4.9.6
Kosi
Pipra-Piprasi
Gandak
Kosi/Gandak
Kosi High Level Committee :-
Kosi High Level Committee :-
1.
Chairman Ganga Flood Control Commission, Patna
Chairman
2.
Director, Research Institute, Pune or its representative,
Member
3.
Member (Flood) Central Water Commission, New Delhi or his
representative
Member
4.
Engineer-in-Chief (North), Water Resources Department, Bihar
Member
5.
Chief Engineer, Water Resources Department Darbhanga
Member
6.
Chief Engineer (Research) W.R.D., Khagaul
Member
7.
Chief Engineer, Hydrology & Project Planning, W.R.D. Patna
Member
8.
Director, Eastern Region, Water Resources Department, HMGN,
Biratnagar
Member
9.
Deputy Director, Central Water Resources Department HMGN,
Kathmandu
Member
10.
Chief Engineer, Water Resources Department Birpur, Bihar
Member-Secretary
Gandak High Level Committee.
Gandak High Level Committee.
1.
Chairman, Ganga Flood Control Commission, Patna
Member
2.
Engineer-in-Chief (North, Water Resources Department
Government, of Bihar, Patna
Member
3.
Engineer-in-Chief, D & R Irrigation Department ,
Government of U.P. (Canal Colony Lucknow-226001)
Member
4.
Director, C.W.P.R.S., Khadakwasla, Pune-411 024
Member
5.
Chief Engineer (Research), Khagaul, Patna
Member
6.
Director, I.R.I., Government, of U.P. Roorkee
Member
7.
Director, Ganga Flood Control Commission, Patna
Member-Secretary
4.9.7 Kosi/Gandak
Kosi/Gandak Pipra-Piprasi
4.9.8
4.9.9
The Departmental Scheme Review Committee shall be constituted consisting of the following :
1.
Engineer-in-Chief (Flood Sector), W.R.D., Bihar Patna.
Chairman
2.
One member from Ganga Flood Control Commission, Patna (To be
nominated by GFCC.)
Member
3.
Chief Engineer, Planning & Monitoring, W.R.D., Patna
Member
4.
Chief Engineer, IRI, Khagaul, Patna
Member
5.
Chief Engineer, Central Design Organization, W.R.D.,
Patna-cum-Chairman State Technical Advisory Committee
Member
4.9.10
Scheme Review Committee
Priority 1 : Protection of embankments and retired embankment shall be given priority over other erosion sites.
Priority 1 :
Priority 2 : The Schemes for the protection of big industrial units, the National Highways, State Highways and other big towns shall be first taken up under the sub-head - Town and Village Protection Works. It is only with the remaining funds that the schemes for protection of old thickly populated settlements shall be taken up.
Priority 2 :
Priority 3 : For want of fund, neither the protection works of culturable land along the rivers nor any protection works for diara area shall be taken up.
Priority 3 :
Departmental Scheme Review Committee
4.9.11
Scheme Review Committee
1.
Chief Minister, Bihar.
Chairman
2.
Finance Minister, Bihar
Member
3.
Minister of Water Resources Bihar.
Member
4.
Planning Minister, Bihar
Member
5.
Revenue and Land Reform Minister, Bihar
Member
6.
Chief Secretary, Bihar
Member
7.
Finance Commissioner, Bihar
Member
8.
Development Commissioner, Bihar
Member
9.
Engineer-in-Chief (North)
Member
10.
Chairman, Ganga Flood Control Commission, Patna
Member
11.
Chief Engineer, Eastern Railway, Calcutta
Member
12.
Chief Engineer, North Eastern Railway, Gorakhpur
Member
13.
Commissioner & Secretary, Water Resources Department,
Bihar
Member-Secretary
4.9.12
4.9.13
(i) If the working period is available, then Board shall approve the scheme with a direction to obtain approval of the Council of Ministers through Scheme Empowered Committee .
Scheme Empowered Committee
Scheme Empowered Committee
1.
Development Commissioner, Bihar
Chairman
2.
