37. Penalty.

[Schedule A]
Particulars of Threshold Value for Atomic Minerals
Particulars of Threshold Value for Atomic Minerals
( See rule 2 (1) (m) and rule 36)
( See rule 2 (1) (m) and rule 36)
1.
Beryl and other beryllium-bearing minerals
0.1% BeO (1000 ppm BeO) of the rock or 10kg/tonne Beryl in
excavated material.
2.
Lithium bearing minerals
0.5% (5,000ppm) Li 2 O in ore,
except brine (200 ppm Li, i.e. 200 g/tonne Li).
3.
Minerals of the 'rare earths' group containing uranium and
thorium
60 ppm U 3 O 8 and/or 250 ppm ThO 2 in ore.
4.
Niobium-bearing minerals
100 ppm (Nb+Ta) 2 O 5 (100 g/tonne) in ore.
5.
Phosphorites and other phosphatic ores containing uranium
60 ppm U 3 O 8 in ore.
6.
Pitchblende and other uranium ores
60 ppm U 3 O 8 in ore, except in Singhbhum Shear zone in Jharkhand where the
threshold value will be 150 ppm U 3 O 8 in ore.
7.
Titanium bearing minerals and ores (ilmenite, rutile and leucoxene)
In case of titanium-bearing minerals occurring in hard rock,
60 ppm U 3 O 8 and/or 250 ppm ThO 2 in the rock. All cases of titanium-bearing minerals occurring in Beach Sand Minerals and other placer deposits in association with monazite are notified as above threshold (i.e. the threshold is 0.00% monazite in Total Heavy Minerals), irrespective of monazite grade.
8.
Tantalum-bearing minerals
100 ppm (Ta+Nb) 2 O 5 (100 g/tonne) in ore.
9.
Uraniferousallanite, monazite and other thorium minerals
60 ppm U 3 O 8 and/or 250 ppm ThO 2 All cases of Beach Sand Minerals and other placer deposits in association with monazite are notified as above threshold (i.e. the threshold is 0.00% monazite in Total Heavy Minerals), irrespective of monazite grade.
10.
Uranium bearing tailings left over from ores after extraction
of copper and gold, ilmenite and other titanium ores.
60 ppm U 3 O 8 and/or 250 ppm ThO 2 .
11.
Zirconium bearing minerals and ores including zircon.
All cases of zirconium -bearing minerals occurring in Beach Sand Minerals and other placer deposits in association with monazite are notified as above threshold (i.e. the threshold is 0.00% monazite in Total Heavy Minerals), irrespective of monazite grade. In other cases, zircon containing less than 2000 ppm of Hafnium.
12.
Beach Sand Minerals i.e. economic heavy minerals found in the teri or beach sand, which include ilmenite, rutile, leucoxene, garnet, monazite, zircon and sillimanite.
All cases of Beach Sand Minerals and other placer deposits in association with monazite are notified as above threshold (i.e. the threshold is 0.00% monazite in Total Heavy Minerals), irrespective of monazite grade.
Schedule B
Parameters for Establishing The Existence of Mineralization for Atomic Minerals
Parameters for Establishing The Existence of Mineralization for Atomic Minerals
[ See rules 4(1), 4(4), 5(1) and 5(2)]
[ See rules 4(1), 4(4), 5(1) and 5(2)]
Part-II: Geological Parameters for exploration
1
Aerial reconnaissance: Satellite imagery/ remote sensing/
airborne geophysical survey etc. using appropriate technology
(applicable mainly for reconnaissance survey (G4) stage).
Geological survey (Mapping):On 1 : 50,000 or smaller scale for
reconnaissance (G4) stage;
on 1 : 10,000 or larger scale for preliminary exploration (G3)
stage; 1:4000 /1 : 5,000 or larger scale for general exploration
(G2) stage; on 1 : 2,000 or larger scale for detailed exploration
(G1) stage.
Ground Geophysical and Geochemical survey: Geophysical and
geochemical survey using appropriate techniques as may be
necessary.
