{
    "act_title": "Madhya Pradesh Electricity Balancing and Settlement Code, 2015",
    "act_slug": "madhya-pradesh-electricity-balancing-and-settlement-code-2015",
    "section_label": "Section",
    "section": {
        "number": "9",
        "title": "9. Data Archiving Requirements.",
        "chapter": null,
        "content": "S. No.\nS. No.\nDocuments / information / data\nDocuments / information / data\nMode and period of\nMode and period of\nResponsibility\nResponsibility\n1.\nShort term Open Access and associated contracts\n\t\t\t\tagreements by Intra-State Entities\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre\n2.\nDeclared Capacity of all State Area Generating\n\t\t\t\tStation / Independent Power Producers / Renewable Energy\n\t\t\t\tGenerators And Entitlements in all Inter State Generating Station\n\t\t\t\t(all revisions)\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre, Generator Control\n\t\t\t\tCentre\n3.\nDemand, Entitlement and Requisition of each\n\t\t\t\tDiscom (all revisions)\nElectronic -2 Years Paper 12 months\nState Load Despatch Centre, Delivery Control\n\t\t\t\tCentre\n4.\nShort-term Open Access transactions: Bilateral\n\t\t\t\ttransactions (direct and through Traders) and Collective\n\t\t\t\ttransactions through Power Exchanges\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre, Delivery Control\n\t\t\t\tCentre\n5.\nSchedules of Inter State Generating Station,\n\t\t\t\tSeller and Buyer (all revisions)\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre, Delivery Control\n\t\t\t\tCentre, Generator Control Centre.\n6.\nABT meter data from Interfaces with Seller, &\n\t\t\t\tBuyer in 15-minute Time Block\nElectronic -2 Years\nState Load Despatch Centre\n7.\nDetails of State Load Despatch Centre\n\t\t\t\tinstructions to Intra-State Entities\nElectronic -2 Years\nState Load Despatch Centre\n8.\nDetails of requests from Intra- State Entities\n\t\t\t\tto State Load Despatch Centre\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre\n9.\nAny other information deemed necessary for\n\t\t\t\tOperational, Commercial Delivery Control Centre or Market Audit\n\t\t\t\tpurpose\nElectronic -2 Years Paper - 12 months\nState Load Despatch Centre, Delivery Control\n\t\t\t\tCentre, Generator Control Centre.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 8
    },
    "prev_section": "8",
    "next_section": "10"
}