← Back to Directory
Atomic Minerals Concession Rules, 2016
Atomic Minerals Concession Rules, 2016
Sections
1. Short title and commencement.
Section 12. Definitions.
Section 23. Applicability.
Section 34. Prospecting for atomic minerals under second proviso to section 4.
Section 45. Grant of mining lease at the instance of Department.
Section 56. Mining by a Government company or corporation owned or controlled by the Government.
Section 67. Discovery of atomic minerals by holder of a mineral concession.
Section 78. Mining plan.
Section 89. Preparation of mining plan.
Section 910. Conditions.
Section 1011. Grant of mining lease by State Government over areas containing atomic minerals.
Section 1112. Action for contravention or non-fulfillment of obligations.
Section 1213. Lapsing of mining lease.
Section 1314. Surrendering mining lease.
Section 1415. Termination.
Section 1516. Payment of compensation to owner of surface rights, etc.
Section 1617. Assessment of compensation for damage.
Section 1718. How fees and deposit are to be made.
Section 1819. Payment of interest.
Section 1920. Payments under mining lease.
Section 2021. Payments under section 9B and section 9C.
Section 9B22. Charging of royalty in case of minerals subjected to processing.
Section 2223. Manner of payment of royalty on minerals on ad valorem basis.
Section 2324. Application for revision.
Section 2425. Orders on revision application.
Section 2526. Power to rectify apparent mistakes.
Section 2627. Copies of leases and annual returns to be supplied to Government.
Section 2728. Change of name, address to be intimated.
Section 2829. Prior approval of Central Government to be obtained through State Government.
Section 2930. Facilities for training of students.
Section 3031. Geophysical data to be supplied to Department.
Section 3132. Registers.
Section 3233. Amalgamation of leases.
Section 3334. Boundaries below surface.
Section 3435. Pending applications.
Section 3537. Penalty.
Section 371. The Bank for the purpose hereof unconditionally and irrevocably undertakes to pay to the State without any demur, reservation, caveat, protest or recourse, immediately on receipt of first written demand from the State, a sum or sums (by way of one or more claims) not exceeding the Guarantee Amount in the aggregate without the State needing to prove or to show to the Bank grounds or reasons for such demand for the sum specified therein and notwithstanding any dispute or difference between the
Section 12. The Bank acknowledges that any such demand by the State of the amounts payable by the Bank to the State shall be final, binding and conclusive evidence in respect of the amounts payable by Applicant to the State under the Concession Document.
Section 23. The Bank hereby waives the necessity for the State from demanding the aforesaid amount or any part thereof from the Applicant and also waives any right that the Bank may have of first requiring the State to pursue its legal remedies against the Applicant, before presenting any written demand to the Bank for payment under this Guarantee.
Section 34. The Bank further unconditionally agrees with the State that the State shall be at liberty, without the Bank's consent and without affecting in any manner the Bank's obligation under this Guarantee, from time to time to:
Section 45. Any payment made hereunder shall be made free and clear of and without deduction for, or on account of, any present or future taxes, levies, imposts, duties, charges, fees, commissions, deductions or withholdings of any nature whatsoever.
Section 56. The Bank agrees that State at its option shall be entitled to enforce this Guarantee against the Bank, as a principal debtor in the first instance without proceeding at the first instance against the Applicant.
Section 67. The Bank further agree that the guarantee herein contained shall remain in full force and effect during the period that specified in the Concession Document and that it shall continue to be enforceable till all the obligations of the Applicant under or by virtue of the said Concession Document with respect to the Performance Security have been fully paid and its claims satisfied or discharged or till the State certifies that the terms and conditions of the Concession Document with respect to
Section 78. The payment so made by the Bank under this Guarantee shall be a valid discharge of Bank's liability for payment thereunder and the State shall have no claim against the Bank for making such payment.
Section 89. This Guarantee is subject to the laws of India. Any suit, action, or other proceedings arising out of this Guarantee or the subject matter hereof shall be subject to the exclusive jurisdiction of courts at the State of [respective State].
Section 910. The Bank has the power to issue this Guarantee in favour of the State. This guarantee will not be discharged due to the change in the constitution of the Bank
Section 1011. The Bank undertakes not to revoke this Guarantee during its currency except with the previous consent of the State in writing.
Section 1112. The State may, with prior intimation to the Bank, assign the right under this Guarantee to any other departments, ministries or any governmental agencies, which may act in the name of the Governor. Save as provided in this clause, this Guarantee shall not by assignable or transferable.
Section 1213. Notwithstanding anything contained herein,
Section 1314. The Bank is liable to pay the guaranteed amount or any part thereof under this bank guarantee only and only if the State serves upon the Bank a written claim or demand on or before the Expiry Date.
Section 141. Definitions.
