29.1 Other Provisions.
(i) Multi-level parking facility should preferably be developed in the designated parking spaces/plots.
(ii) In order to compensate the cost of multi level parking in designated areas and also to fulfill the growing need of parking spaces within urban areas, a maximum 25% of ground floor covered area may be utilized as commercial space. The balance covered area may be utilized on top floors for office use on a plot designated or planned for parking facility.
(iii) In addition to the required parking spaces for maximum permissible FAR, 3 times additional space for parking component shall be provided.
(iv) Maximum ground coverage shall be 70%.
(v) For development of multilevel parking, models should be worked out to encourage the private sector initiative without commercial component.
(vi) Multi level parking facility shall be allowed in all type of plots.
(2) Basement Parking. - (i) In plots larger than 10000 sq.mtrs., the basement shall be allowed upto minimum setback of 6.0mtrs. There will be no restriction on the number of levels of basement subject to mechanical ventilation as per provisions in National Building code - 2005, water proofing and structural safety. Evergreen trees shall have to be planted in setback as per landscaping norms of these byelaws.
(2) Basement Parking.
(ii) Height of first basement above ground level will be maximum 1.5 mtrs below the roof slab. Where stilt or podium parking is permitted, the first basement roof will be leveled with the ground and the roof slab of the extended basement up to envelop line shall be designed for the fire tender load.
(iii) The height of basements from floor to ceiling shall be maximum up to 4.5 mtrs.
(iv) The ramp within setbacks shall be permissible subject to free and convenient movement of fire tender.
(v) Adequate fire safety, light and ventilation and air change through mechanical means shall be provided as per provisions in National Building Code, 2005.
(vi) The basements may be used only for parking, services like fire rooms and storage of non-hazardous materials.
(3) Podium Parking. - For adequate parking space, podium parking up to maximum two floors may be permitted within the envelope line, only for parking, with the following conditions;
(3) Podium Parking.
(i) Minimum plot area = 10000 sqmtrs.
(ii) Minimum width of the road = 18 mtrs.
(iii) Minimum set back at the ground level will be 7.5 mtrs. all around where stilt and one storey podium will be permitted, however, other floors of podium parking may be permitted with larger set back.
(iv) The height of one level of podium will be maximum 2.4mtrs.from floor to the bottom of beam.
(v) Podium levels will not be enclosed by any material on the outer periphery except with one metre high metal Jali/mesh for safety.
(vi) Adequate sprinklers, exits, ramps and fire fighting provisions as per provisions in National Building Code - 2005 will be provided.
(vii) Structural safety measures as per BIS codes and for fire tender movement will be ensured.
(viii) Ramp for podium shall not be allowed in the setback.
(ix) Services and storage shall be allowed upto the extent of permissible ground coverage.
(4) Mechanised Parking. - (i) Mechanized multi level parking will be permitted subject to the following;
(4) Mechanised Parking.
(ii) Minimum plot size = 1000 sq.mtrs.
(iii) Minimum width of road = 18mtrs.
(iv) ECS = 18 sq. mtrs. or as per the design and Technology.
(v) Clear Height of one level = 2.1mtrs.
(vi) Adequate safety measures for mechanical equipments.
(vii) Backup of electricity through automatic generators.
(viii) The company shall ensure proper maintenance, structural safety equipment and machinery.
(5) Underground Parking. - Parking facilities can be created under the open spaces/parks (except heritage park), playground without disturbing the green areas on the surface and surrounding environment. The approvals from the concerned Authority are mandatory after following due process of public hearing before taking up such works. The guidelines for approval are as follows;
(5) Underground Parking.
(i) Minimum area of open spaces/park/playground = 5000 sq.mtrs.
(ii) Minimum width of abutting road = 18mtrs.
(iii) Up to 50% of the area to be utilized for underground parking with minimum two basements.
(iv) Ramps to be provided with not more than 1:10 slope.
(v) Maximum height from the road level shall be 0.5 mtrs with provision for mechanized light and ventilation.
(vi) Minimum set back from the boundary of the park will be 1.5 mtrs for the purpose of staircase and ramps.
(vii) Fire & structural safety measures shall be as per National Building Code, - 2005.
(viii) Minimum depth of the earth shall be 0.5mtrs.for planting shrubs and grass.
(ix) Adequate drainage for irrigation facilities and for water proofing shall be mandatory.
(x) The Authority may consider to relax the minimum area limit depending upon the requirement in a particular area.
(a) When parking space is to be provided for motor vehicles, it shall not be less than 20 square metre in open area and 30 square metre in basement and in stilts and for scooters and cycles the parking spaces provided shall not be less than 3 square metres and 1.40 square metres respectively.
(b) For buildings of different types, parking space for vehicles shall be provided as specified in table No.5-
(6) Extended Basement. - The basement shall be allowed within the setback only for parking purpose all around the plot boundary after leaving a minimum setback of 6.0mtrs. for fire tender movement. The top of the slab shall be flushed with the ground level and the roof shall be designed to take the load of the fire tender with mechanized ventilation.
(6) Extended Basement.
TABLE No. 1 (See regulation 24.1)
TABLE No. 1 (See regulation 24.1)
Ground Coverage, FAR and Setbacks in Residential Plots
Ground Coverage, FAR and Setbacks in Residential Plots
S. No.
S. No.
Size of Plot (Sqmtr.)
Size of Plot (Sqmtr.)
Ground Coverage (In %age)
Ground Coverage (In %age)
Front Setback (Mtr.)
Front Setback (Mtr.)
Rear Setback (Mtr.)
Rear Setback (Mtr.)
Side Setback (Mtr.)
Side Setback (Mtr.)
Maximum FAR
Maximum FAR
1
Upto 50.0
75
1.5
1.5
-
1.8
2
51 to 75
75
1.5
2.0
-
1.8
3
76 to 120
75
2.0
2.4
-
1.8
4
121 to 200
75
3.0
2.4
-
1.8
5
201 to 300
75
3.5
3.0
-
1.8
6
301 to 400
65
4.0
3.0
3.0
1.8
7
401 to 500
65
4.5
3.5
3.0
1.8
8
501 to 750
60
5.0
3.5
3.0
1.5
Note:- (i) Maximum building height in all size of plots shall be 15 Metres.
(ii) Total height shall be counted from top of drain to top of building without exception.
(iii) In case the pemissible ground coverage is not achieved within setbacks, the setbacks of the preceding category may be followed. In special cases where ground coverage is not achieved in the preceding category also, then Chief Executive Officer may relax the setbacks to the extent he considers fit.