Technological :Exploration and sampling using appropriate
techniques from locations such as outcrops, trenches, pits, old
workings and drill holes. The sampling locations are spaced
suitably ( in a grid pattern to the extent possible and may be
modified depending on structural complexity) for establishing
existence of ore body and its lateral and vertical continuity.
For General (G2) and detailed (G1)stages of exploration, the
depth continuity of mineralisation may be considered limited to
the depth up to which direct evidence of mineralization is
established.
The lateral extension to be considered for resource assessment
shall depend on geological considerations and in any case shall
not be more than 50% of the grid spacing of the probe points.
Assessment based on selected information such as isolated
assays, isolated drill holes, assays of panned concentrates etc.
is not recommended.
Sampling and sub-sampling: (a) Random grab/chip/channel
sampling from surface exposure/escarpments/ nallah cuttings/
pit/channel etc. for reconnaissance stage.
(b) Systematic sampling from pits/trenches/outcrops/workings
etc. spaced closely enough to confirm geological and grade
continuity for other stages of geological assessment.
(c) Litho-logging and gamma-ray logging of boreholes as the
case may be, sampling of drill core/chip samples at regular
interval, preferably metre wise or less for the mineralized
portions.
(d) The drill technique to be deployed shall depend on the
rock type to be penetrated and with an aim to achive maximum
sample/core recovery.
Assay data and Laboratory tests:Analysis of all samples
generated for major radicals appropriate to the mineral under
investigation. Analysis of by-products and deleterious elements
wherever necessary.
Petrographic and Mineragraphic studies: Petrographic analysis
of mineralized portions to ascertain the rock types and mineral
assemblages including grain size, texture, gaunge and its
liberation characteristics etc. if considered necessary.
Bulk density study: The bulk density must be measured by
methods that adequately account for void spaces (vugs, porosity
and other void spaces)
Bulk Sampling for Beneficiation studies: Bulk sampling if
necessary for testing processing technology.
Environmental setting.-details about local infrastructure,
host population, historical sites, forests, sanctuaries, national
park and base line information on environmental setting of the
area to be collected.
Any other relevant data: groundwater, geotechnical and rock
characteristics and other data that may be relevant
Part -III
Suggested norms for Exploration by drilling for different types of Uranium, Thorium and Rare Metal and Rare Earth Element deposits
Suggested norms for Exploration by drilling for different types of Uranium, Thorium and Rare Metal and Rare Earth Element deposits
Type of deposit and Principal Minerals
G4 stage
G3 stage
G2 stage
G1 stage
Remarks
I. Bedded Stratiform and Tabular Uranium
Deposits of Regular and irregular Habit, and classified
as: Sandstone type, Carbonate hosted, Phosphate, Black
Shale, Surficial and Coal Lignite hosted uranium deposits
I. Bedded Stratiform and Tabular Uranium
Deposits of Regular and irregular Habit, and classified
as:
Scout drilling/ pitting/ trenching as per
necessity
Bor. - hole grid/ sample spacing may be atleast
800m x 400m or atleast 5 boreholes per sq km
Bor. - hole grid/ sample spacing may be atleast
400m x 200m or atleast 18 boreholes per sq km
Bor. - hole grid/ sample spacing may be atleast
200m x 100m or atleast 65 boreholes per sq km
Exploratory mine openingsopen pit or underground
development with bulk determination of grades at G1 stage as per
requirement
II. Lenticular Uranium bodies of all
dimensions including bodies occurring in linear zones of
composite veins, lenses, pockets, stockworks, and classified
as: Metamorphite, Metasomatite, Unconformi. - related,
Intrusive, Graniterelated, Polymetallic hematite breccia complex
type, Volcanic related and Collapse Breccia Pipe types of uranium
deposits.