Section 12. Grant of Lease
Section 23. Rights and Obligations
Section 34. Governing Law
Section 44. Particulars of the Mining Lease:
Section 45. Location of the Mining Lease:
Section 56. Particulars of Agent: Name and address:
Section 67. Particulars of the Manager of the mine: Name and address
Section 78. Particulars of Mining Engineer employed in the mines:
Section 89. Letter No. and date through which the mining plan was approved by the Atomic Minerals for Directorate for Exploration and Research
Section 910. Any other specific information
Section 10
atomic-minerals-concession-rules-2016.json
•
61 Sections
•
India (Central)
{
"id": 9980,
"slug": "atomic-minerals-concession-rules-2016",
"title": "Atomic Minerals Concession Rules, 2016",
"short_title": "Atomic Minerals Concession Rules, 2016",
"act_number": "Published vide Notification No. G.S.R. 677(E), 11t",
"act_year": 2016,
"act_type": "CENTRAL",
"location": "India (Central)",
"law_status": "unknown",
"enactment_date": null,
"description": "Atomic Minerals Concession Rules, 2016",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "1. Short title and commencement.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "2",
"title": "2. Definitions.",
"chapter": null,
"content": "(a) \"Act\" means the Mines and Minerals (Development and Regulation) Act, 1957 (67 of 1957);\n(b) \"atomic minerals\" means minerals specified in Part B of the First Schedule to the Act;\n(c) \"Beach Sand Minerals\" means economic heavy minerals found in the teri or beach sands, which include ilmenite, rutile, leucoxene, garnet, monazite, zircon and sillimanite;\n(d) \"Board\" means the Atomic Energy Regulatory Board constituted under section 27 of the Atomic Energy Act, 1962 (33 of 1962);\n(e) \"Department\" means the Department of Atomic Energy, in the Central Government;\n(f) \"Directorate\" means the Atomic Minerals Directorate for Exploration and Research under the Department;\n(g) \"illegal mining\" means any reconnaissance or prospecting or mining operation undertaken by any person or a company in any area without holding a mineral concession as required by Sub-section(1) of section 4 of the Act.\nExplanation.\n(a) violation of any rules, other than the rules made under section 23C of the Act, within the mining lease area by a holder of a mining lease shall not be construed as illegal mining;\n(b) any area granted under a mineral concession shall be considered as an area held with lawful authority by the holder of such mineral concession, while determining the extent of illegal mining;\n(h) \"prescribed substances\" means minerals included in the list of prescribed substances under the Atomic Energy Act,1962 (33 of 1962);\n(i) \"railway\" and \"railway administration\" have the meanings respectively assigned to them in the Railways Act, 1989 (24 of 1989);\n(j) \"run-of-mine\" means the raw unprocessed or uncrushed material in its natural state obtained after blasting or digging or dredging from mineralised zone of mining lease area;\n(k) \"Schedule\" means a Schedule to these rules;\n(l) \"section\" means a section of the Act;\n(m) \"threshold value\" means the grade of atomic mineral, specified as percentage of weight of the prescribed substances contained in the ore, [as specified] in Schedule A as the threshold value for the particular atomic mineral occurring as such or in association with one or more minerals; and\nSchedule A\n(n) \"Total Heavy Mineral\" means the minerals which comprises of Ilmenite, Rutile, Zircon, Monazite, Sillimanite, Leucoxene and Garnet.",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
{
"number": "3",
"title": "3. Applicability.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "4",
"title": "4. Prospecting for atomic minerals under second proviso to section 4.",
"chapter": null,
"content": "Schedule B\nSchedule B\n(a) if the grade of atomic minerals is less than the threshold value, the Directorate shall provide a written intimation, along with a copy of the geological report, to the State Government, which may grant mineral concessions over such area in accordance with section 10B and section 17A of the Act, as the case may be, and the rules made thereunder;\n(b) if the grade of atomic minerals is equal to or above the threshold value, then a mining lease shall be granted by the State Government only in accordance with these rules:\nChapter II\nDiscovery and Grant of Mineral Concessions",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "5",
"title": "5. Grant of mining lease at the instance of Department.",
"chapter": null,
"content": "(a) identify and demarcate the area where a mining lease is proposed to be allocated into forest land, land owned by the State Government, and land not owned by the State Government;\n(b) submit a proposal for grant of mining lease over the area identified and demarcated under clause (a) with the precise areas along with survey numbers, to the Central Government with a request to nominate a Government company or corporation owned or controlled by the Government for the grant of such mining lease:\nSchedule B",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "6",
"title": "6. Mining by a Government company or corporation owned or controlled by the Government.",
"chapter": null,
