Faridabad Complex Administration Works Rules, 1977
Faridabad Complex Administration Works Rules, 1977
Sections
1. Short title.
Section 12. Definitions.
Section 23. Administrative Approval and establishment of depreciation fund.
Section 34. Technical Sanction and condition for taking up works.
Section 45. Revised Administration Approval.
Section 56. Saving.
Section 67. Electrical Sanitary Works.
Section 78. Grant-in-aid.
Section 89. Qualifications of Administration Engineers.
Section 910. Preparation of Preliminary Plans, etc.
Section 1011. Preparation of detailed plants/execution of works.
Section 1112. Fees to Staff.
Section 1214. Difficulty.
Section 1415. Power of relaxation.
Section 15
faridabad-complex-administration-works-rules-1977.json
•
14 Sections
•
Haryana
{
"id": 16912,
"slug": "faridabad-complex-administration-works-rules-1977",
"title": "Faridabad Complex Administration Works Rules, 1977",
"short_title": "Faridabad Complex Administration Works Rules, 1977",
"act_number": "Published vide Haryana Government Notification No.",
"act_year": 1977,
"act_type": "STATE",
"location": "Haryana",
"law_status": "unknown",
"enactment_date": null,
"description": "Faridabad Complex Administration Works Rules, 1977",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "1. Short title.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "2",
"title": "2. Definitions.",
"chapter": null,
"content": "(a) \"Act\" means the Faridabad Complex (Regulation and Development) Act, 1971;\n(b) \"Administrative approval\" means an approval to a projected work by the authority specified in the Schedule to accord such approval :\n(c) \"Administration Engineer\" includes Chief Engineer, Superintending Engineer, Executive Engineer and Assistant Engineer of the Administration;\n(d) \"Competent Authority\" means the Authority specified in the Schedule;\n(e) \"Electricity Board\" means the Haryana State Electricity Board;\n(f) \"Electrical works and Electrical projects\" include all works and projects for the generation, distribution or utilisation of electrical energy for any purpose except the transmission of message;\n(g) \"Government\" means the Government of Haryana in Local Government Department\n(h) \"Original works\" include new construction whether of entirely new works or additions and alterations to existing works, also all repairs to newly purchased or previously abandoned buildings or works required for bringing them into use;\n(i) \"Sanitary Board\" the Sanitary Board for the State of Haryana for the time being constituted under the orders of the State Government;\n(j) \"Sanitary Projects and Sanitary works\" include all projects and works, -\n(i) connected with collections, storage, protection, supply, distribution system and regulation of water for drinking and flushing;\n(ii) connected with the drainage, sanitary sewerage or the utilisation of sewerage;\n(iii) connected with the regulation of sanitation of streets, slaughter houses, markets, lodging houses, serials, bathing gets and other public places; or\n(iv) subsidiary to or connected with or relating to the construction and maintenance of water supply scheme, storm sewerage scheme, storm surface channels and sanitary sewerage scheme;\n(k) \"Schedule\" means the Schedule appended to these rules;\n(l) \"Technical sanction\" means the sanction of the authority specified in the Schedule to accord such sanction to the detailed plans and estimates of projected work;\n(m) Words and expressions used herein, and not defined in these rules, shall have the same meaning as assigned to them in the Act.",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
{
"number": "3",
"title": "3. Administrative Approval and establishment of depreciation fund.",
"chapter": null,
"content": "(a) funds for the execution of the work are likely to be forthcoming within the next two years; and\n(b) funds to the extent of an amount approved by the authority according technical sanction are likely to be forthcoming for annual maintenance after completion of the work;\n(c) the Administration has created a depreciation fund and shall credit to such fund from its revenue such amount in respect of depreciation of fixed assets employed in the business as is arrived at by dividing ninety per cent of the original cost of the assets by the prescribed period in respect of such assets.",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "4",