II. Lenticular Uranium bodies of all
dimensions including bodies occurring in linear zones of
composite veins, lenses, pockets, stockworks, and classified
as:
Scout drilling/ pitting/ trenching as per
necessity
Bor. - hole grid/ sample spacing may be atleast
400m x 200m or atleast 18 boreholes per sq km
Bor. - hole grid/ sample spacing may be atleast
200m x 100m or atleast 65 boreholes per sq km
Bor. - hole grid/ sample spacing may be atleast
100m x 50m or atleast 230 boreholes per sq km
Exploratory mine openingsopen pit or underground
development with bulk determination of grades at G1 stage as per
requirement
III. Rare metal and REE pegmatites, reefs and
veins/pipes, Carbonatite and other Alkali Igneous Rocks
III. Rare metal and REE pegmatites, reefs and
veins/pipes, Carbonatite and other Alkali Igneous Rocks
Scout drilling/ random pitting/ trenching as per
necessity
10 to 25 pits/ trenches/ per sq.km. In case
of drilling, borehole spacing may be 40m x 20m or 40m x 40m.
Pitting/ Trenching/ preferably at 20m
interval. In case of drilling, borehole spacing may be 20m x
10m or 20m x 20m.
Exploratory open pit or boreholes at 10m x 10m
or closer or underground sampling with bulk determination of
grades and recovery wherever necessary
IV. Beach and Inland Placer Deposits Beach,
dune and inland (Teri/Red Sands) placer concentration of heavy
mineral deposits (ilmenite, leucoxene, rutile, magnetite,
monazite, garnet, sillimanite and zircon etc.) formed by wave and
wind action with grain size varying from silt to coarse sand.
IV. Beach and Inland Placer Deposits
Random sampling as per availability of sample
points
Auger/Conrad/Bunka/ Dormer/Vibrocore/ RCD
drilling >200. - 3000m x 200m
Auger/Conrad/Bunka/ Dormer/Vibrocore/ RCD
drilling: G.2.1.: >20. - 1000m x 10. - 200m grid G.2.2.:
>100. - 2000m x 200m grid
Auger/Conrad/Bunka/ Dormer/Vibrocore/ RCD
drilling 200m x 100m grid or closer.
Part-IV
S. No.
S. No.
Criteria
Criteria
Explanation
Explanation
1
Titleand Ownership
- Name, address of the prospector including E-mail ID,
telephone number.
2
Details of the area
-Details of period of prospecting/mineral right if
any. -Village, District, State - Survey of India Toposheet
No. Geo-coordinates of the area of all corner points -
cadaster details of the area with land use - mineral(s) under
investigation
3
Infrastructure and Environment
-Local infrastructure, host population, historical sites,
forests, sanctuaries, national park and environmental settings of
the area.
4
Previous Exploration
-Details Of previous exploration carried out by other
agencies/parties. - In case the area forms part of the area
covered under earlier exploration then the same should be shown
in a map with proper scale.
5
Geology
- Brief regional geology of the area outlining the broad
geological, structural frame work. -Deposit type, geological
setting and details of dip, strike, old workings, surface
exposures etc. of the area under study also of adjoining nearby
areas if available and the information is likely to have an
impact on the area under study. -Reliable geological map of
appropriate scale with geo-coordinates showing major lithological
units, structural and tectonic features; extent of surface
mineralisation, structure, location of boreholes, pits, trenches,
old workings and other geo-coordinates. - Cross sections at
suitable intervals showing vertical projections of litho-units
and mineralization. - The extent and variability of the
mineralization expressed as length (along strike or otherwise),
plan width, and depth below surface to the upper and lower limits
of the Mineral Resource.
6
Aerial/ground geophysical/ geochemical data
Details of aerial, geophysicaland geochemical survey results
taken up if any.
7
Technological investigation
-Details of technological investigation
(pitting/trenching/drilling andother details) -Data spacing
for reporting of Exploration Results: Whether the data spacing
and distribution is based on section I and II and is sufficient
to establish the degree of geological and grade continuity
appropriate for the Mineral Resource estimation procedure(s) and
classifications applied.