(iv) In the Residential Plots with in the permissible FAR and Ground Coverage equivalent of 40 % area of rear Set Back construction shall be allowed on either side/both side in the rear set back.
TABLE No. - 2
TABLE No. - 2
(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)
(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)
Setbacks for all category and uses of plots other than individual residential Plots
Setbacks for all category and uses of plots other than individual residential Plots
S. No.
S. No.
Plot Size (in square metre)
Plot Size (in square metre)
Front (in metre)
Front (in metre)
Rear (in metre)
Rear (in metre)
Side (1) (in metre)
Side (1) (in metre)
Side (2) (in metre)
Side (2) (in metre)
1.
Up to 150
3.0
1.5
0
0
2.
Above 151 upto 300
3.0
3.0
0
0
3.
Above 301 upto 500
4.5
3.0
3.0
0
4.
Above 501 upto 2000
6.0
3.0
3.0
3.0
5.
Above 2001 upto 6000
7.5
6.0
4.5
4.5
6.
Above 6001 upto 12000
9.0
6.0
6.0
6.0
7.
Above 12001 upto 20,000
12.0
7.5
7.5
7.5
8.
Above 20,001 upto 40,000
15.0
9.0
9.0
9.0
9.
Above 40,001
16.0
12.0
12.0
12.0
Notes: (1) Specific setbacks shall be as per scheme/layout/zonal plan prepared by the Authority whenever such a plan is prepared by the Authority.
(2) In case the permissible coverage is not achieved within setbacks, the setbacks of the preceding category may be followed.
TABLE No. - 3
TABLE No. - 3
(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)
(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)
Features permitted in the setbacks of the plots after leaving 6.0m clear space for fire tender
Features permitted in the setbacks of the plots after leaving 6.0m clear space for fire tender
S. No.
S. No.
Features
Features
Description
Description
1.
Decorative Column
Columns purely decorative and not load bearing
shall be permitted in setback. Such columns of any material and
number shall be permitted but maximum size of each column shall
not exceed 0.30mtrs x 0.30mtrs
2.
Buttresses
Buttresses, any number, shall be permitted in
setback up to maximum width of 0.750 mtrs in setback.
3.
Moulding, Cornices and Murals
Murals, moulding and cornices if provided along
under any projection shall be permitted upto a maximum width of
150 millimetre over and above the maximum permissible dimensions
of a projection or a canopy.
4.
Planters and Sun Control Devices
Projection in form of planter, cantilevered
fins, egg crates and other sun control devices shall be permitted
in setback upto maximum width of 0.750 metre. Maximum depth of
such planters shall not exceed 0.600 metre.
5.
Jali
Jali of any material shall be permitted over
projections which are primarily meant to cover window
Air-conditioning units and dessert cooler. Maximum width of such
jalies shall not be more than 0.75 mtrs.
6.
Casing Enclosure to cover Rain Water pipe
Casing/enclosures of any material to cover rain
water pipe shall be permitted in setback upto depth of maximum
0.50mtrs and maximum width of 0.75mtrs
Table No. - 4
Table No. - 4
(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)
(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)
Area under canopy in buildings other than residential buildings
Area under canopy in buildings other than residential buildings
S. No.
S. No.
Plot Size (in square metre)
Plot Size (in square metre)
Minimum area under canopy (in sqmtrs.)
Minimum area under canopy (in sqmtrs.)
1.
Upto 150
Nill
2.
Above 150 upto 300
12 (Only in side setback)
3.
Above 300 upto 500
25
4.
Above 500 upto 2000
40
5.
Above 2000 upto 4000
55
6.
Above 4000 upto 10,000
70
7.
Above 10,000 upto 20,000
85
8.
Above 20,000 upto 40,000
100
9.
Above 40,000
115
Note: Minimum width of canopy shall be 1.8 mtrs.
TABLE No. - 5
TABLE No. - 5
Provision of Parking Requirement
Provision of Parking Requirement
SI. No.
SI. No.
Building/plot
Building/plot
Parking space
Parking space
1.
(a) Group Housing
One ECS/parking space per 80 square metres of
permissible FAR area.
(b) Hostel, Lodges, Guest house Hotel.
One parking space for every 2 guest rooms.
2.
Educational Building
One parking space for every 100 square metres of
permissible FAR area .
(a) IT/ITES, Offices, and Institution
One parking space for 50 square metre of
permissble FAR area.
(b) Auditorium
One Parking space per 15 seats
(c) Bus parking
One bus parking per 750 square metre of
permissible FAR area.
(d) Off street parking
Higher Secondary School 4.5 mtrs. off street
parking depth in the entire frontage with boundary wall shifted
back and front set back will be considered from property line and
in other institutions upto 4.5 mtrs. in half the width of the
front of the plot would be required for providing off street
parking on roads of 18.0 mtrs or more width.
(e) Residential area
One parking space per 150 sq mtrs. of
permissible FAR area, in plot size of 112 sq mtrs. and above.
3.
Medical
One parking space for every 65 sq mtrs. of
permissible FAR area.
One ambulance for every 375 sq mtrs of
permissible FAR area.
4.
Commercial
One parking space for 30 sq mtrs of permissible
FAR area.
5.
Industrial
One parking space per 100 sq mtrs of permissible
FAR area.
6.
Storage
One parking space for 100 sq mtrs of permissible
FAR area.
7.
Loading/Unloading
One parking space for every 100 sq mtrs. for
industries and storage building
8.
Multiplex/Cinema
One parking space per 15 seats.
9.
Religious
One parking space per 100 sq mtrs of permissible
FAR area.
10.
Utilities (Fire Station, Police Stations, Post
Office, Taxi Stand etc.)
One parking space per 100 sq mtrs of permissible
FAR area.
11.
Recreational
One parking space per 50 sq mtrs of permissible
FAR area.
12.
One ECS
=13.75 sqmtrs,
13.
Area Requirement
30 sq mtrs. per ECS in basement/stilt/podium/
covered parking and 20 sq mtrs for surface parking
Note: (I) Notwithstanding anything contained in these directions/regulations the Chief Executive Officer may where having regard to the features of a particular sector and the width of a road abutting any building/plot and the master plan consider it expedient to do so order for the preparation of architectural control detailed drawing for any of all the major projects specifically, especially of non residential character which may or may not deviate partly or wholly from the provisions of these regulations. For such purpose, Chief Executive Officer may constitute a committee, which shall submit its report to him for final decision.
