New Okhla Industrial Development Area Building Regulations, 2010
New Okhla Industrial Development Area Building Regulations, 2010
Sections
1. Short title, commencement and application.
Section 12. Definitions.
Section 23. Note.
Section 34. Building permit.
Section 45. Application for building permit.
Section 56. Information Accompanying Application for Layout Plan or Building Permit.
Section 67. Site.
Section 78. Recommended notation for colouring of plans.
Section 89. Preparation and signing of Plans.
Section 910. Building permit fee, completion fees, temporary building permit fees and calculation thereof.
Section 1011. Withdrawal of application.
Section 1112. Scrutiny of the building permit.
Section 1213. Sanction or refusal of building permit.
Section 1314. Appeal against refusal or sanction with modification of a building permit.
Section 1415. Duration of validity of a building permit.
Section 1516. Additions or alterations during construction.
Section 1617. Cancellation of permit for building activity.
Section 1718. Work to be carried out in full accordance of Zoning Regulations, Building Regulations and Directions.
Section 1819. Documents at site.
Section 1920. Notice for issue of occupancy certificate.
Section 2021. Distance from electric lines.
Section 2122. Site and land use pattern.
Section 2223. Means of Access.
Section 2324. Ground coverage, Floor Area Ratio, Height and Setbacks.
Section 242. Loft up to maximum height of 1.5 metres.
Section 23. Air-conditioning plant, electrical installation, generator room, water works, water tank etc.
Section 34. Watchmen/Security shelters and watch towers
Section 45. Garbage shafts , lift shafts and 10 sq mtrs lobby in front of each lift (excluding area of corridor beyond the lift).
Section 56. Fire escape staircases
Section 67. Toilet blocks for visitors, drivers, guards etc on ground floor only.
Section 78. Mumty, machine room for lifts.
Section 89. Cupboards upto a depth of 0.60 mtr.and 1.80 mtrs.in length.
Section 910. Bay window upto a depth of 0.60mtr.and 2.0 mtrs length.
Section 1011. Refuge area as per definition for fire evacuation in National Building Code, 2005.
Section 1112. Sewage treatment plant, water treatment plant, garbage collection centre, Electric sub-station, service ducts, community hall, religious building, milk and vegetable booth, school & creche.
Section 1213. Covered walkways and pathways.
Section 1314. Any other utilities and facilities as decided by the Chief Executive Officer depending upon its requirement.
Section 142. Loft up to maximum height of 1.5 metre .
Section 23. Air-conditioning plant, electrical installation, generator room, water works, water tank etc.
Section 34. Watchmen/Security shelters and watch towers
Section 45. Garbage shafts , lift shafts and 10 sq mtr lobby in front of each lift.
Section 56. Fire escape staircases
Section 67. Toilet blocks for visitors, drivers, guards etc on ground floor only.
Section 78. Mumty, machine room for lifts.
Section 89. Cupboards upto a depth of 0.60 mtr and 1.80 mtrs.in length.
Section 910. Refuge area as per definition for fire evacuation in National Building Code, 2005
Section 1011. Sewage treatment plant, water treatment plant, garbage collection centre, Electric sub-station, service ducts.
Section 1112. Covered walkways and pathways.
Section 1213. Any other utilities and facilities as decided by the Chief Executive Officer depending upon its requirement.
Section 132. Loft up to maximum height of 1.5 metre .
Section 23. Air-conditioning plant, electrical installation, generator room, water works, water tank etc.
Section 34. Watchmen/Security shelters and watch towers
Section 45. Garbage shafts , lift shafts and 10 sq mtr lobby in front of each lift (excluding area of corridor beyond the lift).
Section 56. Fire escape staircases
Section 67. Toilet blocks for visitors, drivers, guards etc on ground floor only.
Section 78. Mumty, machine room for lifts.
Section 89. Cupboards upto a depth of 0.60 mtr and 1.80 mtrs.in length.
Section 910. Refuge area as per definition for fire evacuation in National Building Code, 2005.
Section 1011. Sewage treatment plant, water treatment plant, garbage collection centre Electric sub-station, service ducts.
Section 1112. Covered walkways and pathways.
Section 1213. Any other utilities and facilities as decided by Chief Executive Officer depending upon its requirement.
Section 132. Loft up to maximum height of 1.5 metre .
Section 23. Air-conditioning plant, electrical installation, generator room, water works, water tank etc.
Section 34. Watchmen/Security shelters and watch towers
Section 45. Garbage shafts , lift shafts and 10 sq mtr lobby in front of each lift (excluding area of corridor beyond the lift).
Section 56. Fire escape staircases
Section 67. Toilet blocks for visitors, drivers, guards etc on ground floor only.
Section 78. Mumty, machine room for lifts.
Section 89. Cupboards upto a depth of 0.60mtrs.and 1.80mtrs.in length.
Section 910. Bay window upto a depth of 0.60mtrs.and 2.0mlength.
Section 1011. Refuge area as per definition for fire evacuation and National Building Code, 2005.
Section 1112. Sewage treatment plant, water treatment plant, garbage collection centre, Electric sub-station, service ducts.
Section 1213. Covered walkways and pathways.
Section 1314. Any other utilities and facilities as decided by Chief Executive Officer depending on its requirement.
Section 142. Loft up to maximum height of 1.5 metre .
Section 23. Air-conditioning plant, electrical installation, generator room, water works, water tank etc.
Section 34. Watchmen/Security shelters and watch towers
Section 45. Garbage shafts , lift shafts and 10 sq mtr lobby in front of each lift( excluding area of corridor beyond the lift).
Section 56. Fire escape staircases
Section 67. Toilet blocks for visitors, drivers, guards etc on ground floor only.
Section 78. Mumty, machine room for lifts.
Section 89. Cupboards upto a depth of 0.60 mtr and 1.80 mtrs. in length.
Section 910. Bay window upto a depth of 0.60 mtr and 2.0 m length.
Section 1011. Refuge area as per definition for fire evacuation in National Building Code, 2005.
Section 1112. Sewage treatment plant, water treatment plant, garbage collection centre Electric sub-station, service ducts.
Section 1213. Covered walkways and pathways.
Section 1314. Any other utilities and facilities as decided by Chief Executive Officer depending upon its requirement.
Section 142. Loft up to maximum height of 1.5 metre .
Section 23. Air-conditioning plant, electrical installation, generator room, water works, water tank etc.
Section 34. Watchmen/Security shelters and watch towers
Section 45. Garbage shafts , lift shafts and 10 sq mtr lobby in front of each lift (excluding area of corridor beyond the lift).
Section 56. Fire escape staircases
Section 67. Toilet blocks for visitors, drivers, guards etc on ground floor only.
Section 78. Mumty, machine room for lifts.
Section 89. Cupboards upto a depth of 0.60 mtr and 1.80 mtrs. in length.
Section 910. Refuge area as per definition for fire evacuation in National Building Code, 2005.
Section 1011. Sewage treatment plant, water treatment plant, garbage collection centre, Electric sub-station, service ducts.
Section 1112. Covered walkways and pathways.
Section 1213. Any other utilities and facilities as decided by Chief Executive Officer depending upon its requirement.
Section 132. Setbacks, FAR, ground coverage and height permissible on the sub divided plot shall be as per maximum permissible in each individual use in these Regulations
Section 225. Structural Safet.
Section 2526. Construction of Farm House Building in Agricultural Use Zone.
Section 262. Loft up to maximum height of 1.5 metre .
Section 23. Air-conditioning plant, electrical installation, generator room, water works, water tank etc.
Section 34. Watchmen/Security shelters and watch towers
Section 45. Garbage shafts , lift shafts and 10 sq mtr lobby in front of each lift (excluding area of corridor beyond the lift).
Section 56. Fire escape staircases
Section 67. Toilet blocks for visitors, drivers, guards etc on ground floor only.
Section 78. Mumty, machine room for lifts.
Section 89. Cupboards upto a depth of 0.60 mtr and 1.80 mtrs. in length.
Section 910. Bay window upto a depth of 0.60 mtr and 2.0 m length.
Section 1011. Sewage treatment plant, water treatment plant, garbage collection centre Electric sub-station, service ducts.
Section 1112. Covered walkways and pathways.
Section 1213. Any other utilities and facilities as decided by the Chief Executive Officer depending upon its requirement.
Section 1327. Construction on Plots allotted to the farmers against land acquisition (5% or 6% or 7%) in planned village abadi Expansion scheme or in sectors.
Section 271. Dharmshala/Night shelter/baratghar
Section 12. Dispensary/clinic/laboratory
Section 23. Hostel
Section 34. Guest House/lodging house
Section 45. Motor garage and workshop
Section 56. Office for professionals - out of which minimum 50% of the space shall be used for self use.
Section 67. Restaurant
Section 78. Vending booth/kiosks
Section 89. Bank
Section 910. Post Office
Section 1011. Telegraph Office
Section 1112. Creche and Day-care centre
Section 1213. Retail shop
Section 1314. Telecommunication tower (only ground based)
Section 1428. Purchasable Far.
Section 2829. Provisions of parking, loading and unloading spaces.
Section 291. IS : 1905 - 1987 "Code of practice for structural safety of buildings; masonry walls" Indian Standards Institution, March 1981.
Section 12. IS : 1904 - 1978 "Code of practice for structural safety of buildings; foundation" Indian Standards Institution.
Section 23. IS : 456 - 2000 "Code of practice for plain and Reinforced Concrete" Indian Standards Institution, September 2000.
Section 34. IS : 800 - 1984 "Code of practice for general construction in steel" Indian Standards Institution, February 1985.
Section 45. IS : 883 - 1966 "Code of practice for design of structural timbers in buildings; " Indian Standards Institution, March 1967 Besides any other relevant Indian Standards will need to be referred to
Section 51. IS : 1893 - 1984 "Criteria for Earthquake resistant Design of Structures (Fourth Revision)" June 1986
Section 12. IS : 13920 - 1993 "Ductile detailing of reinforced concrete structures subjected to Seismic forces - Code of Practice" November 1993
Section 23. IS : 4326 - 1993 "Earthquake Resistant Design and Construction of Buildings - Code of Practice (Second Revision)" October 1993
Section 34. IS : 13828 - 1993 "Improving Earthquake Resistance of Low Strength Masonry Buildings - Guidelines" August 1993.
Section 45. IS : 13827 - 1993 "Improving Earthquake Resistance of Earthen Building Guidelines" October 1993
Section 56. IS : 13935 - 1993 "Repair and Seismic Strengthening of Buildings - Guidelines" November 1993.
Section 67. Improving Earthquake Resistance of Building-Guidelines" by expert group, Government of India, Ministry of Urban Affairs and Employment, published by Building Materials and Technology Promotion Council 1998.
Section 78. The National Building Code of India 1983 For location of the building in hazard prone area of earthquakes, cyclone or wind storms and floods, reference may be made to the following:
Section 82. Stiff.N>30:Medium.N=10.3:Soft.N<10:Liquefiable,poorly graded sands with N<15 under Water Table (see Note 5 of Table 1 in IS:1893)
Section 21. Certified that the building for which completion plan has been submitted for approval conforms to the requirements of relevant Indian Standard Codes and National Building Code as referred in Appendix 8-A in respect of Structural Safety in general and natural hazards including earthquake in particular.
Section 12. It is also certified that the building has been constructed as per approved foundation and structural designs provided by the Structural Engineer and is certified to be based on relevant Indian Standard Code and National Building Code as referred above and the building is safe for occupancy.
Section 23. Location/Address of Building
Section 34. Particulars of Building
Section 41. Ground Coverage (square metre)
Section 12. Total covered area (square metre)
Section 23. Total Numbers of Floors above ground.
Section 3
new-okhla-industrial-development-area-building-regulations-2010.json
•
152 Sections
•
Uttar Pradesh
{
"id": 25168,
"slug": "new-okhla-industrial-development-area-building-regulations-2010",
"title": "New Okhla Industrial Development Area Building Regulations, 2010",
"short_title": "New Okhla Industrial Development Area Building Regulations, 2010",
"act_number": "Published vide Notification No. 2213/77-4-10-158N.",
"act_year": 2010,
"act_type": "STATE",
"location": "Uttar Pradesh",
"law_status": "unknown",
"enactment_date": null,
"description": "New Okhla Industrial Development Area Building Regulations, 2010",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "1. Short title, commencement and application.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "2",
"title": "2. Definitions.",
"chapter": null,
"content": "2.1 \"Act\" means Uttar Pradesh Industrial Area Development Act, 1976 (U.P. Act No.6 of 1976.\n2.2 \"Air conditioning\" means the process of treating air so as to control simultaneously its temperature, humidity, cleanliness and distribution to meet the requirement of conditioned space.\n2.3 \"Alteration\" means the structural change, such as addition to the area or height or the removal of part of a building, or construction of cutting into or removal of any wall, partition, column, beam, joint, floor or other support, or a change to the fixtures or equipments of the building.\n2.4 \"Applicant\" means the person who has legal title to a land or building and includes,\n(i) An agent or trustee who receives the rent on behalf of the owner;\n(ii) An agent or trustee who receives the rent of or is entrusted with or is concerned with any building devoted to religious or charitable purposes;\n(iii) A receiver, executor or administrator or a manager appointed by any Court of competent jurisdiction to have the charge, or to exercise the rights of the owner; and\n(iv) A mortgagee in possession.\n2.5 \"Approved\" means approved by the New Okhla Industrial Development Authority.\n2.6 \"Area\" means the Industrial Development Area as notified for the New Okhla Industrial Development Authority.\n2.7 \"Authorised Officer\" means an officer authorized by the Chief Executive Officer.\n2.8 \"Atrium\" - A sky lighted central area, often containing plants, in modern buildings especially for common area.\n2.9 \"Balcony\" means a horizontal projection including a handrail or balustrade to serve as sitting out place.\n2.10 \"Basement or Cellar\" means the lower storey of a building below or partly below ground level.\n2.11 \"Building\" means any permanent structure or erection or part of a structure or erection which is intended to be used for residential, commercial, industrial, institutional, recreational or other purposes for the use and benefit of human being whether in actual use or not.\n2.12 \"Building activity\" means erection, re-erection, making material alteration, or demolition of any building.\n2.13 \"Building height\" means the vertical distance measured in the case of the flat roofs from the top level of the adjoining drain to the highest point of the building and in the case of sloping roof the mid point between the eaves level and the ridge. Architectural features serving no other functions except that of the decoration shall be excluded for the purpose of measuring heights.\n2.14 \"Building line or envelope\" means a line up to which the plinth of a building may be lawfully extended. It includes lines specifically indicated or to be indicated in any scheme or layout plan or in these regulations.\n2.15 \"Canopy\" means a projection over any entrance and if provided in setbacks shall be either cantilevered or supported on columns.\n2.16 \"Chajja\" means a sloping or horizontal structure overhung usually provided for protection from sun and rain or for Architectural considerations.\n2.17 \"Direction\" means the direction issued by the Authority under Section 8 of the Act, and would include, unless the context otherwise indicates, any executive instructions issued here under.\n2.18 \"Drain\" means a conduit or channel for the carriage of storm water or other used water.\n2.19 \"Drainage\" means the removal of any liquid by a system constructed for this purpose.\n2.20 \"Dwelling Unit\" means an independent housing unit with separate facilities for living, cooking and sanitary requirements.\n2.21 \"Evergreen tree\" means tree that remains green for most part of the year and sheds leaves slowly throughout the year.\n2.22 \"Existing building or use\" means building structure or its use as sanctioned/approved by the competent authority, or existing before the declaration of the notified area of respective Authority.\n2.23 \"Extended Basement\" means the construction of floor(s) below the ground leaving a minimum setback of 6.0 metre all-round from the plot boundary for the purpose of fire tender movement. The top slab of basement to flush with the ground level and such slab to be designed for fire tender load with adequate mechanized ventilation.\n2.24 \"Floor\" means the lower surface in the storey on which one normally walks in building.\n2.25 \"Floor Area Ratio (FAR)\" means the quotient obtained by dividing the total covered area (plinth area) on all floors by the area of plot.\n2.26 \"Foundation\" means that part of the structure, which is in direct contact and transmitting loads to the ground.\n2.27 \"Green Building\" A green building is one which uses less water, optimizes energy efficiency, conserves natural resources, generates less waste and provides healthier spaces for occupants, compared to a conventional building.\n2.28 \"Group Housing\" means a premises of size not less than 2000 sq. mtrs. comprising of either residential flats or a cluster of flats and independent houses/villas, with basic amenities like parking, park, convenience shop, public utilities, etc.\n2.29 \"Hazardous Buildings\" means a building or part of a building which is used for the storage, handling, manufacturing or processing of highly combustible or explosive materials or products which are liable to burn with extreme rapidity or which may produce poisonous fumes or explosions, or the storage or handling or manufacturing or processing of highly corrosive, toxic or noxious alkalis, acids or other liquids or chemicals producing flame, fumes or explosive, poisonous, irritant or corrosive gases and the storage, handling or processing of any material producing explosive mixtures of dust or which result in the division of matter into the fine particles subject to spontaneous ignition.\n2.30 \"Hard Landscape\" means the Civil work component of landscape architecture such as pavement, walkways, roads, retaining walls, sculptures, street activities, fountains and other built environment.\n2.31 \"Hedge\" means number of shrubs or trees (often similar species) planted closely together in the line. A hedge may be pruned to shape or allowed to grow to assume its natural shape.\n2.32 \"Jali\" means A grill or screen made of metal, brick, ferro-cement, wood or any other material which is placed in front of a window, door or any opening or piece of machinery in order to protect it.\n2.33 \"Layout Plan\" means a plan of the entire site showing location of plots/building blocks, roads, open spaces, entry/exits, parking, landscaping etc. indicating the activity for all land parcels.\n2.34 \" Technical Person\" means an architect/civil engineer/town planner recognized by the Authority as per Appendix 12.\n2.35 \"Loft\" means an intermediary floor between two floors or a residual space in a pitched roof above normal floor level with a maximum height of 1.5 metres and which is constructed or adopted for storage purpose.\n2.36 \"Development Plan\" means the Development Plan/Master Plan of the Authority in respect of the Area prepared by the Authority.\n2.37 \"Mezzanine floor\" means an intermediate floor, between two floors, above ground level, accessible only from the lower floor.\n2.38 \"Multi Level Parking\" means a separate block or a part of any building on a property to be used primarily for parking of vehicles through mechanized or conventional methods,.\n2.39 \"Mumty or Stair cover\" means a structure with a covering roof over staircase and its landing built to enclose only the stairs for the purpose of providing protection from weather and not used for human habitation.\n2.40 \"Mixed Land use\" means mixing/planning of compatible uses, horizontally or vertically, on a property, such as commercial, offices, residential or institutional.\n2.41 \"Occupancy\" means the main purpose for which a building or a part of a building is used or intended to be used and classification of a building according to occupancy shall deem to include subsidiary occupancies which are contingent upon it.\n2.42 \"Open Space\" means a space forming an integral part of the plot left open to the sky.\n2.43 \"Owner\" means a person, group of persons, a company, trust, registered body, State or Central Government and its departments, undertakings and like in whose name the property stands registered in the relevant records.\n2.44 \"Parking space\" means a space enclosed or unenclosed to park vehicles together with a driveway connecting the parking space with a street permitting ingress and egress of the vehicles.\n2.45 \"Permit\" means a permission or authorization in writing by the Authority to carry out the work regulated by these regulations.\n2.46 \"Planning and Development Directions\" means Directions issued by the Authority under Section 8 of the Act for defining architectural features, facades of the buildings, maintenance of amenities etc. from time to time, and would include, unless the context otherwise indicates, any executive instructions issued hereunder.\n2.47 \"Pergola\" means a perforated slab constructed in such a manner that at least 50% of which is open to sky.\n2.48 \"Purchasable FAR\" means the additional FAR, which an old allottee can purchase over and above the FAR that was specifically allowed to him at the time of allotment. The maximum purchasable FAR shall be allowed up to the maximum limit of applicable FAR in these regulations\n2.49 \"Plinth\" means a portion between the surface of the surrounding ground and surfaced floor immediately above the ground.\n2.50 \"Plot\" means a piece of land enclosed by definite boundaries.\n2.51 \"Podium parking\" means floor/floors above ground, of maximum 2.4mtrs.height each below the bottom of beam, if served by a ramp for movement of vehicles for entry and exit from parking area or alternatively mechanized parking as per standard plan by the registered company undertaking such construction and duly approved by the competent Authority. Ramp for podium shall not be allowed in the setbacks.\n2.52 \"Refuge Area\" means\nFor all building exceeding 24 metres height, refuge area of 15 sq mtrs shall be provided as follows:\n(i). The refuge area shall be provided on the periphery of the plot or preferably on a cantilever projection and open to air on atleast one side protected with suitable railings.\n(a) The floors above 24 metres and up to 39 metres- one refuge area on the floor immediately above 24 metres.\n(b) For floors above 39 metres - one refuge area on the floor immediately above 39 metres and so on after every 15mtrs.\n(ii) Residential flats in multistoreyed buildings with balconies need not be provided with refuge area, however flats without balcony shall provide refuge area as above.\n2.53 \"Road/Street/Right of Way\" means any highway, street, lane, pathway, alley, stairway, passage way, carriage way, footway square, bridge, whether a thorough -fare or not, place on which the public have a right of passage, access or have passed and had access uninterruptedly for a specified period or whether existing or proposed in any scheme, and includes all bunds, channels, ditches, storm water drains, culverts, side walks, traffic islands, roadside trees and hedges, retaining walls, fences, barriers and railings within the street lines.\n2.54 \"Road/Street Line\" means the line defining the side limits of a street/road.\n2.55 \"Road/Street Width\" means distance between boundaries of the road measured at right angles to the course of the road.\n2.56 \"Rain Water Harvesting\" means utilizing rain water for recharging of ground water, sanitation, irrigation etc. by adopting various techniques approved by the Authority.\n2.57 \"Service floor\" means a storey of maximum 2.40 mtrs. height below the beam between any two storeys to be used for running electrical cables, water or sewerage lines, service ducts or AC ducts and services and their maintenance only.\n2.58 \"Setback\" means a specified line parallel to the plot boundaries.\n2.59 \"Soft Landscape\" means the natural elements in a landscape design, such as plant materials and the soil itself.\n2.60 \"Storage\" means a place where goods of non hazardous nature are stored and including bank safe vault and cold storage.\n2.61 \"Table\" means a table annexed to these regulations.\n2.62 \"To abut\" with its geometrical variations and cognate expressions means abutting on road in such a manner that any portion of the building is on the road boundary.\n2.63 \"Temporary Building\" means any structure or erection or part of structure or erection which is intended to be used only for temporary purpose for a definite period and which is made of temporary and quickly removable building material such as canvas cloths, straw, mat, hay, tarpaulin, asbestos sheets/plastic sheets, etc, without any permanent foundation, wall, beam, column, slab using briks, stone, reinforcement concrete and such other materials of permanent nature.\n2.64 \"Unsafe Building\" building which structurally and constructionally unsafe or insanitary or not provided with adequate means of egress or which constitute a fire hazard or otherwise dangerous to human life or which in relation to existing use constitute a hazard to safety or health or public welfare, by reason of inadequate maintenance, dilapidation or abandonment.\n2.65 \"Urbanisable Area\" means the area earmarked for any of the following uses in the Development Plan/Master Plan.\n(i) Residential;\n(ii) Commercial;\n(iii) Industrial;\n(iv) Institutional;\n(v) Green area\n(vi) Transportation, and\n(vii) Any other Special uses as specified in the Development Plan/Master Plan/Scheme duly approved by the Authority.",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
{
"number": "3",
"title": "3. Note.",
