{
    "act_title": "Faridabad Complex Administration Works Rules, 1977",
    "act_slug": "faridabad-complex-administration-works-rules-1977",
    "section_label": "Section",
    "section": {
        "number": "12",
        "title": "12. Fees to Staff.",
        "chapter": null,
        "content": "Table\nDescription of work\nIf the estimated cost of the work is less than Rs.\n\t\t\t\t\t10,000\nIf the estimated cost of the work is from Rs.\n\t\t\t\t\t10,000 to Rs. 29,999\nIf the estimated costs of work is Rs. 30,000 or\n\t\t\t\t\tover\n1\n2\n3\n4\nFor visiting a site and giving advice preparatory to design\nTravelling allowance according to Government rules plus a fee\n\t\t\t\t\tof Rs. 50, for each day or part of a day\nFor the preparation of preliminary plans and estimates by\n\t\t\t\t\tcubic measurement of otherwise\n1¼ per cent of the estimated cost\n1 per cent of the estimated cost\n¾ per cent of the estimated cost\nFor the preparation of general drawing plans (Estimates),\n\t\t\t\t\televations, sections and specifications\n1¼ per cent of the estimated cost\n1 per cent of the estimated cost\n¾ per cent of the estimated cost\nFor the preparation of half inch, full size and other\n\t\t\t\t\tdetailed drawings\nDitto\nDitto\nDitto\nFor the interviews and correspondence with the Engineer In\n\t\t\t\t\tcharge of Construction to an extent not amounting to supervision\nDitto\nDitto\nDitto\nFor the supervision of construction including periodical\n\t\t\t\t\tinspection to the extent necessary to ensure efficient\n\t\t\t\t\tconstruction and the issue of all necessary orders regarding the\n\t\t\t\t\twork and the tendering of the advice during execution\n3 per cent of the estimated cost\n3 per cent of the estimated cost\n2 per cent of the estimated cost\nFor the preparation of plans and estimates and construction\n\t\t\t\t\tthrough the staff of the Public Works Department\n7 per cent Departmental Charges\nFor the preparation of plan of the town where none already\n\t\t\t\t\texists, and such preparation is an essential preliminary to the\n\t\t\t\t\tpreparation of the plans and estimates for the work under\n\t\t\t\t\tconsideration\nSuch sum as may be agreed upon in each case before the\n\t\t\t\t\tpreparation of the plan is in hand\n13.\nTable\nDescription of work\nIf the estimated cost of the work is less than Rs.\n\t\t\t\t\t10,000\nIf the estimated cost of the work is from Rs.\n\t\t\t\t\t10,000 to Rs. 29,999\nIf the estimated cost of the work is Rs. 30,000 or\n\t\t\t\t\tmore\n1\n2\n3\n4\nFor visiting a site and giving advice preparatory to design,\n\t\t\t\t\tor during execution of work\nTravelling allowance according to\n\t\t\t\t\tGovernment rules plus a fee of fifty rupees for each day or part\n\t\t\t\t\tof a day\nFor the preparation of preliminary plans and estimates by\n\t\t\t\t\tcubic measurement or otherwise\n2¼ per cent of the estimated cost\n1¾ per cent of the estimated cost\n1¼ per cent of the estimated cost\nFor the preparation of general plans, elevation, sections and\n\t\t\t\t\tspecifications\nDitto\nDitto\nDitto\nFor the preparation of half inch, full size and other\n\t\t\t\t\tdetailed drawings\nDitto\nDitto\nDitto\nFor correspondence and interviews with the engineer in charge\n\t\t\t\t\tof construction to an extent not amounting to supervision\nDitto\nDitto\nDitto",
        "footnote": "",
        "is_definition": false,
        "sort_order": 11
    },
    "prev_section": "11",
    "next_section": "14"
}