Cement
Line
Sand
Maximum stress in kg/ square centimetre
corresponding to bricks or crushing strength in Kg./square
centimetre.
35
70
105
1
..
3
3.5
7
10.5
1
..
4
3.5
7
10.0
1
1
6
3.5
7
10.0
1
2
9
3.5
5.5
8.5
1
..
6
3.5
5.5
5.5
1
6
6
3.5
5.5
8.5
1
3
12
2.5
5
7.0
--
1
2
2.5
5
7.0
--
1
1.5
2.5
4
5.5
Burnt bricks in mud motors
3
Coursed rubble masonry (other than Ashler) in cement mortar
(1:4)
10
Coursed rubble masonry (other than Ashler) in lime mortar 1:2
or cement mortar 1:6
5
Random rubble masonry in cement mortar 1:4
9
Random rubble masonry in line mortar 1:2 or cement mortar 1:6
4.5
Ashler masonry in cement mortar 1:3 with 1:3:6 mass concrete
backing
13
Ashler masonry in line mortar 1:2 or cement mortar 1:6 with
1:4:8 mass concrete backing
6.5
Section 45 • Faridabad Complex Administration Building Rules, 1989
45. Thickness of walls. Sections 43(2) 57(2)(m).
faridabad-complex-administration-building-rules-1989-sec-45.json
•
Section 45
{
"act_title": "Faridabad Complex Administration Building Rules, 1989",
"act_slug": "faridabad-complex-administration-building-rules-1989",
"section_label": "Section",
"section": {
"number": "45",
"title": "45. Thickness of walls. Sections 43(2) 57(2)(m).",
"chapter": null,
"content": "Cement\nLine\nSand\nMaximum stress in kg/ square centimetre\n\t\t\t\t\tcorresponding to bricks or crushing strength in Kg./square\n\t\t\t\t\tcentimetre.\n35\n70\n105\n1\n..\n3\n3.5\n7\n10.5\n1\n..\n4\n3.5\n7\n10.0\n1\n1\n6\n3.5\n7\n10.0\n1\n2\n9\n3.5\n5.5\n8.5\n1\n..\n6\n3.5\n5.5\n5.5\n1\n6\n6\n3.5\n5.5\n8.5\n1\n3\n12\n2.5\n5\n7.0\n--\n1\n2\n2.5\n5\n7.0\n--\n1\n1.5\n2.5\n4\n5.5\nBurnt bricks in mud motors\n3\nCoursed rubble masonry (other than Ashler) in cement mortar\n\t\t\t\t(1:4)\n10\nCoursed rubble masonry (other than Ashler) in lime mortar 1:2\n\t\t\t\tor cement mortar 1:6\n5\nRandom rubble masonry in cement mortar 1:4\n9\nRandom rubble masonry in line mortar 1:2 or cement mortar 1:6\n4.5\nAshler masonry in cement mortar 1:3 with 1:3:6 mass concrete\n\t\t\t\tbacking\n13\nAshler masonry in line mortar 1:2 or cement mortar 1:6 with\n\t\t\t\t1:4:8 mass concrete backing\n6.5",
"footnote": "",
"is_definition": false,
"sort_order": 43
},
"prev_section": "44",
"next_section": "46"
}