"chapter": null,
"content": "Chapter - II\nLayout/Building Permit and Occupancy",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "4",
"title": "4. Building permit.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "5",
"title": "5. Application for building permit.",
"chapter": null,
"content": "(a) Whitewashing and painting;\n(b) Plastering, patch work, flooring.\n(c) Renewal of roof at the same height;\n(d) Reconstruction of portions of building damaged by any natural calamity to the same extent as previously approved;\n(e) Internal additions/alterations within the building envelop certified and supervised by a Technical Person ;\n(f) Digging or filling of earth;",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "6",
"title": "6. Information Accompanying Application for Layout Plan or Building Permit.",
"chapter": null,
"content": "6.1 Layouts regarding sub-division of land\n(i) The boundaries of the plot and the name and number of the properties and road abutting the plot;\n(ii) Plot number of the property on which the building is intended to be erected;\n(iii) All existing buildings and physical features standing on, over or under the site;\n(iv) Building envelope at each floor level in relation to the site;\n(v) The total plot area and the break-up of area under different uses, roads and open space with their percentages with reference to the total area of the plot;\n(vi) Total floor area ratio, ground coverage and height of the building of each category proposed;\n(vii) Setbacks of total plot as well as individual proposed plots;\n(viii) Details of setback, floor area ratio, ground coverage, on each irregular shaped plots in the proposed layout on at least 1 : 500 scale;\n(ix) Sewerage and drainage lines up to discharge point and water supply lines;\n(x) Details of boundary wall, plinth, culvert and ramp, trees;\n(xi) Scale used and the direction of north point relating to plan of proposed building;\n(xii) Parking plans indicating the parking spaces for all the buildings;\n(xiii) Landscape plan;\n(xiv) Location and size of temporary structures like stores, labour hutments, site office and such like, and\n(xv) Electrical load requirement.\n(1) Building Plan : For any proposed structure, requirement of building plan shall be as per clause 6.2, 6.3 and 6.4 as the case may be.\n(1) Building Plan :\n(2) Service Plans - Details of private water supply and sewage disposal system independent of the Municipal Services, if any and rain water harvesting system, solar passive architecture as per Uttar Pradesh Government orders.\n(2) Service Plans\n(3) Specification - General specification of materials to be used in different parts of the building as given in Appendix -6.\n(3) Specification\n(4) Documents - as per Checklist 1C annexed to Appendix 1.\n(4) Documents\n6.2 Residential building on plots other than group housing (flatted):\n(1) The plan shall show-\n(1) The plan shall show-\n(i) Key Plan - A key plan drawn to a scale of not less than 1:1000 shall be submitted along with the application for a building permit showing the boundary locations of the site with respect to neighbourhood landmarks;\n(ii) The boundaries of the plot and the name/number of the properties and road abutting the plot;\n(iii) Plot number of the property on which the building is intended to be erected;\n(iv) All existing building and physical features standing on, over or under the site,\n(v) Building envelope at each floor level in relation to the site,\n(vi) The total plot area and the break-up of covered areas on each floor with their percentages with reference to the total area of the plot;\n(vii) Total height of the building;\n(viii) Setbacks;\n(ix) Details of projections and structures in setbacks;\n(x) Sewerage and drainage lines upto discharge point, rain water harvesting and water supply lines;\n(xi) Details of boundary wall and its plinth, culvert and ramp, trees, concealing of water tank on roof with jali;\n(xii) Car parking, if applicable;\n(xiii) Scale used and the direction of north point relating to plan of proposed building;\n(2) Documents as per Checklist 1-B enclosed with Appendix -1.\n(2) Documents\n(3) Specification: General specifications of materials to be used in different parts of the building as given in Appendix -6.\n(3) Specification:\n6.3 Other buildings\n6.3.1 The site plan shall show:-\n6.3.1 The site plan shall show:-\n(i) The boundaries of the plot and the name/number of the properties and roads abutting to the plot;\n(ii) Plot number of the property on which the building is intended to be erected;\n(iii) All existing buildings and physical features standing on, over or under the site;\n(iv) Building envelope at each floor level in relation to the site;\n(v) The total area and the break-up of covered areas on each floor with their percentages with reference to the total area of the plot;\n(vi) Total height of the building;\n(vii) Setbacks;\n(viii) Details of projections and structures in setbacks;\n(ix) Sewerage and drainage lines upto discharge point and water supply lines;\n(x) Details of boundary wall, plinth, culvert and ramp, trees;\n(xi) Scale used and the direction of north point relating to plan of proposed building;\n(xii) Parking plan indicating the parking spaces of all the buildings;\n(xiii) Landscape plan;\n(xiv) Location and size of temporary structures like stores, labour hutments, site office; and\n(xv) Electrical load requirement.\n(xvi) Location and details of facilities to be provided for physically challenged persons.\n6.3.2 Building Plan. - The plan of the building, elevations and sections shall be drawn to a scale not less than 1:200\n6.3.2 Building Plan.\n(i) The plan shall include all floor plans of the building together with the covered area;\n(ii) The plan shall specify the use of all parts of the building;\n(iii) The plan shall show water supply, sewerage, drainage lines and the like;\n(iv) The plan shall include sectional drawing showing clearly the thickness of walls, size and spacing of framing members and floor slabs. The sections shall also indicate the height of the rooms and the parapet. At least one cross section shall be taken through the staircase;\n(v) The plan shall show all street elevations;\n(vi) The plan shall include terrace plan indicating the drainage and the slope of the roof;\n(vii) The plan shall give dimension of the permissible projections in setbacks;\n(viii) The plan shall give direction of the north point in relation to the plan and scale used.\n6.3.3 Building plans for all types of multi-storeyed buildings. - For multi-storeyed buildings which are more than 15 metres in height, the following additional information shall be indicated in the building plans in addition to those mentioned in regulation 6.3.2;\n6.3.3 Building plans for all types of multi-storeyed buildings.\n(i) Access for fire appliances and vehicles and details of vehicular turning circle and clear motorable access way around the building;\n(ii) Size (width) of main and alternate staircase along with balcony, corridors and ventilated lobby approach;\n(iii) Location and details of lift enclosures;\n(iv) Location and size of fire lift;\n(v) Smoke stop lobby doors, if provided;\n(vi) Refuge area, refuge chutes, refuge chamber, service ducts, etc. if any;\n(vii) Air conditioning system, if provided, with position of dampers, mechanical ventilation system, electrical services, boilers, gas pipes or the like;\n(viii) Details of exits including provision of ramps for hospital and special lifts;\n(ix) Location of generator, transformer and switch gear room;\n(x) Smoke exhauster system, if any;\n(xi) Details of fire alarm system;\n(xii) Location of centralized control, connecting all fire alarm system, built in fire protection arrangements and public address system;\n(xiii) Location and dimension of static water storage tank and pump rooms with fire fighting inlets for mobile pump and water storage tank;\n(xiv) Location and details of first aid and fire fighting equipment and installations;\n(xv) Location and details of fixed fire protection installations such as sprinklers, wet risers, hose -reels, drenchers, CO2 installation, etc.\n(xvi) Location and details of facilities to be provided for physically challenged persons.\n6.3.4 Service Plans. - Details of private water supply and sewage disposal system independent of the Municipal Services, if any and rain water harvesting system and solar passive architecture as per the Government of Uttar Pradesh orders.\n6.3.4 Service Plans.\n6.3.5 Specification. - General specification of materials to be used in different parts of the building as given in Appendix -6.\n6.3.5 Specification.\n6.3.6 Documents. - as per Checklist 1B annexed to Appendix 1.\n6.3.6 Documents.\n6.4 Temporary Building\n6.4.1 The site plan shall show:-\n6.4.1 The site plan shall show:-\n(i) The boundaries of the plot and the name/number of the properties and roads abutting the plot;\n(ii) Plot number of the property on which the building is intended to be erected;\n(iii) All existing buildings and physical features standing on, over or under the site;\n(iv) Total height of the building;\n(v) Setbacks;\n(vi) Details of projections and structures in setbacks;\n(vii) Sewerage and drainage lines upto discharge point and water supply lines;\n(viii) Scale used and the direction of north point relating to plan of proposed building;\n(ix) Location and size of temporary structures like stores, labour hutments, site office or such like temporary structures.\n6.4.2 Building Plan. - The plans shall be submitted for building other than labour hutment. The plan of the building, elevations and sections accompanying the application shall be drawn to a scale not less than 1:200\n6.4.2 Building Plan.\n(i) The plan shall include all floor plans of the building together with the covered area;\n(ii) The plan shall specify the use of all parts of the building;\n(iii) The plan shall show water supply, sewerage, drainage lines and the like;\n(iv) The plan shall include sectional drawing showing clearly the thickness of walls, size and spacing of framing members and floor slabs. The sections shall also indicate the height of the rooms and the parapet;\n(v) The plan shall show all street elevations;\n(vi) The plan shall give indication of the north point in relation to the plan and scale used.\n6.4.3 Specification. - General specification of materials to be used in different parts of the building as given in Appendix -6.\n6.4.3 Specification.\n6.4.4 Documents. - as per Checklist 1 D annexed to Appendix 1.\n6.4.4 Documents.",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "7",
"title": "7. Site.",
"chapter": null,
"content": "Table\nTable\nSite area\nSite area\nScale\nScale\nUp to 0.1 hectare\nNot less than 1:200\nUp to 0.1 hectare-1 hectare\nNot less than 1:500\nMore than 1 hectare\nNot less than 1:1000",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "8",
"title": "8. Recommended notation for colouring of plans.",
"chapter": null,
"content": "S. No.\nS. No.\nItem\nItem\nSite Plan\nSite Plan\nBuilding Plan\nBuilding Plan\n1.\nPlot lines\nThick green\nThick green\n2.\nExisting street\nGreen\n........\n3.\nPermissible building line\nThick dotted green\n........\n4.\nExisting work (Outline)\nGreen\nGreen\n5.\nWork proposed to be demolished\nYellow hatched\nYellow hatched\n6.\nProposed-\na) Additions/Alterations.\nb) Entirely new work\nRed Not to be coloured\nRed Not to be coloured\n7.\nDrainage\nRed dotted\nRed dotted\n8.\nWater Supply\nGreen dotted thin\nGreen dotted thin",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "9",
"title": "9. Preparation and signing of Plans.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "10",
"title": "10. Building permit fee, completion fees, temporary building permit fees and calculation thereof.",
"chapter": null,
"content": "(i) For all type of buildings Rs. 15.00 per square metre covered area on all floors.\n(ii) For layout plan - Re. 1/- per square metre plot area upto for first 4.0ha and Rs. 0.50 per square metre for balance area.\n(i) For all type of buildings Rs 10/- square metre of covered area on all floors.\n(ii) For layout plan - Rs. 0.5/- per square metre plot area for first 4.0 ha acres and Rs. 0.25 per square metre for balance area.\n(iii) In case even after two objection letters issued by Authority if rectification of all objections is not done then Rs. 500/- shall be levied towards site visit fees for each subsequent visit.",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "11",
"title": "11. Withdrawal of application.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "12",
"title": "12. Scrutiny of the building permit.",
"chapter": null,
"content": "(ii) The Authorized Officer shall examine the information listed in regulation 6.3 for residential buildings on plots (other than Group Housing).\n(iii) For layout plan, buildings and other temporary structures the Technical Person shall provide the information in regulation 6.3, 6.4 and 6.5 respectively and provision of fire safety requirements, public convenience, safety provisions and other relevant laws. The Authorised/Technical Person shall also be responsible for all other provisions as per Building Regulations, Planning and Development Directions, National Building Code, Indian Standard Institution standards and such other provisions as required by the Authority from time to time.\n(iv) The Owner and Technical Person shall jointly and severely liable and all of them shall submit indemnity bond in favour of the Authority against violation of these Regulations, Planning and Development Directions and provisions of National Building Code.\n(v) The Authority, however reserves the right to perform test checks by complete scrutiny of any of the plans submitted for approval.\n(vi) In case of any violation, the Technical Person shall be black listed under intimation to concerned registration organisation from practicing in the Industrial Development Area for a period of 5 years.\n(vii) In case owner is found responsible for violation, action may be taken as per provision in lease deed.",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
{
"number": "13",
"title": "13. Sanction or refusal of building permit.",
"chapter": null,
"content": "(a) the Authorised Officer shall give reasons and quote the relevant provision of the regulations which the plan contravenes, as far as possible in the first instance itself and ensure that no new objections are raised when they are resubmitted after compliance of earlier objections.\n(b) The Authority shall demolish the unauthorised construction at the expense and cost of the owner/lessee/sub-lessee. In case the owner/lessee/sub-lessee fails to pay the above said cost, the same may be recovered from him as arrear of land revenue.\n(i) First time - Warning to concerned Technical person\n(ii) Second time - black listed in Authority for one year.\n(iii) Third time - refer to Council of Architecture/ITPI/MIC for cancellation of Registration.",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "14",
"title": "14. Appeal against refusal or sanction with modification of a building permit.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
{
"number": "15",
"title": "15. Duration of validity of a building permit.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 14
},
{
"number": "16",
"title": "16. Additions or alterations during construction.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 15
},
{
"number": "17",
"title": "17. Cancellation of permit for building activity.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 16
},
{
"number": "18",
"title": "18. Work to be carried out in full accordance of Zoning Regulations, Building Regulations and Directions.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 17
},
{
"number": "19",
"title": "19. Documents at site.",
"chapter": null,
"content": "(i) A copy of building permit.\n(ii) Copy of approved drawings.",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
{
"number": "20",
"title": "20. Notice for issue of occupancy certificate.",
"chapter": null,
"content": "20.1.1 Occupancy certificate necessary for occupation. - No building erected, re-erected, shall be occupied in whole or part until the issue of occupancy certificate by the Chief Executive Officer in the Form given in Appendix-11. Provided that if the Chief Executive Officer fails to issue the occupancy certificate or send any intimation showing his inability to issue such certificate within 90 days of the date of receipt of application for occupancy certificate an intimation to this effect shall have to be sent to the Authority by the owner for occupying the building.\n20.1.1 Occupancy certificate necessary for occupation.\n20.1.2 Issue of occupancy certificate regarding Multi Storey Buildings. - Without prejudice to the provision of regulation 20.1.1, In case of multi storey building the work shall also be subjected to the inspection of the Chief Fire Officer, Uttar Pradesh Fire Service and the occupancy certificate shall be issued by the Chief Executive Officer only after the clearance from the Chief Fire Officer regarding the completion of work from the fire protection point of view. Other certificates such as fees, structural safety, water harvesting, etc also have to be submitted alongwith the completion drawings\n20.1.2 Issue of occupancy certificate regarding Multi Storey Buildings.\n20.2 \"Unsafe building\"\n20.3 \"Unauthorised development\"\n(i) Take suitable action which may include demolition of unauthorized works, sealing of premises, prosecution and criminal proceedings against the offenders in pursuance of relevant Acts in force.\n(ii) Take suitable action against the technical person concerned.\n20.4 \"Temporary occupation\"\nChapter - III\nGeneral Requirements\nSite Requirements\nSite Requirements",
"footnote": "",
"is_definition": false,
"sort_order": 19
},
{
"number": "21",
"title": "21. Distance from electric lines.",
"chapter": null,
"content": "Vertically\nVertically\nHorizontally\nHorizontally\n(a) Low and medium voltage\n2.4 metres\n1.2 metres\n(b) High voltage lines upto and including 33000\n\t\t\t\t\tvolts\n3.7 metres\n1.8 metres\n(c) Extra high voltage lines\n3.7m + (0.305 metres for every additional 33000\n\t\t\t\t\tvlots)\n1.8mtrs+ (0. 305 metres for every additional \n\t\t\t\t\t33000 volts)",
"footnote": "",
"is_definition": false,
"sort_order": 20
},
{
"number": "22",
"title": "22. Site and land use pattern.",
"chapter": null,
"content": "(i) the proposed land use does not correspond to the land use in the Development Plan/Master Plan/Layout Plan\n(ii) the construction of any building is for public worship, which in the opinion of the Authority will affect the religious feelings of any class or persons in the vicinity thereof.\n(iii) the use of building or place will be a source of annoyance to, or injurious to the health of the inhabitants of the neighbourhood.",
"footnote": "",
"is_definition": false,
"sort_order": 21
},
{
"number": "23",
"title": "23. Means of Access.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 22
},
{
"number": "24",
"title": "24. Ground coverage, Floor Area Ratio, Height and Setbacks.",
"chapter": null,
"content": "24.1 Residential Buildings on plots (other than flatted group housing).\n(1) Ground coverage, Floor Area Ratio, height and setbacks shall be as per Table-I appended to these regulations. However, the set back shall be applicable as per regulations prevailing at the time of initial allotment of sector.\n(2) Other provisions:\n(2) Other provisions:\n(i) The directions of side, rear set back and gate shall be as per the Setback/Layout Plan and directions prepared by the Authority from time to time.\n(ii) In case of plots being amalgamated with the approval of the Authority, the set back lines in front and adjoining property are to be followed as per Setback Plan.\n(iii)Subdivision of individual residential plot or building constructed on it shall not be allowed.\n(iv) Only two dwelling units and a servant quarter shall be allowed upto a plot size of 100sqmtrs. For plots above 100 sqmtrs and upto 500sqmtrs maximum three dwelling units shall be allowed. For plots above 500 sqmtrs. maximum four dwelling units shall be allowed. In density calculation 4.5 person per dwelling unit shall be considered in all kind of residential plots. Each servant quarter shall be counted as half dwelling unit.\n(v) Stilt parking shall be allowed upto maximum height of 2.4 mtrs upto bottom of beam free from FAR for plot size of 112 sq mtrs and above. However, in case stilt is not provided, parking may be allowed in the setbacks.\n(vi) No construction of any kind shall be permitted beyond the building envelope (on set backs) except-\n(a) A chajja (projection) of maximum width of 0.75 metres at lintel or roof level. No construction of any type shall be permitted over such projections.\n(b) Underground water tanks with top flush with the adjoining ground level.\n(c) In plots of 200 square metre and above, if required, a temporary guard room of porta cabin 1.5 metre x 1.5 metre shall be permitted after approval by the Authority.\n(d) Canopy projections of 4.5 metre X. 2.4 metre in front or side set backs (maximum 2 numbers) in plots where front set back is 4.5 metre or more and only one such canopy in side set back where front set back is less than 4.5 metre. No construction of any type shall be permitted over the canopy projection. The canopy may be supported by circular column of maximum 30 centimetres diametre or rectangular columns of 30 centimetres x 30 centimetre size.\n(e) Open Plinth steps:\n(i) Open plinth steps and plinth ramp in front and rear setback.\n(ii) Open plinth steps and plinth ramps beyond a depth of 6mtrs in side setback.\n(f) In case of corner plots upto 200 square metre category, load bearing columns max size 300 milimetre X 300 milimetre in side setback maximum 2 numbers may be permitted.\n(g) Other features as mentioned in Table 3.\n(h) Open ramps for movement of vehicles in side setback only.\n(i) Balcony upto 1.5 m width (upto 1.0 m width where setback is less than 3.0 m)\n(j) No enclousure of any type shall be allowed on the balcony, neither shall be compoundable.\n(k) The inner courtyard can be covered by a temprorary coverage, at a height of 1.5mtrs. above roof level. If covered at roof level, it shall not be permissible.\n(l) The internal changes within the building envelope are permissible without any revision submission.\n(vii) FAR shall also include\n(vii) FAR shall also include\n(i) Mezzanine\n(ii) Pergola shall be counted towards Floor Area Ratio calculation if closed from three or more than three sides.\n(viii) Floor Area Ratio shall not include -\n(viii) Floor Area Ratio shall not include -\n(i) A cantilever projection (in setbacks) of a width of 0.75 metre at any level. No construction of any type or any material shall be permitted over projections other than mentioned herewith.\n(ii) Canopy projections of 4.5 metre X 2.4 metre in front or side set back (maximum 2 numbers), in plots where front set back is 4.5 metre or more and only one such canopy in side setback where front setback is less than 4.5 metres.\n(iii) Basement, (only single basement) equivalent to ground coverage shall be permitted, if used for parking, services and storage.\n(iv) Stilt area of non-habitable height proposed to be used for parking, landscaping etc.\n(v) Loft upto 1.5 metre height\n(vi) Other features as mentioned in Table 3.\n(vii) Open ramps for movement of vehicles in side setback only.\n(viii) Balconies (upto 1.50mtrs. width, If Balcony of more than 1.50mtrs. width is proposed, then 1/4th of its area shall be counted in FAR), Cupboard (0.60m wide), Staircase, Lift, Mumty for staircase, and Bay wndows.\n(ix) Basement:\n(ix) Basement:\n(i) Basement area shall not exceed beyond building envelope.\n(ii) The height of any basement shall be maximum 1.5 metre from bottom of the slab above the top level of the external drain.The maximum height of the basement from floor to ceiling shall be 4.5 metres.\n(iii) Basement shall be allowed upto a distance of 2.0 mtrs. from the adjacent plot on the basis of structure stability certificate.\n(x) Minimum requirement for sanction/completion: 40 sqm or 50 percent of maximum permissible ground coverage(whichever is more) with provisions of a functional toilet/bath and kitchen Provision of following items in building shall be mandatory for issue of occupancy certificate.\n(x) Minimum requirement for sanction/completion: 40 sqm or 50 percent of maximum permissible ground coverage(whichever is more) with provisions of a functional toilet/bath and kitchen Provision of following items in building shall be mandatory for issue of occupancy certificate.\n(a) Flooring;\n(b) Electrical wiring whereas electrical fittings shall not be mandatory.\n(c) Plumbing and fittings in at least one toilet and kitchen\n(d) Trees as per Table no. 6 or direction issued from time to time which ever is higher;\n(e) Number plate;\n(f) Boundary wall shall be mandatory.\n(g) Internal and external finishing (Plastering and whitewashing shall not be mandatory);\n(h) House shall be lockable i.e. all external doors and windows shall have to be provided with grill provided in the windows then fixing of glasses in the windows panes shall not be mandatory;\n(i) No violation of Building Regulations, Zonal Plan Regulations and Master Plan should be there in the building at the time of issue of occupancy certificate.\n24.2 Group Housing (Flatted and cluster type)\n(I) Minimum Plot Area- 2000 square metre. However, the Authority may revise this limit by recording the reason .\n(II) Maximum permissible -\n(i)\nGround coverage\n35 percent up to 40000 sq mtrs and 40% above 40000 sq.mtrs.\n(ii)\nFloor Area Ratio\n2.75\n(iii)\nHeight\nNo limit. For buildings above 30 metres in height, clearance\n\t\t\t\tfrom Airport Authority shall have to be taken.\n(iv)\nDensity(Family size 4.5)\nAs mentioned in the sector Layout Plan or decided by the\n\t\t\t\tAuthority for a particular scheme.\n24.2.1 Other Provisions: - (1) No construction of any kind shall be permitted beyond the building envelope (on setbacks) except\n24.2.1 Other Provisions:\n(1) No construction of any kind shall be permitted beyond the building envelope (on setbacks) except\n(i) A Chajja (projection) of maximum width of 0.75 metre at lintel or roof level. No construction of any type or any material shall be permitted over projections other than mentioned herewith.\n(ii) Underground water tanks with top flush with the adjoining ground level.\n(iii) Watchman Shelters and Watch Towers with following provisions:\n(iv) No projection of watchman shelters and watch towers shall be allowed outside the plot line.