Commissioner & Secretary/Secretary, Finance Department and
in his absence Addl. Finance Commissioner
Member
3.
Commissioner and Secretary of Administrative Department of the
concerned Project
Member
4.
Departmental Head of the concerned Project.
Member
5.
Commissioner & Secretary/Secretary of Planning &
Development Department Co-ordinator
Member
Scheme Empowered Committee
(ii) If the working time is less, the Board while giving approval to the schemes shall give directive to issue work order to start the work in anticipation of administrative approval and approval of the Council of Ministers through Scheme Empowered Committee .
Scheme Empowered Committee
Scheme Empowered Committee
4.9.14
4.9.15
4.10 Guidelines for Central Flood Control Cell, Patna :
4.10.1 General :
4.10.2
4.10.3 Functions of Central Flood Control Cell, Patna :
(i) To keep records of river gauge, rainfall and hydrological data obtained from field officer and Flood Forecasting Division, Government of India, Patna.
(ii) To transmit the flood data received from different sources and to send warning message and directive to take necessary measures to overcome the flood emergency in case the situation turns grave.
(iii) To issue Flood warning to concerned Engineering Officers and Civil Authorities when the river gauge reading is one metre above danger level.
(iv) To compile flood data received from different sources.
(v) To be in close contact with all concerned officers related to flood problems.
(vi) To make available flood bulletin to Radio Station and Public Relation Department, Bihar as needed from time to time.
(vii) To make available Flood Report to different department of Government of Bihar.
4.10.4 Management of Cell :
i.
Executive Engineer
1
ii.
Assistant Engineer
2
iii.
Typist
2
iv.
Peon cum Dak Runner (Post deliverer)
3
v.
Driver
1
Note: The following additional staff shall be working
in the shift starting from 2.00 P.M. to 10.00 PM
Note:
1.
Assistant Engineer
2
2.
Office Peon cum Dak Runner
3
3.
Typist
2 nos.
Note: The following officers & staffs shall work in
the general shift (10.00 A.M. to 6.00 P.M.)
Note:
1.
Superintending Engineer
1 (over all in-charge)
2.
Executive Engineer
2 (In-charge operation and disbursement)
3.
Assistant Engineer
5
4.
Junior Engineer
4
5.
Typist
3
6.
Steno-Typist
1
7.
Section Officer/Senior Assistant.
4
8.
Assistant
5
9.
Accounts Clerk
4
10.
Diary Clerk
1
11.
Draftsman
3
12.
Photo-copier operator
1 (in pay scale of Daftary)
1.
Peon-cum-messenger.
16 (should know cycling)
14.
Driver
2
( Note. - Officers and staffs shall be adjusted by the Superintending Engineer in-charge of the Central Flood Control Cell as the per their availability and requirement.)
Note.
4.10.5 Tools & Plants :
(a) The Cell shall be equipped with three telephones.
(b) There shall be sufficient provision for wireless sets.
(c) The Cell shall have sufficient no. of Jeeps and Jeep Drivers. Provision of 6 numbers of Bicycle shall also be made for the Cell
(d) For emergency lighting the Cell shall be equipped with generating sets, petromax, torch, candle, match boxes besides umbrella, raincoats etc.
(e) The cell shall also be equipped with other tools and equipment considered necessary to enhance its efficiency.
4.10.6 Maintenance of Records :
(a) Duty Register
In this register the presence of working staff shall be marked by working staff which will be filled up in following proforma.
Duty Register
SI. No.
Date
Shift No.
Name of staff present on duty
Signature of the staff present on duty
Remarks
1
2
3
4
5
6
(b) Logbook
Log book shall be maintained in the following pro-froma . In this register all the information received from & send to concerned persons shall be entered.
Log Book.
Date
Time
Message received
Source
Message transmitted
To whom message transmitted
Time of transmission
Remarks
1
2
3
4
5
6
7
8
(c) Gauge-Register : -
In this register, the river gauge shall be entered river wise daily in following pro-forma .