(II) Helipad may be permitted on the roof top of buildings above 60 mtrs. height subject to the clearance from Airport Authority and structural safety from I.I.T/N.I.T.
(III) Development of parking facilities may be permitted proportionately on the basis of proposed phase wise development. However, provision of parking facilities has to be made on the basis of maximum permissible F.A.R.
(IV) Parking norms are revised from time to time. Parking facilities have to be provided on the basis of revised norms for new proposed construction. Parking facility developed on the basis of old norms for old construction may be allowed to continue. If no parking facility has been developed, provisions have to be made on the basis of new norms for the entire old and proposed construction.
TABLE No. - 6
TABLE No. - 6
Provisions for Landscaping
Provisions for Landscaping
Plot size (in square metre)
Plot size (in square metre)
Number of trees required
Number of trees required
Minimum open space to be kept for landscaping
Minimum open space to be kept for landscaping
Upto 2000
One tree per 100 square metre of open space out
of which minimum 50 percent to be in the category of evergreen
trees.*
25 percent of open area. In case of industrial
plots no soft landscaping is required
Above 2000 to 12000
One tree per 100 square metre of open space out
of which minimum 50 percent trees to be in the category of
evergreen trees.
25 percent of open area
More than 12000-
One tree per 100 square metre of open space out
of which minimum 50 percent to be in the category of evergreen
trees.
50 percent of open area
(b) In case of plotted development in group housing plantation provision shall be as per Landscape Master Plan and following norms shall be followed.
(i) On 18.0 metre and 24.0 metre wide road, alternate variety of evergreen and ornamental trees shall be planted @ 7.5 metre centre to centre.
(ii) On road upto 12 metre ornamental trees will be planted @ 5 metre centre to centre of single variety in each pocket.
(c) Recreational, Institutional Green: In addition to the requirement as mentioned in clause (a) detailed landscape plan will have to be got approved by the Authority as per specification in Landscape Master Plan and landscape manual approved by the Authority.
(i) One tree in every plot for plot size upto 120 square metre.
(ii) Two trees in every plot for plot size above 120 and upto 300 square metre.
(iii) One tree additional in every100sqm for plot above 300 square metre.
* Evergreen Tree: Tree that remains green for most part of the year and sheds leave slowly throughout the year, having height more than 2.0 mtrs, with a well distinguished trunk,
* Evergreen Tree:
Appendix-I
Appendix-I
{See regulation 5}
Form for first application to erect, re-erect, demolish or to make material alteration in a building
Name of applicant (in Block letters).
(i) Note - Strike out which is not applicable.
Checklist -1 A (For buildings on individual residential plots)
Checklist -1 A (For buildings on individual residential plots)
(i) Ownership documents; copies of allotment letter ( transfer letter/memo or mutation letter in case of transfer) possession certificate, the lease deed (transfer deed in case of transfer), and dimension plan issued by the Authority.
(ii) Form for first application to erect, re-erect, demolish or to make material alteration in a building (Appendix 1)
(iii) Certificate prescribed in Appendix- 2 for undertaking the supervision by the Technical Person. Any change of the technical personnel during construction work shall be intimated to the Chief Executive Officer in writing.
(iv) Structural stability certificate from the Architect/Structural Engineers as per Appendix-3.
(v) Certificate for sanction of Building Plan as per Appendix-4.
(vi) Where basement is proposed to be constructed, Indemnity bond on Rs. 100/- stamp paper duly attested by a Notary, shall have to be submitted.
(vii) Specification of proposed building as per Appendix -6.
(viii) Application for drainage of premises as per Appendix-7.
(ix) Photocopy of the registration of the Technical Person as per Appendix 12 duly authenticated with plot number for which it is submitted.
(x) In case of demolition photo of existing building.
(xi) Soft copy of drawings in CD.
(xii) In case of revalidation and revision original sanctioned plan to be submitted.
(xiii) Photocopy of receipt of fees deposited, and such other charges, if any, as required by the Authority from time to time.
(xiv) Three copies of drawings (one cloth mounted) duly signed by the Technical Person and Owner.
(xv) Any other document as may be required by the Authority from time to time.
CHECKLIST -1 B (For buildings other than those on individual residential plots)
CHECKLIST -1 B (For buildings other than those on individual residential plots)
(i) Ownership documents; copies of allotment letter, possession certificate, the lease deed (transfer deed in case of transfer), and dimension plan issued by the authority.
(ii) Form for first application to erect, re-erect, demolish or to make material alteration in a building (Appendix 1).
(iii) Certificate prescribed in Appendix- 2 for undertaking the supervision by the Technical Person. Any change of the technical personnel during construction work shall be intimated to the Chief Executive Officer in writing.
(iv) Structural stability certificate from the Architect/Structural Engineers as per Appendix-3.
(v) Certificate for sanction of Building Plan as per Appendix-4.
(vi) Where basement is proposed to be constructed, Indemnity bond on Rs. 100/- stamp paper duly attested by a Notary, shall have to be submitted.
(vii) Specification of proposed building as per Appendix -6.
(viii) Application for drainage of premises as per Appendix-7.
(ix) Photocopy of the registration of the Technical Person as per Appendix 12 duly authenticated with Plot No. for which it is submitted.
(x) Photocopy of receipt of fees deposited, and such other charges, if any, as required by the Authority from time to time.
(xi) Three copies of drawings (one cloth mounted) duly signed by the Technical Person and owner.
(xii) Certificate of registered structural engineer and owner regarding earthquake resistance of the building as per Appendix 8(A)/8(B)/8(C), where-ever applicable.
(xiii) Two copies of the drawings giving details of provisions for fire safety, security as per National Building Code.
(xiv) Approval from the competent authority in case of hazardous buildings.
(xv) Soft copies of the drawings in compact disc.
(xvi) Valid time extension ,where- ever applicable.
(xvii) NOC from Airport Authority if building is more than 30.0 mtrs high.
(xviii) NOC from Ministry of environment if covered area is more than 20,000 sq mtrs.
(xix) Any other document as may be required by the Authority from time to time.
(xx) In case of revision and revalidation original sanction plan to be surrendered/submitted as the case may be.
Checklist - 1C (For layouts and sub-division of plots)
Checklist - 1C (For layouts and sub-division of plots)
(i) Ownership documents; copies of allotment letter (transfer/mutation letter in case of transfer) possession certificate, lease deed (transfer deed in case of transfer), and dimension plan issued by the Authority.