"title": "4. Technical Sanction and condition for taking up works.",
"chapter": null,
"content": "(a) technical sanction of the competent authority has been obtained;\n(b) it has in its employ an Engineer possessing qualifications and experience prescribed under Rule 9",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "5",
"title": "5. Revised Administration Approval.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "6",
"title": "6. Saving.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "7",
"title": "7. Electrical Sanitary Works.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "8",
"title": "8. Grant-in-aid.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "9",
"title": "9. Qualifications of Administration Engineers.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "10",
"title": "10. Preparation of Preliminary Plans, etc.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "11",
"title": "11. Preparation of detailed plants/execution of works.",
"chapter": null,
"content": "Note I. - The rules contained in the P.W.D. Code and the Departmental Financial Rules shall be observed while preparing preliminary surveys, plans, specification, estimates and while executing the works, in so far as the said rules are not inconsistent with these rules.\nNote II. - Regarding completion of work, the completion certificate shall be furnished by the authority competent to accord technical sanction counter signed by the next higher technical authority, if there is one in the service of the Administration.",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "12",
"title": "12. Fees to Staff.",
"chapter": null,
"content": "Table\nDescription of work\nIf the estimated cost of the work is less than Rs.\n\t\t\t\t\t10,000\nIf the estimated cost of the work is from Rs.\n\t\t\t\t\t10,000 to Rs. 29,999\nIf the estimated costs of work is Rs. 30,000 or\n\t\t\t\t\tover\n1\n2\n3\n4\nFor visiting a site and giving advice preparatory to design\nTravelling allowance according to Government rules plus a fee\n\t\t\t\t\tof Rs. 50, for each day or part of a day\nFor the preparation of preliminary plans and estimates by\n\t\t\t\t\tcubic measurement of otherwise\n1¼ per cent of the estimated cost\n1 per cent of the estimated cost\n¾ per cent of the estimated cost\nFor the preparation of general drawing plans (Estimates),\n\t\t\t\t\televations, sections and specifications\n1¼ per cent of the estimated cost\n1 per cent of the estimated cost\n¾ per cent of the estimated cost\nFor the preparation of half inch, full size and other\n\t\t\t\t\tdetailed drawings\nDitto\nDitto\nDitto\nFor the interviews and correspondence with the Engineer In\n\t\t\t\t\tcharge of Construction to an extent not amounting to supervision\nDitto\nDitto\nDitto\nFor the supervision of construction including periodical\n\t\t\t\t\tinspection to the extent necessary to ensure efficient\n\t\t\t\t\tconstruction and the issue of all necessary orders regarding the\n\t\t\t\t\twork and the tendering of the advice during execution\n3 per cent of the estimated cost\n3 per cent of the estimated cost\n2 per cent of the estimated cost\nFor the preparation of plans and estimates and construction\n\t\t\t\t\tthrough the staff of the Public Works Department\n7 per cent Departmental Charges\nFor the preparation of plan of the town where none already\n\t\t\t\t\texists, and such preparation is an essential preliminary to the\n\t\t\t\t\tpreparation of the plans and estimates for the work under\n\t\t\t\t\tconsideration\nSuch sum as may be agreed upon in each case before the\n\t\t\t\t\tpreparation of the plan is in hand\n13.\nTable\nDescription of work\nIf the estimated cost of the work is less than Rs.\n\t\t\t\t\t10,000\nIf the estimated cost of the work is from Rs.