Log Book.
SI. No.
Date
Name of Site
Danger level
Gauge Reading
Source of information
Remarks
1
2
3
4
5
6
7
(d) Rainfall Register : -
In this register the daily record of rainfall observed at different rain gauge stations shall be mentioned in the following proforma .
Rainfall Register
Date
Rainfall in mm.
Name of station
Remarks
1
2
3
4
(e) Flood Damage Register : -
In this register damages, due to flood and waterlogging at different places, shall be maintained in the following proforma . The information of damages due to flood shall be sent to Central Flood Control Cell, Patna by the field officers of the department and District Magistrates of the districts.
Flood Damage Register
Date
District
Name of village
Affected area
Affected crop Area (in acre)
Value of the damaged crop (in Rs.)
Nos. of damaged houses
Value of the damaged houses
Loss of life & property
Loss of cattle
Loss of the public utilities.
1
2
3
4
5
6
7
8
9
10
11
(f) Directive Register : -
In this register, the orders of senior officers and instructions of the shift in charge to next shift-in-charge shall be recorded
Directive Register
Date
Directive
Given by whom
Nature of compliance
Remarks
1
2
3
4
5
(g) News paper-cutting Register : -
This register shall be maintained in the following proforma . News paper cutting related to floods within the State and in the adjoining States and Nepal, shall be collected and passed in this register. The cell shall subscribe the important local newspapers.
Newspaper cutting Register
Date
Name of newspaper
Cuttings
1
2
3
(h) The details of breaches/cutting of embankment and canals shall be entered in the register in the following proforma :- Register of breaches/cutting in canal/embankment SI. No. Name of the District Name of the canal/ embankment Place of breach/ cutting Date of breach/ cutting Discharge from breach/ cutting Date of discharge 1 2 3 4 5 6 7
Register of breaches/cutting in canal/embankment
SI. No.
Name of the District
Name of the canal/ embankment
Place of breach/ cutting
Date of breach/ cutting
Discharge from breach/ cutting
Date of discharge
1
2
3
4
5
6
7
Date of closure of breach/ cutting
Affected area
Loss from breach/ cutting (Rs. in lakh)
Total expenditure on repair (Rs. in lakh)
Breached or cut
Remarks
8
9
10
11
12
13
(i) Dak-Register : -
Dak Register shall be maintained in Cell in the following proforma :-
Dak Register
SI. No.
Date
Sent to whom
Order contained the letter
Name of Messenger
Signature & Date of receipt
Remarks
1
2
3
4
5
6
7
(j) Trunk Calls/STD Register : -
Trunk Call/STD Register shall be maintained in the Cell in the following proforma .
Trunk Calls/STD Register
SI. No.
