{
    "act_title": "Atomic Minerals Concession Rules, 2016",
    "act_slug": "atomic-minerals-concession-rules-2016",
    "section_label": "Section",
    "section": {
        "number": "37",
        "title": "37. Penalty.",
        "chapter": null,
        "content": "[Schedule A]\nParticulars of Threshold Value for Atomic Minerals\nParticulars of Threshold Value for Atomic Minerals\n( See rule 2 (1) (m) and rule 36)\n( See rule 2 (1) (m) and rule 36)\n1.\nBeryl and other beryllium-bearing minerals\n0.1% BeO (1000 ppm BeO) of the rock or 10kg/tonne Beryl in\n\t\t\t\texcavated material.\n2.\nLithium bearing minerals\n0.5% (5,000ppm) Li 2 O in ore,\n\t\t\t\texcept brine (200 ppm Li, i.e. 200 g/tonne Li).\n3.\nMinerals of the 'rare earths' group containing uranium and\n\t\t\t\tthorium\n60 ppm U 3 O 8 and/or 250 ppm ThO 2 in ore.\n4.\nNiobium-bearing minerals\n100 ppm (Nb+Ta) 2 O 5 (100 g/tonne) in ore.\n5.\nPhosphorites and other phosphatic ores containing uranium\n60 ppm U 3 O 8 in ore.\n6.\nPitchblende and other uranium ores\n60 ppm U 3 O 8 in ore, except in Singhbhum Shear zone in Jharkhand where the\n\t\t\t\tthreshold value will be 150 ppm U 3 O 8 in ore.\n7.\nTitanium bearing minerals and ores (ilmenite, rutile and leucoxene)\nIn case of titanium-bearing minerals occurring in hard rock,\n\t\t\t\t60 ppm U 3 O 8 and/or 250 ppm ThO 2 in the rock. All cases of titanium-bearing minerals occurring in Beach Sand Minerals and other placer deposits in association with monazite are notified as above threshold (i.e. the threshold is 0.00% monazite in Total Heavy Minerals), irrespective of monazite grade.\n8.\nTantalum-bearing minerals\n100 ppm (Ta+Nb) 2 O 5 (100 g/tonne) in ore.\n9.\nUraniferousallanite, monazite and other thorium minerals\n60 ppm U 3 O 8 and/or 250 ppm ThO 2 All cases of Beach Sand Minerals and other placer deposits in association with monazite are notified as above threshold (i.e. the threshold is 0.00% monazite in Total Heavy Minerals), irrespective of monazite grade.\n10.\nUranium bearing tailings left over from ores after extraction\n\t\t\t\tof copper and gold, ilmenite and other titanium ores.\n60 ppm U 3 O 8 and/or 250 ppm ThO 2 .\n11.\nZirconium bearing minerals and ores including zircon.\nAll cases of zirconium -bearing minerals occurring in Beach Sand Minerals and other placer deposits in association with monazite are notified as above threshold (i.e. the threshold is 0.00% monazite in Total Heavy Minerals), irrespective of monazite grade. In other cases, zircon containing less than 2000 ppm of Hafnium.\n12.\nBeach Sand Minerals i.e. economic heavy minerals found in the teri or beach sand, which include ilmenite, rutile, leucoxene, garnet, monazite, zircon and sillimanite.\nAll cases of Beach Sand Minerals and other placer deposits in association with monazite are notified as above threshold (i.e. the threshold is 0.00% monazite in Total Heavy Minerals), irrespective of monazite grade.\nSchedule B\nParameters for Establishing The Existence of Mineralization for Atomic Minerals\nParameters for Establishing The Existence of Mineralization for Atomic Minerals\n[ See rules 4(1), 4(4), 5(1) and 5(2)]\n[ See rules 4(1), 4(4), 5(1) and 5(2)]\nPart-II: Geological Parameters for exploration\n1\nAerial reconnaissance: Satellite imagery/ remote sensing/\n\t\t\t\tairborne geophysical survey etc. using appropriate technology\n\t\t\t\t(applicable mainly for reconnaissance survey (G4) stage).\nGeological survey (Mapping):On 1 : 50,000 or smaller scale for\n\t\t\t\treconnaissance (G4) stage;\non 1 : 10,000 or larger scale for preliminary exploration (G3)\n\t\t\t\tstage; 1:4000 /1 : 5,000 or larger scale for general exploration\n\t\t\t\t(G2) stage; on 1 : 2,000 or larger scale for detailed exploration\n\t\t\t\t(G1) stage.\nGround Geophysical and Geochemical survey: Geophysical and\n\t\t\t\tgeochemical survey using appropriate techniques as may be\n\t\t\t\tnecessary.