\n(v) Maximum height of watchman shelter shall be 4 metres and for watch towers 15 metres. Total area, as mentioned below, under such shelters shall be split up in desired number of watch man shelter and watch towers as follows:\nSr. No.\nSr. No.\nPlot Size\nPlot Size\nTotal area for watchman shelter and watch\n\t\t\t\ttower\nTotal area for watchman shelter and watch\n\t\t\t\ttower\nMaximum area under each watchman shelter\nMaximum area under each watchman shelter\nMaximum area under each watch tower\nMaximum area under each watch tower\n1\nUpto 0.5 acres\n15 square metres\n15 square metres\n5 square metres\n2\nAbove 0.5 acres upto 10 acres\n30 square metres\n24 square metres\n5 square metres\n3\nAbove 10 acres upto 25 acres\n45 square metres\n24 square metres\n5 square metres\n4\nAbove 25 acres upto 50 acres\n60 square metres\n24 square metres\n5 square metres\n5\nAbove 50 acres for an additional 50 acres\nAn additional 10 square metres and part thereof\n24 square metres\n5 square metres\n(vi) The following features shall be permitted after leaving minimum 6 mtrs. open corridor for fire tenders.\n(a) Metre room as per norms of Electricity Authority..\n(b) Open transformers without any permanent enclosure keeping in view the necessary safety requirements.\n(c) Other features as mentioned in Table 3\n(d) Rockery, well and well structures, water pool, swimming pool (if uncovered), uncovered platform around tree, tank, fountain, bench, chabutra with open top and unenclosed by side walls, compound wall, gate, slide swing, culverts on drains.\n(e) Any other feature, primarily ornamental in nature, not enclosing or covering space of commercial use may be permitted by the Chief Executive Officer on case to case basis.\n(f) Open generator set, filtration plant, Electrical distribution equipments, feeder pillars, telephone distribution equipments may be permitted in open setback as a service utility provided after leaving clear space for fire tender.\n(2) Floor Area Ratio shall include. - (i) Mezzanine\n(2) Floor Area Ratio shall include.\n(ii) The shafts provided for lifts shall be taken for covered area calculations only on one floor and included in ground coverage.\n(iii) Pergola, shall be counted towards Floor Area Ratio if closed from three or more than three sides.\n(iv) Metre room as per Electricity Authority norms.\n(3) Floor Area Ratio shall not include:\n(3) Floor Area Ratio shall not include:\n(i) A cantilever projection at any level (in setbacks) of a width of 0.75 metre . No construction of any type or any material shall be permitted over projections.\n(ii) Basement(s) , shall be permissible within the setback line on each floor. However maximum permissible area under basement shall be limited up to:\n(a) Basement area, if used for services, storage etc. then maximum area under such facilities shall be equivalent to maximum permissible ground coverage.\n(b) Basement area/Podium parking as defined in parking table, if used for parking, then area equivalent to parking requirement shall be permitted.\n(c) In plots bigger than 10000 sq mtrs. The basement shall be allowed in setback area after leaving a minimum setback of 6.0 mtrs.\n(iii) Basement, if put to any use other than mentioned above, shall be included in the FAR of the building.\n(iv) Stilt area of non-habitable height 2.40 metres from bottom of beam proposed to be used for parking, landscaping etc.\n(v) Balconies upto 1.5 metre width free from FAR(in case it is more than 1.5 m, ½ of area beyond 1.5 m shall be included in FAR) may be projected in open setbacks provided 6 mtrs. clear space is available for fire tender movement.\n(vi) Other features as mentioned in Table 3.\n(vii) Rockery, well and well structures, water pool, swimming pool (if uncovered), uncovered platform around tree, tank, fountain, bench, chabutra with open top and unenclosed by side walls, compound wall, gate, slide, swing, uncovered staircase (unenclosed and uncovered on three sides except for 0.9 metre high railing/wall and open to sky), overhead tanks on top of buildings, open shafts, culverts on drains.\n(viii) Open ramps with no area enclosed below it of usable height. If used for approach to the entrance of the building, then the height as per requirement may be considered. The space under the ramp shall not be used for any commercial purpose, however it can be landscaped with approval of the Chief Executive Officer on case to case basis.\n(ix) Atrium shall be kept free from FAR and ground coverage. In case any commercial activity is proposed in Atrium or any saleable area or any other structure which is counted in FAR & ground coverage, its respective area shall be added in total FAR & ground coverage.\n(x) Any other feature purely ornamental in nature and not enclosing or covering space of commercial use may be permitted by the Chief Executive Officer on case to case basis.\n(xi) Additional 5% of the plot area as ground coverage will be allowed for dedicated multi level parking in plots bigger than 10000 sq mtrs.\n(xii) In multistorey buildings service floor may be allowed after 4 floors. Maximum of 3 service floors may be allowed in a building. Service floor shall not be counted in FAR and maximum height of service floor shall be 2.40 mtrs. from floor to bottom of the beam.\n(4) All the common facilities prescribed below will have to be provided and shall be counted in the prescribed FAR of Group Housing. - Shops and community facilities as per population norms as specified in the earlier lease deed. In case of plots where minimum population required for provision of convenient shopping is not achieved then:-\n(4) All the common facilities prescribed below will have to be provided and shall be counted in the prescribed FAR of Group Housing.\n(a) Area for shopping and commercial activities equivalent to 1.0 percent permissible FAR of the plot area shall be allowed.\n(b) Minimum four kiosks of 4 sq.m of carpet area and two shops of 10sqm carpet area shall be provided mandatorily.\n(c) Maximum height of shops and kiosks shall be 4.0 metre from floor to ceiling.\n(d) However shops may be allowed as integral part of Group housing building on the ground floor.\n(5) 15% of prescribed FAR shall be added towards common areas, which shall include the following built structures. The structures on ground will be counted in Ground Coverage. - 1. Canopy projections of area as mentioned in table 4, no construction of any type shall be permitted over the canopy. Canopy, if cantilevered and no structure on it having a size of 2.4m x 4.5m shall not be counted in Ground Coverage.\n(5) 15% of prescribed FAR shall be added towards common areas, which shall include the following built structures. The structures on ground will be counted in Ground Coverage.",
"footnote": "",
"is_definition": false,
"sort_order": 23
},
{
"number": "2",
"title": "2. Loft up to maximum height of 1.5 metres.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 24
},
{
"number": "3",
"title": "3. Air-conditioning plant, electrical installation, generator room, water works, water tank etc.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 25
},
{
"number": "4",
"title": "4. Watchmen/Security shelters and watch towers",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 26
},
{
"number": "5",
"title": "5. Garbage shafts , lift shafts and 10 sq mtrs lobby in front of each lift (excluding area of corridor beyond the lift).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 27
},
{
"number": "6",
"title": "6. Fire escape staircases",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 28
},
{
"number": "7",
"title": "7. Toilet blocks for visitors, drivers, guards etc on ground floor only.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 29
},
{
"number": "8",
"title": "8. Mumty, machine room for lifts.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 30
},
{
"number": "9",
"title": "9. Cupboards upto a depth of 0.60 mtr.and 1.80 mtrs.in length.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 31
},
{
"number": "10",
"title": "10. Bay window upto a depth of 0.60mtr.and 2.0 mtrs length.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 32
},
{
"number": "11",
"title": "11. Refuge area as per definition for fire evacuation in National Building Code, 2005.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": true,
"sort_order": 33
},
{
"number": "12",
"title": "12. Sewage treatment plant, water treatment plant, garbage collection centre, Electric sub-station, service ducts, community hall, religious building, milk and vegetable booth, school & creche.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 34
},
{
"number": "13",
"title": "13. Covered walkways and pathways.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 35
},
{
"number": "14",
"title": "14. Any other utilities and facilities as decided by the Chief Executive Officer depending upon its requirement.",
"chapter": null,
"content": "(6) Distance between two adjacent building blocks. - Distance between two adjacent building blocks shall be minimum 6 mtrs. to 16 mtrs, depending on the height of blocks. For building height up to 18 mtrs., the spacing shall be 6mtrs.and thereafter the spacing shall be increased by 1metre for every addition of 3 mtrs. in height of building subject to a maximum spacing of 16 mtrs. as per National Building Code -2005. If the blocks have dead-end sides facing each other, than the spacing shall be maximum 9 mtrs. instead of 16 mtrs. Moreover, the allottee may provide or propose more than 16 mtrs space between two blocks.\n(6) Distance between two adjacent building blocks.\n(7) The Authority shall have a right to impose such restriction and limitations as to the number of storey and extent of height of the building as he considers fit where protected areas, ancient or historical monuments lie within a radius of one and half kilometre from the boundary line of such buildings by recording the reasons.\n(7)\n(8) In density calculation each servant quarter will be reckoned as half dwelling unit. (standard size of the family for a dwelling unit for density purpose is 4.5 persons)\n(8)\n(9) A group housing shall conform to the provisions of the Sector Plan and Zonal Development Plan or scheme (if any) of the area, in terms of setbacks, ground coverage, Floor Area Ratio and height restrictions.\n(9)\n(10) The provisions contained in this regulation shall not apply to housing for economically weaker sections and low income group schemes undertaken by the State Government, Authority or any other public body approved in this behalf by the State Government. The Authority may decide the norms for setback, Ground coverage F.A.R. height, density, parking etc. for specific projects of these groups depending upon the size of plot, width of Road, availability of infrastructure, etc. by recording the reasons.\n(10)\n(11) The internal height of the basement (floor to ceiling) shall be minimum 2.4mtrrs from bottom of beam and maximum 4.5 metres, except wherever height of equipments such as electric generator, air conditioner, fire hydrant etc is more than 4.5 metres, additional height equivalent to height of equipments may be permitted. In case of Automatic/semi automatic/mechanised parking facility also more than 4.5 mtrs, additional height may be allowed by the Chief Executive Officer depending upon the technology and requirement of space. .\n(11)\n(12) The height of basement shall be maximum 1.5 metres upto bottom of the slab above the top of the drain. In case the basement is flush with the ground level adequate light and ventilation shall be ensured.\n(12)\n(13) Toilet block for visitors, drivers etc. comprising of minimum a water closet, a bath and 2 urinals shall be provided on the ground floor.\n(13)\n(14) In case of group housing having more than two storey, steps must be taken to ensure water at higher floors. For this purpose booster pumps and overhead tanks may be installed.\n(14)\n(15) At least one of the lifts provided shall be of the specification of goods lift.\n(15)\n(16) Minimum requirement for sanction/completion: Minimum covered area required for completion shall be as per lease deed or Memorandum of Understanding or as follows:-\n(16)\nS. No.\nS. No.\nSize of Plot(Sq. Mtrs.)\nSize of Plot(Sq. Mtrs.)\nMinimum Built up Area(As % of Total\n\t\t\t\tPermissible Far)\nMinimum Built up Area(As % of Total\n\t\t\t\tPermissible Far)\n1.\nUpto 4000 Sq. Mtrs.\n50%\n2.\nExceeding 4000 Sq. Mtrs. but not exceeding 10000\n\t\t\t\tSq. Mtrs.\n40%\n3.\nExceeding 10000 Sq. Mtrs. but not exceeding\n\t\t\t\t20000 Sq. Mtrs.\n35%\n4.\nExceeding 20000 Sq. Mtrs. but not exceeding\n\t\t\t\t100000 Sq. Mtrs.\n30%\n5.\nExceeding 100000 Sq. Mtrs. but not exceeding\n\t\t\t\t200000 Sq. Mtrs.\n25%\n6.\nExceeding 200000 Sq. Mtrs. but not exceeding\n\t\t\t\t400000 Sq. Mtrs.\n20%\n7.\nAbove 400000 Sq. Mtrs.\n15%\nNote: (i) No further time extension shall be required if the completion has been taken by the allottee as per table mentioned above. The above mentioned completion requirement shall be applicable in all allotments. In the old allotments, the provisions of project report or lease deed or previous options may be followed.\n(ii) However validity of plans may be granted to the allottee in multiples of 5 years after taking completion of minimum area,\n(iii) In all the projects of 40 hactares and above, blockwise temprorary Occupancy may be allowed subject to a minimum of 1,00,000sqm built up area, the building completed with all mandatory provisions of services and the allottee shall segregate these blocks for the purpose of security during construction period.\n(17) Provision of following item in building shall be mandatory for issue of completion certificate: - (i) Flooring;/i.e hard surface and completely finished floors for common areas or/and public use areas.\n(17) Provision of following item in building shall be mandatory for issue of completion certificate:\n(ii) Electrical wiring;\n(iii) Plumbing work to be complete.\n(iv) Parking and landscaping as per Table no. 5 and Table no. 6 respectively or as per directions issued from time to time whichever is higher;\n(v) Number plate and illumination board as per direction amended or direction issued from time-to-time;\n(vi) Internal and external finishing (Plastering may not be mandatory);\n(vii) Boundary wall and gates shall be mandatory;\n(viii) Buildings shall be lockable i.e. all external doors and windows shall be provided. In case grill is provided in the windows the fixing of glass in the windows pane shall not be mandatory;\n(ix) No violation should be there in the overall building or site at the time of issue of occupancy certificate;\n(x) Any other special provision as mentioned in the lease deed;\n(xi) In case of completion of whole project, all temporary structures to be removed. In case if any special clause is mentioned in the lease deed or Memorandum of Understanding then the requirement mentioned in the same shall be applicable.\n24.3 Industrial Buildings:\nGround coverage, Floor Area Ratio and height\nS. No.\nS. No.\nPlot Area (square metre)\nPlot Area (square metre)\nMaximum Ground coverage (%)\nMaximum Ground coverage (%)\nMaximum Floor Area Ratio\nMaximum Floor Area Ratio\nMaximum Height in mtrs\nMaximum Height in mtrs\n1.\nUpto 1000\n60\n1.50\n18\n2.\nAbove 1000 but not exceeding 12000\n60\n1.30\n24\n3.\nAbove 12000\n55\n1.00\nNo Limit\n4.\nFlatted Factories\n35\n1.40\n24\n24.3.1 Other Provisions: - (1) No construction of any kind shall be permitted beyond the building envelope (on setbacks) except\n24.3.1 Other Provisions:\n(1) No construction of any kind shall be permitted beyond the building envelope (on setbacks) except\n(i) No construction of any type or any material shall be permitted over projections other than mentioned herewith.\n(ii) Underground water tanks with top flush with the adjoining ground level.\n(iii) Watchman Shelters and Watch Towers with following provisions:\n(iv) No projection of watchman shelters and watch towers shall be allowed outside the plot line.\n(v) Maximum height of watchman shelter shall be 4 metres and for watch towers 15 metres. Total area, as mentioned below, under such shelters shall be split up in desired number of watch man shelter and watch towers as follows:\nSr. No.\nSr. No.\nPlot Size\nPlot Size\nTotal area for watchman shelter and watch\n\t\t\t\ttower\nTotal area for watchman shelter and watch\n\t\t\t\ttower\nMaximum area under each watchman shelter\nMaximum area under each watchman shelter\nMaximum area under each watch tower\nMaximum area under each watch tower\n1\nUpto 0.5 acres\n15 square metres\n15 square metres\n5 square metres\n2\nAbove 0.5 acres upto 10 acres\n30 square metres\n24 square metres\n5 square metres\n3\nAbove 10 acres upto 25 acres\n45 square metres\n24 square metres\n5 square metres\n4\nAbove 25 acres upto 50 acres\n60 square metres\n24 square metres\n5 square metres\n5\nAbove 50 acres for an additional 50 acres\nAn additional 10 square metres and part thereof\n24 square metres\n5 square metres\n(vi) The following features shall be permitted after leaving minimum 6 mtrs. open corridor for fire tenders.\n(a) Metre room as per norms of Electricity Authority..\n(b) Open transformers without any permanent enclosure keeping in view the necessary safety requirements.\n(c) Other features as mentioned in Table 3\n(d) Rockery, well and well structures, water pool, swimming pool (if uncovered), uncovered platform around tree, tank, fountain, bench, chabutra with open top and unenclosed by side walls, compound wall, gate, slide swing, culverts on drains.\n(e) Any other feature, primarily ornamental in nature, not enclosing or covering space of commercial use may be permitted by the Chief Executive Officer on case to case basis.\n(f) Open generator set, filtration plant, Electrical distribution equipments, feeder pillars, telephone distribution equipments may be permitted in open setback as a service utility provided after leaving clear space for fire tender.\n(2) Floor Area Ratio shall include. - (i) Mezzanine\n(2) Floor Area Ratio shall include.\n(ii) The shafts provided for lifts shall be taken for covered area calculations only on one floor and included in ground coverage.\n(iii) Pergola, shall be counted towards Floor Area Ratio if closed from three or more than three sides.\n(iv) Metre room as per Electricity Authority norms.\n(3) Floor Area Ratio shall not include:\n(3) Floor Area Ratio shall not include:\n(i) A cantilever projection at any level (in setbacks) of a width of 0.75 metre . No construction of any type or any material shall be permitted over projections.\n(ii) Basement(s) , shall be permissible within the setback line on each floor. However maximum permissible area under basement shall be limited up to:\n(a) Basement area, if used for services, storage etc. then maximum area under such facilities shall be equivalent to maximum permissible ground coverage.\n(b) Basement area/Podium parking as defined in parking table, if used for parking, then area equivalent to parking requirement shall be permitted.\n(c) In plots bigger than 10000 sq mtrs. The basement shall be allowed in setback area after leaving a minimum setback of 6.0 mtrs.\n(iii) Basement, if put to any use other than mentioned above, shall be included in the FAR of the building.\n(iv) Stilt area of non-habitable height 2.40 metres from bottom of beam proposed to be used for parking, landscaping etc.\n(v) Balconies (Upto 1.5 metres width free) from FAR may be projected in open setbacks provided 6 mtrs. clear space is available for fire tender movement.\n(vi) Other features as mentioned in Table 3.\n(vii) Rockery, well and well structures, water pool, swimming pool (if uncovered), uncovered platform around tree, tank, fountain, bench, chabutra with open top and unenclosed by side walls, compound wall, gate, slide, swing, uncovered staircase (unenclosed and uncovered on three sides except for 0.9 metre high railing/wall and open to sky), overhead tanks on top of buildings, open shafts, culverts on drains.\n(viii) Open ramps with no area enclosed below it of usable height. If used for approach to the entrance of the building, then the height as per requirement may be considered. The space under the ramp shall not be used for any commercial purpose. However it can be landscaped with approval of the Chief Executive Officer on case to case basis.\n(ix) Atrium shall be kept free from FAR and ground coverage. In case any commercial activity is proposed in Atrium or any saleable area or any other structure which is counted in FAR & ground coverage, its respective area shall be added in total FAR & ground coverage.\n(x) Any other feature purely ornamental in nature and not enclosing or covering space of commercial use may be permitted by the Chief Executive Officer on case to case basis.\n(xi) Additional 5% of the plot area as ground coverage will be allowed for dedicated multi level parking in plots bigger than 10000 sq mtrs (excluding green areas).\n(xii) In multistorey buildings service floor may be allowed after 4 floors. Maximum of 3 service floors may be allowed in a building. Service floor shall not be counted in FAR and maximum height of service floor shall be 2.40 mtrs. from floor to bottom of the beam.\n(4) 15% of prescribed FAR shall be added towards common areas, which shall include the following built structures. The structures on ground will be counted in Ground Coverage. - 1. Canopy projections of area as mentioned in table 4, no construction of any type shall be permitted over the canopy. Canopy, if cantilevered and no structure on it having a size of 2.4m x 4.5m shall not be counted in Ground Coverage.\n(4) 15% of prescribed FAR shall be added towards common areas, which shall include the following built structures. The structures on ground will be counted in Ground Coverage.",
"footnote": "",
"is_definition": false,
"sort_order": 36
},
{
"number": "2",
"title": "2. Loft up to maximum height of 1.5 metre .",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 37
},
{
"number": "3",
"title": "3. Air-conditioning plant, electrical installation, generator room, water works, water tank etc.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 38
},
{
"number": "4",
"title": "4. Watchmen/Security shelters and watch towers",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 39
},
{
"number": "5",
"title": "5. Garbage shafts , lift shafts and 10 sq mtr lobby in front of each lift.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 40
},
{
"number": "6",
"title": "6. Fire escape staircases",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 41
},
{
"number": "7",
"title": "7. Toilet blocks for visitors, drivers, guards etc on ground floor only.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 42
},
{
"number": "8",
"title": "8. Mumty, machine room for lifts.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 43
},
{
"number": "9",
"title": "9. Cupboards upto a depth of 0.60 mtr and 1.80 mtrs.in length.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 44
},
{
"number": "10",
"title": "10. Refuge area as per definition for fire evacuation in National Building Code, 2005",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": true,
"sort_order": 45
},
{
"number": "11",
"title": "11. Sewage treatment plant, water treatment plant, garbage collection centre, Electric sub-station, service ducts.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 46
},
{
"number": "12",
"title": "12. Covered walkways and pathways.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 47
},
{
"number": "13",
"title": "13. Any other utilities and facilities as decided by the Chief Executive Officer depending upon its requirement.",
"chapter": null,
