Faridabad Complex Administration Building Rules, 1989

Faridabad Complex Administration Building Rules, 1989

Raw JSON API

Sections

1. Short title and extent.

Section 1

2. Definitions.

Section 2

3. Application for erection or re-erection of buildings. Sections 43(2), 57(2).

Section 3

4. Site plan. Section 43(2), 53(2)(m).

Section 43

5. Building Plan. Sections 43(2), 57(2)(m).

Section 5

6. Type plans. Sections 43(2), 57(2)m.

Section 6

7. Information necessary to validate the application. Sections 43(2), 57(2)(m).

Section 7

8. Permission to erect the building. Sections 43(2), 57(2)(m).

Section 8

9. Validity of sanctioned plans. Sections 43(2). 57(2)(m).

Section 9

10. Revalidation of plans. Sections 43(2), 57(2)(m).

Section 10

11. Revision of plans during construction. Sections 43(2), 57(2)(m).

Section 11

12. Notice of commencement of work. Sections 43(2), 57(2)(m).

Section 12

13. Completion of building. Sections 41(2), 57(2)(m).

Section 13

14. Occupancy violation. Sections 43(2), 57(2)(m).

Section 14

15. Revocation of Sanctions. Sections 42(2), 57(2)(m).

Section 15

16. Submission of plans by Government Departments. Sections 43(2), 57(2)(m).

Section 16

17. Maintenance of register or sanction/rejection of building applications. Sections 43(2), 57(2)(m).

Section 17

18. Use of site type and character of building. Sections 43(2), 57(2)(m).

Section 18

20. Size of plot for a residential building. Sections 43(2), 57(2)(m).

Section 20

21. Proportion of site which may be covered with residential buildings. Sections 43(2), 57(2)(m).

Section 21

22. Basement in a residential building. Sections 43(2), 57(2)(m).

Section 22

23. Height of residential building. Sections 43(2), 57(2)(m).

Section 23

24. Minimum size of plot, coverage, and basement for an industrial building. Sections 34(2), 57(2)(m).

Section 24

25. Minimum size of plot coverage basement and height of an industrial building. Sections 43(2), 57(2)(m).

Section 25

26. Minimum size of plot coverage, basement etc. for institutional and public buildings. Sections 43(2), 57(2)(m).

Section 26

27. Building lines. Sections 43(2), 57(2)(m).

Section 27

28. Area of internal courtyard for purposes of light and ventilation. Sections 43(2), 57(2)(m).

Section 28

29. Plinth etc. of main building. Sections 43(2)47(2)(m).

Section 29

30. Area and size of habitable room. Sections 43(2), 57(2)(m).

Section 30

31. Size, height etc. of kitchen. Sections 42(2), 57(2)(m).

Section 31

32. Minimum dimension, ventilation, location, etc. of bathroom and water-closet. Sections 43(2), 57(2)(m).

Section 32

33. Staircase. Sections 43(2), 57(2)(m).

Section 33

34. Provision of lift. Sections 43(2) , 57(2)(m).

Section 34

35. Lobbies, corridors and passage. Sections 43(2), 57(2)(m).

Section 35

36. Projection from the buildings. Sections 43(2), 57(2)(m).

Section 36

37. Mezzanine floor. Sections 43(2), 57(2)(m).

Section 37

38. Garage. Sections 43(2), 57(2)(m).

Section 38

39. Materials. Sections 43(2), 57(2)(m).

Section 39

40. Sites. Sections 43(2), 57(2)(m).

Section 40

41. Foundations. Section 43(2), 57(2)(m).

Section 43

42. Damp proof course. Sections 43(2), 57(2)(m).

Section 42

43. Loads. Sections 43(2), 57(2)(m).

Section 43

44. Walls. Sections 43(2), 57(2)(m).

Section 44

45. Thickness of walls. Sections 43(2) 57(2)(m).

Section 45

46. Slenderness ratio. Sections 43(2), 57(2)(m).

Section 46

47. Hollow bricks and block walls. Sections 43(2), 57(2)(m).

Section 47

48. Roofs. Sections 43(2), 57(2)(m).

Section 48

49. Chimneys and flues. Sections 43(2) 57(2)(m).

Section 49

50. Notice for carrying out drainage work and application for permission. Sections 43(2), 57(2)(m).

Section 50

51. Work to be executed under the supervision of plumber. Sections 43(2), 57(2)(m).

Section 51

52. Adequate water supply for installation of water borne sanitary installation. Sections 42(2) 57(2)(m).

Section 52

53. Sanitary fittings and execution of works to I.S.I. specifications. Sections 43(2), 57(2)(m).

Section 53

54. All drainage system to be air, smoke and water tight. Sections 43(2), 57(2)(m).

Section 54

55. Net work of foul and waste water drainage. Section 42(2), 57(2)(m).

Section 42

56. Junctions. Sections 43(2), 57(2)(m).

Section 56

57. Minimum sanitary facilities in various types of buildings. Sections 43(2), 57(2)(m).

Section 57

58. Water closets. Sections 43(2), 57(2)(m).

Section 58

59. Urinals. Sections 43(2), 57(2)(m).

Section 59

61. Ventilation of drains. Section 42(2), 57(2)(m).

