4.1
4.1.1
4.1.2
(a) Risk Category "A" : -
(a) Risk Category "A" :
This category shall include such locations of embankments and structures where the river erosion has started affecting structure toe or slope of the embankment and as a result of which, damage to the structure/embankment and consequent danger is apprehended.
Any erosion on sites under this category shall be immediately inspected by the Chief Engineer who, while giving directions for carrying out necessary flood protection works, shall instantly intimate the headquarters. Also, he shall take action to depute there a Special Team "A" to have vigilance all round the clock.
The Special Team under this category would consist of an officer of the rank of Superintending Engineer supported by three Executive Engineers and six Assistant Engineers/Junior Engineers. A team of two Assistant Engineers/Junior Engineers headed by an Executive Engineer shall work on such sites in shifts of 8 hours' duration. The flood fighting works shall be carried out under the supervision of Chief Engineer/Superintending Engineer and daily information shall be communicated to the headquarters. In case of the flood fighting works continuing for more than three days, the Team 'A' constituted at the headquarters shall proceed immediately to such sites.
(b) Risk Category "B" : -
(b) Risk Category "B" :
This category shall include such location of embankments and structures where it is felt that though the river is at some distance from the structure/embankment, but the intensity of erosion is such that if not checked immediately it may soon be close to structure/embankment and may endanger the situation.
On any site under this category, if the pressure due to river increases, the Superintending Engineer shall immediately inspect the site, issue instructions for flood fighting works as required, and intimate the Chief Engineer and the headquarter immediately. He shall also take action to depute a Special Team 'B' for vigilance of the site all round the clock. The Special Team under this category shall consist of an Officer of the rank of Executive Engineer supported by three Assistant Engineers and six Junior Engineers. A team of two Junior Engineers headed by one Assistant Engineer shall work on such site in shifts of eight hours duration. The flood fighting works shall be carried out under the supervision of Superintending Engineer/Executive Engineer, and daily information shall be communicated to Chief Engineer/Headquarter. In case the flood fighting works on such sites continue for more than three days, the Chief Engineer shall himself inspect the site and undertake the control of the works as required. In the event of the flood fighting works continuing for more than seven days the Team 'B' constituted at the Headquarter shall immediately proceed for the site.
(c) Risk Category "C" : -
(c) Risk Category "C" :
This category includes such sites where though presently the river is at a considerable distance from the structure/embankment but the erosion is continuing and though there appears no danger at present, however, this needs to be checked so that the site may be protected by carrying out ordinary flood fighting works.
In case of an increasing pressure due to the river on a vulnerable site under this category, the Executive Engineer shall immediately inspect the site and if feels issuing necessary directions for flood fighting works on a small scale he shall immediately intimate the
Superintending Engineer/Chief Engineer/Headquarter. Also, in order to have vigil at the sites a Special Team consisting of three Assistant Engineers and six Junior Engineers so that two Junior Engineers under an Assistant Engineer may be deputed at site in 8 hourly shift. In case of the flood fighting works continuing for more than 2 days, the Superintending Engineer shall immediately inspect the site and take direct control of the flood fighting works under intimation to Chief Engineer/Headquarter. In the event of the flood fighting works continuing for more than five days the Chief Engineer shall inspect the site, take direct control of the flood fighting works under intimation to the headquarter. In case the need arises the Team 'B' constituted at the Chief Engineer level shall be deputed at the site to keep a continuous watch over the flood fighting works.
Accordingly, the above three special teams constituted at the Chief Engineer's Headquarter shall be available for the entire flood season to provide assistance to the Executive Engineers incharge of the embankment in the emergency situations which, as soon as receives instructions from the competent authority, shall proceed to the specific site requiring their emergency services. Each Special Team shall have a jeep exclusively at its disposal so that the member of the Special Team may rush to the work site immediately after receiving the information. Similarly, one each of special Team 'A' and Special Team 'B' shall be constituted at the departmental headquarter which as per the needs and direction of the competent authority shall be sent to the specific site.
4.1.3.
4.2 Patrolling :
4.2.1
4.2.2
4.2.3
4.2.4
4.2.5
4.3 Transmission of Information :
4.3.1
4.3.2
4.3.3
Status Report...................(Name of embankment.)
Name of river...................
Name of bank..................................... (left bank or right bank)
4.3.4
4.3.5
4.3.6
4.3.7
4.3.8
4.3.9
4.3.10
4.3.11
4.3.12
4.4 Control Room :
4.4.1
4.4.2
4.4.3
4.4.4
4.5 Flood-Fighting-Materials :
4.6 Weekly Report :
4.6.1
4.6.2
4.6.3
4.7 Assistance to be given by district administration during flood period.
4.7.1
4.7.2
4.7.3
4.8 Patrolling work and security arrangement for vigilance during floods.
4.8.1
1.
District Magistrate -
Chairman
2.
Superintendent of Police -
Member
3.
Executive Engineer (concerned with Flood control works) -
Member
4.