"content": "(5) Distance between two adjacent building blocks. - Distance between two adjacent building blocks shall be minimum 6 mtrs. to 16 mtrs, depending on the height of blocks. For building height up to 18 mtrs., the spacing shall be 6mtrs.and thereafter the spacing shall be increased by 1metre for every addition of 3 mtrs. in height of building subject to a maximum spacing of 16 mtrs. as per NATIONAL BUILDING CODE, 2005. If the blocks have dead-end sides facing each other, than the spacing shall be maximum 9 mtrs. instead of 16 mtrs. Moreover, the allottee may provide or propose more than 16 mtrs space between two blocks.\n(5) Distance between two adjacent building blocks.\n(6) The Authority shall have a right to impose such restriction and limitations as to the number of storey and extent of height of the building as he considers fit where protected areas, ancient or historical monuments lie within a radius of one and half kilometre from the boundary line of such buildings by recording the reasons.\n(6)\n(7) The internal height of the basement (floor to ceiling) shall be minimum 2.4 mtrs from bottom of beam and maximum 4.5 metre. Except wherever height of equipments such as electric generator, air conditioner, fire hydrant etc. is more than 4.5 metre, additional height equivalent to height of equipments may be permitted. In case of Automatic/semi automatic/mechanised parking facility also more than 4.5 mtrs, additional height may be allowed by the Chief Executive Officer depending upon the technology and requirement of space. .\n(7)\n(8) The height of basement shall be maximum 1.5 metres upto bottom of the slab above the top of the drain. In case the basement is flush with the ground level adequate light and ventilation shall be ensured.\n(8)\n(9) Toilet block for visitors, drivers etc. comprising of minimum a water closet, a bath and 2 urinals shall be provided on the ground floor.\n(9)\n(10) At least one of the lifts provided shall be of the specification of goods lift.\n(10)\n(11) Minimum requirement for sanction/completion: Minimum covered area required for completion shall be as per lease deed or Memorandum of Understanding or as follows:-\n(11)\nS. No.\nS. No.\nSize of Plot(Sq. Mtrs.)\nSize of Plot(Sq. Mtrs.)\nMinimum Built up Area(As % of Total\n\t\t\t\tPermissible Far)\nMinimum Built up Area(As % of Total\n\t\t\t\tPermissible Far)\n1.\nUpto 4000 Sq. Mtrs.\n50%\n2.\nExceeding 4000 Sq. Mtrs. but not exceeding 10000\n\t\t\t\tSq. Mtrs.\n40%\n3.\nExceeding 10000 Sq. Mtrs. but not exceeding\n\t\t\t\t20000 Sq. Mtrs.\n35%\n4.\nExceeding 20000 Sq. Mtrs. but not exceeding\n\t\t\t\t100000 Sq. Mtrs.\n30%\n5.\nExceeding 100000 Sq. Mtrs. but not exceeding\n\t\t\t\t200000 Sq. Mtrs.\n25%\n6.\nExceeding 200000 Sq. Mtrs. but not exceeding\n\t\t\t\t400000 Sq. Mtrs.\n20%\n7.\nAbove 400000 Sq. Mtrs.\n15%\nNote: (i) No further time extension shall be required if the completion has been taken by the allottee as per table mentioned above. The above mentioned completion requirement shall be applicable in all allotments. In the old allotments, the provisions of project report or lease deed or previous options may be followed.\n(ii) However validity of plans may be granted to the allottee in multiples of 5 years after taking completion of minimum area,\n(iii) In all the projects of 40 hactares and above, block wise temprorary Occupancy may be allowed subject to a minimum of 1,00,000 sqm built up area, the building completed with all mandatory provisions of services and the allottee shall segregate these blocks for the purpose of security during construction period.\n(12) Provision of following item in building shall be mandatory for issue of completion certificate. - (i) Flooring;/i.e hard surface and completely finished floors for common areas or/and public use areas.\n(12) Provision of following item in building shall be mandatory for issue of completion certificate.\n(ii) Electrical wiring;\n(iii) Plumbing work to be complete.\n(iv) Parking and landscaping as per Table no. 5 and Table no. 6 respectively or as per directions issued from time to time whichever is higher;\n(v) Number plate and illumination board as per direction amended or direction issued from time-to-time;\n(vi) Internal and external finishing (Plastering may not be mandatory);\n(vii) Boundary wall and gates shall be mandatory;\n(viii) Buildings shall be lockable i.e. all external doors and windows shall be provided. In case grill is provided in the windows the fixing of glass in the windows pane shall not be mandatory;\n(ix) No violation should be there in the overall building or site at the time of issue of occupancy certificate;\n(x) Any other special provision as mentioned in the lease deed;\n(xi) In case of completion of whole project, all temporary structures to be removed. In case if any special clause is mentioned in the lease deed or Memorandum of Understanding then the requirement mentioned in the same shall be applicable.\n[24.4\nSI. No.\nSI. No.\nUse\nUse\nMaximum Ground Coverage (Percentage)\nMaximum Ground Coverage (Percentage)\n1\nConvenient Shopping Centre\n50%\n2\nSector Shopping\n50%\n3\nSub-District Centre, Shopping/Commercial use\n\t\t\t\talong Master Plan roads and other Master Plan level\n\t\t\t\tShopping/Commercial Centre\n50%\n4\nHotel\n40%\n5\nBanks\n40%\n6\nCenema Multiplex Complex\n40%\n7\nWare Housing Godowns\n60%\n8\nCity Centre\n50%]\n24.4.1 Other Provisions. - (1) No construction of any kind shall be permitted beyond the building envelope (on setbacks) except\n24.4.1 Other Provisions.\n(1) No construction of any kind shall be permitted beyond the building envelope (on setbacks) except\n(i) A Chajja (projection) of maximum width of 0.75 metre at lintel or roof level. No construction of any type or any material shall be permitted over projections other than mentioned herewith.\n(ii) Underground water tanks with top flush with the adjoining ground level.\n(iii) Watchman Shelters and Watch Towers with following provisions:\n(iv) No projection of watchman shelters and watch towers shall be allowed outside the plot line.\n(v) Maximum height of watchman shelter shall be 4 metres and for watch towers 15 metres. Total area, as mentioned below, under such shelters shall be split up in desired number of watch man shelter and watch towers as follows:\nSr. No.\nSr. No.\nPlot Size\nPlot Size\nTotal area for watchman shelter and watch\n\t\t\t\ttower\nTotal area for watchman shelter and watch\n\t\t\t\ttower\nMaximum area under each watchman shelter\nMaximum area under each watchman shelter\nMaximum area under each watch tower\nMaximum area under each watch tower\n1\nUpto 0.5 acres\n15 square metres\n15 square metres\n5 square metres\n2\nAbove 0.5 acres upto 10 acres\n30 square metres\n24 square metres\n5 square metres\n3\nAbove 10 acres upto 25 acres\n45 square metres\n24 square metres\n5 square metres\n4\nAbove 25 acres upto 50 acres\n60 square metres\n24 square metres\n5 square metres\n5\nAbove 50 acres for an additional 50 acres\nAn additional 10 square metres and part thereof\n24 square metres\n5 square metres\n(vi) The following features shall be permitted after leaving minimum 6 mtrs. open corridor for fire tenders.\n(a) Metre room as per norms of Electricity Authority..\n(b) Open transformers without any permanent enclosure keeping in view the necessary safety requirements.\n(c) Other features as mentioned in Table 3\n(d) Rockery, well and well structures, water pool, swimming pool (if uncovered), uncovered platform around tree, tank, fountain, bench, chabutra with open top and unenclosed by side walls, compound wall, gate, slide swing, culverts on drains.\n(e) Any other feature, primarily ornamental in nature, not enclosing or covering space of commercial use may be permitted by the Chief Executive Officer on case to case basis.\n(f) Open generator set, filtration plant, Electrical distribution equipments, feeder pillars, telephone distribution equipments may be permitted in open setback as a service utility provided after leaving clear space for fire tender.\n(2) Floor Area Ratio shall include. - (i) Mezzanine\n(2) Floor Area Ratio shall include.\n(ii) The shafts provided for lifts shall be taken for covered area calculations only on one floor and included in ground coverage.\n(iii) Pergola, shall be counted towards Floor Area Ratio if closed from three or more than three sides.\n(iv) Metre room as per Electricity Authority norms.\n(3) Floor Area Ratio shall not include. - (i) A cantilever projection at any level (in setbacks) of a width of 0.75 metre . No construction of any type or any material shall be permitted over projections.\n(3) Floor Area Ratio shall not include.\n(ii) Basement(s) shall be permissible within the setback line on each floor. However maximum permissible area under basement shall be limited up to:\n(a) Basement area, if used for services, storage etc. then maximum area under such facilities shall be equivalent to maximum permissible ground coverage.\n(b) Basement area/Podium parking as defined in parking table, if used for parking, then area equivalent to parking requirement shall be permitted.\n(c) In plots bigger than 10000 sq mtrs. The basement shall be allowed in setback area after leaving a minimum setback of 6.0 mtrs.\n(iii) Basement, if put to any use other than mentioned above, shall be included in the FAR of the building.\n(iv) Stilt area of non-habitable height 2.40 metres from bottom of beam proposed to be used for parking, landscaping etc.\n(v) Balconies (upto 1.5 metre width) free from FAR may be projected in open setbacks provided 6 mtrs. clear space is available for fire tender movement.\n(vi) Other features as mentioned in Table 3.\n(vii) Rockery, well and well structures, water pool, swimming pool (if uncovered), uncovered platform around tree, tank, fountain, bench, chabutra with open top and unenclosed by side walls, compound wall, gate, slide, swing, uncovered staircase (unenclosed and uncovered on three sides except for 0.9 metre high railing/wall and open to sky), overhead tanks on top of buildings, open shafts, culverts on drains.\n(viii) Open ramps with no area enclosed below it of usable height. If used for approach to the entrance of the building, then the height as per requirement may be considered. The space under the ramp shall not be used for any commercial purpose, however it can be landscaped with approval of the Chief Executive Officer on case to case basis.\n[(ix) Atrium shall be kept free from FAR and ground coverage with the condition that in case of commercial plots of more than 5000 sqm the maximum ground coverage shall be inclusive of Atrium. In case any commercial activity is proposed in Atrium or any saleble area or any other structure which is counted in FAR and ground coverage, its respective area shall be added in total FAR and ground coverage.]\n(x) Any other feature purely ornamental in nature and not enclosing or covering space of commercial use may be permitted by the Chief Executive Officer on case to case basis.\n(xi) Additional 5% of the plot area as ground coverage will be allowed for dedicated multi level parking in plots bigger than 10000 sq mtrs (excluding green areas).\n(xii) In multistorey buildings service floor ,may be allowed after 4 floors. Maximum of 3 service floors may be allowed in a building. Service floor shall not be counted in FAR and maximum height of service floor shall be 2.40 mtrs. from floor to bottom of the beam.\n(4) 15% of prescribed FAR shall be added towards common areas, which shall include the following built structures. The structures on ground will be counted in Ground Coverage. - 1. Canopy projections of area as mentioned in table 4, no construction of any type shall be permitted over the canopy. Canopy, if cantilevered and no structure on it having a size of 2.4m x 4.5m shall not be counted in Ground Coverage.\n(4) 15% of prescribed FAR shall be added towards common areas, which shall include the following built structures. The structures on ground will be counted in Ground Coverage.",
"footnote": "",
"is_definition": false,
"sort_order": 48
},
{
"number": "2",
"title": "2. Loft up to maximum height of 1.5 metre .",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 49
},
{
"number": "3",
"title": "3. Air-conditioning plant, electrical installation, generator room, water works, water tank etc.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 50
},
{
"number": "4",
"title": "4. Watchmen/Security shelters and watch towers",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 51
},
{
"number": "5",
"title": "5. Garbage shafts , lift shafts and 10 sq mtr lobby in front of each lift (excluding area of corridor beyond the lift).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 52
},
{
"number": "6",
"title": "6. Fire escape staircases",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 53
},
{
"number": "7",
"title": "7. Toilet blocks for visitors, drivers, guards etc on ground floor only.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 54
},
{
"number": "8",
"title": "8. Mumty, machine room for lifts.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 55
},
{
"number": "9",
"title": "9. Cupboards upto a depth of 0.60 mtr and 1.80 mtrs.in length.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 56
},
{
"number": "10",
"title": "10. Refuge area as per definition for fire evacuation in National Building Code, 2005.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": true,
"sort_order": 57
},
{
"number": "11",
"title": "11. Sewage treatment plant, water treatment plant, garbage collection centre Electric sub-station, service ducts.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 58
},
{
"number": "12",
"title": "12. Covered walkways and pathways.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 59
},
{
"number": "13",
"title": "13. Any other utilities and facilities as decided by Chief Executive Officer depending upon its requirement.",
"chapter": null,
"content": "(5) Distance between two adjacent building blocks. - Distance between two adjacent building blocks shall be minimum 6 mtrs. to 16 mtrs, depending on the height of blocks. For building height up to 18 mtrs., the spacing shall be 6mtrs.and thereafter the spacing shall be increased by 1metre for every addition of 3 mtrs. in height of building subject to a maximum spacing of 16 mtrs. as per NATIONAL BUILDING CODE, 2005. If the blocks have dead-end sides facing each other, than the spacing shall be maximum 9 mtrs. instead of 16 mtrs. Moreover, the allottee may provide or propose more than 16 mtrs space between two blocks.\n(5) Distance between two adjacent building blocks.\n(6) The Authority shall have a right to impose such restriction and limitations as to the number of storey and extent of height of the building as he considers fit where protected areas, ancient or historical monuments lie within a radius of one and half kilometre from the boundary line of such buildings by recording reasons.\n(6)\n(7) The internal height of the basement (floor to ceiling) shall be minimum 2.4 mtrs from bottom of beam and maximum 4.5 metre. Except wherever height of equipments such as electric generator, air conditioner, fire hydrant etc. is more than 4.5 mete, additional height equivalent to height of equipments may be permitted. In case of Automatic/semi automatic/mechanised parking facility also more than 4.5 mtrs, additional height may be allowed by the Chief Executive Officer depending upon the technology and requirement of space.\n(7)\n(8) The height of basement shall be maximum 1.5 metres upto bottom of the slab above the top of the drain. In case the basement is flush with the ground level adequate light and ventilation shall be ensured.\n(8)\n(9) Toilet block for visitors, drivers etc. comprising of minimum a water closet, a bath and 2 urinals shall be provided on the ground floor.\n(9)\n(10) At least one of the lifts provided shall be of the specification of goods lift.\n(10)\n(11) Minimum requirement for sanction/completion: - Minimum covered area required for completion shall be as per lease deed or Memorandum of Understanding or as follows:-\n(11) Minimum requirement for sanction/completion:\nS. No.\nS. No.\nSize of Plot(Sq. Mtrs.)\nSize of Plot(Sq. Mtrs.)\nMinimum Built up Area(As % of Total\n\t\t\t\tPermissible Far)\nMinimum Built up Area(As % of Total\n\t\t\t\tPermissible Far)\n1.\nUpto 4000 Sq. Mtrs.\n50%\n2.\nExceeding 4000 Sq. Mtrs. but not exceeding 10000\n\t\t\t\tSq. Mtrs.\n40%\n3.\nExceeding 10000 Sq. Mtrs. but not exceeding\n\t\t\t\t20000 Sq. Mtrs.\n35%\n4.\nExceeding 20000 Sq. Mtrs. but not exceeding\n\t\t\t\t100000 Sq. Mtrs.\n30%\n5.\nExceeding 100000 Sq. Mtrs. but not exceeding\n\t\t\t\t200000 Sq. Mtrs.\n25%\n6.\nExceeding 200000 Sq. Mtrs. but not exceeding\n\t\t\t\t400000 Sq. Mtrs.\n20%\n7.\nAbove 400000 Sq. Mtrs.\n15%\nNote: (i) No further time extension shall be required if the completion has been taken by the allottee as per table mentioned above. The above mentioned completion requirement shall be applicable in all allotments. In the old allotments, the provisions of project report or lease deed or previous options may be followed.\n(ii) However validity of plans may be granted to the allottee in multiples of 5 years after taking completion of minimum area,\n(iii) In all the projects of 40 hactares and above, block wise temprorary Occupancy may be allowed subject to a minimum of 1,00,000 sqm built up area, the building completed with all mandatory provisions of services and the allottee shall segregate these blocks for the purpose of security during construction period.\n(12) Provision of following item in building shall be mandatory for issue of completion certificate. - (i) Flooring;/i.e hard surface and completely finished floors for common areas or/and public use areas.\n(12) Provision of following item in building shall be mandatory for issue of completion certificate.\n(ii) Electrical wiring;\n(iii) Plumbing work to be complete.\n(iv) Parking and landscaping as per Table no. 5 and Table no. 6 respectively or as per directions issued from time to time whichever is higher;\n(v) Number plate and illumination board as per direction amended or direction issued from time-to-time;\n(vi) Internal and external finishing (Plastering may not be mandatory);\n(vii) Boundary wall and gates shall be mandatory;\n(viii) Buildings shall be lockable i.e. all external doors and windows shall be provided. In case grill is provided in the windows the fixing of glass in the windows pane shall not be mandatory;\n(ix) No violation should be there in the overall building or site at the time of issue of occupancy certificate;\n(x) Any other special provision as mentioned in the lease deed;\n(xi) In case of completion of whole project, all temporary structures to be removed. In case if any special clause is mentioned in the lease deed or Memorandum of Understanding then the requirement mentioned in the same shall be applicable.\n24.5 Institutional.\nSl. No.\nSl. No.\nUse\nUse\nMaximum ground coverage\nMaximum ground coverage\nMaximum FAR\nMaximum FAR\nMaximum height in metres\nMaximum height in metres\n1.\nAll Higher Educational Institutions, e.g.\n\t\t\t\tEngineering, Management, Degree college, Research and Training\n\t\t\t\tCentre, Film/Audio/Vedio Studio, University, vocational\n\t\t\t\tinstitute ,etc.\n35%\n1.50\nNo limit\n2.\nHigher Secondary School\n40%\n1.50\n24.0\n3.\nNursery School/Creche/Primary School\n40%\n1.50\n15.0\n4.\nReligious Building\n35%\n1.20\nNo limit\n5.\nDispensary/Health care & Social Assistance\n\t\t\t\tservices, & Clinic, Clinical lab\n30%\n1.50\n20.0\n6.\nHospital in any system of medicine, Naturopathy\n\t\t\t\tcentre, Nursing Home Specialized Health Centre, Trauma Centre.\n30%\n2.75\nNo limit\n7.\nGovernment, Semi-Government, Corporate Offices &\n\t\t\t\tother offices.\n30%\n2.00\nNo limit\n8.\nMuseum, Art Gallery and Exhibition Centre, Art\n\t\t\t\tCentre.\n30%\n1.50\nNo limit\n9.\nInformation Technology and Information\n\t\t\t\tTechnology Enabled Services, Biotech Park\n30%\n2.00\nNo limit\n10.\nCommunity Centre, Club Building and Barat\n\t\t\t\tGhar/Gym, Spa/Health Club, Fire Station, Police Station, Post\n\t\t\t\tOffice, Library & other such facilities.\n30%\n1.50\n24.0\n11.\nDharamshala/Lodge/Guest House/Hostel\n30%\n2.50\nNo Limit\n12.\nDharam Kanta , Petrol Pump & Gas godown\n30%\n0.50\n15.0\n13.\nOld age home, orphanage, reformatory\n30%\n1.50\n15.0\n14.\nConvention/Conference/Socio Cultural/Social\n\t\t\t\tWelfare Centre\n30%\n1.50\nNo Limit\n15.\nOther Utilities\n30%\n1.00\n15.0\n24.5.1 Other Provisions. - (1) No construction of any kind shall be permitted beyond the building envelope (on setbacks) except.\n24.5.1 Other Provisions.\n(1) No construction of any kind shall be permitted beyond the building envelope (on setbacks) except.\n(i) A Chajja (projection) of maximum width of 0.75 metre at lintel or roof level. No construction of any type or any material shall be permitted over projections other than mentioned herewith.\n(ii) Underground water tanks with top flush with the adjoining ground level.\n(iii) Watchman Shelters and Watch Towers with following provisions:\n(iv) No projection of watchman shelters and watch towers shall be allowed outside the plot line.\n(v) Maximum height of watchman shelter shall be 4 metres and for watch towers 15 metres. Total area, as mentioned below, under such shelters shall be split up in desired number of watch man shelter and watch towers as follows:\nSr. No.\nSr. No.\nPlot Size\nPlot Size\nTotal area for watchman shelter and watch\n\t\t\t\ttower\nTotal area for watchman shelter and watch\n\t\t\t\ttower\nMaximum area under each watchman shelter\nMaximum area under each watchman shelter\nMaximum area under each watch tower\nMaximum area under each watch tower\n1\nUpto 0.5 acres\n15 square metres\n15 square metres\n5 square metres\n2\nAbove 0.5 acres upto 10 acres\n30 square metres\n24 square metres\n5 square metres\n3\nAbove 10 acres upto 25 acres\n45 square metres\n24 square metres\n5 square metres\n4\nAbove 25 acres upto 50 acres\n60 square metres\n24 square metres\n5 square metres\n5\nAbove 50 acres for an additional 50 acres\nAn additional 10 square metres and part thereof\n24 square metres\n5 square metres\n(vi) The following features shall be permitted after leaving minimum 6 mtrs. open corridor for fire tenders.\n(a) Metre room as per norms of Electricity Authority..\n(b) Open transformers without any permanent enclosure keeping in view the necessary safety requirements.\n(c) Other features as mentioned in Table 3\n(d) Rockery, well and well structures, water pool, swimming pool (if uncovered), uncovered platform around tree, tank, fountain, bench, chabutra with open top and unenclosed by side walls, compound wall, gate, slide swing, culverts on drains.\n(e) Any other feature, primarily ornamental in nature, not enclosing or covering space of commercial use may be permitted by the Chief Executive Officer on case to case basis.\n(f) Open generator set, filtration plant, Electrical distribution equipments, feeder pillars, telephone distribution equipments may be permitted in open setback as a service utility provided after leaving clear space for fire tender.\n(2) Floor Area Ratio shall include. - (i) Mezzanine\n(2) Floor Area Ratio shall include.\n(ii) The shafts provided for lifts shall be taken for covered area calculations only on one floor and included in ground coverage.\n(iii) Pergola, shall be counted towards Floor Area Ratio if closed from three or more than three sides.\n(iv) Metre room as per Electricity Authority norms.\n(3) Floor Area Ratio shall not include. - (i) A cantilever projection at any level (in setbacks) of a width of 0.75 metre . No construction of any type or any material shall be permitted over projections.\n(3) Floor Area Ratio shall not include.\n(ii) Basement(s) , shall be permissible within the setback line on each floor. However maximum permissible area under basement shall be limited up to:\n(a) Basement area, if used for services, storage etc. then maximum area under such facilities shall be equivalent to maximum permissible ground coverage.\n(b) Basement area/Podium parking as defined in parking table, if used for parking, then area equivalent to parking requirement shall be permitted.\n(c) In plots bigger than 10000 sq mtrs. The basement shall be allowed in setback area after leaving a minimum setback of 6.0 mtrs.\n(iii) Basement, if put to any use other than mentioned above, shall be included in the FAR of the building.\n(iv) Stilt area of non-habitable height 2.40 metres from bottom of beam proposed to be used for parking, landscaping etc.\n(v) Balconies (upto 1.5metre width) free from FAR may be projected in open setbacks provided 6 mtrs. clear space is available for fire tender movement.\n(vi) Other features as mentioned in Table 3.\n(vii) Rockery, well and well structures, water pool, swimming pool (if uncovered), uncovered platform around tree, tank, fountain, bench, chabutra with open top and unenclosed by side walls, compound wall, gate, slide, swing, uncovered staircase (unenclosed and uncovered on three sides except for 0.9 metre high railing/wall and open to sky), overhead tanks on top of buildings, open shafts, culverts on drains.\n(viii) Open ramps with no area enclosed below it of usable height. If used for approach to the entrance of the building, then the height as per requirement may be considered. The space under the ramp shall not be used for any commercial purpose, however it can be landscaped with approval of the Chief Executive Officer on case to case basis.\n(ix) Atrium shall be kept free from FAR and ground coverage. In case any commercial activity is proposed in Atrium or any saleable area or any other structure which is counted in FAR & ground coverage, its respective area shall be added in total FAR & ground coverage.\n(x) Any other feature purely ornamental in nature and not enclosing or covering space of commercial use may be permitted by the Chief Executive Officer on case to case basis.\n(xi) Additional 5% of the plot area as ground coverage will be allowed for dedicated multi level parking/podium parking in plots bigger than 10000 sq mtrs (excluding green areas).\n(xii) In multistorey buildings service floor may be allowed after 4 floors. Maximum of 3 service floors may be allowed in a building. Service floor shall not be counted in FAR and maximum height of service floor shall be 2.40 mtrs. from floor to bottom of the beam.\n(4) 15% of prescribed FAR shall be added towards common areas, which shall include the following built structures. The structures on ground will be counted in Ground Coverage. - 1. Canopy projections of area as mentioned in table 4, no construction of any type shall be permitted over the canopy. Canopy, if cantilevered and no structure on it having a size of 2.4m x 4.5m shall not be counted in Ground Coverage.\n(4) 15% of prescribed FAR shall be added towards common areas, which shall include the following built structures. The structures on ground will be counted in Ground Coverage.",
"footnote": "",
"is_definition": false,
"sort_order": 60
},
{
"number": "2",
"title": "2. Loft up to maximum height of 1.5 metre .",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 61
},
{
"number": "3",
"title": "3. Air-conditioning plant, electrical installation, generator room, water works, water tank etc.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 62
},
{
"number": "4",
"title": "4. Watchmen/Security shelters and watch towers",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 63
},
{
"number": "5",
"title": "5. Garbage shafts , lift shafts and 10 sq mtr lobby in front of each lift (excluding area of corridor beyond the lift).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 64
},
{
"number": "6",
"title": "6. Fire escape staircases",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 65
},
{
"number": "7",
"title": "7. Toilet blocks for visitors, drivers, guards etc on ground floor only.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 66
},
{
"number": "8",
"title": "8. Mumty, machine room for lifts.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 67
},
{
"number": "9",
"title": "9. Cupboards upto a depth of 0.60mtrs.and 1.80mtrs.in length.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 68
},
{
"number": "10",
"title": "10. Bay window upto a depth of 0.60mtrs.and 2.0mlength.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 69
},
{
"number": "11",
"title": "11. Refuge area as per definition for fire evacuation and National Building Code, 2005.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": true,
"sort_order": 70
},
{
"number": "12",
"title": "12. Sewage treatment plant, water treatment plant, garbage collection centre, Electric sub-station, service ducts.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 71
},
{
"number": "13",
"title": "13. Covered walkways and pathways.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 72
},
{
"number": "14",
"title": "14. Any other utilities and facilities as decided by Chief Executive Officer depending on its requirement.",
"chapter": null,
