12. Fees to Staff.

Table
Description of work
If the estimated cost of the work is less than Rs.
10,000
If the estimated cost of the work is from Rs.
10,000 to Rs. 29,999
If the estimated costs of work is Rs. 30,000 or
over
1
2
3
4
For visiting a site and giving advice preparatory to design
Travelling allowance according to Government rules plus a fee
of Rs. 50, for each day or part of a day
For the preparation of preliminary plans and estimates by
cubic measurement of otherwise
1¼ per cent of the estimated cost
1 per cent of the estimated cost
¾ per cent of the estimated cost
For the preparation of general drawing plans (Estimates),
elevations, sections and specifications
1¼ per cent of the estimated cost
1 per cent of the estimated cost
¾ per cent of the estimated cost
For the preparation of half inch, full size and other
detailed drawings
Ditto
Ditto
Ditto
For the interviews and correspondence with the Engineer In
charge of Construction to an extent not amounting to supervision
Ditto
Ditto
Ditto
For the supervision of construction including periodical
inspection to the extent necessary to ensure efficient
construction and the issue of all necessary orders regarding the
work and the tendering of the advice during execution
3 per cent of the estimated cost
3 per cent of the estimated cost
2 per cent of the estimated cost
For the preparation of plans and estimates and construction
through the staff of the Public Works Department
7 per cent Departmental Charges
For the preparation of plan of the town where none already
exists, and such preparation is an essential preliminary to the
preparation of the plans and estimates for the work under
consideration
Such sum as may be agreed upon in each case before the
preparation of the plan is in hand
13.
Table
Description of work
If the estimated cost of the work is less than Rs.
10,000
If the estimated cost of the work is from Rs.
10,000 to Rs. 29,999
If the estimated cost of the work is Rs. 30,000 or
more
1
2
3
4
For visiting a site and giving advice preparatory to design,
or during execution of work
Travelling allowance according to
Government rules plus a fee of fifty rupees for each day or part
of a day
For the preparation of preliminary plans and estimates by
cubic measurement or otherwise
2¼ per cent of the estimated cost
1¾ per cent of the estimated cost
1¼ per cent of the estimated cost
For the preparation of general plans, elevation, sections and
specifications
Ditto
Ditto
Ditto
For the preparation of half inch, full size and other
detailed drawings
Ditto
Ditto
Ditto
For correspondence and interviews with the engineer in charge
of construction to an extent not amounting to supervision
Ditto
Ditto
Ditto