8
Sampling Technique
Nature and quality of sampling ( For example cut channels,
random chips and other sampling) and measures taken to ensure
sample representivity.
9
Drilling Technique and drill employed
- Drill type (For example core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic and other drilling
techniques) and details ( For example core diameter, triple or
standard tube, collar R.L, sampling, azimuth, inclination,
coordinates of bore holes and other details). -Whether core
and chip sample recoveries have been properly recorded and
results assessed. -Measures taken to maximize sample recovery
and ensure representative nature of the samples. Logging. -
Whether core and chip samples have been logged to a level of
detail to support appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
10
Sub-sampling techniques and sample preparation
-If core, whether cut or sawn and whether quarter, half or all
core taken. -If non-core, whether riffled, tube sampled,
rotary split etc. and whether sampled wet or dry. -For all
sample types, the nature, quality and appropriateness of the
sample preparation technique. -Quality control procedures
adopted for all Sub-sampling stages to maximize representivity of
samples. -Measures taken to ensure that the sampling is
representative of the in situ material collected. -Whether
sample sizes are appropriate to the grain size of the material
being sampled.
11
Quality of assay data and laboratory tests
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total. Nature of quality control
procedures adopted (For example standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of
accuracy (that is lack of bias) and precision have been
established.
12
Moisture
- Whether the tonnages are estimated on a dry basis or with
natural moisture, and the method of determination of the moisture
content.
13
Bulk Density
Whether assumed or determined. If assumed, the basis for the
assumptions. If determined, the method used, whether wet or dry,
the frequency of the measurements, the nature, size and
representativeness of the samples.
14
Resource estimation techniques
- Discussion on sufficient data density to assure continuity
of mineralization and synthesis adequate data base for estimation
procedure used. -The nature and appropriateness of the
estimation technique(s) applied and key assumptions, including
treatment of extreme grade values, domaining, Interpolation
parameters, maximum distance of extrapolation from data points. -The basis for the classification of the Mineral Resources
into varying confidence categories. -The assumptions made
regarding recovery of byproducts. -Detailed description of
the method used and the assumptions made to estimate tonnages and
grades (section, polygon, inverse distance, geostatistical, or
other method). -Description of how the geological
interpretation was used to control the resource estimates. -Discussion of basis for using or not using grade cutting or
capping. If a computer method was chosen, description of
programmes and parameters used. -Geostatistical methods are
extremely varied and shall be described in detail. The method
chosen shall be justified. The geostatistical parameters,
including the variogram, and their compatibility with the
geological interpretation shall be discussed. Experience gained
in applying geostatistics to similar deposits should be taken
into account. -Data verification and /or validation
procedures used.
15
Further work.
- The nature and scale of planned further work (For example
tests for lateral extensions or depth extensions or largescale
step-out drilling).
16
Annexures/ enclosures to the report
The report shall include all relevant data including maps,
sections, logs, analysis reports photographs etc. in support of
the estimates made
17
Any Other Information
Any other information as may be available or required by any
authority.
Part-V.
S. No.
S. No.
Criteria
Criteria
Explanation
Explanation
1
Mineral Resource estimate for conversion to Mineral Reserve
- Description of Mineral Resource estimate used as a basis for
the conversion to a Mineral reserve. - Clear statement as to
whether the Mineral Resources are reported additional to, or
inclusive of the Mineral Reserves. -The type and level of
study undertaken to enable Mineral Resources to be converted to Mineral Reserves, that is Pre-feasibility/ Feasibility level.
2
Cut off Parameters
-The basis of the adopted cut-off grade(s) or quality
parameters applied, including the basis, if appropriate, of
equivalent metal formulae and the threshold values prescribed by
Indian Bureau of Mines.
3
Mining factors or assumptions.