"content": "(5) Distance between two adjacent building blocks. - Distance between two adjacent building blocks shall be minimum 6 mtrs. to 16 mtrs, depending on the height of blocks. For building height up to 18 mtrs., the spacing shall be 6mtrs.and thereafter the spacing shall be increased by 1metre for every addition of 3 mtrs. in height of building subject to a maximum spacing of 16 mtrs. as per NATIONAL BUILDING CODE, 2005. If the blocks have dead-end sides facing each other, than the spacing shall be maximum 9 mtrs. instead of 16 mtrs. Moreover, the allottee may provide or propose more than 16 mtrs space between two blocks.\n(5) Distance between two adjacent building blocks.\n(6) The Authority shall have a right to impose such restriction and limitations as to the number of storey and extent of height of the building as he considers fit where protected areas, ancient or historical monuments lie within a radius of one and half kilometre from the boundary line of such buildings by recording the reasons.\n(6)\n(7) The internal height of the basement (floor to ceiling) shall be minimum 2.4 mtrs from bottom of beam and maximum 4.5 metre. Except wherever height of equipments such as electric generator, air conditioner, fire hydrant etc. is more than 4.5 metre additional height equivalent to height of equipments may be permitted. In case of Automatic/semi automatic/mechanised parking facility also more than 4.5 mtrs, additional height may be allowed by the Chief Executive Officer depending upon the technology and requirement of space. .\n(7)\n(8) The height of basement shall be maximum 1.5 metres upto bottom of the slab above the top of the drain. In case the basement is flush with the ground level adequate light and ventilation shall be ensured.\n(8)\n(9) Toilet block for visitors, drivers etc. comprising of minimum a water closet, a bath and 2 urinals shall be provided on the ground floor.\n(9)\n(10) At least one of the lifts provided shall be of the specification of goods lift.\n(10)\n(11) Minimum requirement for sanction/completion. - Minimum covered area required for completion shall be as per lease deed or Memorandum of Understanding or as follows:-\n(11) Minimum requirement for sanction/completion.\nS. No.\nS. No.\nSize of Plot(Sq. Mtrs.)\nSize of Plot(Sq. Mtrs.)\nMinimum Built up Area(As % of Total\n\t\t\t\tPermissible Far)\nMinimum Built up Area(As % of Total\n\t\t\t\tPermissible Far)\n1.\nUpto 4000 Sq. Mtrs.\n50%\n2.\nExceeding 4000 Sq. Mtrs. but not exceeding 10000\n\t\t\t\tSq. Mtrs.\n40%\n3.\nExceeding 10000 Sq. Mtrs. but not exceeding\n\t\t\t\t20000 Sq. Mtrs.\n35%\n4.\nExceeding 20000 Sq. Mtrs. but not exceeding\n\t\t\t\t100000 Sq. Mtrs.\n30%\n5.\nExceeding 100000 Sq. Mtrs. but not exceeding\n\t\t\t\t200000 Sq. Mtrs.\n25%\n6.\nExceeding 200000 Sq. Mtrs. but not exceeding\n\t\t\t\t400000 Sq. Mtrs.\n20%\n7.\nAbove 400000 Sq. Mtrs.\n15%\nNote: (i) No further time extension shall be required if the completion has been taken by the allottee as per table mentioned above. The above mentioned completion requirement shall be applicable in all allotments. In the old allotments, the provisions of project report or lease deed or previous options may be followed.\n(ii) However validity of plans may be granted to the allottee in multiples of 5 years after taking completion of minimum area,\n(iii) In all the projects of 40 hactares and above, block wise temprorary Occupancy may be allowed subject to a minimum of 1,00,000 sqm built up area, the building completed with all mandatory provisions of services and the allottee shall segregate these blocks for the purpose of security during construction period.\n(12) Provision of following item in building shall be mandatory for issue of completion certificate. - (i) Flooring;/i.e hard surface and completely finished floors for common areas or/and public use areas.\n(12) Provision of following item in building shall be mandatory for issue of completion certificate.\n(ii) Electrical wiring;\n(iii) Plumbing work to be complete.\n(iv) Parking and landscaping as per Table no. 5 and Table no. 6 respectively or as per directions issued from time to time whichever is higher;\n(v) Number plate and illumination board as per direction amended or direction issued from time-to-time;\n(vi) Internal and external finishing (Plastering may not be mandatory);\n(vii) Boundary wall and gates shall be mandatory;\n(viii) Buildings shall be lockable i.e. all external doors and windows shall be provided. In case grill is provided in the windows the fixing of glass in the windows pane shall not be mandatory;\n(ix) No violation should be there in the overall building or site at the time of issue of occupancy certificate;\n(x) Any other special provision as mentioned in the lease deed;\n(xi) In case of completion of whole project, all temporary structures to be removed. In case if any special clause is mentioned in the lease deed or Memorandum of Understanding then the requirement mentioned in the same shall be applicable.\n24.6 Green Areas.\nSl. No.\nSl. No.\nUse\nUse\nMaximum ground coverage\nMaximum ground coverage\nMaximum FAR\nMaximum FAR\nMaximum height in metres\nMaximum height in metres\n1.\nSports and Amusement Complex, Stadia, Swimming\n\t\t\t\tPool, Shooting Range, Recreational Green/Park complex with sports\n\t\t\t\tfacilities\n20%\n0.40 + 0.20 purchasable\n24.0\n2.\nLow Density Sports & Amusement Complex,\n\t\t\t\tRecreational Club, Social Cultural Centre\n10%\n0.20 + 0.10 purchasable\n24.0\n3.\nInstitutional Green\n35%\n0.80 + 0.20 purchasable\nOnly for Institutional activity\n4.\nNursery\n50 sq mtrs\n50 sq mtrs\n6.0\n24.6.1 Other Provisions. - (1) No construction of any kind shall be permitted beyond the building envelope (on setbacks) except.\n24.6.1 Other Provisions.\n(1) No construction of any kind shall be permitted beyond the building envelope (on setbacks) except.\n(i) A Chajja (projection) of maximum width of 0.75 metre at lintel or roof level. No construction of any type or any material shall be permitted over projections other than mentioned herewith.\n(ii) Underground water tanks with top flush with the adjoining ground level.\n(iii) Watchman Shelters and Watch Towers with following provisions:\n(iv) No projection of watchman shelters and watch towers shall be allowed outside the plot line.\n(v) Maximum height of watchman shelter shall be 4 metres and for watch towers 15 metres. Total area, as mentioned below, under such shelters shall be split up in desired number of watch man shelter and watch towers as follows:\nSr. No.\nSr. No.\nPlot Size\nPlot Size\nTotal area for watchman shelter and watch\n\t\t\t\ttower\nTotal area for watchman shelter and watch\n\t\t\t\ttower\nMaximum area under each watchman shelter\nMaximum area under each watchman shelter\nMaximum area under each watch tower\nMaximum area under each watch tower\n1\nUpto 0.5 acres\n15 square metres\n15 square metres\n5 square metres\n2\nAbove 0.5 acres upto 10 acres\n30 square metres\n24 square metres\n5 square metres\n3\nAbove 10 acres upto 25 acres\n45 square metres\n24 square metres\n5 square metres\n4\nAbove 25 acres upto 50 acres\n60 square metres\n24 square metres\n5 square metres\n5\nAbove 50 acres for an additional 50 acres\nAn additional 10 square metres and part thereof\n24 square metres\n5 square metres\n(vi) The following features shall be permitted after leaving minimum 6 mtrs. open corridor for fire tenders.\n(a) Metre room as per norms of Electricity Authority..\n(b) Open transformers without any permanent enclosure keeping in view the necessary safety requirements.\n(c) Other features as mentioned in Table 3\n(d) Rockery, well and well structures, water pool, swimming pool (if uncovered), uncovered platform around tree, tank, fountain, bench, chabutra with open top and unenclosed by side walls, compound wall, gate, slide swing, culverts on drains.\n(e) Any other feature, primarily ornamental in nature, not enclosing or covering space of commercial use may be permitted by the Chief Executive Officer on case to case basis.\n(f) Open generator set, filtration plant, Electrical distribution equipments, feeder pillars, telephone distribution equipments may be permitted in open setback as a service utility provided after leaving clear space for fire tender.\n(2) Floor Area Ratio shall include. - (i) Mezzanine\n(2) Floor Area Ratio shall include.\n(ii) The shafts provided for lifts shall be taken for covered area calculations only on one floor and included in ground coverage.\n(iii) Pergola, shall be counted towards Floor Area Ratio if closed from three or more than three sides.\n(iv) Metre room as per Electricity Authority norms.\n(3) Floor Area Ratio shall not include. - (i) A cantilever projection at any level (in setbacks) of a width of 0.75 metre . No construction of any type or any material shall be permitted over projections.\n(3) Floor Area Ratio shall not include.\n(ii) Basement area equivalent to maximum permissible ground coverage for services, storage and parking.\n(iii) Basement, if put to any use other than mentioned above, shall be included in the FAR of the building.\n(iv) Stilt area of non-habitable height 2.40 metres from bottom of beam proposed to be used for parking, landscaping etc.\n(v) Balconies (upto 1.5metre width) free from FAR may be projected in open setbacks provided 6 mtrs. clear space is available for fire tender movement.\n(vi) Other features as mentioned in Table 3.\n(vii) Rockery, well and well structures, water pool, swimming pool (if uncovered), uncovered platform around tree, tank, fountain, bench, chabutra with open top and unenclosed by side walls, compound wall, gate, slide, swing, uncovered staircase (unenclosed and uncovered on three sides except for 0.9 metre high railing/wall and open to sky), overhead tanks on top of buildings, open shafts, culverts on drains.\n(viii) Open ramps with no area enclosed below it of usable height. If used for approach to the entrance of the building, then the height as per requirement may be considered. The space under the ramp shall not be used for any commercial purpose, however it can be landscaped with approval of the Chief Executive Officer on case to case basis.\n(ix) Any other feature purely ornamental in nature and not enclosing or covering space of commercial use may be permitted by the Chief Executive Officer on case to case basis.\n(4) 15% of prescribed FAR shall be added towards common areas, which shall include the following built structures. The structures on ground will be counted in Ground Coverage. - 1. Canopy projections of area as mentioned in table 4, no construction of any type shall be permitted over the canopy. Canopy, if cantilevered and no structure on it having a size of 2.4m x 4.5m shall not be counted in Ground Coverage.\n(4) 15% of prescribed FAR shall be added towards common areas, which shall include the following built structures. The structures on ground will be counted in Ground Coverage.",
"footnote": "",
"is_definition": false,
"sort_order": 73
},
{
"number": "2",
"title": "2. Loft up to maximum height of 1.5 metre .",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 74
},
{
"number": "3",
"title": "3. Air-conditioning plant, electrical installation, generator room, water works, water tank etc.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 75
},
{
"number": "4",
"title": "4. Watchmen/Security shelters and watch towers",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 76
},
{
"number": "5",
"title": "5. Garbage shafts , lift shafts and 10 sq mtr lobby in front of each lift( excluding area of corridor beyond the lift).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 77
},
{
"number": "6",
"title": "6. Fire escape staircases",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 78
},
{
"number": "7",
"title": "7. Toilet blocks for visitors, drivers, guards etc on ground floor only.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 79
},
{
"number": "8",
"title": "8. Mumty, machine room for lifts.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 80
},
{
"number": "9",
"title": "9. Cupboards upto a depth of 0.60 mtr and 1.80 mtrs. in length.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 81
},
{
"number": "10",
"title": "10. Bay window upto a depth of 0.60 mtr and 2.0 m length.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 82
},
{
"number": "11",
"title": "11. Refuge area as per definition for fire evacuation in National Building Code, 2005.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": true,
"sort_order": 83
},
{
"number": "12",
"title": "12. Sewage treatment plant, water treatment plant, garbage collection centre Electric sub-station, service ducts.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 84
},
{
"number": "13",
"title": "13. Covered walkways and pathways.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 85
},
{
"number": "14",
"title": "14. Any other utilities and facilities as decided by Chief Executive Officer depending upon its requirement.",
"chapter": null,
"content": "(5) Distance between two adjacent building blocks - Distance between two adjacent building blocks shall be minimum 6 mtrs. to 16 mtrs, depending on the height of blocks. For building height up to 18 mtrs., the spacing shall be 6mtrs.and thereafter the spacing shall be increased by 1metre for every addition of 3 mtrs. in height of building subject to a maximum spacing of 16 mtrs. as per NATIONAL BUILDING CODE, 2005. If the blocks have dead-end sides facing each other, than the spacing shall be maximum 9 mtrs. instead of 16 mtrs. Moreover, the allottee may provide or propose more than 16 mtrs space between two blocks.\n(5) Distance between two adjacent building blocks\n(6) The Authority shall have a right to impose such restriction and limitations as to the number of storey and extent of height of the building as he considers fit where protected areas, ancient or historical monuments lie within a radius of one and half kilometre from the boundary line of such buildings by recording the reasons.\n(6)\n(7) The internal height of the basement (floor to ceiling) shall be minimum 2.4 mtrs from bottom of beam and maximum 4.5 metre. Except wherever height of equipments such as electric generator, air conditioner, fire hydrant etc. is more than 4.5 metre, additional height equivalent to height of equipments may be permitted. In case of Automatic/semi automatic/mechanised parking facility also more than 4.5 mtrs, additional height may be allowed by the Chief Executive Officer depending upon the technology and requirement of space. .\n(7)\n(8) The height of basement shall be maximum 1.5 metres upto bottom of the slab above the top of the drain. In case the basement is flush with the ground level adequate light and ventilation shall be ensured.\n(8)\n(9) Toilet block for visitors, drivers etc. comprising of minimum a water closet, a bath and 2 urinals shall be provided on the ground floor.\n(9)\n(10) At least one of the lifts provided shall be of the specification of goods lift.\n(10)\n(11) Minimum requirement for sanction/completion. - Minimum covered area required for completion shall be as per lease deed or Memorandum of Understanding or as follows:-\n(11) Minimum requirement for sanction/completion.\nS. No.\nS. No.\nSize of Plot(Sq. Mtrs.)\nSize of Plot(Sq. Mtrs.)\nMinimum Built up Area(As % of Total\n\t\t\t\tPermissible Far)\nMinimum Built up Area(As % of Total\n\t\t\t\tPermissible Far)\n1.\nUpto 4000 Sq. Mtrs.\n50%\n2.\nExceeding 4000 Sq. Mtrs. but not exceeding 10000\n\t\t\t\tSq. Mtrs.\n40%\n3.\nExceeding 10000 Sq. Mtrs. but not exceeding\n\t\t\t\t20000 Sq. Mtrs.\n35%\n4.\nExceeding 20000 Sq. Mtrs. but not exceeding\n\t\t\t\t100000 Sq. Mtrs.\n30%\n5.\nExceeding 100000 Sq. Mtrs. but not exceeding\n\t\t\t\t200000 Sq. Mtrs.\n25%\n6.\nExceeding 200000 Sq. Mtrs. but not exceeding\n\t\t\t\t400000 Sq. Mtrs.\n20%\n7.\nAbove 400000 Sq. Mtrs.\n15%\nNote: (i) No further time extension shall be required if the completion has been taken by the allottee as per table mentioned above. The above mentioned completion requirement shall be applicable in all allotments. In the old allotments, the provisions of project report or lease deed or previous options may be followed.\n(ii) However validity of plans may be granted to the allottee in multiples of 5 years after taking completion of minimum area,\n(iii) In all the projects of 40 hactares and above, block wise temprorary Occupancy may be allowed subject to a minimum of 1,00,000 sqm built up area, the building completed with all mandatory provisions of services and the allottee shall segregate these blocks for the purpose of security during construction period.\n(12) Provision of following item in building shall be mandatory for issue of completion certificate. - (i) Flooring;/i.e hard surface and completely finished floors for common areas or/and public use areas.\n(12) Provision of following item in building shall be mandatory for issue of completion certificate.\n(ii) Electrical wiring;\n(iii) Plumbing work to be complete.\n(iv) Parking and landscaping as per Table no. 5 and Table no. 6 respectively or as per directions issued from time to time whichever is higher;\n(v) Number plate and illumination board as per direction amended or direction issued from time-to-time;\n(vi) Internal and external finishing (Plastering may not be mandatory);\n(vii) Boundary wall and gates shall be mandatory;\n(viii) Buildings shall be lockable i.e. all external doors and windows shall be provided. In case grill is provided in the windows the fixing of glass in the windows pane shall not be mandatory;\n(ix) No violation should be there in the overall building or site at the time of issue of occupancy certificate;\n(x) Any other special provision as mentioned in the lease deed;\n(xi) In case of completion of whole project, all temporary structures to be removed. In case if any special clause is mentioned in the lease deed or Memorandum of Understanding then the requirement mentioned in the same shall be applicable\n24.7 Transportation.\nSl. No.\nSl. No.\nUse\nUse\nMaximum ground coverage\nMaximum ground coverage\nMaximum FAR\nMaximum FAR\nMaximum height in metres\nMaximum height in metres\n1.\nBus Terminal, ISBT, Light Rail Transit Terminal,\n\t\t\t\tBus Depots/workshop, Booking Officers, Transport Nagar\n30%\n2.00\nNo limit\n2.\nAny other item not convered in this table\nTo be decided by the Authority\nTo be decided by the Authority\nTo be decided by the Authority\n24.7.1 Other Provisions. - (1) No construction of any kind shall be permitted beyond the building envelope (on setbacks) except.\n24.7.1 Other Provisions.\n(1) No construction of any kind shall be permitted beyond the building envelope (on setbacks) except.\n(i) A Chajja (projection) of maximum width of 0.75 metre at lintel or roof level. No construction of any type or any material shall be permitted over projections other than mentioned herewith.\n(ii) Underground water tanks with top flush with the adjoining ground level.\n(iii) Watchman Shelters and Watch Towers with following provisions:\n(iv) No projection of watchman shelters and watch towers shall be allowed outside the plot line.\n(v) Maximum height of watchman shelter shall be 4 metres and for watch towers 15 metres. Total area, as mentioned below, under such shelters shall be split up in desired number of watch man shelter and watch towers as follows:\nSr. No.\nSr. No.\nPlot Size\nPlot Size\nTotal area for watchman shelter and watch\n\t\t\t\ttower\nTotal area for watchman shelter and watch\n\t\t\t\ttower\nMaximum area under each watchman shelter\nMaximum area under each watchman shelter\nMaximum area under each watch tower\nMaximum area under each watch tower\n1\nUpto 0.5 acres\n15 square metres\n15 square metres\n5 square metres\n2\nAbove 0.5 acres upto 10 acres\n30 square metres\n24 square metres\n5 square metres\n3\nAbove 10 acres upto 25 acres\n45 square metres\n24 square metres\n5 square metres\n4\nAbove 25 acres upto 50 acres\n60 square metres\n24 square metres\n5 square metres\n5\nAbove 50 acres for an additional 50 acres\nAn additional 10 square metres and part thereof\n24 square metres\n5 square metres\n(vi) The following features shall be permitted after leaving minimum 6 mtrs. open corridor for fire tenders.\n(a) Metre room as per norms of Electricity Authority..\n(b) Open transformers without any permanent enclosure keeping in view the necessary safety requirements.\n(c) Other features as mentioned in Table 3\n(d) Rockery, well and well structures, water pool, swimming pool (if uncovered), uncovered platform around tree, tank, fountain, bench, chabutra with open top and unenclosed by side walls, compound wall, gate, slide swing, culverts on drains.\n(e) Any other feature, primarily ornamental in nature, not enclosing or covering space of commercial use may be permitted by the Chief Executive Officer on case to case basis.\n(f) Open generator set, filtration plant, Electrical distribution equipments, feeder pillars, telephone distribution equipments may be permitted in open setback as a service utility provided after leaving clear space for fire tender.\n(2) Floor Area Ratio shall include - (i) Mezzanine\n(2) Floor Area Ratio shall include\n(ii) The shafts provided for lifts shall be taken for covered area calculations only on one floor and included in ground coverage.\n(iii) Pergola, shall be counted towards Floor Area Ratio if closed from three or more than three sides.\n(iv) Metre room as per Electricity Authority norms.\n(3) Floor Area Ratio shall not include. - (i) A cantilever projection at any level (in setbacks) of a width of 0.75 metre . No construction of any type or any material shall be permitted over projections.\n(3) Floor Area Ratio shall not include.\n(ii) Basement(s) shall be permissible within the setback line on each floor. However maximum permissible area under basement shall be limited up to:\n(a) Basement area, if used for services, storage etc. then maximum area under such facilities shall be equivalent to maximum permissible ground coverage.\n(b) Basement area/Podium parking as defined in parking table, if used for parking, then area equivalent to parking requirement shall be permitted.\n(c) In plots bigger than 10000 sq mtrs. The basement shall be allowed in setback area after leaving a minimum setback of 6.0 mtrs.\n(iii) Basement, if put to any use other than mentioned above, shall be included in the FAR of the building.\n(iv) Stilt area of non-habitable height 2.40 metres from bottom of beam proposed to be used for parking, landscaping etc.\n(v) Balconies (upto 1.5metre width) free from FAR may be projected in open setbacks provided 6 mtrs. clear space is available for fire tender movement.\n(vi) Other features as mentioned in Table 3.\n(vii) Rockery, well and well structures, water pool, swimming pool (if uncovered), uncovered platform around tree, tank, fountain, bench, chabutra with open top and unenclosed by side walls, compound wall, gate, slide, swing, uncovered staircase (unenclosed and uncovered on three sides except for 0.9 metre high railing/wall and open to sky), overhead tanks on top of buildings, open shafts, culverts on drains.\n(viii) Open ramps with no area enclosed below it of usable height. If used for approach to the entrance of the building, then the height as per requirement may be considered. The space under the ramp shall not be used for any commercial purpose, however it can be landscaped with approval of the Chief Executive Officer on case to case basis.\n(ix) Atrium shall be kept free from FAR and ground coverage. In case any commercial activity is proposed in Atrium or any saleable area or any other structure which is counted in FAR & ground coverage, its respective area shall be added in total FAR & ground coverage.\n(x) Any other feature purely ornamental in nature and not enclosing or covering space of commercial use may be permitted by the Chief Executive Officer on case to case basis.\n(xi) Additional 5% of the plot area as ground coverage will be allowed for dedicated multi level parking in plots bigger than 10000 sq mtrs (excluding green areas).\n(xii) In multistorey buildings service floor ,may be allowed after 4 floors. Maximum of 3 service floors may be allowed in a building. Service floor shall not be counted in FAR and maximum height of service floor shall be 2.40 mtrs. from floor to bottom of the beam.\n(4) 15% of prescribed FAR shall be added towards common areas, which shall include the following built structures. The structures on ground will be counted in Ground Coverage. - 1. Canopy projections of area as mentioned in table 4, no construction of any type shall be permitted over the canopy.Canopy, if cantilevered and no structure on it having a size of 2.4m x 4.5m shall not be counted in Ground Coverage.\n(4) 15% of prescribed FAR shall be added towards common areas, which shall include the following built structures. The structures on ground will be counted in Ground Coverage.",
"footnote": "",
"is_definition": false,
"sort_order": 86
},
{
"number": "2",
"title": "2. Loft up to maximum height of 1.5 metre .",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 87
},
{
"number": "3",
"title": "3. Air-conditioning plant, electrical installation, generator room, water works, water tank etc.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 88
},
{
"number": "4",
"title": "4. Watchmen/Security shelters and watch towers",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 89
},
{
"number": "5",
"title": "5. Garbage shafts , lift shafts and 10 sq mtr lobby in front of each lift (excluding area of corridor beyond the lift).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 90
},
{
"number": "6",
"title": "6. Fire escape staircases",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 91
},
{
"number": "7",
"title": "7. Toilet blocks for visitors, drivers, guards etc on ground floor only.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 92
},
{
"number": "8",
"title": "8. Mumty, machine room for lifts.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 93
},
{
"number": "9",
"title": "9. Cupboards upto a depth of 0.60 mtr and 1.80 mtrs. in length.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 94
},
{
"number": "10",
"title": "10. Refuge area as per definition for fire evacuation in National Building Code, 2005.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": true,
"sort_order": 95
},
{
"number": "11",
"title": "11. Sewage treatment plant, water treatment plant, garbage collection centre, Electric sub-station, service ducts.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 96
},
{
"number": "12",
"title": "12. Covered walkways and pathways.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 97
},
{
"number": "13",
"title": "13. Any other utilities and facilities as decided by Chief Executive Officer depending upon its requirement.",
"chapter": null,