"content": "(a) prepare a mining plan in accordance with provisions of Chapter IV and submit the same for approval of the Directorate for approval under clause (b) of Sub-section (2) of section 5, within a period of twelve months from the date of issuance of the communication from the State Government under Sub-rule (5);\n(b) provide a performance security to the State Government in the form of a bank guarantee as per the format specified in Schedule C or as a security deposit, for an amount equivalent to 0.50 per cent. of the value of estimated resources, which performance security may be invoked by the State Government as per the terms and conditions of Mine Development and Production Agreement and the mining lease deed;\nSchedule C\n(c) the performance security shall be adjusted every five years so that it continues to correspond to 0.50 per cent. of the reassessed value of estimated resources;\n(d) obtain approval or permit or no-objection or the like from the concerned Government authorities as may be required under applicable laws for commencement of mining operations;\n(e) sign an Mine Development and Production Agreement with the State Government as per the format specified by the Central Government after compliance of conditions specified in clauses (a), (b), (c) and (d) of this Sub-rule; and\n(f) meet other conditions as may be specified by the State Government with the prior approval of the Department.\n(a) the mining lease deed shall be in the format specified in Schedule D ;\nSchedule D\n(b) the area of such mining lease shall be the same as specified by the State Government as in clause (a) of subrule (1) of rule 5 and no change in area shall be made by the State Government without the prior approval of the Department:\n(c) in case the atomic minerals in grade equal to or more than the threshold value exists in association with other minerals, then the mining lease shall be granted for all such minerals including the atomic minerals to the same lessee.",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "7",
"title": "7. Discovery of atomic minerals by holder of a mineral concession.",
"chapter": null,
"content": "(a) if the grade of atomic minerals is less than the threshold value, the mineral concession may continue its operations; or\n(b) if the grade of atomic minerals is equal to or above the threshold value, then,\n(i) in case of a reconnaissance permit which was granted prior to 12thJanuary, 2015, the holder of such reconnaissance permit shall be eligible to receive a prospecting licence followed by a mining lease, only if it is a Government company or corporation approved by the Department;\n(ii) in case of a prospecting licence, including a prospecting licence-cum-mining lease under section 10A, the holder of such prospecting licence shall be eligible to receive a mining lease, only if it is a Government company or corporation approved by the Department; or\n(iii) in case of a mining lease, the lessee shall continue mining for that particular mineral for which the mining lease was granted with the prior approval of the Department and in case of refusal by the Department the mining lease shall be terminated by the State Government as soon as the communication to this effect is received by the State Government:\nChapter III\nMining Plan for Atomic Minerals",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "8",
"title": "8. Mining plan.",
"chapter": null,
"content": "(i) the plan of the lease hold area showing the nature and extent of the mineral body;\n(ii) details of the geology and lithology of the area including mineral reserves of the area;\n(iii) the extent of manual mining or mining by the use of machinery and mechanical devices;\n(iv) the plan of the area showing natural water courses, limits of reserves and other forest areas and density of trees, if any, assessment of impact of mining activity on forest, land surface and environment including air and water pollution; details of scheme of restoration of the area by afforestation, land reclamation, use of pollution control devices and such other measures as may be directed by the Department or the State Government from time to time;\n(v) a tentative scheme of mining and annual programme and plan for excavation from year to year for five years;\n(vi) precise area or allocated area from the State Government marked in the cadastral maps.\n(vii) a progressive mine closure plan as provided in the Mineral Conservation and Development Rules, 1988 made under section 18; and\n(viii) any other matter which the Directorate may require to be provided in the mining plan.",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "9",
"title": "9. Preparation of mining plan.",
"chapter": null,
"content": "(a) a degree in mining engineering or a post-graduate degree in geology granted by a University established or incorporated by or under a Central Act, a provincial Act or a State Act, including any institution recognised by the University Grants Commission under section 4 of the University Grants Commission Act, 1956 (3 of 1956) or any equivalent qualification granted by any University or institution outside India and recognised by the Central Government; and\n(b) professional experience of five years of working in a supervisory capacity in the field of mining after obtaining the degree.\nChapter IV\nTerms and Conditions of A Mining Lease",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "10",
"title": "10. Conditions.",
"chapter": null,
"content": "(a) the lessee shall at all times comply with the provisions of the Act, the rules and all other applicable laws, including the Atomic Energy Act, 1962 (33 of 1962);\n(b) the lessee shall report in writing to the State Government and the Department, the discovery in the leased area of any mineral not specified in the lease, within sixty days of such discovery;\n(c) if any mineral not specified in the lease is discovered in the leased area, the lessee shall not win and dispose of such mineral unless such mineral is included in the lease or a separate lease is obtained therefor;\n(d) the lessee shall pay, for every year, except the first year of the lease, such yearly dead rent at the rates specified in the Third Schedule to the Act and if the lease permits the working of more than one mineral in the same area, the State Government shall not charge separate dead rent in respect of each mineral:\n(i) the aggregate of royalty in respect of all minerals; or\n(ii) the dead rent for the highest value mineral, whichever is higher;\n(e) the lessee shall also pay, for the surface area used by him for the purposes of mining operations, surface rent and water rate at such rate, not exceeding the land revenue, water and cesses assessable on the land, as may be specified by the State Government in the lease;\n(f) the lessee shall commence mining operations within two years from the date of execution of mining lease deed and shall thereafter conduct such operations in a proper, skilful and workman-like manner.