Section 42

62. Manholes. Sections 43(2), 57(2)(m).

Section 62

63. Soil pipes and soil ventilating pipes. Sections 43(2), 57(2)(m).

Section 63

64. Separation of soil pipes from rain water pipes. Sections 43(2), 57(2)(m).

Section 64

65. Provision of traps. Sections 43(2), 57(2)(m).

Section 65

66. Waste water pipes. Sections 43(2), 57(2)(m).

Section 66

67. Over from pipe. Sections 43(2), 57(2)(m).

Section 67

68. Pipe not to be exposed on external walls. Sections 43(2), 57(2)(m).

Section 68

69. Method of disposal. Sections 43(2), 57(2)(m).

Section 69

70. Septic tanks. Sections 43(2), 57(2)(m).

Section 70

71. Absorption pits. Sections 43(2), 57(2)(m).

Section 71

72. Sub-soil irrigation for disposal of effluent. Sections 43(2), 57(2)(m).

Section 72

73. Sanitary installations and drainage to be completed before applying for connection. Sections 43(2), 57(2)(m).

Section 73

74. Application for connection with public sewer. Sections 43(2), 57(2)(m).

Section 74

75. Sewer connection. Sections 43(2), 57(2)(m).

Section 75

76. Drainage of roofs. Sections 43(2), 57(2)(m).

Section 76

77. Size of down pipes. Sections 43(2), 57(2)(m).

Section 77

78. Storm water not to drain into sewer. Sections 43(2), 57(2)(m).

Section 78

79. Inspections. Sections 43(2), 57(2)(m).

Section 79

80. Minor alteration in case of emergency. Sections 43(2), 57(2)(m).

Section 80

81. Carrying out of work. Sections 43(2), 57(2)(m).

Section 81

82. Sub-division of Plots. Sections 43(2), 57(2)(m).

Section 82

83. Application for permission to sub-divide. Sections 43(2), 57(2)(m).

Section 83

84. Access for the sub-divided plots. Sections 43(2), 57(2)(m).

Section 84

85. Minimum size of sub-divided plots. Sections 43(2), 57(2)(m).

Section 85

86. Provision of services. Sections 43(2), 57(2)(m).

Section 86

87. Construction on sub-divided plots. Sections 43(2), 57(2)(m).

Section 87

88. Registration of Architects, Engineers and Plumbers. Sections 43(2), 57(2)(m).

Section 88

89. Repeal and Savings. Sections 43(2), 57(2)(m).

Section 89

1. Dead Loading.

Section 1

2. Superimposed Loading.

Section 2

3. Partition.

Section 3

3. Covered area on each floor

Section 3

1. Plans are valid upto-----------------month----------------year.

Section 1

2. The construction will be undertaken as per sanctioned plan only and no deviation from bye-laws will be permitted without prior permission. Any deviation done against bye-laws is liable to be demolished and the supervising architect engaged on the job will run the risk of having licence cancelled.

Section 2

3. Violation of building bye-laws will not be compounded.

Section 3

4. It will be the duty of the owner of the plot and the Architect preparing the plans to ensure that the sanctioned plans are as per prevalent building bye-laws. If any infringement of bye-laws remains unnoticed, the Faridabad Complex Administration reserve the right to amend the plans as and when the infringement comes to its notice and Faridabad Complex Administration will stand indemnified against any claim on this account.

Section 4

5. A notice in writing shall be sent to Faridabad Complex Administration before commencement of the erection of building as per bye-laws. Similar notice will be sent to the Faridabad Complex Administration when the building has reached upto plinth level.

Section 5

6. The party shall not occupy or permit it to occupy the building or use or permit to be used the building or any part thereof affected by any such work until occupancy certificate is issued by the Faridabad Complex Administration.

Section 6

7. Faridabad Complex Administration will stand indemnified and kept harmless from all proceedings in courts and before other authorities of all expense/losses/claims which the Faridabad Complex Administration may incur or become liable to pay as a result or in consequences of the sanction accorded by it to the building plan.

Section 7

8. The door and window leaves shall be fixed in such a way that they shall not, when open, project on any street.

Section 8

9. The building shall not be constructed within minimum distance as specified in Indian Electricity Rules from Voltage lines running on side of the site.

Section 9

10. The land left open on consequences of the enforcement of the set back rules shall from part of the public street.

Section 10

11. The sanction will be void ab initio of auxiliary conditions mentioned above are not complied.

Section 11

2. Description of The Building

Section 2