-The method and assumptions used to convert the Mineral
Resource to a Mineral Reserve (that is either by application of
appropriate factors by optimisation or by preliminary or detailed
design supported with conceptual plan for mining). -The choice
of, the nature and the appropriateness of the selected mining
method(s), the size of the selected mining unit (length, width,
height) and other mining parameters including associated design
issues such as pre-strip, access, and other associated
designations. -The assumptions made regarding geotechnical
parameters (For example pit slopes, stope sizes, and other geo
technical parameters), grade control and pre-production
drilling. -The major assumptions made and Mineral Resource
model used for pit optimisation (if appropriate). -The mining
dilution factors, mining recovery factors, and minimum mining
width used. -The infrastructure requirements of the selected
mining methods. Where available, the historic reliability of the
performance parameters.
4
Metallurgical factors or assumptions.
-The metallurgical process proposed and the appropriateness of
that process to the type of deposit. -The nature, amount and
representativeness of metallurgical test work undertaken and the
metallurgical recovery factors applied. -Any assumptions or
allowances made for deleterious elements. -The existence of
any bulk sample or pilot scale test work and the degree to which
such samples are representative of the orebody as a whole. -The
tonnages and grades reported for Mineral Reserves should state
clearly whether these are in respect of material to the plant or
after recovery. Comment on existing plant and equipment,
including an indication of replacement and salvage value
5
Cost and revenue factors
-The derivation of, or assumptions made, regarding projected
capital and operating costs. - The assumptions made regarding
revenue including head grade, metal or commodity price
exchange rates, transportation and treatment charges, penalties,
and other revenue factors. - The allowances made for royalties
payable, both Government and private. - Basic cash flow inputs
for a stated period.
6
Market assessment
-The demand, supply and stock situation for the particular
commodity, consumption trends and factors likely to affect supply
and demand into the future. -A customer and competitor
analysis along with the identification of likely market windows
for the product. -Price and volume forecasts and the basis for
these forecasts. -For industrial minerals the customer
specification, testing and acceptance requirements prior to a
supply contract.
7
Other modifying factors
-The effect, if any, of natural risk, infrastructure,
environmental, legal, marketing, social or governmental factors
on the likely viability of a project and/or on the estimation and
classification of the Mineral Reserves. -The status of titles
and approvals critical to the viability of the project, such as
mining leases, discharge permits, government and statutory
approvals. -Environmental descriptions of anticipated
liabilities. Location plans of mineral rights and titles.
8
Classification.
-The basis for the classification of the Mineral Reserves into
varying confidence categories. - Finalization of estimates of
grade wise mineable quantities in contemplation with proposed
preliminary mine design/conceptual plan subject to all necessary
approvals/contracts have been confirmed or there are reasonable
expectations that all such approvals/contracts will be obtained
within a reasonable time frame and with certification that
Economic viability is not affected by short-term adverse market
conditions provided that longer?term forecasts remain positive.
Schedule C
Format of Bank Guarantee for Performance Security
Format of Bank Guarantee for Performance Security
[See rule 6(6)(b)]
[See rule 6(6)(b)]
[ Date ]
The Governor of [Name of State]
WHEREAS
A. [Name], a government [company/corporation]incorporated in India under the Companies Act, (1956/2013) with corporate identity number [CIN of the Applicant], whose registered office is at [address of registered office], India and principal place of business is at [address of principal place of business, if different from registered office] (the "Applicant") is required to provide an unconditional and irrevocable bank guarantee for an amount equal to INR [figures] (Indian Rupees [words]) as a performance security valid until [date of expiry of performance bank guarantee] ("Expiry Date").
B. The Performance Security is required to be provided to The Governor of [Name of State], (the "State") for discharge of certain obligations under the [reference to the principal documents-mining lease, mine development and production agreement] dated, [date] with respect to [particulars of concession] (collectively the "Concession Document").
C. We, [name of the bank] (the "Bank") at the request of the Applicant do hereby undertake to pay to the State an amount not exceeding INR [figures] (Indian Rupees [words]) ("Guarantee Amount") to secure the obligations of the Applicant under the Concession Document on demand from the State on the terms and conditions herein contained herein.