\nExplanation.\n(g) subject to the provisions of the Act, the rules and any other applicable law, the lessee shall, with respect to the land leased to him, have the right for the purpose of mining operations on that land -\n(i) to work in the mines and conduct mining operations;\n(ii) to sink pits and shafts and construct buildings and roads;\n(iii) to erect plant and machinery;\n(iv) to quarry and obtain building and road materials and make bricks;\n(v) to use water and take timber;\n(vi) to use land for stacking purpose;\n(vii) to do any other thing specified in the lease;\n(h) the lessee shall at his own expenses erect and at all times maintain and keep in good repair boundary marks and pillars necessary to indicate the demarcation shown in the mining plan annexed to the lease;\n(i) the lessee shall construct and upkeep the boundary pillars as follows:-\n(A) each corner of the lease area shall have a boundary pillar (corner pillar);\n(B) there shall be erected intermediate boundary pillars between the corner pillars in such a way that each pillar is visible from the adjacent pillar located on either side of it;\n(C) the distance between two adjacent pillars shall not be more than fifty metres;\n(D) the pillars shall be of square pyramid frustum shaped above the surface and cuboid shaped below the surface;\n(E) each pillar shall be of reinforced cement concrete;\n(F) the corner pillars shall have a base of 0.30m X 0.30m and height of 1.30m of which 0.70m shall be above ground level and 0.60m below the ground;\n(G) the intermediate pillars shall have a base of 0.25m X 0.25m and height of 1.0m of which 0.70m shall be above ground level and 0.30m below the ground;\n(H) all the pillars shall be painted in yellow colour and the top ten centimetres in red colour by enamel paint and shall be grouted with cement concrete;\n(I) shall mark on all corner pillars, distance and bearing to the forward and backward pillars and latitude and longitude;\n(J) each pillar shall have serial number in a clockwise direction and the number shall be engraved on the pillars;\n(K) the number of pillar shall be the number of the individual pillar upon the total number of pillars in the lease;\n(L) the tip of all the corner boundary pillars shall be a square of fifteen centimetres on which a permanent circle of ten centimetres diameter shall be drawn by paint or engraved and the actual boundary point shall be intersection of two diameters drawn at ninety degrees;\n(M) the lease boundary survey shall be accurate within such limits of error as the Director of the Directorate may specify in this behalf;\n(N) the location and number of the pillars shall also be shown in the surface and other plans maintained by the lessee; and\n(O) in case of forest area within the lease, the size and construction and colour of the boundary pillars shall be as per the norms specified by the Forest Department of the State Government in this behalf;\n(j) the lessee shall not carry on, or allow to be carried on, any mining operations at any point within a distance of fifty metres from any railway line, except under and in accordance with the written permission of the railway administration concerned, or under or beneath any ropeway or ropeway trestle or station, except under and in accordance with the written permission of the authority owning the ropeway, or from any reservoir, canal or other public works, or buildings, except under and in accordance with the prior permission of the State Government.\nExplanation.\n(k) the lessee shall not, in the case of village roads, including any track shown in the revenue record as village road, allow any working to be carried on within a distance of ten metres of the outer edge of the cutting except with the prior permission of the Deputy Commissioner or Collector or any other officer duly authorised by the State Government in this behalf and otherwise than in accordance with such directions, restrictions and additions, either general or special, which may be attached to such permission;\n(l) the lessee shall keep accurate and faithful accounts showing the quantity and other particulars of all minerals obtained and dispatched from the mine, the number and nationality of persons employed therein, and complete plans of the mine, and shall allow any officer authorised by the Department or the Directorate or the State Government in this behalf to examine at any time any account, plan and record maintained by him and shall furnish to the Central Government or the State Government with such information and returns as it or any officer authorised by it in this behalf may require:\n(m) the lessee shall keep accurate records of all trenches, pits and drillings made by him in the course of mining operations carried on by him under the lease, and shall allow any officer authorised by the Central Government or the State Government to inspect the same and such records shall contain the following particulars, namely. -\n(i) the subsoil and strata through which such trenches, pits or drillings pass;\n(ii) any mineral encountered;\n(iii) such other particulars as the Central Government or the State Government may from time to time require;\n(n) the lessee shall strengthen and support, to the satisfaction of the railway administration concerned or the State Government, as the case may be any part of the mine which in its opinion requires such strengthening or support for the safety of any railway, reservoir, canal, road or any other public works or buildings;\n(o) the lessee shall allow any officer authorised by the Central Government or the State Government to enter upon any building, excavation or land comprised in the lease for the purpose of inspecting the same;\n(p) whenever mining is undertaken for beach sand mineral deposits or heavy mineral deposits available at inland teris or areas containing atomic mineral in association with other minerals, the lessee shall maintain the records and details of the list of minerals mined, details of mining methodology and storage location of these minerals within the mining lease area, tonnage of such minerals, the mineralogy, complete material balance towards conservation of such minerals with respect to in situ mineral contents.