"content": "(5) Distance between two adjacent building blocks. - Distance between two adjacent building blocks shall be minimum 6 mtrs. to 16 mtrs, depending on the height of blocks. For building height up to 18 mtrs., the spacing shall be 6mtrs.and thereafter the spacing shall be increased by 1metre for every addition of 3 mtrs. in height of building subject to a maximum spacing of 16 mtrs. as per NATIONAL BUILDING CODE, 2005. If the blocks have dead-end sides facing each other, than the spacing shall be maximum 9 mtrs. instead of 16 mtrs. Moreover, the allottee may provide or propose more than 16 mtrs space between two blocks.\n(5)\n(6) The Authority shall have a right to impose such restriction and limitations as to the number of storey and extent of height of the building as he considers fit where protected areas, ancient or historical monuments lie within a radius of one and half kilometre from the boundary line of such buildings by recording the reasons.\n(6)\n(7) The internal height of the basement (floor to ceiling) shall be minimum 2.4 mtrs from bottom of beam and maximum 4.5 metre. Except wherever height of equipments such as electric generator, air conditioner, fire hydrant etc. is more than 4.5 metre, additional height equivalent to height of equipments may be permitted. In case of Automatic/semi automatic/mechanised parking facility also more than 4.5 mtrs, additional height may be allowed by the Chief Executive Officer depending upon the technology and requirement of space. .\n(7)\n(8) The height of basement shall be maximum 1.5 metres upto bottom of the slab above the top of the drain. In case the basement is flush with the ground level adequate light and ventilation shall be ensured.\n(8)\n(9) Toilet block for visitors, drivers etc. comprising of minimum a water closet, a bath and 2 urinals shall be provided on the ground floor.\n(9)\n(10) At least one of the lifts provided shall be of the specification of goods lift.\n(10)\n(11) Minimum requirement for sanction/completion. - Minimum covered area required for completion shall be as per lease deed or Memorandum of Understanding or as follows:-\n(11) Minimum requirement for sanction/completion.\nS. No.\nS. No.\nSize of Plot(Sq. Mtrs.)\nSize of Plot(Sq. Mtrs.)\nMinimum Built up Area(As % of Total\n\t\t\t\tPermissible Far)\nMinimum Built up Area(As % of Total\n\t\t\t\tPermissible Far)\n1.\nUpto 4000 Sq. Mtrs.\n50%\n2.\nExceeding 4000 Sq. Mtrs. but not exceeding 10000\n\t\t\t\tSq. Mtrs.\n40%\n3.\nExceeding 10000 Sq. Mtrs. but not exceeding\n\t\t\t\t20000 Sq. Mtrs.\n35%\n4.\nExceeding 20000 Sq. Mtrs. but not exceeding\n\t\t\t\t100000 Sq. Mtrs.\n30%\n5.\nExceeding 100000 Sq. Mtrs. but not exceeding\n\t\t\t\t200000 Sq. Mtrs.\n25%\n6.\nExceeding 200000 Sq. Mtrs. but not exceeding\n\t\t\t\t400000 Sq. Mtrs.\n20%\n7.\nAbove 400000 Sq. Mtrs.\n15%\nNote: (i) No further time extension shall be required if the completion has been taken by the allottee as per table mentioned above. The above mentioned completion requirement shall be applicable in all allotments. In the old allotments, the provisions of project report or lease deed or previous options may be followed.\n(ii) However validity of plans may be granted to the allottee in multiples of 5 years after taking completion of minimum area,\n(iii) In all the projects of 40 hactares and above, block wise temprorary Occupancy may be allowed subject to a minimum of 1,00,000 sqm built up area, the building completed with all mandatory provisions of services and the allottee shall segregate these blocks for the purpose of security during construction period.\n(12) Provision of following item in building shall be mandatory for issue of completion certificate. - (i) Flooring;/i.e hard surface and completely finished floors for common areas or/and public use areas.\n(12) Provision of following item in building shall be mandatory for issue of completion certificate.\n(ii) Electrical wiring;\n(iii) Plumbing work to be complete.\n(iv) Parking and landscaping as per Table no. 5 and Table no. 6 respectively or as per directions issued from time to time whichever is higher;\n(v) Number plate and illumination board as per direction amended or direction issued from time-to-time;\n(vi) Internal and external finishing (Plastering may not be mandatory);\n(vii) Boundary wall and gates shall be mandatory;\n(viii) Buildings shall be lockable i.e. all external doors and windows shall be provided. In case grill is provided in the windows the fixing of glass in the windows pane shall not be mandatory;\n(ix) No violation should be there in the overall building or site at the time of issue of occupancy certificate;\n(x) Any other special provision as mentioned in the lease deed;\n(xi) In case of completion of whole project, all temporary structures to be removed. In case if any special clause is mentioned in the lease deed or Memorandum of Understanding then the requirement mentioned in the same shall be applicable.\n24.8 General Provisions for Building/projects in regulations 24.1, 24.2, 24.3, 24.4, 24.5 24.6, 24.7.\n(ii) In case of mixed land use Ground coverage and F.A.R shall be determined on the basis of prime use/activity as decided in the scheme.\n(2) Total height shall be counted from top of external drain to top of the building except for\n• Illuminated boards\n• Water Tanks, mumty and machine room\n• Other such structures with non usable height.\n(3) Minimum permissible setbacks shall be as per Table no. 1 and 2. If there is no mention in the lease deed then as per Building Regulations prevailing at the time of allotment.\n(4) Maximum permissible density shall be as per lease deed. Maximum density variation of - 50 percent and +5 percent shall be allowed in Group Housing.\n(5) The above regulations are for general applications.\n(6) The Authority shall however prepare and provide Architectural control drawing/Architectural control for each commercial project.\n(7) Notwithstanding anything contained in these regulations, the Authority may where it considers expedient to do so, having regard to the special features of a particular zone/sector and the width of road abutting and the Development Plan, permit such ground coverage FAR, height and setback in relation to a building or a group of buildings by recording the reasons.\n(8) Provisions of Ground coverage, FAR, building height, parking etc., for Information Technology (IT) and Information Technology and Enabled Services in Industrial plots shall be applicable as per the provisions for Information Technology and Information Technology and Enabled Services in Institutional plots. This provision is applicable for those plots which were originally allotted for IT/ITES.\n(9) In case of any activity other than listed above mentioned regulations (24.1 to 24.7), the ground coverage and FAR shall be decided by the Authority keeping in view the similar kind of activities mentioned in these regulations.\n(10) For buildings of height above, 30 metres necessary clearance from Airport Authority of India shall be taken. Total height of the building shall be counted from the top of the external drain to top of the building without exemption.\n(11) The above regulations are for general applications.\n(12) Purchasable FAR shall be available only for those allottees whose allotment was based on specific FAR.\n(13) For Horticulture Nursery, the following provisions shall be applicable:\n(i) Green house up to maximum 10 percent of plot area.\n(ii) Watchman shelters as per clause (v) of sub clause (I) of 24.6.1 and also permitted in setbacks.\n(iii) Metre room as per norms of Electricity Authority and shall also be permitted in setbacks.\n(iv) Shops and support facilities shall be permitted maximum upto 15 sq mtrs included in permitted Ground Coverage.\n(v) Setback shall be as per Table 2.\n[(14) The applicant who shall construct Green Building on a plot of 5000 sq mtrs and above for any use may be allowed an additional FAR of 5% of the permissible/availed FAR (excluding additional 15% of prescribed FAR for services), free of cost, after submission of pre-certificate for green building from below mentioned rating agencies, provided that the applicant fulfills the following conditions:-\n(i) The Building/Design of the building is rated by Leadership in Energy and Environmental Design (LEED) as Gold or Platinum or the Building/Design of the building is rated as 4 or 5 star by the Government of India or the Building/Design of the building is rated by Indian Green Building Council (IGBC) as Gold or Platinum.\n(ii) The Building has been completed fulfilling the parking and landscaping norms of the prevailing regulations.\n(iii) The applicant has made sufficient provisions for using the additional FAR.\nNote: The applicant has to submit a final rating certificate for green building from LEED/GRIHA/IGBC at the time of applying for completion certificate. A compliance certificate, the Authority, after every five years. In case he fails to submit this compounding fees of the FAR given free of cost at the rate of 200% of the cost of purchasable FAR.]\n(15) The Authority is authorized to permit additional height at focal points wherever it is considered appropriate by recording the reasons.\n(16) Enclosure of balcony in any type of building shall not be permitted or/and compounded. Enclosure shall be considered as illegal construction.\n24.9 Informal Sector.\n(1)\nPlotted Development\nPlotted Development\nI.\nPlot Size\n:\n20-25 square metre\nII.\nGround Coverage\n:\n80 percent\nIII.\nFAR\n:\n2.00\nIV.\nHeight\n:\n10 metre maximum\nV.\nSetback\n:\n1.5 metre in front\nVI.\nRoads\n:\nMain vehicular roads shall not be less than 9.0\n\t\t\t\tmetres and access to plots shall be provided through\n\t\t\t\troads/passages not less than 6.0 metres.\nVII.\nOpen space\n:\nMay be provided in a group or Cluster\n(2)\nFlatted Development\nFlatted Development\nI.\nGround coverage\n:\n40 percent\nII.\nFAR\n:\n2.00\nIII.\nSetback\n:\n9.0 front 3.0 metre rear and 3.0 metre side\n\t\t\t\tsetback\nIV.\nHeight\n:\nNo Limit\nV.\nBalcony\n:\n0.9 metre wide.\nVI.\nRoads\n:\nMain vehicular roads 12 metre\nVII.\nOther spaces\n:\n60 percent (Open + Roads + Parks)\nVIII.\nIndividual toilets or group may be provided\n(3)\nDormitory\nDormitory\nI.\nGround coverage/FAR\n:\n40 percent/1.60\nII.\nSetback\n:\n9.0 in front 3.0 metre and 3.0 in side setback\nIII.\nHeight\n:\n15 metre (Maximum)\nIV.\nBalcony\n:\n0.9 metre wide.\nCommon facilities for development.\n(ii) Proposed plantation on road side has to be ever green trees planted 10 metre centre to centre.\n(iii) Provisions for community facilities like Creche, Balwadi, Health care centre etc. to be made as per population requirement.\n(iv) The population size of unit shall be 2.5 person per unit or as decided by the Authority.\n(v) The number of Dwelling Units permissible will be equivalent to number of members in the registered society or as decided by the Authority with the maximum variation of ±10 percent.\n24.10 Layout and Sub-Division of Land.",
"footnote": "",
"is_definition": false,
"sort_order": 98
},
{
"number": "2",
"title": "2. Setbacks, FAR, ground coverage and height permissible on the sub divided plot shall be as per maximum permissible in each individual use in these Regulations",
"chapter": null,
"content": "24.11 Standards for facilities for group housing projects as per following population norms:\nS. No.\nS. No.\nUse premises\nUse premises\nService population per unit\nService population per unit\nMinimum area per unit ( in ha)\nMinimum area per unit ( in ha)\na)\nEducation\nEducation\n1.\nNursery school/creche\n10000\n0.10\n2.\nSenior Secondary school\n20000-30000\n0.80\n3.\nCollege\n80000-100000\n1.0\nb)\nHealth\nHealth\n1.\nNursing home/Dispensary\n15000-20000\n0.10\n2.\nHospital\n100000\n2.0\nc)\nSocio - Cultural\nSocio - Cultural\n1.\nCommunity Hall and library\n25000\n0.40\n2.\nRecreational club\n100000\n1.00\nd)\nShopping\nShopping\n1.\nConvenient shopping/Local/sector shopping\n1% of permissible group housing FAR\ne)\nOther community facilities\nOther community facilities\n1.\nMilk booths\n10000-15000\n0.020\n2.\nReligious building\n25000-35000\n0.100\nf)\nRecreation/Green Parks\nRecreation/Green Parks\n1.\nPark and Play Ground\n15% of plot area\ng)\nUtilities\nUtilities\n1.\nOverhead tank\nAs per requirement\n2.\nElectric sub station\nAs per requirement\n3.\nAuto cum taxi stand\n25000\n0.050\n4.\nPolice Chowki\n25000\n0.050\n5.\nPetrol pump/Gas station\n50000-100000\n0.200\nNote : (i) Provision of these facilities is mandatory in Group Housing/Residential schemes. However, the Authority may allow more numbers for social/community facilities (Non-commercial) and more areas as per requirement of any project within the limits of permissible FAR.\n(ii)For facilities like Nursery School/Creche, Nursing Home, Dispensary, convenient shops, etc. instead of earmarking plots, the permissible FAR may be planned on Ground Floor of Group housing Blocks or as separate building blocks within the permissible ground coverage. The allottee shall be free to plan the facilities either in the form of plots or building blocks.\n24.12 Provision of Social and Physical Infrastructure at Sector Level (Zone R) (If facilities are provided as per sector norms then in individual group housing pockets the facilities indicated in regulation 24.11 shall not be applicable)\nS. No.\nS. No.\nUse premises\nUse premises\nService population per unit\nService population per unit\nUnit Area ( in Ha)\nUnit Area ( in Ha)\na)\nEducation\nEducation\n1.\nCreche and Day Care Centre\n5000-25,000\n0.100\n2.\nNursery School\n5,000-7,500\n0.100\n3.\nPrimary School\n7,500-15,000\n0.200\n4.\nSenior Secondary School\n15,000-25,000\n0.800\nb)\nHealth\nHealth\n1.\nDispensary\n7,500-15,000\n0.100\n2.\nNursing Home\n5,000-7,500\n0.100\nc)\nShopping\nShopping\n1.\nConvenient shopping Centres. Sector shopping cum service\n\t\t\t\tcentre\n7,500-15,000\n0.5000\n2.\nKiosks/hawker area\nd)\nOther community facilities\nOther community facilities\n1.\nCommunity Centre\n7,500-15,000\n0.4000\n2.\nMilk and Vegetable Booth\n5,000-7,500\n0.020\ne)\nRecreation\nRecreation\n1.\nPark and Play Ground\n15% of plot/sector\nMin area per unit 0.2500\nf)\nUtilities\nUtilities\n1.\nElectric Sub-Station 11KV\nAs per requiremen\n0.050\n2.\nAuto Cum Taxi Stand\nAs per requiremen\n0.050\n24.13 Note :-\n24.14 Note :-\nChapter - IV",
"footnote": "",
"is_definition": false,
"sort_order": 99
},
{
"number": "25",
"title": "25. Structural Safet.",
"chapter": null,
"content": "(a) Building shall be so planned, designed and constructed so as to ensure fire safety and this shall be done in accordance with Part IV `Fire Protection' of the National Building Code of India as amended from time to time.\n(b) In case of multi-storeyed buildings above 15 metre in height, building which are more than three storeys and building with more than 400 square metres ground floor coverage and all other buildings of industrial, storage, assembly and hazardous type building scheme, provisions of Uttar Pradesh Agni Nivaran aur Agni Suraksha Adhinium (Act no. 6 of 2005) shall apply.\n25.2 Structural Design.\n25.3 Quality of Material and Workmanship.\n25.4 Building Services.\n25.5 Plumbing.\n25.6 Water supply requirements\n25.7 Sanitary Fitting.\n(2) Every factory building within the area shall be provided with such latrines and urinals as may be prescribed by or under the provisions of the Factories Act 1948 as amended from time to time.\n25.8 Structural Safety for Natural Hazard Protection.\n25.9 Provision for Physically Handicapped.\n25.10 Note:-\n25.11 Note:-\nChapter -V",
"footnote": "",
"is_definition": false,
"sort_order": 100
},
{
"number": "26",
"title": "26. Construction of Farm House Building in Agricultural Use Zone.",
"chapter": null,
"content": "26.1 Minimum size of plot-\n26.2 Maximum coverage and FAR\n(a)\nMaximum permissible ground coverage for all\n\t\t\t\ttypes of activity\n10 percent\n(b)\nMaximum permissible FAR\n0.15\n(c)\nResidential accommodation of watch and\n\t\t\t\tward/maintenance staff\n15 percent of permissible FAR\n(d)\nMaximum height\n10.0 m\n(e)\nSetbacks\nFront/side abutting road 15.0 metre and all\n\t\t\t\tother sides 9.0 metre\n26.3 Other provisions.\n(b) The maximum height of boundary wall shall be 3.0 mtrs from external drain top.\n(c) Running creeper or flowering creeper will be planted all along the wall.\n(d) Minimum 50 percent of the total area of the farm house shall be under plantation/cultivation. At least 100 trees per hectares have to be planted out of which at least 50 percent shall be evergreen trees.\n(e) Basement within the outer walls of the buildings equivalent to the area of ground coverage shall be allowed. In the event of open areas falling within the outer walls of the buildings, maximum area of the basement may be allowed equivalent to double the area of the ground coverage.\n(f) Minimum requirement for sanction and completion shall be 25% of permissible FAR.\n26.4 Water supply, sewerage and drainage.\n(b) The owner shall be responsible to provide drains in the farm house to be used for rain water and in case of dairy farm, open or closed sanitary drains to clean sheds, as may be required by the Authority.\n(c) The owner shall be responsible to provide septic tank with necessary dispersion trenches for disposal of human and animal wastes in the farm house within his own premises.\n26.5 Electrification.\n26.6 Other Provisions.\n(1) No construction of any kind shall be permitted beyond the building envelope (on setbacks) except\n(i) A Chajja (projection) of maximum width of 0.75 metre at lintel or roof level. No construction of any type or any material shall be permitted over projections other than mentioned herewith.\n(ii) Underground water tanks with top flush with the adjoining ground level.\n(iii) Watchman Shelters and Watch Towers with following provisions:\n(iv) No projection of watchman shelters and watch towers shall be allowed outside the plot line.\n(v) Maximum height of watchman shelter shall be 4 metres and for watch towers 15 metres. Total area, as mentioned below, under such shelters shall be split up in desired number of watch man shelter and watch towers as follows:\nSr. No.\nSr. No.\nPlot Size\nPlot Size\nTotal area for watchman shelter and watch\n\t\t\t\ttower\nTotal area for watchman shelter and watch\n\t\t\t\ttower\nMaximum area under each watchman shelter\nMaximum area under each watchman shelter\nMaximum area under each watch tower\nMaximum area under each watch tower\n1\nUpto 0.5 acres\n15 square metres\n15 square metres\n5 square metres\n2\nAbove 0.5 acres upto 10 acres\n30 square metres\n24 square metres\n5 square metres\n3\nAbove 10 acres upto 25 acres\n45 square metres\n24 square metres\n5 square metres\n4\nAbove 25 acres upto 50 acres\n60 square metres\n24 square metres\n5 square metres\n5\nAbove 50 acres for an additional 50 acres\nAn additional 10 square metres and part thereof\n24 square metres\n5 square metres\n(vi) The following features shall be permitted after leaving minimum 6 mtrs. open corridor for fire tenders.\n(a) Metre room as per norms of Electricity Authority.\n(b) Open transformers without any permanent enclosure keeping in view the necessary safety requirements.\n(c) Other features as mentioned in Table 3\n(d) Rockery, well and well structures, water pool, swimming pool (if uncovered), uncovered platform around tree, tank, fountain, bench, chabutra with open top and unenclosed by side walls, compound wall, gate, slide swing, culverts on drains.\n(e) Any other feature, primarily ornamental in nature, not enclosing or covering space of commercial use may be permitted by the Chief Executive Officer on case to case basis.\n(f) Open generator set, filtration plant, Electrical distribution equipments, feeder pillars, telephone distribution equipments may be permitted in open setback as a service utility provided after leaving clear space for fire tender.\n(2) Floor Area Ratio shall include. - (i) Mezzanine\n(2) Floor Area Ratio shall include.\n(ii) The shafts provided for lifts shall be taken for covered area calculations only on one floor and included in ground coverage.\n(iii) Pergola, shall be counted towards Floor Area Ratio if closed from three or more than three sides.\n(iv) Metre room as per Electricity Authority norms.\n(3) Floor Area Ratio shall not include. - (i) A cantilever projection at any level (in setbacks) of a width of 0.75 metre . No construction of any type or any material shall be permitted over projections.\n(3) Floor Area Ratio shall not include.\n(ii) Basement shall be for storage, services and parking only. It shall not be more than permissible ground coverage.\n(iii) Basement, if put to any use other than mentioned above, shall be included in the FAR of the building.\n(iv) Stilt area of non-habitable height 2.40 metres from bottom of beam proposed to be used for parking, landscaping etc.\n(v) Balconies (upto 1.5metre width) free from FAR may be projected in open setbacks provided 6 mtr clear space is available for fire tender movement.\n(vi) Other features as mentioned in Table 3.\n(vii) Rockery, well and well structures, water pool, swimming pool (if uncovered), uncovered platform around tree, tank, fountain, bench, chabutra with open top and unenclosed by side walls, compound wall, gate, slide, swing, uncovered staircase (unenclosed and uncovered on three sides except for 0.9 metre high railing/wall and open to sky), overhead tanks on top of buildings, open shafts, culverts on drains.\n(viii) Open ramps with no area enclosed below it of usable height. If used for approach to the entrance of the building, then the height as per requirement may be considered. The space under the ramp shall not be used for any commercial purpose, however it can be landscaped with approval of the Chief Executive Officer on case to case basis.\n(ix) Any other feature purely ornamental in nature and not enclosing or covering space of commercial use may be permitted by the Chief Executive Officer on case to case basis.\n(4) 15% of prescribed FAR shall be added towards common areas, which shall include the following built structures. The structures on ground will be counted in Ground Coverage. - 1. Canopy projections of area as mentioned in table 4, no construction of any type shall be permitted over the canopy. Canopy, if cantilevered and no structure on it having a size of 2.4m x 4.5m shall not be counted in Ground Coverage.\n(4) 15% of prescribed FAR shall be added towards common areas, which shall include the following built structures. The structures on ground will be counted in Ground Coverage.",
"footnote": "",
"is_definition": false,
"sort_order": 101
},
{
"number": "2",
"title": "2. Loft up to maximum height of 1.5 metre .",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 102
},
{
"number": "3",
"title": "3. Air-conditioning plant, electrical installation, generator room, water works, water tank etc.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 103
},
{
"number": "4",
"title": "4. Watchmen/Security shelters and watch towers",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 104
},
{
"number": "5",
"title": "5. Garbage shafts , lift shafts and 10 sq mtr lobby in front of each lift (excluding area of corridor beyond the lift).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 105
},
{
"number": "6",
"title": "6. Fire escape staircases",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 106
},
{
"number": "7",
"title": "7. Toilet blocks for visitors, drivers, guards etc on ground floor only.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 107
},
{
"number": "8",
"title": "8. Mumty, machine room for lifts.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 108
},
{
"number": "9",
"title": "9. Cupboards upto a depth of 0.60 mtr and 1.80 mtrs. in length.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 109
},
{
"number": "10",
"title": "10. Bay window upto a depth of 0.60 mtr and 2.0 m length.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 110
},
{
"number": "11",
"title": "11. Sewage treatment plant, water treatment plant, garbage collection centre Electric sub-station, service ducts.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 111
},
{
"number": "12",
"title": "12. Covered walkways and pathways.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 112
},
{
"number": "13",
"title": "13. Any other utilities and facilities as decided by the Chief Executive Officer depending upon its requirement.",
"chapter": null,
"content": "(5) The Authority shall have a right to impose such restriction and limitations as to the number of storey and extent of height of the building as he considers fit where protected areas, ancient or historical monuments lie within a radius of one and half kilometre from the boundary line of such buildings by recording the reasons.\n(5)\n(6) The height of basement shall be maximum 1.5 metres upto bottom of the slab above the top of the drain. In case the basement is flush with the ground level adequate light and ventilation shall be ensured.\n(6)\n(7) Provision of following item in building shall be mandatory for issue of completion certificate. - (i) Flooring;/i.e hard surface and completely finished floors for common areas.\n(7) Provision of following item in building shall be mandatory for issue of completion certificate.\n(ii) Electrical wiring;\n(iii) Plumbing work to be complete.\n(iv) Parking and landscaping as per Table no. 5 and Table no. 6 respectively or as per directions issued from time to time whichever is higher;\n(v) Number plate and illumination board as per direction amended or direction issued from time-to-time;\n(vi) Internal and external finishing (Plastering may not be mandatory);\n(vii) Boundary wall and gates shall be mandatory;\n(viii) Buildings shall be lockable i.e. all external doors and windows shall be provided. In case grill is provided in the windows the fixing of glass in the windows pane shall not be mandatory;\n(ix) No violation should be there in the overall building or site at the time of issue of occupancy certificate;\n(x) Any other special provision as mentioned in the lease deed;\n(xi) In case of completion of whole project, all temporary structures to be removed. In case if any special clause is mentioned in the lease deed or Memorandum of Understanding then the requirement mentioned in the same shall be applicable.\nChapter-VI",
"footnote": "",
"is_definition": false,
"sort_order": 113
},
{
"number": "27",
"title": "27. Construction on Plots allotted to the farmers against land acquisition (5% or 6% or 7%) in planned village abadi Expansion scheme or in sectors.",
"chapter": null,
