Project Planning, Patna\nMember\n10.\nChief Engineer, Minor Irrigation, Patna\nMember\n11.\nChief Engineer, Public Works Department, Patna\nMember\n12.\nDirector, Agriculture Department, Patna\nMember\n13.\nChief Forest Conservator, P.O.-Hinoo, Ranchi,\nMember\n14.\nMember (River Management) CWC-R.K. Puram, New Delhi\nMember\n15.\nChief Engineer (Bridges), N.E. Railway, Gorakhpur, U.P.\nMember\n16.\nChief Engineer, Eastern Railway, 17, Netaji Subhash Road,\n\t\t\t\tCalcutta-700 001\nMember\n17.\nChief Engineer, (Bridges) N.E.F. Railway, Maligaon, Gauhati,\n\t\t\t\tAssam.\nMember\n18.\nChief Engineer, Water Resources Department, Patna\nMember\n19.\nChief Engineer, (Research), Water Resources Department,\n\t\t\t\tKhagaul, Patna.\nMember\n20.\nSuperintending Engineer, Flood Control Planning &\n\t\t\t\tMonitoring Circle, Patna\nMember\n21.\nSuperintending Engineer, Flood Control Design Circle, Patna\nMember-Secretary\n4.9.4\nKosi river\nPipra-Piprasi\nGandak river\n1.\nChief Engineer, Central Design Organisation, W.R.D Bihar\nChairman\n2.\nOne nominated officer from Ganga Flood Control Commission\nMember\n3.\nChief Engineer, Planning & Monitoring, Water Resources\n\t\t\t\tDepartment\nMember\n4.\nChief Engineer, Water Resources Department, Incharge Kosi\n\t\t\t\tEmbankment/Gandak Pipra Piprasi Embankment\nMember-Secretary\n4.9.5",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "1",
"title": "1. Regime plan of the river wherein location of erosion of previous years are marked",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "2",
"title": "2. Probing chart of the site.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "3",
"title": "3. Details of flood protection work executed in the previous years and their outcome.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "4",
"title": "4. Details of flood fighting works executed during the previous years.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "5",
"title": "5. Discharge data and Gauge readings of the nearest gauge stations.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
{
"number": "6",
"title": "6. Details of works and its estimated cost as proposed by the Field Officers.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "7",
"title": "7. Any other related information, if any, or the one which the Subcommittee desires.",
"chapter": null,
"content": "4.9.6\nKosi\nPipra-Piprasi\nGandak\nKosi/Gandak\nKosi High Level Committee :-\nKosi High Level Committee :-\n1.\nChairman Ganga Flood Control Commission, Patna\nChairman\n2.\nDirector, Research Institute, Pune or its representative,\nMember\n3.\nMember (Flood) Central Water Commission, New Delhi or his\n\t\t\t\trepresentative\nMember\n4.\nEngineer-in-Chief (North), Water Resources Department, Bihar\nMember\n5.\nChief Engineer, Water Resources Department Darbhanga\nMember\n6.\nChief Engineer (Research) W.R.D., Khagaul\nMember\n7.\nChief Engineer, Hydrology & Project Planning, W.R.D. Patna\nMember\n8.\nDirector, Eastern Region, Water Resources Department, HMGN,\n\t\t\t\tBiratnagar\nMember\n9.\nDeputy Director, Central Water Resources Department HMGN,\n\t\t\t\tKathmandu\nMember\n10.\nChief Engineer, Water Resources Department Birpur, Bihar\nMember-Secretary\nGandak High Level Committee.\nGandak High Level Committee.\n1.\nChairman, Ganga Flood Control Commission, Patna\nMember\n2.\nEngineer-in-Chief (North, Water Resources Department\n\t\t\t\tGovernment, of Bihar, Patna\nMember\n3.\nEngineer-in-Chief, D & R Irrigation Department ,\n\t\t\t\tGovernment of U.P. (Canal Colony Lucknow-226001)\nMember\n4.\nDirector, C.W.P.R.S., Khadakwasla, Pune-411 024\nMember\n5.\nChief Engineer (Research), Khagaul, Patna\nMember\n6.\nDirector, I.R.I., Government, of U.P. Roorkee\nMember\n7.\nDirector, Ganga Flood Control Commission, Patna\nMember-Secretary\n4.9.7 Kosi/Gandak\nKosi/Gandak Pipra-Piprasi\n4.9.8\n4.9.9\nThe Departmental Scheme Review Committee shall be constituted consisting of the following :\n1.\nEngineer-in-Chief (Flood Sector), W.R.D., Bihar Patna.\nChairman\n2.\nOne member from Ganga Flood Control Commission, Patna (To be\n\t\t\t\tnominated by GFCC.)