\nTechnological :Exploration and sampling using appropriate\n\t\t\t\ttechniques from locations such as outcrops, trenches, pits, old\n\t\t\t\tworkings and drill holes. The sampling locations are spaced\n\t\t\t\tsuitably ( in a grid pattern to the extent possible and may be\n\t\t\t\tmodified depending on structural complexity) for establishing\n\t\t\t\texistence of ore body and its lateral and vertical continuity.\nFor General (G2) and detailed (G1)stages of exploration, the\n\t\t\t\tdepth continuity of mineralisation may be considered limited to\n\t\t\t\tthe depth up to which direct evidence of mineralization is\n\t\t\t\testablished.\nThe lateral extension to be considered for resource assessment\n\t\t\t\tshall depend on geological considerations and in any case shall\n\t\t\t\tnot be more than 50% of the grid spacing of the probe points.\nAssessment based on selected information such as isolated\n\t\t\t\tassays, isolated drill holes, assays of panned concentrates etc.\n\t\t\t\tis not recommended.\nSampling and sub-sampling: (a) Random grab/chip/channel\n\t\t\t\tsampling from surface exposure/escarpments/ nallah cuttings/\n\t\t\t\tpit/channel etc. for reconnaissance stage.\n(b) Systematic sampling from pits/trenches/outcrops/workings\n\t\t\t\tetc. spaced closely enough to confirm geological and grade\n\t\t\t\tcontinuity for other stages of geological assessment.\n(c) Litho-logging and gamma-ray logging of boreholes as the\n\t\t\t\tcase may be, sampling of drill core/chip samples at regular\n\t\t\t\tinterval, preferably metre wise or less for the mineralized\n\t\t\t\tportions.\n(d) The drill technique to be deployed shall depend on the\n\t\t\t\trock type to be penetrated and with an aim to achive maximum\n\t\t\t\tsample/core recovery.\nAssay data and Laboratory tests:Analysis of all samples\n\t\t\t\tgenerated for major radicals appropriate to the mineral under\n\t\t\t\tinvestigation. Analysis of by-products and deleterious elements\n\t\t\t\twherever necessary.\nPetrographic and Mineragraphic studies: Petrographic analysis\n\t\t\t\tof mineralized portions to ascertain the rock types and mineral\n\t\t\t\tassemblages including grain size, texture, gaunge and its\n\t\t\t\tliberation characteristics etc. if considered necessary.\nBulk density study: The bulk density must be measured by\n\t\t\t\tmethods that adequately account for void spaces (vugs, porosity\n\t\t\t\tand other void spaces)\nBulk Sampling for Beneficiation studies: Bulk sampling if\n\t\t\t\tnecessary for testing processing technology.\nEnvironmental setting.-details about local infrastructure,\n\t\t\t\thost population, historical sites, forests, sanctuaries, national\n\t\t\t\tpark and base line information on environmental setting of the\n\t\t\t\tarea to be collected.\nAny other relevant data: groundwater, geotechnical and rock\n\t\t\t\tcharacteristics and other data that may be relevant\nPart -III\nSuggested norms for Exploration by drilling for different types of Uranium, Thorium and Rare Metal and Rare Earth Element deposits\nSuggested norms for Exploration by drilling for different types of Uranium, Thorium and Rare Metal and Rare Earth Element deposits\nType of deposit and Principal Minerals\nG4 stage\nG3 stage\nG2 stage\nG1 stage\nRemarks\nI. Bedded Stratiform and Tabular Uranium\n\t\t\t\tDeposits of Regular and irregular Habit, and classified\n\t\t\t\tas: Sandstone type, Carbonate hosted, Phosphate, Black\n\t\t\t\tShale, Surficial and Coal Lignite hosted uranium deposits\nI. Bedded Stratiform and Tabular Uranium\n\t\t\t\tDeposits of Regular and irregular Habit, and classified\n\t\t\t\tas:\nScout drilling/ pitting/ trenching as per\n\t\t\t\tnecessity\nBor. - hole grid/ sample spacing may be atleast\n\t\t\t\t800m x 400m or atleast 5 boreholes per sq km\nBor. - hole grid/ sample spacing may be atleast\n\t\t\t\t400m x 200m or atleast 18 boreholes per sq km\nBor. - hole grid/ sample spacing may be atleast\n\t\t\t\t200m x 100m or atleast 65 boreholes per sq km\nExploratory mine openingsopen pit or underground\n\t\t\t\tdevelopment with bulk determination of grades at G1 stage as per\n\t\t\t\trequirement\nII. Lenticular Uranium bodies of all\n\t\t\t\tdimensions including bodies occurring in linear zones of\n\t\t\t\tcomposite veins, lenses, pockets, stockworks, and classified\n\t\t\t\tas: Metamorphite, Metasomatite, Unconformi. - related,\n\t\t\t\tIntrusive, Graniterelated, Polymetallic hematite breccia complex\n\t\t\t\ttype, Volcanic related and Collapse Breccia Pipe types of uranium\n\t\t\t\tdeposits.