\n(q) the lessee shall, in the matter of employment, give preference to the tribals and to the persons who become displaced because of the taking up of mining operations;\n(r) the lessee shall pay to the occupier of the surface of the land such compensation as may become payable under these rules;\n(s) the State Government or any lessee or person authorised by it in that behalf by the State Government shall have the right to -\n(i) enter into and upon the leased land and to construct upon, over or through the same, any railways, tramways, roadways or pipelines for any purpose authorised by the State Government and to get from the said lands, stones, gravel, earth and other materials for making, maintaining and repairing such railways, tramways, roads or any existing railways and roads; and\n(ii) to pass over or along any such railways, tramways, road lines and other ways, at all times, with or without horses, cattle or other animals, carts, wagons, carriages, locomotives or other vehicles for all purposes:\n(t) the lessee shall also comply with the provisions of any other rules made under section 11B.\n(a) the time-limit, mode and place of payment of rents and royalties;\n(b) the compensation for damage to the land covered by the lease;\n(c) the felling of trees;\n(d) the restriction of surface operations in any area prohibited by any authority;\n(e)the notice by lessee for surface occupation;\n(f) the provision of proper weighing machines;\n(g) the entering and working in a reserved or protected forest;\n(h)the securing of pits and shafts;\n(i) the reporting of accidents;\n(j) the indemnity to Government against claims of third parties;\n(k) the delivery of possession of lands and mines on the surrender, expiration or determination of the lease;\n(l) the time limit for removal of mineral, ore, plant, machinery and other properties from the lease hold area after expiration, or sooner termination or surrender or abandonment of the mining lease;\n(m) the forfeiture of property left after termination of lease;\n(n) the power to take possession of plant, machinery, premises and mines in the event of war or emergency;\n(o) filing of civil suits or petitions relating to disputes arising out of the area under lease.",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "11",
"title": "11. Grant of mining lease by State Government over areas containing atomic minerals.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "12",
"title": "12. Action for contravention or non-fulfillment of obligations.",
"chapter": null,
"content": "Explanation.\nChapter V\nLapse, Surrender or Termination",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
{
"number": "13",
"title": "13. Lapsing of mining lease.",
"chapter": null,
"content": "(a) the reasons on account of which it is not possible for the lessee to undertake mining operations or continue such operations;\n(b) the manner in which such reasons are beyond the control of the lessee; and\n(c) the steps that have been taken by the lessee to mitigate the impact of such reasons.\n(a) the reasons on account of which the lessee failed to undertake mining operations or continue such operations;\n(b) the manner in which such reasons are beyond the control of the lessee; and\n(c) the steps that have been taken by the lessee to mitigate the impact of such reasons:",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "14",
"title": "14. Surrendering mining lease.",
"chapter": null,
"content": "(a) the lessee has submitted a certificate from the Director of the Directorate confirming implementation of the final mine closure plan approved by the Director of the Directorate, including protective, reclamation and rehabilitation work; and\n(b) all dues with respect to the mining lease have been settled.",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
{
"number": "15",
"title": "15. Termination.",
"chapter": null,
"content": "Chapter VI\nCompensation",
"footnote": "",
"is_definition": false,
"sort_order": 14
},
{
"number": "16",
"title": "16. Payment of compensation to owner of surface rights, etc.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 15
},
{
"number": "17",
"title": "17. Assessment of compensation for damage.",
"chapter": null,
"content": "Chapter VII\nPayments",
"footnote": "",
"is_definition": false,
"sort_order": 16
},
{
"number": "18",
"title": "18. How fees and deposit are to be made.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 17
},
{
"number": "19",
"title": "19. Payment of interest.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
{
"number": "20",
"title": "20. Payments under mining lease.",
"chapter": null,
"content": "(i) the aggregate of royalty in respect of all minerals; or\n(ii) the dead rent for the highest value mineral, whichever is higher.",
"footnote": "",
"is_definition": false,
"sort_order": 19
},
{
"number": "9B",
"title": "21. Payments under section 9B and section 9C.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 20
},
{
"number": "22",
"title": "22. Charging of royalty in case of minerals subjected to processing.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 21
},
{
"number": "23",
"title": "23. Manner of payment of royalty on minerals on ad valorem basis.",
"chapter": null,
"content": "Royalty = ∑ Sale price of mineral (grade wise and State-wise) published by Department of Atomic Energy/ Indian Bureau of Mines / State Government X Rate of royalty (in percentage) X Total quantity of mineral of a particular grade dispatched\nChapter VIII\nRevision",
"footnote": "",
"is_definition": false,
"sort_order": 22
},
{
"number": "24",
"title": "24. Application for revision.",
"chapter": null,
"content": "(a) any order made by the State Government or other authority in exercise of the powers conferred on it by or under the Act or these rules in relation to regulation of atomic mineral concessions and for purposes connected therewith; or\n(b) non-passing of any order specified in clause (a) within the time specified therefor may, within three months from the date of communication of the order to him, or the date on which the time period for passing such order expired, apply to the Department in the form specified in Schedule E for passing of an order, pursuant to section 30.\nSchedule E",