(ii) Form for first application to develop, redevelop or to make material alteration. (Appendix 1).
(iii) Certificate prescribed in Appendix- 2 for undertaking the supervision by the Technical Person. Any change of the technical personnel during development work shall be intimated to the Chief Executive Officer in writing.
(iv) Structural stability certificate from the Architect/Structural Engineers as per Appendix-3.
(v) Certificate for sanction of Layout Plan as per Appendix-4.
(vi) Specification of proposed layout development as per Appendix-6.
(vii) Application for drainage of premises as per Appendix-7.
(viii) Photocopy of the registration of the Technical Person as per Appendix 12 duly authenticated with Plot number for which it is submitted.
(ix) Application form for water and sewer connection (where-ever applicable).
(x) Photocopy of receipt of fees deposited, and such other charges, if any, as required by the Authority from time to time.
(xi) Three copies of drawings (one cloth mounted) duly signed by the Licensed Technical Person and owner.
(xii) Certificate of registered structural engineer and owner regarding earthquake resistance of the building as per Appendix 8(A)/8(B)/8(C), where-ever applicable.
(xiii) Three copies of the drawings giving details of provisions for fire safety, security as per National Building Code.
(xiv) Soft copies of the drawings.
(xv) Valid time extension letter, where-ever applicable.
(xvi) Any other document as may be required by the Authority from time to time.
(xvii) In case of revision and revalidation original sanction plan to be surrendered/submitted as the case may be.
Checklist - 1D (For Temporary Structures)
Checklist - 1D (For Temporary Structures)
(i) Ownership documents; copies of allotment letter (transfer letter in case of transfer) possession certificate, lease deed (transfer deed in case of transfer), and dimension plan issued by the Authority.
(ii) Form for first application to erect, re-erect, demolish or to make material alteration in a building (Appendix 1).
(iii) Certificate prescribed in Appendix- 2 for undertaking the supervision by the technical person. Any change of the technical personnel during construction work shall be intimated to the Chief Executive Officer in writing.
(iv) Certificate for sanction of Building Plan as per Appendix-4.
(v) Specification of proposed building as per Appendix -6.
(vi) Photocopy of the registration of the Technical Person as per Appendix 12 duly authenticated with Plot number for which it is submitted.
(vii) Application form for water and sewer connection (where-ever applicable).
(viii) Photocopy of receipt of fees deposited, and such other charges, if any, as required by the Authority from time to time.
(ix) Three copies of drawings (one cloth mounted) duly signed by the Technical Person and owner.
(x) Valid time extension letter , if applicable.
(xi) Any other document as may be required by the Authority from time to time.
(xii) In case of revision and revalidation original sanction plan to be surrendered/submitted as the case may be.
Appendix-2
Appendix-2
( See Appendix-1 Checklist 1A, 1B, 1C and 1D)
Form for supervision of Building Work
I hereby certify that the erection/re-erection and material alteration/demolition in/of building/site on Plot number ...........................in Sector.................................................. , Noida shall be carried out under my supervision and I certify that all the material (type and grade) and the workmanship of the work shall be generally in accordance with the general and detailed specifications submitted along with and that the work shall be carried out according to the sanctioned plan.
Note - Strike out which is not applicable.
Appendix-3
Appendix-3
( See Appendix-1 Checklist 1A, 1B and 1C)
For Structural Stability Certificate
I hereby certify that the structural design of the Building on Plot number.....................................in Sector..........................................................................., Noida shall be done by me/us and carried out in accordance with Part/IV structural design of National Building code of India corrected upto date.
Appendix - 4
Appendix - 4
(See regulation 25.10& 25.11)
Certificate of Sanction of Layout Plan/Building Plan
Certificate of Sanction of Layout Plan/Building Plan
(To be given by Technical Person as per Appendix 12)
(To be given by Technical Person as per Appendix 12)
Appendix-5
Appendix-5
( See Appendix Number 1 Checklist 1A, 1B and 1C)
Indemnity Bond
Indemnity Bond
Now therefore this deed Witnesseth as follows
(Promisor),
Appendix-6
Appendix-6
See regulation 6.1, 6.2, ,6.3, 6.4
General Specifications Sheet
General Specifications Sheet
New Okhla Industrial Development Authority
New Okhla Industrial Development Authority
Specification of proposed building
Specification of proposed building
(i) Foundation ..........................................................................................
(ii) Walls ................................................................................................
(iii) Floors .......................................................................................................................
(iv) Roofs .............................................................................................................................
Appendix-7
Appendix-7
( See Appendix 1 Checklist 1A, 1B and 1C)
New Okhla Industrial Development Authority
New Okhla Industrial Development Authority
(To be submitted in duplicate)
Application for Drai age of Premises
Application for Drai age of Premises
Appendix - 8(A)
Appendix - 8(A)
(See regulation umber 25.2)
(See regulation umber 25.2)
