(a) A Representative from State Load Despatch Centre (not below the rank of Chief Engineer)- chairperson of the Standing Committee;
(b) A Representative from State Transmission Unit (not below the rank of Chief Engineer);
(c) A representative from Madhya Pradesh Power Management Company Limited (not below the rank of Chief Engineer or equivalent post);
(d) A representative from Madhya Pradesh Power Generating Company Limited L (not below the rank of Chief Engineer or equivalent post);
(e) A representative from three discoms (on rotation for one year and not below the rank of Chief Engineer or equivalent post);
(f) A representative from National Hydro Development Corporation, Independent Power Producers (having installed capacity 250 Mega Watt. & above) and Renewable Energy Generators (having installed capacity of 50 Mega Watt & above at single location) on rotation for one year; and
(g) A Certified Energy Auditor from State Load Despatch Centre /Discom/ Madhya Pradesh Power Generating Company Limited / Madhya Pradesh Power Management Company Limited / State Transmission Unit as nominated by the Standing Committee, to assist the Committee for preparation of energy audit report.
Section 10 • Madhya Pradesh Electricity Balancing and Settlement Code, 2015
10. Standing Committee for Market Audi.
madhya-pradesh-electricity-balancing-and-settlement-code-2015-sec-10.json
•
Section 10
{
"act_title": "Madhya Pradesh Electricity Balancing and Settlement Code, 2015",
"act_slug": "madhya-pradesh-electricity-balancing-and-settlement-code-2015",
"section_label": "Section",
"section": {
"number": "10",
"title": "10. Standing Committee for Market Audi.",
"chapter": null,
"content": "(a) A Representative from State Load Despatch Centre (not below the rank of Chief Engineer)- chairperson of the Standing Committee;\n(b) A Representative from State Transmission Unit (not below the rank of Chief Engineer);\n(c) A representative from Madhya Pradesh Power Management Company Limited (not below the rank of Chief Engineer or equivalent post);\n(d) A representative from Madhya Pradesh Power Generating Company Limited L (not below the rank of Chief Engineer or equivalent post);\n(e) A representative from three discoms (on rotation for one year and not below the rank of Chief Engineer or equivalent post);\n(f) A representative from National Hydro Development Corporation, Independent Power Producers (having installed capacity 250 Mega Watt. & above) and Renewable Energy Generators (having installed capacity of 50 Mega Watt & above at single location) on rotation for one year; and\n(g) A Certified Energy Auditor from State Load Despatch Centre /Discom/ Madhya Pradesh Power Generating Company Limited / Madhya Pradesh Power Management Company Limited / State Transmission Unit as nominated by the Standing Committee, to assist the Committee for preparation of energy audit report.",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
"prev_section": "9",
"next_section": "11"
}