"content": "27.1 Setback Ground coverage and FAR shall be as per the following table :-\nS. No.\nS. No.\nSize of Plot (Sqmtr.)\nSize of Plot (Sqmtr.)\nGround Coverage (In %age)\nGround Coverage (In %age)\nFront Setback (Mtr.)\nFront Setback (Mtr.)\nRear Setback (Mtr.)\nRear Setback (Mtr.)\nSide Setback (Mtr.)\nSide Setback (Mtr.)\nMaximum FAR\nMaximum FAR\n1\nUpto 50.0\n75\n1.5\n1.5\n-\n1.8\n2\n51 to 75\n75\n1.5\n2.0\n-\n1.8\n3\n76 to 120\n75\n2.0\n2.4\n-\n1.8\n4\n121 to 200\n75\n3.0\n2.4\n-\n1.8\n5\n201 to 300\n75\n3.5\n3.0\n-\n1.8\n6\n301 to 400\n65\n4.0\n3.0\n3.0\n1.8\n7\n401 to 500\n65\n4.5\n3.5\n3.0\n1.8\n8\n501 to 750\n60\n5.0\n3.5\n3.0\n1.5\nNote:- (i) Maximum building height in all size of plots shall be 15 Metres.\n(ii) Total height shall be counted from top of drain to top of building without exception.\n(iii) In case the pemissible ground coverage is not achieved within setbacks, the setbacks of the preceding category may be followed. In special cases where ground coverage is not achieved in the preceding category also, then Chief Executive Officer may relax the setbacks to the extent he considers fit.\n(iv) In the Residential Plots with in the permissible FAR and Ground Coverage equivalent of 40 % area of rear Set Back construction shall be allowed on either side/both side in the rear set back.\n27.2 Note:-\n27.3 Use of the Plot.\nOn plots allotted in planned village expansion scheme or in sectors (5% or 6%or 7%):",
"footnote": "",
"is_definition": false,
"sort_order": 114
},
{
"number": "1",
"title": "1. Dharmshala/Night shelter/baratghar",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 115
},
{
"number": "2",
"title": "2. Dispensary/clinic/laboratory",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 116
},
{
"number": "3",
"title": "3. Hostel",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 117
},
{
"number": "4",
"title": "4. Guest House/lodging house",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 118
},
{
"number": "5",
"title": "5. Motor garage and workshop",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 119
},
{
"number": "6",
"title": "6. Office for professionals - out of which minimum 50% of the space shall be used for self use.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 120
},
{
"number": "7",
"title": "7. Restaurant",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 121
},
{
"number": "8",
"title": "8. Vending booth/kiosks",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 122
},
{
"number": "9",
"title": "9. Bank",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 123
},
{
"number": "10",
"title": "10. Post Office",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 124
},
{
"number": "11",
"title": "11. Telegraph Office",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 125
},
{
"number": "12",
"title": "12. Creche and Day-care centre",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 126
},
{
"number": "13",
"title": "13. Retail shop",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 127
},
{
"number": "14",
"title": "14. Telecommunication tower (only ground based)",
"chapter": null,
"content": "27.4 Fees for Conversion of use.\n(ii) On roads of ROW above 12.0 metre and up to 18.0 metres. 1.25 times of the prevailing residential rate revised from time to time.\n(iii) On roads of ROW above 18.0 metre and up to 24.0 metres. 1.50 times of the prevailing residential rate revised from time to time.\n(iv) On roads of ROW above 24.0 metre and up to 45.0 metres. 2.00 times of the prevailing reserved residential rate as per plot size, revised from time to time.\n(v) For corner plot 5% additional of above mentioned charges shall be levied.\n27.5 Other Provisions.\n(ii) Items permissible in the setback and calculation of Floor Area Ratio shall be done as per regulation 24.\n(iii) Provisions of parking, loading and unloading spaces:\n(a) Parking space to be provided for motor vehicles, shall not be less than 20 square metres in open area ( under stilts; 30square metre) and for scooters and cycles the parking spaces provided shall not be less than 3 square metres and 1.40metre respectively.\n(b) parking space for other vehicles shall be provided as per table-5.\n(iv) Boundary wall height provision shall be as per prevailing direction issued by the Authority from time to time.\n27.6 Fees for Sanction and completion of building plans.\n27.7 Regarding Commercial activities.\n(2) The activities as mentioned in sub regulation (i) above and in regulation 27.3 shall also be allowed on the allotted plots of those farmers whose land was acquired and due to any special circumstances a part of land has been returned to them as per lease back policy of the Authority.\nChapter-VII",
"footnote": "",
"is_definition": false,
"sort_order": 128
},
{
"number": "28",
"title": "28. Purchasable Far.",
"chapter": null,
"content": "28.1 Note:-\n(i) The Plots exist on 24 mtrs. and above wide road.\n(ii) The construction has not started.\nOR\nOR\nOR\nOR\nNote: The Purchasable FAR shall be allowed up to the maximum limit of the applicable FAR in the Building Regulations. .\n28.2 Purchasable FAR shall be allowed with the following provisions/conditions.\n(ii) Parking facilities shall be provided within the plot as per the provisions of the building bylaws.\n(iii) No objection certificate from the Airport Authority of India/Competent Authority shall be obtained for the height of the building.\n(iv) Structural design duly checked and verified by the I.I.T/N.I.T./Government Engineering College shall be submitted along with the proposal in case where additional floors are being proposed.\n(v) No objection certificate from Fire Safety and Environmental Clearance shall be obtained from the Competent Authorities.\n(vi) Purchasable FAR shall be applicable only on the basis of assessment of planned and available physical infrastructure.\n(vii) Use of purchaseable FAR shall be governed by the terms and conditions of lease deed.\n(viii) In case where purchasable FAR is allowed, the Authority shall permit increase in the height of building as per requirement.\n(ix) Additional Propotionate residential units shall be allowed on the purchaseable FAR for Group Housing.\nNote:- (i) Purchasable FAR is an enabling provision. It shall not be allowed to any Allottee as a matter of right.\n(ii) With the consideration of Traffic density, conditions of approach road, availability of physical infrastructure, distance from the protected area and heritage sites or in the light of planning the Authority may identify the zones/areas where purchasable FAR shall not be allowed.\n(iii) In case of mixed land use permitted in any pocket/plot:\n(a) Permissible FAR for various uses shall be as applicable for respective use including the purchasable FAR.\n(b) The total FAR in the pocket/plot shall be subject to the overall permissible FAR for the pocket/plot.\n(c) Purchasable FAR shall be calculated on the basis of the FAR of the individual uses within that pocket/plot.\n28.3 Calculation Method for the rate of charges of Purchasable FAR.\n28.4 Note.\n(ii) The purchase able FAR shall be allowed to a maximum permissible FAR allowed for the particular use above the constructed building. If the allottee has done the construction before sanctioning, the compounding charge of un-sanctioned area shall be payable at the rate of Rs. 200/- per sq mtr. This penalty shall be over and above the fee charged for purchase able FAR. In case the construction is beyond the limit of purchasable F.A.R the allottee will have to first remove the extra construction beyond permitted F.A.R., then allottee may be allowed the extra purchasable F.A.R.\n[(iii) The Authority may also allow additional ground coverage upto the maximum limit of 50% in Commercial plots of more than 5000 sqm area on the basis of additional charges.]\n(iv) Increase in FAR of industrial plots prior to the commencement of these regulations shall continue to be allowed free of cost. But the increase of FAR of industrial plots notified in these Regulations shall be allowed on purchasable basis. Purchasable FAR may be allowed up to 2.0 FAR in the Industrial plots.\nChapter VIII",
"footnote": "",
"is_definition": false,
"sort_order": 129
},
{
"number": "29",
"title": "29. Provisions of parking, loading and unloading spaces.",
"chapter": null,
"content": "29.1 Other Provisions.\n(i) Multi-level parking facility should preferably be developed in the designated parking spaces/plots.\n(ii) In order to compensate the cost of multi level parking in designated areas and also to fulfill the growing need of parking spaces within urban areas, a maximum 25% of ground floor covered area may be utilized as commercial space. The balance covered area may be utilized on top floors for office use on a plot designated or planned for parking facility.\n(iii) In addition to the required parking spaces for maximum permissible FAR, 3 times additional space for parking component shall be provided.\n(iv) Maximum ground coverage shall be 70%.\n(v) For development of multilevel parking, models should be worked out to encourage the private sector initiative without commercial component.\n(vi) Multi level parking facility shall be allowed in all type of plots.\n(2) Basement Parking. - (i) In plots larger than 10000 sq.mtrs., the basement shall be allowed upto minimum setback of 6.0mtrs. There will be no restriction on the number of levels of basement subject to mechanical ventilation as per provisions in National Building code - 2005, water proofing and structural safety. Evergreen trees shall have to be planted in setback as per landscaping norms of these byelaws.\n(2) Basement Parking.\n(ii) Height of first basement above ground level will be maximum 1.5 mtrs below the roof slab. Where stilt or podium parking is permitted, the first basement roof will be leveled with the ground and the roof slab of the extended basement up to envelop line shall be designed for the fire tender load.\n(iii) The height of basements from floor to ceiling shall be maximum up to 4.5 mtrs.\n(iv) The ramp within setbacks shall be permissible subject to free and convenient movement of fire tender.\n(v) Adequate fire safety, light and ventilation and air change through mechanical means shall be provided as per provisions in National Building Code, 2005.\n(vi) The basements may be used only for parking, services like fire rooms and storage of non-hazardous materials.\n(3) Podium Parking. - For adequate parking space, podium parking up to maximum two floors may be permitted within the envelope line, only for parking, with the following conditions;\n(3) Podium Parking.\n(i) Minimum plot area = 10000 sqmtrs.\n(ii) Minimum width of the road = 18 mtrs.\n(iii) Minimum set back at the ground level will be 7.5 mtrs. all around where stilt and one storey podium will be permitted, however, other floors of podium parking may be permitted with larger set back.\n(iv) The height of one level of podium will be maximum 2.4mtrs.from floor to the bottom of beam.\n(v) Podium levels will not be enclosed by any material on the outer periphery except with one metre high metal Jali/mesh for safety.\n(vi) Adequate sprinklers, exits, ramps and fire fighting provisions as per provisions in National Building Code - 2005 will be provided.\n(vii) Structural safety measures as per BIS codes and for fire tender movement will be ensured.\n(viii) Ramp for podium shall not be allowed in the setback.\n(ix) Services and storage shall be allowed upto the extent of permissible ground coverage.\n(4) Mechanised Parking. - (i) Mechanized multi level parking will be permitted subject to the following;\n(4) Mechanised Parking.\n(ii) Minimum plot size = 1000 sq.mtrs.\n(iii) Minimum width of road = 18mtrs.\n(iv) ECS = 18 sq. mtrs. or as per the design and Technology.\n(v) Clear Height of one level = 2.1mtrs.\n(vi) Adequate safety measures for mechanical equipments.\n(vii) Backup of electricity through automatic generators.\n(viii) The company shall ensure proper maintenance, structural safety equipment and machinery.\n(5) Underground Parking. - Parking facilities can be created under the open spaces/parks (except heritage park), playground without disturbing the green areas on the surface and surrounding environment. The approvals from the concerned Authority are mandatory after following due process of public hearing before taking up such works. The guidelines for approval are as follows;\n(5) Underground Parking.\n(i) Minimum area of open spaces/park/playground = 5000 sq.mtrs.\n(ii) Minimum width of abutting road = 18mtrs.\n(iii) Up to 50% of the area to be utilized for underground parking with minimum two basements.\n(iv) Ramps to be provided with not more than 1:10 slope.\n(v) Maximum height from the road level shall be 0.5 mtrs with provision for mechanized light and ventilation.\n(vi) Minimum set back from the boundary of the park will be 1.5 mtrs for the purpose of staircase and ramps.\n(vii) Fire & structural safety measures shall be as per National Building Code, - 2005.\n(viii) Minimum depth of the earth shall be 0.5mtrs.for planting shrubs and grass.\n(ix) Adequate drainage for irrigation facilities and for water proofing shall be mandatory.\n(x) The Authority may consider to relax the minimum area limit depending upon the requirement in a particular area.\n(a) When parking space is to be provided for motor vehicles, it shall not be less than 20 square metre in open area and 30 square metre in basement and in stilts and for scooters and cycles the parking spaces provided shall not be less than 3 square metres and 1.40 square metres respectively.\n(b) For buildings of different types, parking space for vehicles shall be provided as specified in table No.5-\n(6) Extended Basement. - The basement shall be allowed within the setback only for parking purpose all around the plot boundary after leaving a minimum setback of 6.0mtrs. for fire tender movement. The top of the slab shall be flushed with the ground level and the roof shall be designed to take the load of the fire tender with mechanized ventilation.\n(6) Extended Basement.\nTABLE No. 1 (See regulation 24.1)\nTABLE No. 1 (See regulation 24.1)\nGround Coverage, FAR and Setbacks in Residential Plots\nGround Coverage, FAR and Setbacks in Residential Plots\nS. No.\nS. No.\nSize of Plot (Sqmtr.)\nSize of Plot (Sqmtr.)\nGround Coverage (In %age)\nGround Coverage (In %age)\nFront Setback (Mtr.)\nFront Setback (Mtr.)\nRear Setback (Mtr.)\nRear Setback (Mtr.)\nSide Setback (Mtr.)\nSide Setback (Mtr.)\nMaximum FAR\nMaximum FAR\n1\nUpto 50.0\n75\n1.5\n1.5\n-\n1.8\n2\n51 to 75\n75\n1.5\n2.0\n-\n1.8\n3\n76 to 120\n75\n2.0\n2.4\n-\n1.8\n4\n121 to 200\n75\n3.0\n2.4\n-\n1.8\n5\n201 to 300\n75\n3.5\n3.0\n-\n1.8\n6\n301 to 400\n65\n4.0\n3.0\n3.0\n1.8\n7\n401 to 500\n65\n4.5\n3.5\n3.0\n1.8\n8\n501 to 750\n60\n5.0\n3.5\n3.0\n1.5\nNote:- (i) Maximum building height in all size of plots shall be 15 Metres.\n(ii) Total height shall be counted from top of drain to top of building without exception.\n(iii) In case the pemissible ground coverage is not achieved within setbacks, the setbacks of the preceding category may be followed. In special cases where ground coverage is not achieved in the preceding category also, then Chief Executive Officer may relax the setbacks to the extent he considers fit.\n(iv) In the Residential Plots with in the permissible FAR and Ground Coverage equivalent of 40 % area of rear Set Back construction shall be allowed on either side/both side in the rear set back.\nTABLE No. - 2\nTABLE No. - 2\n(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)\n(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)\nSetbacks for all category and uses of plots other than individual residential Plots\nSetbacks for all category and uses of plots other than individual residential Plots\nS. No.\nS. No.\nPlot Size (in square metre)\nPlot Size (in square metre)\nFront (in metre)\nFront (in metre)\nRear (in metre)\nRear (in metre)\nSide (1) (in metre)\nSide (1) (in metre)\nSide (2) (in metre)\nSide (2) (in metre)\n1.\nUp to 150\n3.0\n1.5\n0\n0\n2.\nAbove 151 upto 300\n3.0\n3.0\n0\n0\n3.\nAbove 301 upto 500\n4.5\n3.0\n3.0\n0\n4.\nAbove 501 upto 2000\n6.0\n3.0\n3.0\n3.0\n5.\nAbove 2001 upto 6000\n7.5\n6.0\n4.5\n4.5\n6.\nAbove 6001 upto 12000\n9.0\n6.0\n6.0\n6.0\n7.\nAbove 12001 upto 20,000\n12.0\n7.5\n7.5\n7.5\n8.\nAbove 20,001 upto 40,000\n15.0\n9.0\n9.0\n9.0\n9.\nAbove 40,001\n16.0\n12.0\n12.0\n12.0\nNotes: (1) Specific setbacks shall be as per scheme/layout/zonal plan prepared by the Authority whenever such a plan is prepared by the Authority.\n(2) In case the permissible coverage is not achieved within setbacks, the setbacks of the preceding category may be followed.\nTABLE No. - 3\nTABLE No. - 3\n(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)\n(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)\nFeatures permitted in the setbacks of the plots after leaving 6.0m clear space for fire tender\nFeatures permitted in the setbacks of the plots after leaving 6.0m clear space for fire tender\nS. No.\nS. No.\nFeatures\nFeatures\nDescription\nDescription\n1.\nDecorative Column\nColumns purely decorative and not load bearing\n\t\t\t\tshall be permitted in setback. Such columns of any material and\n\t\t\t\tnumber shall be permitted but maximum size of each column shall\n\t\t\t\tnot exceed 0.30mtrs x 0.30mtrs\n2.\nButtresses\nButtresses, any number, shall be permitted in\n\t\t\t\tsetback up to maximum width of 0.750 mtrs in setback.\n3.\nMoulding, Cornices and Murals\nMurals, moulding and cornices if provided along\n\t\t\t\tunder any projection shall be permitted upto a maximum width of\n\t\t\t\t150 millimetre over and above the maximum permissible dimensions\n\t\t\t\tof a projection or a canopy.\n4.\nPlanters and Sun Control Devices\nProjection in form of planter, cantilevered\n\t\t\t\tfins, egg crates and other sun control devices shall be permitted\n\t\t\t\tin setback upto maximum width of 0.750 metre. Maximum depth of\n\t\t\t\tsuch planters shall not exceed 0.600 metre.\n5.\nJali\nJali of any material shall be permitted over\n\t\t\t\tprojections which are primarily meant to cover window\n\t\t\t\tAir-conditioning units and dessert cooler. Maximum width of such\n\t\t\t\tjalies shall not be more than 0.75 mtrs.\n6.\nCasing Enclosure to cover Rain Water pipe\nCasing/enclosures of any material to cover rain\n\t\t\t\twater pipe shall be permitted in setback upto depth of maximum\n\t\t\t\t0.50mtrs and maximum width of 0.75mtrs\nTable No. - 4\nTable No. - 4\n(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)\n(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)\nArea under canopy in buildings other than residential buildings\nArea under canopy in buildings other than residential buildings\nS. No.\nS. No.\nPlot Size (in square metre)\nPlot Size (in square metre)\nMinimum area under canopy (in sqmtrs.)\nMinimum area under canopy (in sqmtrs.)\n1.\nUpto 150\nNill\n2.\nAbove 150 upto 300\n12 (Only in side setback)\n3.\nAbove 300 upto 500\n25\n4.\nAbove 500 upto 2000\n40\n5.\nAbove 2000 upto 4000\n55\n6.\nAbove 4000 upto 10,000\n70\n7.\nAbove 10,000 upto 20,000\n85\n8.\nAbove 20,000 upto 40,000\n100\n9.\nAbove 40,000\n115\nNote: Minimum width of canopy shall be 1.8 mtrs.\nTABLE No. - 5\nTABLE No. - 5\nProvision of Parking Requirement\nProvision of Parking Requirement\nSI. No.\nSI. No.\nBuilding/plot\nBuilding/plot\nParking space\nParking space\n1.\n(a) Group Housing\nOne ECS/parking space per 80 square metres of\n\t\t\t\tpermissible FAR area.\n(b) Hostel, Lodges, Guest house Hotel.\nOne parking space for every 2 guest rooms.\n2.\nEducational Building\nOne parking space for every 100 square metres of\n\t\t\t\tpermissible FAR area .\n(a) IT/ITES, Offices, and Institution\nOne parking space for 50 square metre of\n\t\t\t\tpermissble FAR area.\n(b) Auditorium\nOne Parking space per 15 seats\n(c) Bus parking\nOne bus parking per 750 square metre of\n\t\t\t\tpermissible FAR area.\n(d) Off street parking\nHigher Secondary School 4.5 mtrs. off street\n\t\t\t\tparking depth in the entire frontage with boundary wall shifted\n\t\t\t\tback and front set back will be considered from property line and\n\t\t\t\tin other institutions upto 4.5 mtrs. in half the width of the\n\t\t\t\tfront of the plot would be required for providing off street\n\t\t\t\tparking on roads of 18.0 mtrs or more width.\n(e) Residential area\nOne parking space per 150 sq mtrs. of\n\t\t\t\tpermissible FAR area, in plot size of 112 sq mtrs. and above.\n3.\nMedical\nOne parking space for every 65 sq mtrs. of\n\t\t\t\tpermissible FAR area.\nOne ambulance for every 375 sq mtrs of\n\t\t\t\tpermissible FAR area.\n4.\nCommercial\nOne parking space for 30 sq mtrs of permissible\n\t\t\t\tFAR area.\n5.\nIndustrial\nOne parking space per 100 sq mtrs of permissible\n\t\t\t\tFAR area.\n6.\nStorage\nOne parking space for 100 sq mtrs of permissible\n\t\t\t\tFAR area.\n7.\nLoading/Unloading\nOne parking space for every 100 sq mtrs. for\n\t\t\t\tindustries and storage building\n8.\nMultiplex/Cinema\nOne parking space per 15 seats.\n9.\nReligious\nOne parking space per 100 sq mtrs of permissible\n\t\t\t\tFAR area.\n10.\nUtilities (Fire Station, Police Stations, Post\n\t\t\t\tOffice, Taxi Stand etc.)\nOne parking space per 100 sq mtrs of permissible\n\t\t\t\tFAR area.\n11.\nRecreational\nOne parking space per 50 sq mtrs of permissible\n\t\t\t\tFAR area.\n12.\nOne ECS\n=13.75 sqmtrs,\n13.\nArea Requirement\n30 sq mtrs. per ECS in basement/stilt/podium/\n\t\t\t\tcovered parking and 20 sq mtrs for surface parking\nNote: (I) Notwithstanding anything contained in these directions/regulations the Chief Executive Officer may where having regard to the features of a particular sector and the width of a road abutting any building/plot and the master plan consider it expedient to do so order for the preparation of architectural control detailed drawing for any of all the major projects specifically, especially of non residential character which may or may not deviate partly or wholly from the provisions of these regulations. For such purpose, Chief Executive Officer may constitute a committee, which shall submit its report to him for final decision.\n(II) Helipad may be permitted on the roof top of buildings above 60 mtrs. height subject to the clearance from Airport Authority and structural safety from I.I.T/N.I.T.\n(III) Development of parking facilities may be permitted proportionately on the basis of proposed phase wise development. However, provision of parking facilities has to be made on the basis of maximum permissible F.A.R.\n(IV) Parking norms are revised from time to time. Parking facilities have to be provided on the basis of revised norms for new proposed construction. Parking facility developed on the basis of old norms for old construction may be allowed to continue. If no parking facility has been developed, provisions have to be made on the basis of new norms for the entire old and proposed construction.\nTABLE No. - 6\nTABLE No. - 6\nProvisions for Landscaping\nProvisions for Landscaping\nPlot size (in square metre)\nPlot size (in square metre)\nNumber of trees required\nNumber of trees required\nMinimum open space to be kept for landscaping\nMinimum open space to be kept for landscaping\nUpto 2000\nOne tree per 100 square metre of open space out\n\t\t\t\tof which minimum 50 percent to be in the category of evergreen\n\t\t\t\ttrees.*\n25 percent of open area. In case of industrial\n\t\t\t\tplots no soft landscaping is required\nAbove 2000 to 12000\nOne tree per 100 square metre of open space out\n\t\t\t\tof which minimum 50 percent trees to be in the category of\n\t\t\t\tevergreen trees.\n25 percent of open area\nMore than 12000-\nOne tree per 100 square metre of open space out\n\t\t\t\tof which minimum 50 percent to be in the category of evergreen\n\t\t\t\ttrees.\n50 percent of open area\n(b) In case of plotted development in group housing plantation provision shall be as per Landscape Master Plan and following norms shall be followed.\n(i) On 18.0 metre and 24.0 metre wide road, alternate variety of evergreen and ornamental trees shall be planted @ 7.5 metre centre to centre.\n(ii) On road upto 12 metre ornamental trees will be planted @ 5 metre centre to centre of single variety in each pocket.\n(c) Recreational, Institutional Green: In addition to the requirement as mentioned in clause (a) detailed landscape plan will have to be got approved by the Authority as per specification in Landscape Master Plan and landscape manual approved by the Authority.\n(i) One tree in every plot for plot size upto 120 square metre.\n(ii) Two trees in every plot for plot size above 120 and upto 300 square metre.\n(iii) One tree additional in every100sqm for plot above 300 square metre.\n* Evergreen Tree: Tree that remains green for most part of the year and sheds leave slowly throughout the year, having height more than 2.0 mtrs, with a well distinguished trunk,\n* Evergreen Tree:\nAppendix-I\nAppendix-I\n{See regulation 5}\nForm for first application to erect, re-erect, demolish or to make material alteration in a building\nName of applicant (in Block letters).\n(i) Note - Strike out which is not applicable.\nChecklist -1 A (For buildings on individual residential plots)\nChecklist -1 A (For buildings on individual residential plots)\n(i) Ownership documents; copies of allotment letter ( transfer letter/memo or mutation letter in case of transfer) possession certificate, the lease deed (transfer deed in case of transfer), and dimension plan issued by the Authority.\n(ii) Form for first application to erect, re-erect, demolish or to make material alteration in a building (Appendix 1)\n(iii) Certificate prescribed in Appendix- 2 for undertaking the supervision by the Technical Person. Any change of the technical personnel during construction work shall be intimated to the Chief Executive Officer in writing.\n(iv) Structural stability certificate from the Architect/Structural Engineers as per Appendix-3.\n(v) Certificate for sanction of Building Plan as per Appendix-4.\n(vi) Where basement is proposed to be constructed, Indemnity bond on Rs. 100/- stamp paper duly attested by a Notary, shall have to be submitted.\n(vii) Specification of proposed building as per Appendix -6.\n(viii) Application for drainage of premises as per Appendix-7.\n(ix) Photocopy of the registration of the Technical Person as per Appendix 12 duly authenticated with plot number for which it is submitted.\n(x) In case of demolition photo of existing building.\n(xi) Soft copy of drawings in CD.\n(xii) In case of revalidation and revision original sanctioned plan to be submitted.\n(xiii) Photocopy of receipt of fees deposited, and such other charges, if any, as required by the Authority from time to time.\n(xiv) Three copies of drawings (one cloth mounted) duly signed by the Technical Person and Owner.\n(xv) Any other document as may be required by the Authority from time to time.