S. No.
S. No.
Documents / information / data
Documents / information / data
Mode and period of
Mode and period of
Responsibility
Responsibility
1.
Short term Open Access and associated contracts
agreements by Intra-State Entities
Electronic -2 Years Paper - 12 months
State Load Despatch Centre
2.
Declared Capacity of all State Area Generating
Station / Independent Power Producers / Renewable Energy
Generators And Entitlements in all Inter State Generating Station
(all revisions)
Electronic -2 Years Paper - 12 months
State Load Despatch Centre, Generator Control
Centre
3.
Demand, Entitlement and Requisition of each
Discom (all revisions)
Electronic -2 Years Paper 12 months
State Load Despatch Centre, Delivery Control
Centre
4.
Short-term Open Access transactions: Bilateral
transactions (direct and through Traders) and Collective
transactions through Power Exchanges
Electronic -2 Years Paper - 12 months
State Load Despatch Centre, Delivery Control
Centre
5.
Schedules of Inter State Generating Station,
Seller and Buyer (all revisions)
Electronic -2 Years Paper - 12 months
State Load Despatch Centre, Delivery Control
Centre, Generator Control Centre.
6.
ABT meter data from Interfaces with Seller, &
Buyer in 15-minute Time Block
Electronic -2 Years
State Load Despatch Centre
7.
Details of State Load Despatch Centre
instructions to Intra-State Entities
Electronic -2 Years
State Load Despatch Centre
8.
Details of requests from Intra- State Entities
to State Load Despatch Centre
Electronic -2 Years Paper - 12 months
State Load Despatch Centre
9.
Any other information deemed necessary for
Operational, Commercial Delivery Control Centre or Market Audit
purpose
Electronic -2 Years Paper - 12 months
State Load Despatch Centre, Delivery Control
Centre, Generator Control Centre.
Section 9 • Madhya Pradesh Electricity Balancing and Settlement Code, 2015
9. Data Archiving Requirements.
madhya-pradesh-electricity-balancing-and-settlement-code-2015-sec-9.json
•
Section 9
{
"act_title": "Madhya Pradesh Electricity Balancing and Settlement Code, 2015",
"act_slug": "madhya-pradesh-electricity-balancing-and-settlement-code-2015",
"section_label": "Section",
"section": {
"number": "9",
"title": "9. Data Archiving Requirements.",
"chapter": null,
"content": "S. No.\nS. No.\nDocuments / information / data\nDocuments / information / data\nMode and period of\nMode and period of\nResponsibility\nResponsibility\n1.\nShort term Open Access and associated contracts\n\t\t\t\tagreements by Intra-State Entities\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre\n2.\nDeclared Capacity of all State Area Generating\n\t\t\t\tStation / Independent Power Producers / Renewable Energy\n\t\t\t\tGenerators And Entitlements in all Inter State Generating Station\n\t\t\t\t(all revisions)\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre, Generator Control\n\t\t\t\tCentre\n3.\nDemand, Entitlement and Requisition of each\n\t\t\t\tDiscom (all revisions)\nElectronic -2 Years Paper 12 months\nState Load Despatch Centre, Delivery Control\n\t\t\t\tCentre\n4.\nShort-term Open Access transactions: Bilateral\n\t\t\t\ttransactions (direct and through Traders) and Collective\n\t\t\t\ttransactions through Power Exchanges\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre, Delivery Control\n\t\t\t\tCentre\n5.\nSchedules of Inter State Generating Station,\n\t\t\t\tSeller and Buyer (all revisions)\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre, Delivery Control\n\t\t\t\tCentre, Generator Control Centre.\n6.\nABT meter data from Interfaces with Seller, &\n\t\t\t\tBuyer in 15-minute Time Block\nElectronic -2 Years\nState Load Despatch Centre\n7.\nDetails of State Load Despatch Centre\n\t\t\t\tinstructions to Intra-State Entities\nElectronic -2 Years\nState Load Despatch Centre\n8.\nDetails of requests from Intra- State Entities\n\t\t\t\tto State Load Despatch Centre\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre\n9.\nAny other information deemed necessary for\n\t\t\t\tOperational, Commercial Delivery Control Centre or Market Audit\n\t\t\t\tpurpose\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre, Delivery Control\n\t\t\t\tCentre, Generator Control Centre.",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
"prev_section": "8",
"next_section": "10"
}