\nII. Lenticular Uranium bodies of all\n\t\t\t\tdimensions including bodies occurring in linear zones of\n\t\t\t\tcomposite veins, lenses, pockets, stockworks, and classified\n\t\t\t\tas:\nScout drilling/ pitting/ trenching as per\n\t\t\t\tnecessity\nBor. - hole grid/ sample spacing may be atleast\n\t\t\t\t400m x 200m or atleast 18 boreholes per sq km\nBor. - hole grid/ sample spacing may be atleast\n\t\t\t\t200m x 100m or atleast 65 boreholes per sq km\nBor. - hole grid/ sample spacing may be atleast\n\t\t\t\t100m x 50m or atleast 230 boreholes per sq km\nExploratory mine openingsopen pit or underground\n\t\t\t\tdevelopment with bulk determination of grades at G1 stage as per\n\t\t\t\trequirement\nIII. Rare metal and REE pegmatites, reefs and\n\t\t\t\tveins/pipes, Carbonatite and other Alkali Igneous Rocks\nIII. Rare metal and REE pegmatites, reefs and\n\t\t\t\tveins/pipes, Carbonatite and other Alkali Igneous Rocks\nScout drilling/ random pitting/ trenching as per\n\t\t\t\tnecessity\n10 to 25 pits/ trenches/ per sq.km. In case\n\t\t\t\tof drilling, borehole spacing may be 40m x 20m or 40m x 40m.\nPitting/ Trenching/ preferably at 20m\n\t\t\t\tinterval. In case of drilling, borehole spacing may be 20m x\n\t\t\t\t10m or 20m x 20m.\nExploratory open pit or boreholes at 10m x 10m\n\t\t\t\tor closer or underground sampling with bulk determination of\n\t\t\t\tgrades and recovery wherever necessary\nIV. Beach and Inland Placer Deposits Beach,\n\t\t\t\tdune and inland (Teri/Red Sands) placer concentration of heavy\n\t\t\t\tmineral deposits (ilmenite, leucoxene, rutile, magnetite,\n\t\t\t\tmonazite, garnet, sillimanite and zircon etc.) formed by wave and\n\t\t\t\twind action with grain size varying from silt to coarse sand.\nIV. Beach and Inland Placer Deposits\nRandom sampling as per availability of sample\n\t\t\t\tpoints\nAuger/Conrad/Bunka/ Dormer/Vibrocore/ RCD\n\t\t\t\tdrilling >200. -  3000m x 200m\nAuger/Conrad/Bunka/ Dormer/Vibrocore/ RCD\n\t\t\t\tdrilling: G.2.1.: >20. - 1000m x 10. - 200m grid G.2.2.:\n\t\t\t\t>100. - 2000m x 200m grid\nAuger/Conrad/Bunka/ Dormer/Vibrocore/ RCD\n\t\t\t\tdrilling 200m x 100m grid or closer.\nPart-IV\nS. No.\nS. No.\nCriteria\nCriteria\nExplanation\nExplanation\n1\nTitleand Ownership\n- Name, address of the prospector including E-mail ID,\n\t\t\t\ttelephone number.\n2\nDetails of the area\n-Details of period of prospecting/mineral right if\n\t\t\t\tany. -Village, District, State - Survey of India Toposheet\n\t\t\t\tNo. Geo-coordinates of the area of all corner points -\n\t\t\t\tcadaster details of the area with land use - mineral(s) under\n\t\t\t\tinvestigation\n3\nInfrastructure and Environment\n-Local infrastructure, host population, historical sites,\n\t\t\t\tforests, sanctuaries, national park and environmental settings of\n\t\t\t\tthe area.\n4\nPrevious Exploration\n-Details Of previous exploration carried out by other\n\t\t\t\tagencies/parties. - In case the area forms part of the area\n\t\t\t\tcovered under earlier exploration then the same should be shown\n\t\t\t\tin a map with proper scale.\n5\nGeology\n- Brief regional geology of the area outlining the broad\n\t\t\t\tgeological, structural frame work. -Deposit type, geological\n\t\t\t\tsetting and details of dip, strike, old workings, surface\n\t\t\t\texposures etc. of the area under study also of adjoining nearby\n\t\t\t\tareas if available and the information is likely to have an\n\t\t\t\timpact on the area under study. -Reliable geological map of\n\t\t\t\tappropriate scale with geo-coordinates showing major lithological\n\t\t\t\tunits, structural and tectonic features; extent of surface\n\t\t\t\tmineralisation, structure, location of boreholes, pits, trenches,\n\t\t\t\told workings and other geo-coordinates. - Cross sections at\n\t\t\t\tsuitable intervals showing vertical projections of litho-units\n\t\t\t\tand mineralization. - The extent and variability of the\n\t\t\t\tmineralization expressed as length (along strike or otherwise),\n\t\t\t\tplan width, and depth below surface to the upper and lower limits\n\t\t\t\tof the Mineral Resource.