\n\t\t\t\t\t10,000 to Rs. 29,999\nIf the estimated cost of the work is Rs. 30,000 or\n\t\t\t\t\tmore\n1\n2\n3\n4\nFor visiting a site and giving advice preparatory to design,\n\t\t\t\t\tor during execution of work\nTravelling allowance according to\n\t\t\t\t\tGovernment rules plus a fee of fifty rupees for each day or part\n\t\t\t\t\tof a day\nFor the preparation of preliminary plans and estimates by\n\t\t\t\t\tcubic measurement or otherwise\n2¼ per cent of the estimated cost\n1¾ per cent of the estimated cost\n1¼ per cent of the estimated cost\nFor the preparation of general plans, elevation, sections and\n\t\t\t\t\tspecifications\nDitto\nDitto\nDitto\nFor the preparation of half inch, full size and other\n\t\t\t\t\tdetailed drawings\nDitto\nDitto\nDitto\nFor correspondence and interviews with the engineer in charge\n\t\t\t\t\tof construction to an extent not amounting to supervision\nDitto\nDitto\nDitto",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
{
"number": "14",
"title": "14. Difficulty.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "15",
"title": "15. Power of relaxation.",
"chapter": null,
"content": "Schedule\nS.No.\nNature of Power\nCompetent Authority\nExtent of Powers\nRemarks\n1.\nTo accord administrative approval to proposals for works\nSubject to Budget provision\n(a) Works other than sanitary works\n(i) Government (ii) Chief Administrator\nFull powers Full powers for works upto Rs. 5# lac\n(b) Sanitary works\n(i) Sanitary Board (ii) Chief Administrator\nFull powers Full powers for works upto Rs. 5# lac\nNote - (1) The meeting of the Technical\n\t\t\t\t\tCommittee will be called by the Chief Administrator as and when\n\t\t\t\t\tnecessary. For this purpose Government officer attending the\n\t\t\t\t\tmeeting will be paid travelling allowance by the Faridabad\n\t\t\t\t\tComplex Administration as per Government Rules.\n2.\nTo accord technical sanction to the detailed estimates of\n\t\t\t\t\tworks -\n(a) Works other than Electrical works\n(i) Chief Engineer of the Administration\nFull Powers\nNote - Till the appointment of Chief\n\t\t\t\t\tEngineer by the Administration of Technical Committee consisting\n\t\t\t\t\tof Chief Engineers, P.W.D., B. and R./P.H., Superintending\n\t\t\t\t\tEngineer and Executive Engineer of the Administration.\n(ii) Superintending Engineer of Administration whether whole\n\t\t\t\t\ttime or part time\nUp to Rs. 10,00,000 for each work\n(iii) (a) Executive Engineer Administration with a minimum of\n\t\t\t\t\t10 years service (including the service as Assistant Engineer)\nUp to Rs. 1,00,000 for each work\n(b) Other Executive Engineer Administration\nUp to Rs. 50,000 for each work\n(iv) Assistant Engineer, Administration\nUp to Rs. 10,000 for each work in the absence of Executive\n\t\t\t\t\tEngineer mentioned at (iii) above in case of emergency only\n(b) Electrical Works\n(1) Chief Engineer of the Administration\nFull Powers\nNote - Till the appointment of Chief\n\t\t\t\t\tEngineer by the Administration a Technical Committee consisting\n\t\t\t\t\tof Chief Engineers, Electrical (HSEB) Superintending Engineer\n\t\t\t\t\tand Executive Engineer of the Administration.\n(ii) Superintending Engineer Electrical of the Administration\n\t\t\t\t\twhether whole-time or part time\nUp to Rs. 10,00,000 for each work\n(iii) Executive Engineer (Administration)\nUp to Rs. 2,00,000* for each work\n(iv) Assistant Engineer, Administration\nUp to Rs. 10,000 for each work in the absence of Executive\n\t\t\t\t\tEngineer mentioned at (iii) above and in case of emergency only\n* Substituted vide Haryana Government Notification No. GSR 53/HA42/71/S.57/91 dated 5.8.1991.\n# Substituted vide Haryana Government Notification No. GSR 19/HA42/71/S.57/94 dated 11.3.1994.",
"footnote": "",
"is_definition": false,
"sort_order": 13
}
],
"metadata": {
"Act ID": "hl239",
"Act Number": "Published vide Haryana Government Notification No. 6174-2CI- 77/26761 26th August, 1977",
"Enactment Date": "",
"Act Year": "1977",
"Short Title": "Faridabad Complex Administration Works Rules, 1977",
"Type": "STATE",
"Location": "Haryana"
},
"updated_at": "2026-09-29 21:55:19"
}