Date
Person calling on telephone
For where the call was made
Time & type of call
Call materialised or not
Signature of the person recording the call
Remarks
1
2
3
4
5
6
7
8
4.10.7
4.10.8 Maps and Charts :
4.10.9 Arrangements for flood fighting.
4.10.10 Flood-Report.
Section 7 • The Bihar Irrigation, Flood Management and Drainage Rules, 2003
7. Any other related information, if any, or the one which the Subcommittee desires.
the-bihar-irrigation-flood-management-and-drainage-rules-2003-sec-7.json
•
Section 7
{
"act_title": "The Bihar Irrigation, Flood Management and Drainage Rules, 2003",
"act_slug": "the-bihar-irrigation-flood-management-and-drainage-rules-2003",
"section_label": "Section",
"section": {
"number": "7",
"title": "7. Any other related information, if any, or the one which the Subcommittee desires.",
"chapter": null,
"content": "4.9.6\nKosi\nPipra-Piprasi\nGandak\nKosi/Gandak\nKosi High Level Committee :-\nKosi High Level Committee :-\n1.\nChairman Ganga Flood Control Commission, Patna\nChairman\n2.\nDirector, Research Institute, Pune or its representative,\nMember\n3.\nMember (Flood) Central Water Commission, New Delhi or his\n\t\t\t\trepresentative\nMember\n4.\nEngineer-in-Chief (North), Water Resources Department, Bihar\nMember\n5.\nChief Engineer, Water Resources Department Darbhanga\nMember\n6.\nChief Engineer (Research) W.R.D., Khagaul\nMember\n7.\nChief Engineer, Hydrology & Project Planning, W.R.D. Patna\nMember\n8.\nDirector, Eastern Region, Water Resources Department, HMGN,\n\t\t\t\tBiratnagar\nMember\n9.\nDeputy Director, Central Water Resources Department HMGN,\n\t\t\t\tKathmandu\nMember\n10.\nChief Engineer, Water Resources Department Birpur, Bihar\nMember-Secretary\nGandak High Level Committee.\nGandak High Level Committee.\n1.\nChairman, Ganga Flood Control Commission, Patna\nMember\n2.\nEngineer-in-Chief (North, Water Resources Department\n\t\t\t\tGovernment, of Bihar, Patna\nMember\n3.\nEngineer-in-Chief, D & R Irrigation Department ,\n\t\t\t\tGovernment of U.P. (Canal Colony Lucknow-226001)\nMember\n4.\nDirector, C.W.P.R.S., Khadakwasla, Pune-411 024\nMember\n5.\nChief Engineer (Research), Khagaul, Patna\nMember\n6.\nDirector, I.R.I., Government, of U.P. Roorkee\nMember\n7.\nDirector, Ganga Flood Control Commission, Patna\nMember-Secretary\n4.9.7 Kosi/Gandak\nKosi/Gandak Pipra-Piprasi\n4.9.8\n4.9.9\nThe Departmental Scheme Review Committee shall be constituted consisting of the following :\n1.\nEngineer-in-Chief (Flood Sector), W.R.D., Bihar Patna.\nChairman\n2.\nOne member from Ganga Flood Control Commission, Patna (To be\n\t\t\t\tnominated by GFCC.)\nMember\n3.\nChief Engineer, Planning & Monitoring, W.R.D., Patna\nMember\n4.\nChief Engineer, IRI, Khagaul, Patna\nMember\n5.\nChief Engineer, Central Design Organization, W.R.D.,\n\t\t\t\tPatna-cum-Chairman State Technical Advisory Committee\nMember\n4.9.10\nScheme Review Committee\nPriority 1 : Protection of embankments and retired embankment shall be given priority over other erosion sites.\nPriority 1 :\nPriority 2 : The Schemes for the protection of big industrial units, the National Highways, State Highways and other big towns shall be first taken up under the sub-head - Town and Village Protection Works. It is only with the remaining funds that the schemes for protection of old thickly populated settlements shall be taken up.\nPriority 2 :\nPriority 3 : For want of fund, neither the protection works of culturable land along the rivers nor any protection works for diara area shall be taken up.\nPriority 3 :\nDepartmental Scheme Review Committee\n4.9.11\nScheme Review Committee\n1.\nChief Minister, Bihar.\nChairman\n2.\nFinance Minister, Bihar\nMember\n3.\nMinister of Water Resources Bihar.\nMember\n4.\nPlanning Minister, Bihar\nMember\n5.\nRevenue and Land Reform Minister, Bihar\nMember\n6.\nChief Secretary, Bihar\nMember\n7.\nFinance Commissioner, Bihar\nMember\n8.\nDevelopment Commissioner, Bihar\nMember\n9.