\nCHECKLIST -1 B (For buildings other than those on individual residential plots)\nCHECKLIST -1 B (For buildings other than those on individual residential plots)\n(i) Ownership documents; copies of allotment letter, possession certificate, the lease deed (transfer deed in case of transfer), and dimension plan issued by the authority.\n(ii) Form for first application to erect, re-erect, demolish or to make material alteration in a building (Appendix 1).\n(iii) Certificate prescribed in Appendix- 2 for undertaking the supervision by the Technical Person. Any change of the technical personnel during construction work shall be intimated to the Chief Executive Officer in writing.\n(iv) Structural stability certificate from the Architect/Structural Engineers as per Appendix-3.\n(v) Certificate for sanction of Building Plan as per Appendix-4.\n(vi) Where basement is proposed to be constructed, Indemnity bond on Rs. 100/- stamp paper duly attested by a Notary, shall have to be submitted.\n(vii) Specification of proposed building as per Appendix -6.\n(viii) Application for drainage of premises as per Appendix-7.\n(ix) Photocopy of the registration of the Technical Person as per Appendix 12 duly authenticated with Plot No. for which it is submitted.\n(x) Photocopy of receipt of fees deposited, and such other charges, if any, as required by the Authority from time to time.\n(xi) Three copies of drawings (one cloth mounted) duly signed by the Technical Person and owner.\n(xii) Certificate of registered structural engineer and owner regarding earthquake resistance of the building as per Appendix 8(A)/8(B)/8(C), where-ever applicable.\n(xiii) Two copies of the drawings giving details of provisions for fire safety, security as per National Building Code.\n(xiv) Approval from the competent authority in case of hazardous buildings.\n(xv) Soft copies of the drawings in compact disc.\n(xvi) Valid time extension ,where- ever applicable.\n(xvii) NOC from Airport Authority if building is more than 30.0 mtrs high.\n(xviii) NOC from Ministry of environment if covered area is more than 20,000 sq mtrs.\n(xix) Any other document as may be required by the Authority from time to time.\n(xx) In case of revision and revalidation original sanction plan to be surrendered/submitted as the case may be.\nChecklist - 1C (For layouts and sub-division of plots)\nChecklist - 1C (For layouts and sub-division of plots)\n(i) Ownership documents; copies of allotment letter (transfer/mutation letter in case of transfer) possession certificate, lease deed (transfer deed in case of transfer), and dimension plan issued by the Authority.\n(ii) Form for first application to develop, redevelop or to make material alteration. (Appendix 1).\n(iii) Certificate prescribed in Appendix- 2 for undertaking the supervision by the Technical Person. Any change of the technical personnel during development work shall be intimated to the Chief Executive Officer in writing.\n(iv) Structural stability certificate from the Architect/Structural Engineers as per Appendix-3.\n(v) Certificate for sanction of Layout Plan as per Appendix-4.\n(vi) Specification of proposed layout development as per Appendix-6.\n(vii) Application for drainage of premises as per Appendix-7.\n(viii) Photocopy of the registration of the Technical Person as per Appendix 12 duly authenticated with Plot number for which it is submitted.\n(ix) Application form for water and sewer connection (where-ever applicable).\n(x) Photocopy of receipt of fees deposited, and such other charges, if any, as required by the Authority from time to time.\n(xi) Three copies of drawings (one cloth mounted) duly signed by the Licensed Technical Person and owner.\n(xii) Certificate of registered structural engineer and owner regarding earthquake resistance of the building as per Appendix 8(A)/8(B)/8(C), where-ever applicable.\n(xiii) Three copies of the drawings giving details of provisions for fire safety, security as per National Building Code.\n(xiv) Soft copies of the drawings.\n(xv) Valid time extension letter, where-ever applicable.\n(xvi) Any other document as may be required by the Authority from time to time.\n(xvii) In case of revision and revalidation original sanction plan to be surrendered/submitted as the case may be.\nChecklist - 1D (For Temporary Structures)\nChecklist - 1D (For Temporary Structures)\n(i) Ownership documents; copies of allotment letter (transfer letter in case of transfer) possession certificate, lease deed (transfer deed in case of transfer), and dimension plan issued by the Authority.\n(ii) Form for first application to erect, re-erect, demolish or to make material alteration in a building (Appendix 1).\n(iii) Certificate prescribed in Appendix- 2 for undertaking the supervision by the technical person. Any change of the technical personnel during construction work shall be intimated to the Chief Executive Officer in writing.\n(iv) Certificate for sanction of Building Plan as per Appendix-4.\n(v) Specification of proposed building as per Appendix -6.\n(vi) Photocopy of the registration of the Technical Person as per Appendix 12 duly authenticated with Plot number for which it is submitted.\n(vii) Application form for water and sewer connection (where-ever applicable).\n(viii) Photocopy of receipt of fees deposited, and such other charges, if any, as required by the Authority from time to time.\n(ix) Three copies of drawings (one cloth mounted) duly signed by the Technical Person and owner.\n(x) Valid time extension letter , if applicable.\n(xi) Any other document as may be required by the Authority from time to time.\n(xii) In case of revision and revalidation original sanction plan to be surrendered/submitted as the case may be.\nAppendix-2\nAppendix-2\n( See Appendix-1 Checklist 1A, 1B, 1C and 1D)\nForm for supervision of Building Work\nI hereby certify that the erection/re-erection and material alteration/demolition in/of building/site on Plot number ...........................in Sector.................................................. , Noida shall be carried out under my supervision and I certify that all the material (type and grade) and the workmanship of the work shall be generally in accordance with the general and detailed specifications submitted along with and that the work shall be carried out according to the sanctioned plan.\nNote - Strike out which is not applicable.\nAppendix-3\nAppendix-3\n( See Appendix-1 Checklist 1A, 1B and 1C)\nFor Structural Stability Certificate\nI hereby certify that the structural design of the Building on Plot number.....................................in Sector..........................................................................., Noida shall be done by me/us and carried out in accordance with Part/IV structural design of National Building code of India corrected upto date.\nAppendix - 4\nAppendix - 4\n(See regulation 25.10& 25.11)\nCertificate of Sanction of Layout Plan/Building Plan\nCertificate of Sanction of Layout Plan/Building Plan\n(To be given by Technical Person as per Appendix 12)\n(To be given by Technical Person as per Appendix 12)\nAppendix-5\nAppendix-5\n( See Appendix Number 1 Checklist 1A, 1B and 1C)\nIndemnity Bond\nIndemnity Bond\nNow therefore this deed Witnesseth as follows\n(Promisor),\nAppendix-6\nAppendix-6\nSee regulation 6.1, 6.2, ,6.3, 6.4\nGeneral Specifications Sheet\nGeneral Specifications Sheet\nNew Okhla Industrial Development Authority\nNew Okhla Industrial Development Authority\nSpecification of proposed building\nSpecification of proposed building\n(i) Foundation ..........................................................................................\n(ii) Walls ................................................................................................\n(iii) Floors .......................................................................................................................\n(iv) Roofs .............................................................................................................................\nAppendix-7\nAppendix-7\n( See Appendix 1 Checklist 1A, 1B and 1C)\nNew Okhla Industrial Development Authority\nNew Okhla Industrial Development Authority\n(To be submitted in duplicate)\nApplication for Drai age of Premises\nApplication for Drai age of Premises\nAppendix - 8(A)\nAppendix - 8(A)\n(See regulation umber 25.2)\n(See regulation umber 25.2)\nKindly (√) tick the relevant codes that have been followed\n(a) For General Structural Safety",
"footnote": "",
"is_definition": false,
"sort_order": 130
},
{
"number": "1",
"title": "1. IS : 1905 - 1987 \"Code of practice for structural safety of buildings; masonry walls\" Indian Standards Institution, March 1981.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 131
},
{
"number": "2",
"title": "2. IS : 1904 - 1978 \"Code of practice for structural safety of buildings; foundation\" Indian Standards Institution.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 132
},
{
"number": "3",
"title": "3. IS : 456 - 2000 \"Code of practice for plain and Reinforced Concrete\" Indian Standards Institution, September 2000.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 133
},
{
"number": "4",
"title": "4. IS : 800 - 1984 \"Code of practice for general construction in steel\" Indian Standards Institution, February 1985.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 134
},
{
"number": "5",
"title": "5. IS : 883 - 1966 \"Code of practice for design of structural timbers in buildings; \" Indian Standards Institution, March 1967 Besides any other relevant Indian Standards will need to be referred to",
"chapter": null,
"content": "(b) For Earthquake protection.",
"footnote": "",
"is_definition": false,
"sort_order": 135
},
{
"number": "1",
"title": "1. IS : 1893 - 1984 \"Criteria for Earthquake resistant Design of Structures (Fourth Revision)\" June 1986",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 136
},
{
"number": "2",
"title": "2. IS : 13920 - 1993 \"Ductile detailing of reinforced concrete structures subjected to Seismic forces - Code of Practice\" November 1993",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 137
},
{
"number": "3",
"title": "3. IS : 4326 - 1993 \"Earthquake Resistant Design and Construction of Buildings - Code of Practice (Second Revision)\" October 1993",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 138
},
{
"number": "4",
"title": "4. IS : 13828 - 1993 \"Improving Earthquake Resistance of Low Strength Masonry Buildings - Guidelines\" August 1993.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 139
},
{
"number": "5",
"title": "5. IS : 13827 - 1993 \"Improving Earthquake Resistance of Earthen Building Guidelines\" October 1993",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 140
},
{
"number": "6",
"title": "6. IS : 13935 - 1993 \"Repair and Seismic Strengthening of Buildings - Guidelines\" November 1993.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 141
},
{
"number": "7",
"title": "7. Improving Earthquake Resistance of Building-Guidelines\" by expert group, Government of India, Ministry of Urban Affairs and Employment, published by Building Materials and Technology Promotion Council 1998.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 142
},
{
"number": "8",
"title": "8. The National Building Code of India 1983 For location of the building in hazard prone area of earthquakes, cyclone or wind storms and floods, reference may be made to the following:",
"chapter": null,
"content": "9. \"Vulnerability Atlas of India\"by expert group, Government of India, Ministry of Urban Affairs and Employment, published by Building Materials and Technology Promotion Council 1997.\nNote : 1. As and when anyone of the above referred standards and documents is revised, the design and construction of Buildings thereafter must satisfy the latest version for approval of building plans by the Authority.\nSignature of the Engineer who will supervise the construction (with qualification and experience as mentioned in Appendix 12) Name (Block)\nLegible Seal: (with address)\nAppendix -8 (B)\nAppendix -8 (B)\n(See regulation umber 25.2)\n4.1 Building Information Schedule\n4.1 Building Information Schedule\n1.\n1.\nBuilding Address\nBuilding Address\nPlot number\nPlot number\nSector\nSector\nTown: Noida\nTown: Noida\n2.\nBuilding function & Locations\n2.1\nUse\nInstitutional\nCommercial\nIndustrial *\n2.2\nImportance\nOrdinary\nImportant\nHazardous *\n2.3\nSeismic Zone\n(Design Intensity Used\nV(IX)\nIV(VIII)\nIII(VII)\nII(VI)\nIS:1893\n3.\nDesign *EQ Factor\nα0 = ......\nI = ......\nβ =\nαh = ......\nIS:1893\n4.\nFoundation\n4.1\nSoil type at site (Note 2)\nRock/stiff Medium Soft\nLiquefiable\nExpensive(Bearing IS:1904 Capacity.)\n4.2\nType of Foundation\nStrip\nIndiv.Col.\nFottings/Raft\nBearing Piles\nFriction Piles\nIS:1893\n5.\nLoad Bearing Wall Buildings\n5.1\nBulding Category\nA(αh‹⋅05)\nB(αh=⋅05 to ⋅06)\nC(αh⋅06 to ‹⋅08)\nD(αh⋅08 to α‹9⋅12)\nE(αh › 0.12) IS: 4326\n5.2\nBearing Walls\nBrick\nStone\nSolid Block\nHollow Block\nAdobe\n5.3\nMortat (Note 4)\nC:S=1.....\nC:L:S=1.....\nL:S=1....\nClay Mud\n*\n5.4\nFloors\nReinforce Concrete Alabs\nStone Slabs on Joists\nPrefab flooring elements\n*\n5.5\nRoof Structure R.C. Slab\nFlat like floors/pitched\nTrussed/Raftered/A Frame/Slopping\n5.6\nRoof Covering\nCGI Sheeting\n*AC Sheeting\nClay tiles/Slate\nWoodshingle\n5.7\nOpening in walls\nControl used on sizes?\nControl used on location?\nStrengthening around?\nIS:4326\nYes/No\nYes/No\nYes/No\nIS:13828\n5.8\nBands Provided\nPlinth Band\nLintel Band\nRoof/Eave Band\nGable Band\nRidge Band\nYes/No\nYes/No\nYes/No\nYes/No\n5.9\nVertical Bars\nAt corners of rooms\nAt jambs of openings\nYes/No/NA\nYes/No/NA\n5.10\nStiffening of Prefab R.C. Screed & Band\n\t\t\t\tPeripheral band and Diagonal Planks and Floors/Roofs connectors\n\t\t\t\talround band\nIS:4326\n6.\nSteel/R.C. frame buildings\n6.1\nBuilding shape Both axes near symmetrical One\n\t\t\t\t\taxis near symmetrical/Unsymmetrical (torsion considered)\n6.2\nInfills/partitions\nOut of plane stability check? Yes/No\nIn Plane stiffness considered? Yes/No\nIS:1893,IS:4326\n6.3\nDectile Detailing of IS:13920\nBeams?\nColumns?\nBeam/column Joint?\nSheer Walls?\nR.C. Frames\nYes/No\nYes/No\nYes/No\nYes/No\n6.4\nDuctile Detailing of SP6(6)\nBeams?\nColumns?\nBeam/column Joint?\nSteel Frames\nYes/No\nYes/No\nYes/No\nNotes 1. Encircle the applicable Data point or insert information.",
"footnote": "",
"is_definition": false,
"sort_order": 143
},
{
"number": "2",
"title": "2. Stiff.N>30:Medium.N=10.3:Soft.N<10:Liquefiable,poorly graded sands with N<15 under Water Table (see Note 5 of Table 1 in IS:1893)",
"chapter": null,
"content": "3. * Means any other. Specify.\nSignature of the Engineer who will supervise the construction (with qualification and experience as mentioned in Appendix 12) Name (Block) Address: Legible Seal: (with address)\n* R.C. stands for Reinforce Concrete\n* CGI stands for Corrugated Galvanised Iron\n* B.C. stands for Bearing Capacity\n* EQ stands for Earth Quake\n*AC stands for Asbestos Corrogated\nAppendix - 8(C)\nAppendix - 8(C)\n(See regulation Number 25.2)\nCertificate\nCertificate\nSignature of the Engineer who will supervise the construction (with qualification and experience as mentioned in Appendix 12) Name (Block) .............\nAddress: Legible Seal: (with address)\nAppendix - 8D\nAppendix - 8D\n(See regulation No. 25.2)\nCertificate\nCertificate",
"footnote": "",
"is_definition": false,
"sort_order": 144
},
{
"number": "1",
"title": "1. Certified that the building for which completion plan has been submitted for approval conforms to the requirements of relevant Indian Standard Codes and National Building Code as referred in Appendix 8-A in respect of Structural Safety in general and natural hazards including earthquake in particular.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 145
},
{
"number": "2",
"title": "2. It is also certified that the building has been constructed as per approved foundation and structural designs provided by the Structural Engineer and is certified to be based on relevant Indian Standard Code and National Building Code as referred above and the building is safe for occupancy.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 146
},
{
"number": "3",
"title": "3. Location/Address of Building",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 147
},
{
"number": "4",
"title": "4. Particulars of Building",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 148
},
{
"number": "1",
"title": "1. Ground Coverage (square metre)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 149
},
{
"number": "2",
"title": "2. Total covered area (square metre)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 150
},
{
"number": "3",
"title": "3. Total Numbers of Floors above ground.",
"chapter": null,
"content": "Signature of the Engineer who will supervise the construction (with qualification and experience as mentioned in Appendix 12) Name (Block)\nName (Block) ...............................\nAddress: Legible Seal: (with address)\nAppendix -9\nAppendix -9\n(See regulation no. 20)\nForm for Occupancy Certificate for Building Work\nNote - Strike out the words which are not applicable.\nChecklist - 9A (For buildings on individual residential plots)\n(i) 3 copies of drawings (one set cloth bounded) duly signed by Technical Person and owner.\n(ii) Completion fees, as applicable.\n(iii) Valid time extension certificate, if applicable.\n(iv) Photographs of the building from front and side setbacks.\n(v) Photocopy of registration of Technical Person signing the plan and Appendices.\n(vi) Copy of receipt of payment of Water, Sewer connection charges, Metre charges and any other charges as may be required by the Authority.\n(vii) Compact Disc of the building plan submitted.\n(viii) Any other document as may be required from time to time.\nChecklist - 9B (For buildings on Plots other than individual residential plots)\n(i) 3 copies of drawings (one set cloth bounded) duly signed by Technical Person and owner.\n(ii) Completion fees.\n(iii) Valid time extension certificate, if applicable.\n(iv) Photographs of the building from front and side setbacks.\n(v) Photocopy of registration of Technical Person signing the plan and Appendices.\n(vi) No Objection Certificate from Chief Fire Officer, wherever applicable.\n(vii) No Objection Certificate from Explosive Department, wherever applicable.\n(viii) Certificate from owner and structural Engineer regarding earthquake resistance of building as per Appendix 8/A/B/D, if applicable\n(ix) Copy of receipt of fees deposited with Power Company.\n(x) Copy of receipt of payment of Water, Sewer connection charges, Metre charges if not submitted at the time of plan approval, and any other charges as may be required by the Authority.\n(xi) Compact Disc of the building plan submitted.\n(xii) Any other document as may be required from time to time.\n(xiii) NOC for Environment from Environment Department if applicable.\n(xiv) Affidavit regarding rain water harvesting.\n(xv) Photographs of the building/site and all documents to be self attested by the applicant.\nChecklist - 9C (For buildings layout and sub-division of land)\n(i) 3 copies of drawings (one set cloth bounded) duly signed by Technical Person, and owner.\n(ii) Completion fees.\n(iii) Valid time extension certificate if applicable.\n(iv) Photographs of the site from all sides.\n(v) Photocopy of registration of Technical Person signing the plan and appendices.\n(vi) No Objection Certificate from Chief Fire Officer, wherever applicable.\n(vii) No Objection Certificate from Explosive Department, wherever applicable.\n(viii) Certificate from owner and Structural Engineer regarding earthquake resistance of building as per Appendix 8/A/B/D. if applicable.\n(ix) Copy of receipt of fees deposited with Power Company Limited.\n(x) Copy of receipt of payment of water/sewer connection charges, Metre charges if not submitted at the time of plan approval, and any other charges as may be required by the Authority.\n(xi) Compact Disc of the building plan submitted.\n(xii) Any other document as may be required from time to time.\nNote: All documents and photographs should be self attested by the allotee and the technical person.\nAppendix -10\nAppendix -10\n{See regulation no. 20.1}\nForm for Sanction or refusal of Building Permit\nWith reference to your application number ........dated................for grant of permit for the erection/re-erection/material alteration/demolition in/of building on Plot number.........................in Sector........................, in Noida I have to inform you that the sanction has been granted/refused by the Authority on the following conditions.\n1.\n2.\n3.\n4.\nOffice Stamp\nNote - Strike out which is not applicable.\nAppendix -11\nAppendix -11\n{See regulation number 20.1}\nForm for Occupancy Certificate\nI hereby certify that the erection/re erection/alteration/demolition of building on Plot number............................in Sector....................., Noida completed under the supervision of Technical Person or name...................................has been inspected by the officers of the Authority and declare that the building conforms in all respects to the requirements of the regulations in respect of occupancy. Structural safety based upon the structural stability certificate and the completion certificate submitted by the concerned Technical Personnel for fire safety, hygienic and sanitary conditions inside and the surrounding and is fit for occupation.\nAppendix - 11A\nAppendix - 11A\n(See regulation No.20.4)\nForm for Temporary Occupancy Certificate\nForm for Temporary Occupancy Certificate\nI hereby certify that the erection/re-erection/material alteration/demolition on plot No. .....................Sector.......................... Noida completed under the supervision of ........................... licensed Architect/Engineer/Draftsman/Group License No. ............... has been inspected by me/officers of the Authority and declare that the building does not conforms in respect of the following requirements of the ................................... Regulations/Directions as amended upto date.\n1.\n2.\n3.\n4.\n5.\nHowever, a temporary occupancy certificate is being issued for a period of .................... subject to the condition that the above mentioned defects/discrepancies will be got corrected and a fresh completion certificate is submitted to the Chief Executive Officer for further necessary action.\nSignature ........................... Name of the office................ Designation ........................\nNote :..... Strike out the works which are not applicable.\nAppendix -12\nAppendix -12\nQualification of Technical Personnel for Preparation of Schemes for Building Permit and Supervision\n(i) The qualifications of the technical personnel and their competence to carry out different jobs for building permit and supervision by the Authority shall be as hereinafter indicated.\n(ii) Architects\n2.1 Qualification - The qualification of Architect will be the Associate Membership of the Indian Institute of Architects or such Degree or Diploma which makes him eligible for such membership or qualification mentioned in Schedule -XIV of Architects Act. 1972 and registered with the Council of Architecture as per provisions of the Architects Act. 1972.\nQualification\n2.2 An Architect shall be competent to carry out work related to building permit and shall be entitled to submit the following:\n(i) All plans and related information connected with building permit.\n(ii) Structural details and calculations for building on plots upto 500 square metre and upto four storeys height, and\n(iii) Certificate of supervision for all buildings.\n(iv) Layout Plan upto 2 hectares\n(iii) Engineers\n3.1 Qualification - The qualification for Engineers will be Associate/Corporate Membership (Civil) of the Institution of Engineers or such degree/diploma in Civil, Municipal, or Structural Engineering which makes him eligible for such membership or which is recognized by the Uttar Pradesh Public Service Commission for the post of Assistant Engineer. An engineer shall be competent to carry out the work related to building permit and shall be entitled to submit the following:\nQualification\n(i) Building plans for plots upto 1000 sqm.\n(ii) Structural details and service detail and calculations for all buildings.\n(iii) Certificate of supervision for all buildings.\n(iv) Structural Calculation and details for building mentioned shall be as follows:\nSr No.\nSr No.\nType of Building\nType of Building\nNumber of years of experience for Structural\n Engineer for structural design and supervision\nNumber of years of experience for Structural\n Engineer for structural design and supervision\nOther Details\nOther Details\nGraduate Civil Engineer\nGraduate Civil Engineer\nPost Graduate Structural Engineer\nPost Graduate Structural Engineer\n1\nMultistoreyed/important facility buildings\n which are upto 4 storeys or 12 metre high or 2500 square metre\n covered area\n5 years\n3 years\n2\nMultistoreyed important facility buildings which\n are upto 8 storeys or 24 metre high or 5000 square metre covered\n area\n9 years\n7 years\n3\nMultistoreyed/important facility buildings\n which are above 8 stories or above 24 metre high or above 5000\n square metre covered area\n10 years\n8 years\nCopy of structural design to be signed by\n Professor of Structural Design of Indian Institute of\n Technology/N.I.T, or any other recognized technical institutes.\n(v) Town Planner (for layout plans):- The minimum qualification for a town planner shall be post-graduate degree or post graduate diploma in town and country planning/urban planning which makes him eligible for Associate Membership of the Institute of Town Planners, India or recognized by the Public Service Commissions for the Post of Assistant Town Planner.\nA Town Planner shall be competent to carry out work related to building permit and shall be entitled to submit the layout plans.\n(vi) Group or Agency:- When a group or agency comprising of qualified Architect/Engineer Town Planner is practicing then the qualification and competence of work will be the combination of the individual qualification and competence given under paras 2,3 and 4 above.",
"footnote": "",
"is_definition": false,
"sort_order": 151
}
],
"metadata": {
"Act ID": "Last Updated 6th July, 2019 [up876]",
"Act Number": "Published vide Notification No. 2213/77-4-10-158N./85, dated 30.10.2010",
"Enactment Date": "",
"Act Year": "2010",
"Short Title": "New Okhla Industrial Development Area Building Regulations, 2010",
"Type": "STATE",
"Location": "Uttar Pradesh"
},