Kindly (√) tick the relevant codes that have been followed
(a) For General Structural Safety
Section 29 • New Okhla Industrial Development Area Building Regulations, 2010
29. Provisions of parking, loading and unloading spaces.
new-okhla-industrial-development-area-building-regulations-2010-sec-29.json
•
Section 29
{
"act_title": "New Okhla Industrial Development Area Building Regulations, 2010",
"act_slug": "new-okhla-industrial-development-area-building-regulations-2010",
"section_label": "Section",
"section": {
"number": "29",
"title": "29. Provisions of parking, loading and unloading spaces.",
"chapter": null,
"content": "29.1 Other Provisions.\n(i) Multi-level parking facility should preferably be developed in the designated parking spaces/plots.\n(ii) In order to compensate the cost of multi level parking in designated areas and also to fulfill the growing need of parking spaces within urban areas, a maximum 25% of ground floor covered area may be utilized as commercial space. The balance covered area may be utilized on top floors for office use on a plot designated or planned for parking facility.\n(iii) In addition to the required parking spaces for maximum permissible FAR, 3 times additional space for parking component shall be provided.\n(iv) Maximum ground coverage shall be 70%.\n(v) For development of multilevel parking, models should be worked out to encourage the private sector initiative without commercial component.\n(vi) Multi level parking facility shall be allowed in all type of plots.\n(2) Basement Parking. - (i) In plots larger than 10000 sq.mtrs., the basement shall be allowed upto minimum setback of 6.0mtrs. There will be no restriction on the number of levels of basement subject to mechanical ventilation as per provisions in National Building code - 2005, water proofing and structural safety. Evergreen trees shall have to be planted in setback as per landscaping norms of these byelaws.\n(2) Basement Parking.\n(ii) Height of first basement above ground level will be maximum 1.5 mtrs below the roof slab. Where stilt or podium parking is permitted, the first basement roof will be leveled with the ground and the roof slab of the extended basement up to envelop line shall be designed for the fire tender load.\n(iii) The height of basements from floor to ceiling shall be maximum up to 4.5 mtrs.\n(iv) The ramp within setbacks shall be permissible subject to free and convenient movement of fire tender.\n(v) Adequate fire safety, light and ventilation and air change through mechanical means shall be provided as per provisions in National Building Code, 2005.\n(vi) The basements may be used only for parking, services like fire rooms and storage of non-hazardous materials.\n(3) Podium Parking. - For adequate parking space, podium parking up to maximum two floors may be permitted within the envelope line, only for parking, with the following conditions;\n(3) Podium Parking.\n(i) Minimum plot area = 10000 sqmtrs.\n(ii) Minimum width of the road = 18 mtrs.\n(iii) Minimum set back at the ground level will be 7.5 mtrs. all around where stilt and one storey podium will be permitted, however, other floors of podium parking may be permitted with larger set back.\n(iv) The height of one level of podium will be maximum 2.4mtrs.from floor to the bottom of beam.\n(v) Podium levels will not be enclosed by any material on the outer periphery except with one metre high metal Jali/mesh for safety.\n(vi) Adequate sprinklers, exits, ramps and fire fighting provisions as per provisions in National Building Code - 2005 will be provided.\n(vii) Structural safety measures as per BIS codes and for fire tender movement will be ensured.\n(viii) Ramp for podium shall not be allowed in the setback.\n(ix) Services and storage shall be allowed upto the extent of permissible ground coverage.\n(4) Mechanised Parking. - (i) Mechanized multi level parking will be permitted subject to the following;\n(4) Mechanised Parking.\n(ii) Minimum plot size = 1000 sq.mtrs.\n(iii) Minimum width of road = 18mtrs.\n(iv) ECS = 18 sq. mtrs. or as per the design and Technology.\n(v) Clear Height of one level = 2.1mtrs.\n(vi) Adequate safety measures for mechanical equipments.\n(vii) Backup of electricity through automatic generators.\n(viii) The company shall ensure proper maintenance, structural safety equipment and machinery.\n(5) Underground Parking. - Parking facilities can be created under the open spaces/parks (except heritage park), playground without disturbing the green areas on the surface and surrounding environment. The approvals from the concerned Authority are mandatory after following due process of public hearing before taking up such works. The guidelines for approval are as follows;\n(5) Underground Parking.\n(i) Minimum area of open spaces/park/playground = 5000 sq.mtrs.\n(ii) Minimum width of abutting road = 18mtrs.\n(iii) Up to 50% of the area to be utilized for underground parking with minimum two basements.\n(iv) Ramps to be provided with not more than 1:10 slope.\n(v) Maximum height from the road level shall be 0.5 mtrs with provision for mechanized light and ventilation.\n(vi) Minimum set back from the boundary of the park will be 1.5 mtrs for the purpose of staircase and ramps.\n(vii) Fire & structural safety measures shall be as per National Building Code, - 2005.\n(viii) Minimum depth of the earth shall be 0.5mtrs.for planting shrubs and grass.\n(ix) Adequate drainage for irrigation facilities and for water proofing shall be mandatory.\n(x) The Authority may consider to relax the minimum area limit depending upon the requirement in a particular area.\n(a) When parking space is to be provided for motor vehicles, it shall not be less than 20 square metre in open area and 30 square metre in basement and in stilts and for scooters and cycles the parking spaces provided shall not be less than 3 square metres and 1.40 square metres respectively.\n(b) For buildings of different types, parking space for vehicles shall be provided as specified in table No.5-\n(6) Extended Basement. - The basement shall be allowed within the setback only for parking purpose all around the plot boundary after leaving a minimum setback of 6.0mtrs. for fire tender movement. The top of the slab shall be flushed with the ground level and the roof shall be designed to take the load of the fire tender with mechanized ventilation.\n(6) Extended Basement.\nTABLE No. 1 (See regulation 24.1)\nTABLE No. 1 (See regulation 24.1)\nGround Coverage, FAR and Setbacks in Residential Plots\nGround Coverage, FAR and Setbacks in Residential Plots\nS. No.\nS. No.\nSize of Plot (Sqmtr.)\nSize of Plot (Sqmtr.)\nGround Coverage (In %age)\nGround Coverage (In %age)\nFront Setback (Mtr.)\nFront Setback (Mtr.)\nRear Setback (Mtr.)\nRear Setback (Mtr.)\nSide Setback (Mtr.)\nSide Setback (Mtr.)