\nMember\n3.\nChief Engineer, Planning & Monitoring, W.R.D., Patna\nMember\n4.\nChief Engineer, IRI, Khagaul, Patna\nMember\n5.\nChief Engineer, Central Design Organization, W.R.D.,\n\t\t\t\tPatna-cum-Chairman State Technical Advisory Committee\nMember\n4.9.10\nScheme Review Committee\nPriority 1 : Protection of embankments and retired embankment shall be given priority over other erosion sites.\nPriority 1 :\nPriority 2 : The Schemes for the protection of big industrial units, the National Highways, State Highways and other big towns shall be first taken up under the sub-head - Town and Village Protection Works. It is only with the remaining funds that the schemes for protection of old thickly populated settlements shall be taken up.\nPriority 2 :\nPriority 3 : For want of fund, neither the protection works of culturable land along the rivers nor any protection works for diara area shall be taken up.\nPriority 3 :\nDepartmental Scheme Review Committee\n4.9.11\nScheme Review Committee\n1.\nChief Minister, Bihar.\nChairman\n2.\nFinance Minister, Bihar\nMember\n3.\nMinister of Water Resources Bihar.\nMember\n4.\nPlanning Minister, Bihar\nMember\n5.\nRevenue and Land Reform Minister, Bihar\nMember\n6.\nChief Secretary, Bihar\nMember\n7.\nFinance Commissioner, Bihar\nMember\n8.\nDevelopment Commissioner, Bihar\nMember\n9.\nEngineer-in-Chief (North)\nMember\n10.\nChairman, Ganga Flood Control Commission, Patna\nMember\n11.\nChief Engineer, Eastern Railway, Calcutta\nMember\n12.\nChief Engineer, North Eastern Railway, Gorakhpur\nMember\n13.\nCommissioner & Secretary, Water Resources Department,\n\t\t\t\tBihar\nMember-Secretary\n4.9.12\n4.9.13\n(i) If the working period is available, then Board shall approve the scheme with a direction to obtain approval of the Council of Ministers through Scheme Empowered Committee .\nScheme Empowered Committee\nScheme Empowered Committee\n1.\nDevelopment Commissioner, Bihar\nChairman\n2.\nCommissioner & Secretary/Secretary, Finance Department and\n\t\t\t\tin his absence Addl. Finance Commissioner\nMember\n3.\nCommissioner and Secretary of Administrative Department of the\n\t\t\t\tconcerned Project\nMember\n4.\nDepartmental Head of the concerned Project.\nMember\n5.\nCommissioner & Secretary/Secretary of Planning &\n\t\t\t\tDevelopment Department Co-ordinator\nMember\nScheme Empowered Committee\n(ii) If the working time is less, the Board while giving approval to the schemes shall give directive to issue work order to start the work in anticipation of administrative approval and approval of the Council of Ministers through Scheme Empowered Committee .\nScheme Empowered Committee\nScheme Empowered Committee\n4.9.14\n4.9.15\n4.10 Guidelines for Central Flood Control Cell, Patna :\n4.10.1 General :\n4.10.2\n4.10.3 Functions of Central Flood Control Cell, Patna :\n(i) To keep records of river gauge, rainfall and hydrological data obtained from field officer and Flood Forecasting Division, Government of India, Patna.\n(ii) To transmit the flood data received from different sources and to send warning message and directive to take necessary measures to overcome the flood emergency in case the situation turns grave.\n(iii) To issue Flood warning to concerned Engineering Officers and Civil Authorities when the river gauge reading is one metre above danger level.\n(iv) To compile flood data received from different sources.\n(v) To be in close contact with all concerned officers related to flood problems.\n(vi) To make available flood bulletin to Radio Station and Public Relation Department, Bihar as needed from time to time.\n(vii) To make available Flood Report to different department of Government of Bihar.\n4.10.4 Management of Cell :\ni.\nExecutive Engineer\n1\nii.\nAssistant Engineer\n2\niii.\nTypist\n2\niv.\nPeon cum Dak Runner (Post deliverer)\n3\nv.\nDriver\n1\nNote: The following additional staff shall be working\n\t\t\t\tin the shift starting from 2.00 P.M. to 10.00 PM\nNote:\n1.\nAssistant Engineer\n2\n2.\nOffice Peon cum Dak Runner\n3\n3.\nTypist\n2 nos.\nNote: The following officers & staffs shall work in\n\t\t\t\tthe general shift (10.00 A.M. to 6.00 P.M.)