\n6\nAerial/ground geophysical/ geochemical data\nDetails of aerial, geophysicaland geochemical survey results\n\t\t\t\ttaken up if any.\n7\nTechnological investigation\n-Details of technological investigation\n\t\t\t\t(pitting/trenching/drilling andother details) -Data spacing\n\t\t\t\tfor reporting of Exploration Results: Whether the data spacing\n\t\t\t\tand distribution is based on section I and II and is sufficient\n\t\t\t\tto establish the degree of geological and grade continuity\n\t\t\t\tappropriate for the Mineral Resource estimation procedure(s) and\n\t\t\t\tclassifications applied.\n8\nSampling Technique\nNature and quality of sampling ( For example cut channels,\n\t\t\t\trandom chips and other sampling) and measures taken to ensure\n\t\t\t\tsample representivity.\n9\nDrilling Technique and drill employed\n- Drill type (For example core, reverse circulation, open-hole\n\t\t\t\thammer, rotary air blast, auger, Bangka, sonic and other drilling\n\t\t\t\ttechniques) and details ( For example core diameter, triple or\n\t\t\t\tstandard tube, collar R.L, sampling, azimuth, inclination,\n\t\t\t\tcoordinates of bore holes and other details). -Whether core\n\t\t\t\tand chip sample recoveries have been properly recorded and\n\t\t\t\tresults assessed. -Measures taken to maximize sample recovery\n\t\t\t\tand ensure representative nature of the samples. Logging. -\n\t\t\t\tWhether core and chip samples have been logged to a level of\n\t\t\t\tdetail to support appropriate Mineral Resource estimation, mining\n\t\t\t\tstudies and metallurgical studies.\n10\nSub-sampling techniques and sample preparation\n-If core, whether cut or sawn and whether quarter, half or all\n\t\t\t\tcore taken. -If non-core, whether riffled, tube sampled,\n\t\t\t\trotary split etc. and whether sampled wet or dry. -For all\n\t\t\t\tsample types, the nature, quality and appropriateness of the\n\t\t\t\tsample preparation technique. -Quality control procedures\n\t\t\t\tadopted for all Sub-sampling stages to maximize representivity of\n\t\t\t\tsamples. -Measures taken to ensure that the sampling is\n\t\t\t\trepresentative of the in situ material collected. -Whether\n\t\t\t\tsample sizes are appropriate to the grain size of the material\n\t\t\t\tbeing sampled.\n11\nQuality of assay data and laboratory tests\nThe nature, quality and appropriateness of the assaying and\n\t\t\t\tlaboratory procedures used and whether the technique is\n\t\t\t\tconsidered partial or total. Nature of quality control\n\t\t\t\tprocedures adopted (For example standards, blanks, duplicates,\n\t\t\t\texternal laboratory checks) and whether acceptable levels of\n\t\t\t\taccuracy (that is lack of bias) and precision have been\n\t\t\t\testablished.\n12\nMoisture\n- Whether the tonnages are estimated on a dry basis or with\n\t\t\t\tnatural moisture, and the method of determination of the moisture\n\t\t\t\tcontent.\n13\nBulk Density\nWhether assumed or determined. If assumed, the basis for the\n\t\t\t\tassumptions. If determined, the method used, whether wet or dry,\n\t\t\t\tthe frequency of the measurements, the nature, size and\n\t\t\t\trepresentativeness of the samples.