\nMaximum FAR\nMaximum FAR\n1\nUpto 50.0\n75\n1.5\n1.5\n-\n1.8\n2\n51 to 75\n75\n1.5\n2.0\n-\n1.8\n3\n76 to 120\n75\n2.0\n2.4\n-\n1.8\n4\n121 to 200\n75\n3.0\n2.4\n-\n1.8\n5\n201 to 300\n75\n3.5\n3.0\n-\n1.8\n6\n301 to 400\n65\n4.0\n3.0\n3.0\n1.8\n7\n401 to 500\n65\n4.5\n3.5\n3.0\n1.8\n8\n501 to 750\n60\n5.0\n3.5\n3.0\n1.5\nNote:- (i) Maximum building height in all size of plots shall be 15 Metres.\n(ii) Total height shall be counted from top of drain to top of building without exception.\n(iii) In case the pemissible ground coverage is not achieved within setbacks, the setbacks of the preceding category may be followed. In special cases where ground coverage is not achieved in the preceding category also, then Chief Executive Officer may relax the setbacks to the extent he considers fit.\n(iv) In the Residential Plots with in the permissible FAR and Ground Coverage equivalent of 40 % area of rear Set Back construction shall be allowed on either side/both side in the rear set back.\nTABLE No. - 2\nTABLE No. - 2\n(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)\n(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)\nSetbacks for all category and uses of plots other than individual residential Plots\nSetbacks for all category and uses of plots other than individual residential Plots\nS. No.\nS. No.\nPlot Size (in square metre)\nPlot Size (in square metre)\nFront (in metre)\nFront (in metre)\nRear (in metre)\nRear (in metre)\nSide (1) (in metre)\nSide (1) (in metre)\nSide (2) (in metre)\nSide (2) (in metre)\n1.\nUp to 150\n3.0\n1.5\n0\n0\n2.\nAbove 151 upto 300\n3.0\n3.0\n0\n0\n3.\nAbove 301 upto 500\n4.5\n3.0\n3.0\n0\n4.\nAbove 501 upto 2000\n6.0\n3.0\n3.0\n3.0\n5.\nAbove 2001 upto 6000\n7.5\n6.0\n4.5\n4.5\n6.\nAbove 6001 upto 12000\n9.0\n6.0\n6.0\n6.0\n7.\nAbove 12001 upto 20,000\n12.0\n7.5\n7.5\n7.5\n8.\nAbove 20,001 upto 40,000\n15.0\n9.0\n9.0\n9.0\n9.\nAbove 40,001\n16.0\n12.0\n12.0\n12.0\nNotes: (1) Specific setbacks shall be as per scheme/layout/zonal plan prepared by the Authority whenever such a plan is prepared by the Authority.\n(2) In case the permissible coverage is not achieved within setbacks, the setbacks of the preceding category may be followed.\nTABLE No. - 3\nTABLE No. - 3\n(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)\n(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)\nFeatures permitted in the setbacks of the plots after leaving 6.0m clear space for fire tender\nFeatures permitted in the setbacks of the plots after leaving 6.0m clear space for fire tender\nS. No.\nS. No.\nFeatures\nFeatures\nDescription\nDescription\n1.\nDecorative Column\nColumns purely decorative and not load bearing\n\t\t\t\tshall be permitted in setback. Such columns of any material and\n\t\t\t\tnumber shall be permitted but maximum size of each column shall\n\t\t\t\tnot exceed 0.30mtrs x 0.30mtrs\n2.\nButtresses\nButtresses, any number, shall be permitted in\n\t\t\t\tsetback up to maximum width of 0.750 mtrs in setback.\n3.\nMoulding, Cornices and Murals\nMurals, moulding and cornices if provided along\n\t\t\t\tunder any projection shall be permitted upto a maximum width of\n\t\t\t\t150 millimetre over and above the maximum permissible dimensions\n\t\t\t\tof a projection or a canopy.\n4.\nPlanters and Sun Control Devices\nProjection in form of planter, cantilevered\n\t\t\t\tfins, egg crates and other sun control devices shall be permitted\n\t\t\t\tin setback upto maximum width of 0.750 metre. Maximum depth of\n\t\t\t\tsuch planters shall not exceed 0.600 metre.\n5.\nJali\nJali of any material shall be permitted over\n\t\t\t\tprojections which are primarily meant to cover window\n\t\t\t\tAir-conditioning units and dessert cooler. Maximum width of such\n\t\t\t\tjalies shall not be more than 0.75 mtrs.\n6.\nCasing Enclosure to cover Rain Water pipe\nCasing/enclosures of any material to cover rain\n\t\t\t\twater pipe shall be permitted in setback upto depth of maximum\n\t\t\t\t0.50mtrs and maximum width of 0.75mtrs\nTable No. - 4\nTable No. - 4\n(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)\n(See regulation 24.2, 24.3, 24.4, 24.5, 24.6, 24.7)\nArea under canopy in buildings other than residential buildings\nArea under canopy in buildings other than residential buildings\nS. No.\nS. No.\nPlot Size (in square metre)\nPlot Size (in square metre)\nMinimum area under canopy (in sqmtrs.)\nMinimum area under canopy (in sqmtrs.)\n1.\nUpto 150\nNill\n2.\nAbove 150 upto 300\n12 (Only in side setback)\n3.\nAbove 300 upto 500\n25\n4.\nAbove 500 upto 2000\n40\n5.\nAbove 2000 upto 4000\n55\n6.\nAbove 4000 upto 10,000\n70\n7.\nAbove 10,000 upto 20,000\n85\n8.\nAbove 20,000 upto 40,000\n100\n9.\nAbove 40,000\n115\nNote: Minimum width of canopy shall be 1.8 mtrs.\nTABLE No. - 5\nTABLE No. - 5\nProvision of Parking Requirement\nProvision of Parking Requirement\nSI. No.\nSI. No.\nBuilding/plot\nBuilding/plot\nParking space\nParking space\n1.\n(a) Group Housing\nOne ECS/parking space per 80 square metres of\n\t\t\t\tpermissible FAR area.\n(b) Hostel, Lodges, Guest house Hotel.\nOne parking space for every 2 guest rooms.\n2.\nEducational Building\nOne parking space for every 100 square metres of\n\t\t\t\tpermissible FAR area .\n(a) IT/ITES, Offices, and Institution\nOne parking space for 50 square metre of\n\t\t\t\tpermissble FAR area.\n(b) Auditorium\nOne Parking space per 15 seats\n(c) Bus parking\nOne bus parking per 750 square metre of\n\t\t\t\tpermissible FAR area.\n(d) Off street parking\nHigher Secondary School 4.5 mtrs. off street\n\t\t\t\tparking depth in the entire frontage with boundary wall shifted\n\t\t\t\tback and front set back will be considered from property line and\n\t\t\t\tin other institutions upto 4.5 mtrs. in half the width of the\n\t\t\t\tfront of the plot would be required for providing off street\n\t\t\t\tparking on roads of 18.0 mtrs or more width.\n(e) Residential area\nOne parking space per 150 sq mtrs. of\n\t\t\t\tpermissible FAR area, in plot size of 112 sq mtrs. and above.\n3.\nMedical\nOne parking space for every 65 sq mtrs. of\n\t\t\t\tpermissible FAR area.\nOne ambulance for every 375 sq mtrs of\n\t\t\t\tpermissible FAR area.\n4.\nCommercial\nOne parking space for 30 sq mtrs of permissible\n\t\t\t\tFAR area.\n5.\nIndustrial\nOne parking space per 100 sq mtrs of permissible\n\t\t\t\tFAR area.\n6.\nStorage\nOne parking space for 100 sq mtrs of permissible\n\t\t\t\tFAR area.\n7.\nLoading/Unloading\nOne parking space for every 100 sq mtrs. for\n\t\t\t\tindustries and storage building\n8.\nMultiplex/Cinema\nOne parking space per 15 seats.\n9.\nReligious\nOne parking space per 100 sq mtrs of permissible\n\t\t\t\tFAR area.\n10.\nUtilities (Fire Station, Police Stations, Post\n\t\t\t\tOffice, Taxi Stand etc.)\nOne parking space per 100 sq mtrs of permissible\n\t\t\t\tFAR area.\n11.\nRecreational\nOne parking space per 50 sq mtrs of permissible\n\t\t\t\tFAR area.\n12.\nOne ECS\n=13.75 sqmtrs,\n13.