Concerned District Level Officer of the Relief Department -
Member
4.8.2
4.8.3
4.8.4
4.8.5
4.8.6
4.8.7
4.8.8
4.9 Flood Protection Works :
4.9.1
4.9.2
Section 4 • The Bihar Irrigation, Flood Management and Drainage Rules, 2003
4. Flood Management Rules.
the-bihar-irrigation-flood-management-and-drainage-rules-2003-sec-4.json
•
Section 4
{
"act_title": "The Bihar Irrigation, Flood Management and Drainage Rules, 2003",
"act_slug": "the-bihar-irrigation-flood-management-and-drainage-rules-2003",
"section_label": "Section",
"section": {
"number": "4",
"title": "4. Flood Management Rules.",
"chapter": null,
"content": "4.1\n4.1.1\n4.1.2\n(a) Risk Category \"A\" : -\n(a) Risk Category \"A\" :\nThis category shall include such locations of embankments and structures where the river erosion has started affecting structure toe or slope of the embankment and as a result of which, damage to the structure/embankment and consequent danger is apprehended.\nAny erosion on sites under this category shall be immediately inspected by the Chief Engineer who, while giving directions for carrying out necessary flood protection works, shall instantly intimate the headquarters. Also, he shall take action to depute there a Special Team \"A\" to have vigilance all round the clock.\nThe Special Team under this category would consist of an officer of the rank of Superintending Engineer supported by three Executive Engineers and six Assistant Engineers/Junior Engineers. A team of two Assistant Engineers/Junior Engineers headed by an Executive Engineer shall work on such sites in shifts of 8 hours' duration. The flood fighting works shall be carried out under the supervision of Chief Engineer/Superintending Engineer and daily information shall be communicated to the headquarters. In case of the flood fighting works continuing for more than three days, the Team 'A' constituted at the headquarters shall proceed immediately to such sites.\n(b) Risk Category \"B\" : -\n(b) Risk Category \"B\" :\nThis category shall include such location of embankments and structures where it is felt that though the river is at some distance from the structure/embankment, but the intensity of erosion is such that if not checked immediately it may soon be close to structure/embankment and may endanger the situation.\nOn any site under this category, if the pressure due to river increases, the Superintending Engineer shall immediately inspect the site, issue instructions for flood fighting works as required, and intimate the Chief Engineer and the headquarter immediately. He shall also take action to depute a Special Team 'B' for vigilance of the site all round the clock. The Special Team under this category shall consist of an Officer of the rank of Executive Engineer supported by three Assistant Engineers and six Junior Engineers. A team of two Junior Engineers headed by one Assistant Engineer shall work on such site in shifts of eight hours duration. The flood fighting works shall be carried out under the supervision of Superintending Engineer/Executive Engineer, and daily information shall be communicated to Chief Engineer/Headquarter. In case the flood fighting works on such sites continue for more than three days, the Chief Engineer shall himself inspect the site and undertake the control of the works as required. In the event of the flood fighting works continuing for more than seven days the Team 'B' constituted at the Headquarter shall immediately proceed for the site.\n(c) Risk Category \"C\" : -\n(c) Risk Category \"C\" :\nThis category includes such sites where though presently the river is at a considerable distance from the structure/embankment but the erosion is continuing and though there appears no danger at present, however, this needs to be checked so that the site may be protected by carrying out ordinary flood fighting works.\nIn case of an increasing pressure due to the river on a vulnerable site under this category, the Executive Engineer shall immediately inspect the site and if feels issuing necessary directions for flood fighting works on a small scale he shall immediately intimate the\nSuperintending Engineer/Chief Engineer/Headquarter. Also, in order to have vigil at the sites a Special Team consisting of three Assistant Engineers and six Junior Engineers so that two Junior Engineers under an Assistant Engineer may be deputed at site in 8 hourly shift. In case of the flood fighting works continuing for more than 2 days, the Superintending Engineer shall immediately inspect the site and take direct control of the flood fighting works under intimation to Chief Engineer/Headquarter. In the event of the flood fighting works continuing for more than five days the Chief Engineer shall inspect the site, take direct control of the flood fighting works under intimation to the headquarter. In case the need arises the Team 'B' constituted at the Chief Engineer level shall be deputed at the site to keep a continuous watch over the flood fighting works.\nAccordingly, the above three special teams constituted at the Chief Engineer's Headquarter shall be available for the entire flood season to provide assistance to the Executive Engineers incharge of the embankment in the emergency situations which, as soon as receives instructions from the competent authority, shall proceed to the specific site requiring their emergency services. Each Special Team shall have a jeep exclusively at its disposal so that the member of the Special Team may rush to the work site immediately after receiving the information. Similarly, one each of special Team 'A' and Special Team 'B' shall be constituted at the departmental headquarter which as per the needs and direction of the competent authority shall be sent to the specific site.\n4.1.3.\n4.2 Patrolling :\n4.2.1\n4.2.2\n4.2.3\n4.2.4\n4.2.5\n4.3 Transmission of Information :\n4.3.1\n4.3.2\n4.3.3\nStatus Report...................(Name of embankment.)\nName of river...................\nName of bank..................................... (left bank or right bank)\n4.3.4\n4.3.5\n4.3.6\n4.3.7\n4.3.8\n4.3.9\n4.3.10\n4.3.11\n4.3.12\n4.4 Control Room :\n4.4.1\n4.4.2\n4.4.3\n4.4.4\n4.5 Flood-Fighting-Materials :\n4.6 Weekly Report :\n4.6.1\n4.6.2\n4.6.3\n4.7 Assistance to be given by district administration during flood period.\n4.7.1\n4.7.2\n4.7.3\n4.8 Patrolling work and security arrangement for vigilance during floods.\n4.8.1\n1.\nDistrict Magistrate -\nChairman\n2.\nSuperintendent of Police -\nMember\n3.\nExecutive Engineer (concerned with Flood control works) -\nMember\n4.\nConcerned District Level Officer of the Relief Department -\nMember\n4.8.2\n4.8.3\n4.8.4\n4.8.5\n4.8.6\n4.8.7\n4.8.8\n4.9 Flood Protection Works :\n4.9.1\n4.9.2",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
"prev_section": "3",
"next_section": "1"
}