\n14\nResource estimation techniques\n- Discussion on sufficient data density to assure continuity\n\t\t\t\tof mineralization and synthesis adequate data base for estimation\n\t\t\t\tprocedure used. -The nature and appropriateness of the\n\t\t\t\testimation technique(s) applied and key assumptions, including\n\t\t\t\ttreatment of extreme grade values, domaining, Interpolation\n\t\t\t\tparameters, maximum distance of extrapolation from data points. -The basis for the classification of the Mineral Resources\n\t\t\t\tinto varying confidence categories. -The assumptions made\n\t\t\t\tregarding recovery of byproducts. -Detailed description of\n\t\t\t\tthe method used and the assumptions made to estimate tonnages and\n\t\t\t\tgrades (section, polygon, inverse distance, geostatistical, or\n\t\t\t\tother method). -Description of how the geological\n\t\t\t\tinterpretation was used to control the resource estimates. -Discussion of basis for using or not using grade cutting or\n\t\t\t\tcapping. If a computer method was chosen, description of\n\t\t\t\tprogrammes and parameters used. -Geostatistical methods are\n\t\t\t\textremely varied and shall be described in detail. The method\n\t\t\t\tchosen shall be justified. The geostatistical parameters,\n\t\t\t\tincluding the variogram, and their compatibility with the\n\t\t\t\tgeological interpretation shall be discussed. Experience gained\n\t\t\t\tin applying geostatistics to similar deposits should be taken\n\t\t\t\tinto account. -Data verification and /or validation\n\t\t\t\tprocedures used.\n15\nFurther work.\n- The nature and scale of planned further work (For example\n\t\t\t\ttests for lateral extensions or depth extensions or largescale\n\t\t\t\tstep-out drilling).\n16\nAnnexures/ enclosures to the report\nThe report shall include all relevant data including maps,\n\t\t\t\tsections, logs, analysis reports photographs etc. in support of\n\t\t\t\tthe estimates made\n17\nAny Other Information\nAny other information as may be available or required by any\n\t\t\t\tauthority.\nPart-V.\nS. No.\nS. No.\nCriteria\nCriteria\nExplanation\nExplanation\n1\nMineral Resource estimate for conversion to Mineral Reserve\n- Description of Mineral Resource estimate used as a basis for\n\t\t\t\tthe conversion to a Mineral reserve. - Clear statement as to\n\t\t\t\twhether the Mineral Resources are reported additional to, or\n\t\t\t\tinclusive of the Mineral Reserves. -The type and level of\n\t\t\t\tstudy undertaken to enable Mineral Resources to be converted to Mineral Reserves, that is Pre-feasibility/ Feasibility level.\n2\nCut off Parameters\n-The basis of the adopted cut-off grade(s) or quality\n\t\t\t\tparameters applied, including the basis, if appropriate, of\n\t\t\t\tequivalent metal formulae and the threshold values prescribed by\n\t\t\t\tIndian Bureau of Mines.\n3\nMining factors or assumptions.\n-The method and assumptions used to convert the Mineral\n\t\t\t\tResource to a Mineral Reserve (that is either by application of\n\t\t\t\tappropriate factors by optimisation or by preliminary or detailed\n\t\t\t\tdesign supported with conceptual plan for mining). -The choice\n\t\t\t\tof, the nature and the appropriateness of the selected mining\n\t\t\t\tmethod(s), the size of the selected mining unit (length, width,\n\t\t\t\theight) and other mining parameters including associated design\n\t\t\t\tissues such as pre-strip, access, and other associated\n\t\t\t\tdesignations. -The assumptions made regarding geotechnical\n\t\t\t\tparameters (For example pit slopes, stope sizes, and other geo\n\t\t\t\ttechnical parameters), grade control and pre-production\n\t\t\t\tdrilling. -The major assumptions made and Mineral Resource\n\t\t\t\tmodel used for pit optimisation (if appropriate). -The mining\n\t\t\t\tdilution factors, mining recovery factors, and minimum mining\n\t\t\t\twidth used. -The infrastructure requirements of the selected\n\t\t\t\tmining methods. Where available, the historic reliability of the\n\t\t\t\tperformance parameters.\n4\nMetallurgical factors or assumptions.