"footnote": "",
"is_definition": false,
"sort_order": 23
},
{
"number": "25",
"title": "25. Orders on revision application.",
"chapter": null,
"content": "Chapter IX\nMiscellaneous",
"footnote": "",
"is_definition": false,
"sort_order": 24
},
{
"number": "26",
"title": "26. Power to rectify apparent mistakes.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 25
},
{
"number": "27",
"title": "27. Copies of leases and annual returns to be supplied to Government.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 26
},
{
"number": "28",
"title": "28. Change of name, address to be intimated.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 27
},
{
"number": "29",
"title": "29. Prior approval of Central Government to be obtained through State Government.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 28
},
{
"number": "30",
"title": "30. Facilities for training of students.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 29
},
{
"number": "31",
"title": "31. Geophysical data to be supplied to Department.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 30
},
{
"number": "32",
"title": "32. Registers.",
"chapter": null,
"content": "Schedule G",
"footnote": "",
"is_definition": false,
"sort_order": 31
},
{
"number": "33",
"title": "33. Amalgamation of leases.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 32
},
{
"number": "34",
"title": "34. Boundaries below surface.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 33
},
{
"number": "35",
"title": "35. Pending applications.",
"chapter": null,
"content": "[36. Power of the Central Government to amend Schedule A.\nSchedule A\nChapter X\nPenalty",
"footnote": "",
"is_definition": false,
"sort_order": 34
},
{
"number": "37",
"title": "37. Penalty.",
"chapter": null,
"content": "[Schedule A]\nParticulars of Threshold Value for Atomic Minerals\nParticulars of Threshold Value for Atomic Minerals\n( See rule 2 (1) (m) and rule 36)\n( See rule 2 (1) (m) and rule 36)\n1.\nBeryl and other beryllium-bearing minerals\n0.1% BeO (1000 ppm BeO) of the rock or 10kg/tonne Beryl in\n\t\t\t\texcavated material.\n2.\nLithium bearing minerals\n0.5% (5,000ppm) Li 2 O in ore,\n\t\t\t\texcept brine (200 ppm Li, i.e. 200 g/tonne Li).\n3.\nMinerals of the 'rare earths' group containing uranium and\n\t\t\t\tthorium\n60 ppm U 3 O 8 and/or 250 ppm ThO 2 in ore.\n4.\nNiobium-bearing minerals\n100 ppm (Nb+Ta) 2 O 5 (100 g/tonne) in ore.\n5.\nPhosphorites and other phosphatic ores containing uranium\n60 ppm U 3 O 8 in ore.\n6.\nPitchblende and other uranium ores\n60 ppm U 3 O 8 in ore, except in Singhbhum Shear zone in Jharkhand where the\n\t\t\t\tthreshold value will be 150 ppm U 3 O 8 in ore.\n7.\nTitanium bearing minerals and ores (ilmenite, rutile and leucoxene)\nIn case of titanium-bearing minerals occurring in hard rock,\n\t\t\t\t60 ppm U 3 O 8 and/or 250 ppm ThO 2 in the rock. All cases of titanium-bearing minerals occurring in Beach Sand Minerals and other placer deposits in association with monazite are notified as above threshold (i.e. the threshold is 0.00% monazite in Total Heavy Minerals), irrespective of monazite grade.\n8.\nTantalum-bearing minerals\n100 ppm (Ta+Nb) 2 O 5 (100 g/tonne) in ore.\n9.\nUraniferousallanite, monazite and other thorium minerals\n60 ppm U 3 O 8 and/or 250 ppm ThO 2 All cases of Beach Sand Minerals and other placer deposits in association with monazite are notified as above threshold (i.e. the threshold is 0.00% monazite in Total Heavy Minerals), irrespective of monazite grade.\n10.\nUranium bearing tailings left over from ores after extraction\n\t\t\t\tof copper and gold, ilmenite and other titanium ores.\n60 ppm U 3 O 8 and/or 250 ppm ThO 2 .\n11.\nZirconium bearing minerals and ores including zircon.\nAll cases of zirconium -bearing minerals occurring in Beach Sand Minerals and other placer deposits in association with monazite are notified as above threshold (i.e. the threshold is 0.00% monazite in Total Heavy Minerals), irrespective of monazite grade. In other cases, zircon containing less than 2000 ppm of Hafnium.\n12.\nBeach Sand Minerals i.e. economic heavy minerals found in the teri or beach sand, which include ilmenite, rutile, leucoxene, garnet, monazite, zircon and sillimanite.\nAll cases of Beach Sand Minerals and other placer deposits in association with monazite are notified as above threshold (i.e. the threshold is 0.00% monazite in Total Heavy Minerals), irrespective of monazite grade.\nSchedule B\nParameters for Establishing The Existence of Mineralization for Atomic Minerals\nParameters for Establishing The Existence of Mineralization for Atomic Minerals\n[ See rules 4(1), 4(4), 5(1) and 5(2)]\n[ See rules 4(1), 4(4), 5(1) and 5(2)]\nPart-II: Geological Parameters for exploration\n1\nAerial reconnaissance: Satellite imagery/ remote sensing/\n\t\t\t\tairborne geophysical survey etc. using appropriate technology\n\t\t\t\t(applicable mainly for reconnaissance survey (G4) stage).\nGeological survey (Mapping):On 1 : 50,000 or smaller scale for\n\t\t\t\treconnaissance (G4) stage;\non 1 : 10,000 or larger scale for preliminary exploration (G3)\n\t\t\t\tstage; 1:4000 /1 : 5,000 or larger scale for general exploration\n\t\t\t\t(G2) stage; on 1 : 2,000 or larger scale for detailed exploration\n\t\t\t\t(G1) stage.\nGround Geophysical and Geochemical survey: Geophysical and\n\t\t\t\tgeochemical survey using appropriate techniques as may be\n\t\t\t\tnecessary.\nTechnological :Exploration and sampling using appropriate\n\t\t\t\ttechniques from locations such as outcrops, trenches, pits, old\n\t\t\t\tworkings and drill holes. The sampling locations are spaced\n\t\t\t\tsuitably ( in a grid pattern to the extent possible and may be\n\t\t\t\tmodified depending on structural complexity) for establishing\n\t\t\t\texistence of ore body and its lateral and vertical continuity.