\nArea Requirement\n30 sq mtrs. per ECS in basement/stilt/podium/\n\t\t\t\tcovered parking and 20 sq mtrs for surface parking\nNote: (I) Notwithstanding anything contained in these directions/regulations the Chief Executive Officer may where having regard to the features of a particular sector and the width of a road abutting any building/plot and the master plan consider it expedient to do so order for the preparation of architectural control detailed drawing for any of all the major projects specifically, especially of non residential character which may or may not deviate partly or wholly from the provisions of these regulations. For such purpose, Chief Executive Officer may constitute a committee, which shall submit its report to him for final decision.\n(II) Helipad may be permitted on the roof top of buildings above 60 mtrs. height subject to the clearance from Airport Authority and structural safety from I.I.T/N.I.T.\n(III) Development of parking facilities may be permitted proportionately on the basis of proposed phase wise development. However, provision of parking facilities has to be made on the basis of maximum permissible F.A.R.\n(IV) Parking norms are revised from time to time. Parking facilities have to be provided on the basis of revised norms for new proposed construction. Parking facility developed on the basis of old norms for old construction may be allowed to continue. If no parking facility has been developed, provisions have to be made on the basis of new norms for the entire old and proposed construction.\nTABLE No. - 6\nTABLE No. - 6\nProvisions for Landscaping\nProvisions for Landscaping\nPlot size (in square metre)\nPlot size (in square metre)\nNumber of trees required\nNumber of trees required\nMinimum open space to be kept for landscaping\nMinimum open space to be kept for landscaping\nUpto 2000\nOne tree per 100 square metre of open space out\n\t\t\t\tof which minimum 50 percent to be in the category of evergreen\n\t\t\t\ttrees.*\n25 percent of open area. In case of industrial\n\t\t\t\tplots no soft landscaping is required\nAbove 2000 to 12000\nOne tree per 100 square metre of open space out\n\t\t\t\tof which minimum 50 percent trees to be in the category of\n\t\t\t\tevergreen trees.\n25 percent of open area\nMore than 12000-\nOne tree per 100 square metre of open space out\n\t\t\t\tof which minimum 50 percent to be in the category of evergreen\n\t\t\t\ttrees.\n50 percent of open area\n(b) In case of plotted development in group housing plantation provision shall be as per Landscape Master Plan and following norms shall be followed.\n(i) On 18.0 metre and 24.0 metre wide road, alternate variety of evergreen and ornamental trees shall be planted @ 7.5 metre centre to centre.\n(ii) On road upto 12 metre ornamental trees will be planted @ 5 metre centre to centre of single variety in each pocket.\n(c) Recreational, Institutional Green: In addition to the requirement as mentioned in clause (a) detailed landscape plan will have to be got approved by the Authority as per specification in Landscape Master Plan and landscape manual approved by the Authority.\n(i) One tree in every plot for plot size upto 120 square metre.\n(ii) Two trees in every plot for plot size above 120 and upto 300 square metre.\n(iii) One tree additional in every100sqm for plot above 300 square metre.\n* Evergreen Tree: Tree that remains green for most part of the year and sheds leave slowly throughout the year, having height more than 2.0 mtrs, with a well distinguished trunk,\n* Evergreen Tree:\nAppendix-I\nAppendix-I\n{See regulation 5}\nForm for first application to erect, re-erect, demolish or to make material alteration in a building\nName of applicant (in Block letters).\n(i) Note - Strike out which is not applicable.\nChecklist -1 A (For buildings on individual residential plots)\nChecklist -1 A (For buildings on individual residential plots)\n(i) Ownership documents; copies of allotment letter ( transfer letter/memo or mutation letter in case of transfer) possession certificate, the lease deed (transfer deed in case of transfer), and dimension plan issued by the Authority.\n(ii) Form for first application to erect, re-erect, demolish or to make material alteration in a building (Appendix 1)\n(iii) Certificate prescribed in Appendix- 2 for undertaking the supervision by the Technical Person. Any change of the technical personnel during construction work shall be intimated to the Chief Executive Officer in writing.\n(iv) Structural stability certificate from the Architect/Structural Engineers as per Appendix-3.\n(v) Certificate for sanction of Building Plan as per Appendix-4.\n(vi) Where basement is proposed to be constructed, Indemnity bond on Rs. 100/- stamp paper duly attested by a Notary, shall have to be submitted.\n(vii) Specification of proposed building as per Appendix -6.\n(viii) Application for drainage of premises as per Appendix-7.\n(ix) Photocopy of the registration of the Technical Person as per Appendix 12 duly authenticated with plot number for which it is submitted.\n(x) In case of demolition photo of existing building.\n(xi) Soft copy of drawings in CD.\n(xii) In case of revalidation and revision original sanctioned plan to be submitted.\n(xiii) Photocopy of receipt of fees deposited, and such other charges, if any, as required by the Authority from time to time.\n(xiv) Three copies of drawings (one cloth mounted) duly signed by the Technical Person and Owner.\n(xv) Any other document as may be required by the Authority from time to time.\nCHECKLIST -1 B (For buildings other than those on individual residential plots)\nCHECKLIST -1 B (For buildings other than those on individual residential plots)\n(i) Ownership documents; copies of allotment letter, possession certificate, the lease deed (transfer deed in case of transfer), and dimension plan issued by the authority.\n(ii) Form for first application to erect, re-erect, demolish or to make material alteration in a building (Appendix 1).\n(iii) Certificate prescribed in Appendix- 2 for undertaking the supervision by the Technical Person. Any change of the technical personnel during construction work shall be intimated to the Chief Executive Officer in writing.\n(iv) Structural stability certificate from the Architect/Structural Engineers as per Appendix-3.\n(v) Certificate for sanction of Building Plan as per Appendix-4.\n(vi) Where basement is proposed to be constructed, Indemnity bond on Rs. 100/- stamp paper duly attested by a Notary, shall have to be submitted.\n(vii) Specification of proposed building as per Appendix -6.\n(viii) Application for drainage of premises as per Appendix-7.\n(ix) Photocopy of the registration of the Technical Person as per Appendix 12 duly authenticated with Plot No. for which it is submitted.\n(x) Photocopy of receipt of fees deposited, and such other charges, if any, as required by the Authority from time to time.\n(xi) Three copies of drawings (one cloth mounted) duly signed by the Technical Person and owner.\n(xii) Certificate of registered structural engineer and owner regarding earthquake resistance of the building as per Appendix 8(A)/8(B)/8(C), where-ever applicable.