\nEngineer-in-Chief (North)\nMember\n10.\nChairman, Ganga Flood Control Commission, Patna\nMember\n11.\nChief Engineer, Eastern Railway, Calcutta\nMember\n12.\nChief Engineer, North Eastern Railway, Gorakhpur\nMember\n13.\nCommissioner & Secretary, Water Resources Department,\n\t\t\t\tBihar\nMember-Secretary\n4.9.12\n4.9.13\n(i) If the working period is available, then Board shall approve the scheme with a direction to obtain approval of the Council of Ministers through Scheme Empowered Committee .\nScheme Empowered Committee\nScheme Empowered Committee\n1.\nDevelopment Commissioner, Bihar\nChairman\n2.\nCommissioner & Secretary/Secretary, Finance Department and\n\t\t\t\tin his absence Addl. Finance Commissioner\nMember\n3.\nCommissioner and Secretary of Administrative Department of the\n\t\t\t\tconcerned Project\nMember\n4.\nDepartmental Head of the concerned Project.\nMember\n5.\nCommissioner & Secretary/Secretary of Planning &\n\t\t\t\tDevelopment Department Co-ordinator\nMember\nScheme Empowered Committee\n(ii) If the working time is less, the Board while giving approval to the schemes shall give directive to issue work order to start the work in anticipation of administrative approval and approval of the Council of Ministers through Scheme Empowered Committee .\nScheme Empowered Committee\nScheme Empowered Committee\n4.9.14\n4.9.15\n4.10 Guidelines for Central Flood Control Cell, Patna :\n4.10.1 General :\n4.10.2\n4.10.3 Functions of Central Flood Control Cell, Patna :\n(i) To keep records of river gauge, rainfall and hydrological data obtained from field officer and Flood Forecasting Division, Government of India, Patna.\n(ii) To transmit the flood data received from different sources and to send warning message and directive to take necessary measures to overcome the flood emergency in case the situation turns grave.\n(iii) To issue Flood warning to concerned Engineering Officers and Civil Authorities when the river gauge reading is one metre above danger level.\n(iv) To compile flood data received from different sources.\n(v) To be in close contact with all concerned officers related to flood problems.\n(vi) To make available flood bulletin to Radio Station and Public Relation Department, Bihar as needed from time to time.\n(vii) To make available Flood Report to different department of Government of Bihar.\n4.10.4 Management of Cell :\ni.\nExecutive Engineer\n1\nii.\nAssistant Engineer\n2\niii.\nTypist\n2\niv.\nPeon cum Dak Runner (Post deliverer)\n3\nv.\nDriver\n1\nNote: The following additional staff shall be working\n\t\t\t\tin the shift starting from 2.00 P.M. to 10.00 PM\nNote:\n1.\nAssistant Engineer\n2\n2.\nOffice Peon cum Dak Runner\n3\n3.\nTypist\n2 nos.\nNote: The following officers & staffs shall work in\n\t\t\t\tthe general shift (10.00 A.M. to 6.00 P.M.)\nNote:\n1.\nSuperintending Engineer\n1 (over all in-charge)\n2.\nExecutive Engineer\n2 (In-charge operation and disbursement)\n3.\nAssistant Engineer\n5\n4.\nJunior Engineer\n4\n5.\nTypist\n3\n6.\nSteno-Typist\n1\n7.\nSection Officer/Senior Assistant.\n4\n8.\nAssistant\n5\n9.\nAccounts Clerk\n4\n10.\nDiary Clerk\n1\n11.\nDraftsman\n3\n12.\nPhoto-copier operator\n1 (in pay scale of Daftary)\n1.\nPeon-cum-messenger.\n16 (should know cycling)\n14.\nDriver\n2\n( Note. - Officers and staffs shall be adjusted by the Superintending Engineer in-charge of the Central Flood Control Cell as the per their availability and requirement.)\nNote.\n4.10.5 Tools & Plants :\n(a) The Cell shall be equipped with three telephones.\n(b) There shall be sufficient provision for wireless sets.\n(c) The Cell shall have sufficient no. of Jeeps and Jeep Drivers. Provision of 6 numbers of Bicycle shall also be made for the Cell\n(d) For emergency lighting the Cell shall be equipped with generating sets, petromax, torch, candle, match boxes besides umbrella, raincoats etc.\n(e) The cell shall also be equipped with other tools and equipment considered necessary to enhance its efficiency.