\n-The metallurgical process proposed and the appropriateness of\n\t\t\t\tthat process to the type of deposit. -The nature, amount and\n\t\t\t\trepresentativeness of metallurgical test work undertaken and the\n\t\t\t\tmetallurgical recovery factors applied. -Any assumptions or\n\t\t\t\tallowances made for deleterious elements. -The existence of\n\t\t\t\tany bulk sample or pilot scale test work and the degree to which\n\t\t\t\tsuch samples are representative of the orebody as a whole. -The\n\t\t\t\ttonnages and grades reported for Mineral Reserves should state\n\t\t\t\tclearly whether these are in respect of material to the plant or\n\t\t\t\tafter recovery. Comment on existing plant and equipment,\n\t\t\t\tincluding an indication of replacement and salvage value\n5\nCost and revenue factors\n-The derivation of, or assumptions made, regarding projected\n\t\t\t\tcapital and operating costs. - The assumptions made regarding\n\t\t\t\trevenue including head grade, metal or commodity price\n\t\t\t\texchange rates, transportation and treatment charges, penalties,\n\t\t\t\tand other revenue factors. - The allowances made for royalties\n\t\t\t\tpayable, both Government and private. - Basic cash flow inputs\n\t\t\t\tfor a stated period.\n6\nMarket assessment\n-The demand, supply and stock situation for the particular\n\t\t\t\tcommodity, consumption trends and factors likely to affect supply\n\t\t\t\tand demand into the future. -A customer and competitor\n\t\t\t\tanalysis along with the identification of likely market windows\n\t\t\t\tfor the product. -Price and volume forecasts and the basis for\n\t\t\t\tthese forecasts. -For industrial minerals the customer\n\t\t\t\tspecification, testing and acceptance requirements prior to a\n\t\t\t\tsupply contract.\n7\nOther modifying factors\n-The effect, if any, of natural risk, infrastructure,\n\t\t\t\tenvironmental, legal, marketing, social or governmental factors\n\t\t\t\ton the likely viability of a project and/or on the estimation and\n\t\t\t\tclassification of the Mineral Reserves. -The status of titles\n\t\t\t\tand approvals critical to the viability of the project, such as\n\t\t\t\tmining leases, discharge permits, government and statutory\n\t\t\t\tapprovals. -Environmental descriptions of anticipated\n\t\t\t\tliabilities. Location plans of mineral rights and titles.\n8\nClassification.\n-The basis for the classification of the Mineral Reserves into\n\t\t\t\tvarying confidence categories. - Finalization of estimates of\n\t\t\t\tgrade wise mineable quantities in contemplation with proposed\n\t\t\t\tpreliminary mine design/conceptual plan subject to all necessary\n\t\t\t\tapprovals/contracts have been confirmed or there are reasonable\n\t\t\t\texpectations that all such approvals/contracts will be obtained\n\t\t\t\twithin a reasonable time frame and with certification that\n\t\t\t\tEconomic viability is not affected by short-term adverse market\n\t\t\t\tconditions provided that longer?term forecasts remain positive.\nSchedule C\nFormat of Bank Guarantee for Performance Security\nFormat of Bank Guarantee for Performance Security\n[See rule 6(6)(b)]\n[See rule 6(6)(b)]\n[ Date ]\nThe Governor of [Name of State]\nWHEREAS\nA. [Name], a government [company/corporation]incorporated in India under the Companies Act, (1956/2013) with corporate identity number [CIN of the Applicant], whose registered office is at [address of registered office], India and principal place of business is at [address of principal place of business, if different from registered office] (the \"Applicant\") is required to provide an unconditional and irrevocable bank guarantee for an amount equal to INR [figures] (Indian Rupees [words]) as a performance security valid until [date of expiry of performance bank guarantee] (\"Expiry Date\").\nB. The Performance Security is required to be provided to The Governor of [Name of State], (the \"State\") for discharge of certain obligations under the [reference to the principal documents-mining lease, mine development and production agreement] dated, [date] with respect to [particulars of concession] (collectively the \"Concession Document\").\nC. We, [name of the bank] (the \"Bank\") at the request of the Applicant do hereby undertake to pay to the State an amount not exceeding INR [figures] (Indian Rupees [words]) (\"Guarantee Amount\") to secure the obligations of the Applicant under the Concession Document on demand from the State on the terms and conditions herein contained herein.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 35
    },
    "prev_section": "35",
    "next_section": "1"
}