\nNote:\n1.\nSuperintending Engineer\n1 (over all in-charge)\n2.\nExecutive Engineer\n2 (In-charge operation and disbursement)\n3.\nAssistant Engineer\n5\n4.\nJunior Engineer\n4\n5.\nTypist\n3\n6.\nSteno-Typist\n1\n7.\nSection Officer/Senior Assistant.\n4\n8.\nAssistant\n5\n9.\nAccounts Clerk\n4\n10.\nDiary Clerk\n1\n11.\nDraftsman\n3\n12.\nPhoto-copier operator\n1 (in pay scale of Daftary)\n1.\nPeon-cum-messenger.\n16 (should know cycling)\n14.\nDriver\n2\n( Note. - Officers and staffs shall be adjusted by the Superintending Engineer in-charge of the Central Flood Control Cell as the per their availability and requirement.)\nNote.\n4.10.5 Tools & Plants :\n(a) The Cell shall be equipped with three telephones.\n(b) There shall be sufficient provision for wireless sets.\n(c) The Cell shall have sufficient no. of Jeeps and Jeep Drivers. Provision of 6 numbers of Bicycle shall also be made for the Cell\n(d) For emergency lighting the Cell shall be equipped with generating sets, petromax, torch, candle, match boxes besides umbrella, raincoats etc.\n(e) The cell shall also be equipped with other tools and equipment considered necessary to enhance its efficiency.\n4.10.6 Maintenance of Records :\n(a) Duty Register\nIn this register the presence of working staff shall be marked by working staff which will be filled up in following proforma.\nDuty Register\nSI. No.\nDate\nShift No.\nName of staff present on duty\nSignature of the staff present on duty\nRemarks\n1\n2\n3\n4\n5\n6\n(b) Logbook\nLog book shall be maintained in the following pro-froma . In this register all the information received from & send to concerned persons shall be entered.\nLog Book.\nDate\nTime\nMessage received\nSource\nMessage transmitted\nTo whom message transmitted\nTime of transmission\nRemarks\n1\n2\n3\n4\n5\n6\n7\n8\n(c) Gauge-Register : -\nIn this register, the river gauge shall be entered river wise daily in following pro-forma .\nLog Book.\nSI. No.\nDate\nName of Site\nDanger level\nGauge Reading\nSource of information\nRemarks\n1\n2\n3\n4\n5\n6\n7\n(d) Rainfall Register : -\nIn this register the daily record of rainfall observed at different rain gauge stations shall be mentioned in the following proforma .\nRainfall Register\nDate\nRainfall in mm.\nName of station\nRemarks\n1\n2\n3\n4\n(e) Flood Damage Register : -\nIn this register damages, due to flood and waterlogging at different places, shall be maintained in the following proforma . The information of damages due to flood shall be sent to Central Flood Control Cell, Patna by the field officers of the department and District Magistrates of the districts.\nFlood Damage Register\nDate\nDistrict\nName of village\nAffected area\nAffected crop Area (in acre)\nValue of the damaged crop (in Rs.)\nNos. of damaged houses\nValue of the damaged houses\nLoss of life & property\nLoss of cattle\nLoss of the public utilities.\n1\n2\n3\n4\n5\n6\n7\n8\n9\n10\n11\n(f) Directive Register : -\nIn this register, the orders of senior officers and instructions of the shift in charge to next shift-in-charge shall be recorded\nDirective Register\nDate\nDirective\nGiven by whom\nNature of compliance\nRemarks\n1\n2\n3\n4\n5\n(g) News paper-cutting Register : -\nThis register shall be maintained in the following proforma . News paper cutting related to floods within the State and in the adjoining States and Nepal, shall be collected and passed in this register. The cell shall subscribe the important local newspapers.\nNewspaper cutting Register\nDate\nName of newspaper\nCuttings\n1\n2\n3\n(h) The details of breaches/cutting of embankment and canals shall be entered in the register in the following proforma :- Register of breaches/cutting in canal/embankment SI. No. Name of the District Name of the canal/ embankment Place of breach/ cutting Date of breach/ cutting Discharge from breach/ cutting Date of discharge 1 2 3 4 5 6 7\nRegister of breaches/cutting in canal/embankment\nSI. No.