\n4.10.6 Maintenance of Records :\n(a) Duty Register\nIn this register the presence of working staff shall be marked by working staff which will be filled up in following proforma.\nDuty Register\nSI. No.\nDate\nShift No.\nName of staff present on duty\nSignature of the staff present on duty\nRemarks\n1\n2\n3\n4\n5\n6\n(b) Logbook\nLog book shall be maintained in the following pro-froma . In this register all the information received from & send to concerned persons shall be entered.\nLog Book.\nDate\nTime\nMessage received\nSource\nMessage transmitted\nTo whom message transmitted\nTime of transmission\nRemarks\n1\n2\n3\n4\n5\n6\n7\n8\n(c) Gauge-Register : -\nIn this register, the river gauge shall be entered river wise daily in following pro-forma .\nLog Book.\nSI. No.\nDate\nName of Site\nDanger level\nGauge Reading\nSource of information\nRemarks\n1\n2\n3\n4\n5\n6\n7\n(d) Rainfall Register : -\nIn this register the daily record of rainfall observed at different rain gauge stations shall be mentioned in the following proforma .\nRainfall Register\nDate\nRainfall in mm.\nName of station\nRemarks\n1\n2\n3\n4\n(e) Flood Damage Register : -\nIn this register damages, due to flood and waterlogging at different places, shall be maintained in the following proforma . The information of damages due to flood shall be sent to Central Flood Control Cell, Patna by the field officers of the department and District Magistrates of the districts.\nFlood Damage Register\nDate\nDistrict\nName of village\nAffected area\nAffected crop Area (in acre)\nValue of the damaged crop (in Rs.)\nNos. of damaged houses\nValue of the damaged houses\nLoss of life & property\nLoss of cattle\nLoss of the public utilities.\n1\n2\n3\n4\n5\n6\n7\n8\n9\n10\n11\n(f) Directive Register : -\nIn this register, the orders of senior officers and instructions of the shift in charge to next shift-in-charge shall be recorded\nDirective Register\nDate\nDirective\nGiven by whom\nNature of compliance\nRemarks\n1\n2\n3\n4\n5\n(g) News paper-cutting Register : -\nThis register shall be maintained in the following proforma . News paper cutting related to floods within the State and in the adjoining States and Nepal, shall be collected and passed in this register. The cell shall subscribe the important local newspapers.\nNewspaper cutting Register\nDate\nName of newspaper\nCuttings\n1\n2\n3\n(h) The details of breaches/cutting of embankment and canals shall be entered in the register in the following proforma :- Register of breaches/cutting in canal/embankment SI. No. Name of the District Name of the canal/ embankment Place of breach/ cutting Date of breach/ cutting Discharge from breach/ cutting Date of discharge 1 2 3 4 5 6 7\nRegister of breaches/cutting in canal/embankment\nSI. No.\nName of the District\nName of the canal/ embankment\nPlace of breach/ cutting\nDate of breach/ cutting\nDischarge from breach/ cutting\nDate of discharge\n1\n2\n3\n4\n5\n6\n7\nDate of closure of breach/ cutting\nAffected area\nLoss from breach/ cutting (Rs. in lakh)\nTotal expenditure on repair (Rs. in lakh)\nBreached or cut\nRemarks\n8\n9\n10\n11\n12\n13\n(i) Dak-Register : -\nDak Register shall be maintained in Cell in the following proforma :-\nDak Register\nSI. No.\nDate\nSent to whom\nOrder contained the letter\nName of Messenger\nSignature & Date of receipt\nRemarks\n1\n2\n3\n4\n5\n6\n7\n(j) Trunk Calls/STD Register : -\nTrunk Call/STD Register shall be maintained in the Cell in the following proforma .\nTrunk Calls/STD Register\nSI. No.\nDate\nPerson calling on telephone\nFor where the call was made\nTime & type of call\nCall materialised or not\nSignature of the person recording the call\nRemarks\n1\n2\n3\n4\n5\n6\n7\n8\n4.10.7\n4.10.8 Maps and Charts :\n4.10.9 Arrangements for flood fighting.\n4.10.10 Flood-Report.",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
"prev_section": "6",
"next_section": "1"
}