\nFor General (G2) and detailed (G1)stages of exploration, the\n\t\t\t\tdepth continuity of mineralisation may be considered limited to\n\t\t\t\tthe depth up to which direct evidence of mineralization is\n\t\t\t\testablished.\nThe lateral extension to be considered for resource assessment\n\t\t\t\tshall depend on geological considerations and in any case shall\n\t\t\t\tnot be more than 50% of the grid spacing of the probe points.\nAssessment based on selected information such as isolated\n\t\t\t\tassays, isolated drill holes, assays of panned concentrates etc.\n\t\t\t\tis not recommended.\nSampling and sub-sampling: (a) Random grab/chip/channel\n\t\t\t\tsampling from surface exposure/escarpments/ nallah cuttings/\n\t\t\t\tpit/channel etc. for reconnaissance stage.\n(b) Systematic sampling from pits/trenches/outcrops/workings\n\t\t\t\tetc. spaced closely enough to confirm geological and grade\n\t\t\t\tcontinuity for other stages of geological assessment.\n(c) Litho-logging and gamma-ray logging of boreholes as the\n\t\t\t\tcase may be, sampling of drill core/chip samples at regular\n\t\t\t\tinterval, preferably metre wise or less for the mineralized\n\t\t\t\tportions.\n(d) The drill technique to be deployed shall depend on the\n\t\t\t\trock type to be penetrated and with an aim to achive maximum\n\t\t\t\tsample/core recovery.\nAssay data and Laboratory tests:Analysis of all samples\n\t\t\t\tgenerated for major radicals appropriate to the mineral under\n\t\t\t\tinvestigation. Analysis of by-products and deleterious elements\n\t\t\t\twherever necessary.\nPetrographic and Mineragraphic studies: Petrographic analysis\n\t\t\t\tof mineralized portions to ascertain the rock types and mineral\n\t\t\t\tassemblages including grain size, texture, gaunge and its\n\t\t\t\tliberation characteristics etc. if considered necessary.\nBulk density study: The bulk density must be measured by\n\t\t\t\tmethods that adequately account for void spaces (vugs, porosity\n\t\t\t\tand other void spaces)\nBulk Sampling for Beneficiation studies: Bulk sampling if\n\t\t\t\tnecessary for testing processing technology.\nEnvironmental setting.-details about local infrastructure,\n\t\t\t\thost population, historical sites, forests, sanctuaries, national\n\t\t\t\tpark and base line information on environmental setting of the\n\t\t\t\tarea to be collected.\nAny other relevant data: groundwater, geotechnical and rock\n\t\t\t\tcharacteristics and other data that may be relevant\nPart -III\nSuggested norms for Exploration by drilling for different types of Uranium, Thorium and Rare Metal and Rare Earth Element deposits\nSuggested norms for Exploration by drilling for different types of Uranium, Thorium and Rare Metal and Rare Earth Element deposits\nType of deposit and Principal Minerals\nG4 stage\nG3 stage\nG2 stage\nG1 stage\nRemarks\nI. Bedded Stratiform and Tabular Uranium\n\t\t\t\tDeposits of Regular and irregular Habit, and classified\n\t\t\t\tas: Sandstone type, Carbonate hosted, Phosphate, Black\n\t\t\t\tShale, Surficial and Coal Lignite hosted uranium deposits\nI. Bedded Stratiform and Tabular Uranium\n\t\t\t\tDeposits of Regular and irregular Habit, and classified\n\t\t\t\tas:\nScout drilling/ pitting/ trenching as per\n\t\t\t\tnecessity\nBor. - hole grid/ sample spacing may be atleast\n\t\t\t\t800m x 400m or atleast 5 boreholes per sq km\nBor. - hole grid/ sample spacing may be atleast\n\t\t\t\t400m x 200m or atleast 18 boreholes per sq km\nBor. - hole grid/ sample spacing may be atleast\n\t\t\t\t200m x 100m or atleast 65 boreholes per sq km\nExploratory mine openingsopen pit or underground\n\t\t\t\tdevelopment with bulk determination of grades at G1 stage as per\n\t\t\t\trequirement\nII. Lenticular Uranium bodies of all\n\t\t\t\tdimensions including bodies occurring in linear zones of\n\t\t\t\tcomposite veins, lenses, pockets, stockworks, and classified\n\t\t\t\tas: Metamorphite, Metasomatite, Unconformi. - related,\n\t\t\t\tIntrusive, Graniterelated, Polymetallic hematite breccia complex\n\t\t\t\ttype, Volcanic related and Collapse Breccia Pipe types of uranium\n\t\t\t\tdeposits.\nII. Lenticular Uranium bodies of all\n\t\t\t\tdimensions including bodies occurring in linear zones of\n\t\t\t\tcomposite veins, lenses, pockets, stockworks, and classified\n\t\t\t\tas:\nScout drilling/ pitting/ trenching as per\n\t\t\t\tnecessity\nBor. - hole grid/ sample spacing may be atleast\n\t\t\t\t400m x 200m or atleast 18 boreholes per sq km\nBor. - hole grid/ sample spacing may be atleast\n\t\t\t\t200m x 100m or atleast 65 boreholes per sq km\nBor. - hole grid/ sample spacing may be atleast\n\t\t\t\t100m x 50m or atleast 230 boreholes per sq km\nExploratory mine openingsopen pit or underground\n\t\t\t\tdevelopment with bulk determination of grades at G1 stage as per\n\t\t\t\trequirement\nIII. Rare metal and REE pegmatites, reefs and\n\t\t\t\tveins/pipes, Carbonatite and other Alkali Igneous Rocks\nIII. Rare metal and REE pegmatites, reefs and\n\t\t\t\tveins/pipes, Carbonatite and other Alkali Igneous Rocks\nScout drilling/ random pitting/ trenching as per\n\t\t\t\tnecessity\n10 to 25 pits/ trenches/ per sq.km. In case\n\t\t\t\tof drilling, borehole spacing may be 40m x 20m or 40m x 40m.\nPitting/ Trenching/ preferably at 20m\n\t\t\t\tinterval. In case of drilling, borehole spacing may be 20m x\n\t\t\t\t10m or 20m x 20m.\nExploratory open pit or boreholes at 10m x 10m\n\t\t\t\tor closer or underground sampling with bulk determination of\n\t\t\t\tgrades and recovery wherever necessary\nIV. Beach and Inland Placer Deposits Beach,\n\t\t\t\tdune and inland (Teri/Red Sands) placer concentration of heavy\n\t\t\t\tmineral deposits (ilmenite, leucoxene, rutile, magnetite,\n\t\t\t\tmonazite, garnet, sillimanite and zircon etc.) formed by wave and\n\t\t\t\twind action with grain size varying from silt to coarse sand.\nIV. Beach and Inland Placer Deposits\nRandom sampling as per availability of sample\n\t\t\t\tpoints\nAuger/Conrad/Bunka/ Dormer/Vibrocore/ RCD\n\t\t\t\tdrilling >200. - 3000m x 200m\nAuger/Conrad/Bunka/ Dormer/Vibrocore/ RCD\n\t\t\t\tdrilling: G.2.1.: >20. - 1000m x 10. - 200m grid G.2.2.:\n\t\t\t\t>100. - 2000m x 200m grid\nAuger/Conrad/Bunka/ Dormer/Vibrocore/ RCD\n\t\t\t\tdrilling 200m x 100m grid or closer.