\n(xiii) Two copies of the drawings giving details of provisions for fire safety, security as per National Building Code.\n(xiv) Approval from the competent authority in case of hazardous buildings.\n(xv) Soft copies of the drawings in compact disc.\n(xvi) Valid time extension ,where- ever applicable.\n(xvii) NOC from Airport Authority if building is more than 30.0 mtrs high.\n(xviii) NOC from Ministry of environment if covered area is more than 20,000 sq mtrs.\n(xix) Any other document as may be required by the Authority from time to time.\n(xx) In case of revision and revalidation original sanction plan to be surrendered/submitted as the case may be.\nChecklist - 1C (For layouts and sub-division of plots)\nChecklist - 1C (For layouts and sub-division of plots)\n(i) Ownership documents; copies of allotment letter (transfer/mutation letter in case of transfer) possession certificate, lease deed (transfer deed in case of transfer), and dimension plan issued by the Authority.\n(ii) Form for first application to develop, redevelop or to make material alteration. (Appendix 1).\n(iii) Certificate prescribed in Appendix- 2 for undertaking the supervision by the Technical Person. Any change of the technical personnel during development work shall be intimated to the Chief Executive Officer in writing.\n(iv) Structural stability certificate from the Architect/Structural Engineers as per Appendix-3.\n(v) Certificate for sanction of Layout Plan as per Appendix-4.\n(vi) Specification of proposed layout development as per Appendix-6.\n(vii) Application for drainage of premises as per Appendix-7.\n(viii) Photocopy of the registration of the Technical Person as per Appendix 12 duly authenticated with Plot number for which it is submitted.\n(ix) Application form for water and sewer connection (where-ever applicable).\n(x) Photocopy of receipt of fees deposited, and such other charges, if any, as required by the Authority from time to time.\n(xi) Three copies of drawings (one cloth mounted) duly signed by the Licensed Technical Person and owner.\n(xii) Certificate of registered structural engineer and owner regarding earthquake resistance of the building as per Appendix 8(A)/8(B)/8(C), where-ever applicable.\n(xiii) Three copies of the drawings giving details of provisions for fire safety, security as per National Building Code.\n(xiv) Soft copies of the drawings.\n(xv) Valid time extension letter, where-ever applicable.\n(xvi) Any other document as may be required by the Authority from time to time.\n(xvii) In case of revision and revalidation original sanction plan to be surrendered/submitted as the case may be.\nChecklist - 1D (For Temporary Structures)\nChecklist - 1D (For Temporary Structures)\n(i) Ownership documents; copies of allotment letter (transfer letter in case of transfer) possession certificate, lease deed (transfer deed in case of transfer), and dimension plan issued by the Authority.\n(ii) Form for first application to erect, re-erect, demolish or to make material alteration in a building (Appendix 1).\n(iii) Certificate prescribed in Appendix- 2 for undertaking the supervision by the technical person. Any change of the technical personnel during construction work shall be intimated to the Chief Executive Officer in writing.\n(iv) Certificate for sanction of Building Plan as per Appendix-4.\n(v) Specification of proposed building as per Appendix -6.\n(vi) Photocopy of the registration of the Technical Person as per Appendix 12 duly authenticated with Plot number for which it is submitted.\n(vii) Application form for water and sewer connection (where-ever applicable).\n(viii) Photocopy of receipt of fees deposited, and such other charges, if any, as required by the Authority from time to time.\n(ix) Three copies of drawings (one cloth mounted) duly signed by the Technical Person and owner.\n(x) Valid time extension letter , if applicable.\n(xi) Any other document as may be required by the Authority from time to time.\n(xii) In case of revision and revalidation original sanction plan to be surrendered/submitted as the case may be.\nAppendix-2\nAppendix-2\n( See Appendix-1 Checklist 1A, 1B, 1C and 1D)\nForm for supervision of Building Work\nI hereby certify that the erection/re-erection and material alteration/demolition in/of building/site on Plot number ...........................in Sector.................................................. , Noida shall be carried out under my supervision and I certify that all the material (type and grade) and the workmanship of the work shall be generally in accordance with the general and detailed specifications submitted along with and that the work shall be carried out according to the sanctioned plan.\nNote - Strike out which is not applicable.\nAppendix-3\nAppendix-3\n( See Appendix-1 Checklist 1A, 1B and 1C)\nFor Structural Stability Certificate\nI hereby certify that the structural design of the Building on Plot number.....................................in Sector..........................................................................., Noida shall be done by me/us and carried out in accordance with Part/IV structural design of National Building code of India corrected upto date.\nAppendix - 4\nAppendix - 4\n(See regulation 25.10& 25.11)\nCertificate of Sanction of Layout Plan/Building Plan\nCertificate of Sanction of Layout Plan/Building Plan\n(To be given by Technical Person as per Appendix 12)\n(To be given by Technical Person as per Appendix 12)\nAppendix-5\nAppendix-5\n( See Appendix Number 1 Checklist 1A, 1B and 1C)\nIndemnity Bond\nIndemnity Bond\nNow therefore this deed Witnesseth as follows\n(Promisor),\nAppendix-6\nAppendix-6\nSee regulation 6.1, 6.2, ,6.3, 6.4\nGeneral Specifications Sheet\nGeneral Specifications Sheet\nNew Okhla Industrial Development Authority\nNew Okhla Industrial Development Authority\nSpecification of proposed building\nSpecification of proposed building\n(i) Foundation ..........................................................................................\n(ii) Walls ................................................................................................\n(iii) Floors .......................................................................................................................\n(iv) Roofs .............................................................................................................................\nAppendix-7\nAppendix-7\n( See Appendix 1 Checklist 1A, 1B and 1C)\nNew Okhla Industrial Development Authority\nNew Okhla Industrial Development Authority\n(To be submitted in duplicate)\nApplication for Drai age of Premises\nApplication for Drai age of Premises\nAppendix - 8(A)\nAppendix - 8(A)\n(See regulation umber 25.2)\n(See regulation umber 25.2)\nKindly (√) tick the relevant codes that have been followed\n(a) For General Structural Safety",
"footnote": "",
"is_definition": false,
"sort_order": 130
},
"prev_section": "28",
"next_section": "1"
}