(a) Whitewashing and painting;
(b) Plastering, patch work, flooring.
(c) Renewal of roof at the same height;
(d) Reconstruction of portions of building damaged by any natural calamity to the same extent as previously approved;
(e) Internal additions/alterations within the building envelop certified and supervised by a Technical Person ;
(f) Digging or filling of earth;
Section 5 • New Okhla Industrial Development Area Building Regulations, 2010
5. Application for building permit.
new-okhla-industrial-development-area-building-regulations-2010-sec-5.json
•
Section 5
{
"act_title": "New Okhla Industrial Development Area Building Regulations, 2010",
"act_slug": "new-okhla-industrial-development-area-building-regulations-2010",
"section_label": "Section",
"section": {
"number": "5",
"title": "5. Application for building permit.",
"chapter": null,
"content": "(a) Whitewashing and painting;\n(b) Plastering, patch work, flooring.\n(c) Renewal of roof at the same height;\n(d) Reconstruction of portions of building damaged by any natural calamity to the same extent as previously approved;\n(e) Internal additions/alterations within the building envelop certified and supervised by a Technical Person ;\n(f) Digging or filling of earth;",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
"prev_section": "4",
"next_section": "6"
}