\nName of the District\nName of the canal/ embankment\nPlace of breach/ cutting\nDate of breach/ cutting\nDischarge from breach/ cutting\nDate of discharge\n1\n2\n3\n4\n5\n6\n7\nDate of closure of breach/ cutting\nAffected area\nLoss from breach/ cutting (Rs. in lakh)\nTotal expenditure on repair (Rs. in lakh)\nBreached or cut\nRemarks\n8\n9\n10\n11\n12\n13\n(i) Dak-Register : -\nDak Register shall be maintained in Cell in the following proforma :-\nDak Register\nSI. No.\nDate\nSent to whom\nOrder contained the letter\nName of Messenger\nSignature & Date of receipt\nRemarks\n1\n2\n3\n4\n5\n6\n7\n(j) Trunk Calls/STD Register : -\nTrunk Call/STD Register shall be maintained in the Cell in the following proforma .\nTrunk Calls/STD Register\nSI. No.\nDate\nPerson calling on telephone\nFor where the call was made\nTime & type of call\nCall materialised or not\nSignature of the person recording the call\nRemarks\n1\n2\n3\n4\n5\n6\n7\n8\n4.10.7\n4.10.8 Maps and Charts :\n4.10.9 Arrangements for flood fighting.\n4.10.10 Flood-Report.",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
{
"number": "1",
"title": "1. Rainfall",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 14
},
{
"number": "2",
"title": "2. Gauge reading of rivers at different sites.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 15
},
{
"number": "3",
"title": "3. Tendency of the river",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 16
},
{
"number": "4",
"title": "4. Name of the breach sites, cause of breaches, steps taken to check the flood water and closer of the breaches",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 17
},
{
"number": "5",
"title": "5. Losses and other matter related to it.",
"chapter": null,
"content": "4.10.11 Others.",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
{
"number": "5",
"title": "5. Drainage Rules. - 5.1 Notice regarding prohibition of obstructions.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 19
},
{
"number": "5",
"title": "5. Drainage Rules.",
"chapter": null,
"content": "5.1.1\n5.1.2\n5.1.3\n5.2 Procedure for construction of drainage works.\n5.2.1\n5.2.2\n5.3 Planning and implementation of drainage schemes :\n5.3.1\n5.3.2\n5.4 Maintenance of Drainage System :\n(i) Spoil bank, constructed on the bank of drainage channel shall be maintained in stable shape. Its slope shall be turfed and these turfs shall be maintained by use of fertilisers and pesticides normally in two years or in less period if needed.\n(ii) Longitudinal section of each drain shall be taken and drawn in between October and February after rains each year and these shall be preserved in the office of Executive Engineer, Superintending Engineer and Chief Engineer.\n5.4.2\n(i) To make inspection of all the structure in the drainage system and cleaning of obstruction & weeds therein, if any, after every monsoon period.\n(ii) Thorough inspection of all the structure after each rainy season, to make rectification, if any, of damages to the structures, including its foundation, arranging spot clearing of all shallow drains every year before ensuing monsoon, as per rules, and to take action for complete cleaning of the drains at an interval of five to ten years.\n(iii) To keep all the channels free from weeds as far as possible.\n5.4.3. Curative maintenance plan :",
"footnote": "",
"is_definition": false,
"sort_order": 20
},
{
"number": "6",
"title": "6. Repeal and Saving.",
"chapter": null,
"content": "6.2 Provided that such repeal shall not affect :\n(a) anything duly done or action taken under the repealed Rules; or\n(b) any right, obligation, or liability acquired, accrued or incurred under any rules so repealed ; or\n(c) any penalty, forfeiture or punishment in respect of any offence committed against any rules so repealed .\n6.3.",
"footnote": "",
"is_definition": false,
"sort_order": 21
}
],
"metadata": {
"Act ID": "bh372",
"Act Number": "Published vide Notification S.O. No. Yo. & Mo, 19-113/97-408 Patna, dated 25.4.2003, published in Bihar Gazette (Extraordinary) dated 28.4.2003",
"Enactment Date": "",
"Act Year": "2003",
"Short Title": "The Bihar Irrigation, Flood Management and Drainage Rules, 2003",
"Type": "STATE",
"Location": "Bihar"
},
"updated_at": "2026-09-29 21:55:19"
}