\nPart-IV\nS. No.\nS. No.\nCriteria\nCriteria\nExplanation\nExplanation\n1\nTitleand Ownership\n- Name, address of the prospector including E-mail ID,\n\t\t\t\ttelephone number.\n2\nDetails of the area\n-Details of period of prospecting/mineral right if\n\t\t\t\tany. -Village, District, State - Survey of India Toposheet\n\t\t\t\tNo. Geo-coordinates of the area of all corner points -\n\t\t\t\tcadaster details of the area with land use - mineral(s) under\n\t\t\t\tinvestigation\n3\nInfrastructure and Environment\n-Local infrastructure, host population, historical sites,\n\t\t\t\tforests, sanctuaries, national park and environmental settings of\n\t\t\t\tthe area.\n4\nPrevious Exploration\n-Details Of previous exploration carried out by other\n\t\t\t\tagencies/parties. - In case the area forms part of the area\n\t\t\t\tcovered under earlier exploration then the same should be shown\n\t\t\t\tin a map with proper scale.\n5\nGeology\n- Brief regional geology of the area outlining the broad\n\t\t\t\tgeological, structural frame work. -Deposit type, geological\n\t\t\t\tsetting and details of dip, strike, old workings, surface\n\t\t\t\texposures etc. of the area under study also of adjoining nearby\n\t\t\t\tareas if available and the information is likely to have an\n\t\t\t\timpact on the area under study. -Reliable geological map of\n\t\t\t\tappropriate scale with geo-coordinates showing major lithological\n\t\t\t\tunits, structural and tectonic features; extent of surface\n\t\t\t\tmineralisation, structure, location of boreholes, pits, trenches,\n\t\t\t\told workings and other geo-coordinates. - Cross sections at\n\t\t\t\tsuitable intervals showing vertical projections of litho-units\n\t\t\t\tand mineralization. - The extent and variability of the\n\t\t\t\tmineralization expressed as length (along strike or otherwise),\n\t\t\t\tplan width, and depth below surface to the upper and lower limits\n\t\t\t\tof the Mineral Resource.\n6\nAerial/ground geophysical/ geochemical data\nDetails of aerial, geophysicaland geochemical survey results\n\t\t\t\ttaken up if any.\n7\nTechnological investigation\n-Details of technological investigation\n\t\t\t\t(pitting/trenching/drilling andother details) -Data spacing\n\t\t\t\tfor reporting of Exploration Results: Whether the data spacing\n\t\t\t\tand distribution is based on section I and II and is sufficient\n\t\t\t\tto establish the degree of geological and grade continuity\n\t\t\t\tappropriate for the Mineral Resource estimation procedure(s) and\n\t\t\t\tclassifications applied.\n8\nSampling Technique\nNature and quality of sampling ( For example cut channels,\n\t\t\t\trandom chips and other sampling) and measures taken to ensure\n\t\t\t\tsample representivity.\n9\nDrilling Technique and drill employed\n- Drill type (For example core, reverse circulation, open-hole\n\t\t\t\thammer, rotary air blast, auger, Bangka, sonic and other drilling\n\t\t\t\ttechniques) and details ( For example core diameter, triple or\n\t\t\t\tstandard tube, collar R.L, sampling, azimuth, inclination,\n\t\t\t\tcoordinates of bore holes and other details). -Whether core\n\t\t\t\tand chip sample recoveries have been properly recorded and\n\t\t\t\tresults assessed. -Measures taken to maximize sample recovery\n\t\t\t\tand ensure representative nature of the samples. Logging. -\n\t\t\t\tWhether core and chip samples have been logged to a level of\n\t\t\t\tdetail to support appropriate Mineral Resource estimation, mining\n\t\t\t\tstudies and metallurgical studies.\n10\nSub-sampling techniques and sample preparation\n-If core, whether cut or sawn and whether quarter, half or all\n\t\t\t\tcore taken. -If non-core, whether riffled, tube sampled,\n\t\t\t\trotary split etc. and whether sampled wet or dry. -For all\n\t\t\t\tsample types, the nature, quality and appropriateness of the\n\t\t\t\tsample preparation technique. -Quality control procedures\n\t\t\t\tadopted for all Sub-sampling stages to maximize representivity of\n\t\t\t\tsamples. -Measures taken to ensure that the sampling is\n\t\t\t\trepresentative of the in situ material collected. -Whether\n\t\t\t\tsample sizes are appropriate to the grain size of the material\n\t\t\t\tbeing sampled.\n11\nQuality of assay data and laboratory tests\nThe nature, quality and appropriateness of the assaying and\n\t\t\t\tlaboratory procedures used and whether the technique is\n\t\t\t\tconsidered partial or total. Nature of quality control\n\t\t\t\tprocedures adopted (For example standards, blanks, duplicates,\n\t\t\t\texternal laboratory checks) and whether acceptable levels of\n\t\t\t\taccuracy (that is lack of bias) and precision have been\n\t\t\t\testablished.\n12\nMoisture\n- Whether the tonnages are estimated on a dry basis or with\n\t\t\t\tnatural moisture, and the method of determination of the moisture\n\t\t\t\tcontent.\n13\nBulk Density\nWhether assumed or determined. If assumed, the basis for the\n\t\t\t\tassumptions. If determined, the method used, whether wet or dry,\n\t\t\t\tthe frequency of the measurements, the nature, size and\n\t\t\t\trepresentativeness of the samples.\n14\nResource estimation techniques\n- Discussion on sufficient data density to assure continuity\n\t\t\t\tof mineralization and synthesis adequate data base for estimation\n\t\t\t\tprocedure used. -The nature and appropriateness of the\n\t\t\t\testimation technique(s) applied and key assumptions, including\n\t\t\t\ttreatment of extreme grade values, domaining, Interpolation\n\t\t\t\tparameters, maximum distance of extrapolation from data points. -The basis for the classification of the Mineral Resources\n\t\t\t\tinto varying confidence categories. -The assumptions made\n\t\t\t\tregarding recovery of byproducts. -Detailed description of\n\t\t\t\tthe method used and the assumptions made to estimate tonnages and\n\t\t\t\tgrades (section, polygon, inverse distance, geostatistical, or\n\t\t\t\tother method). -Description of how the geological\n\t\t\t\tinterpretation was used to control the resource estimates. -Discussion of basis for using or not using grade cutting or\n\t\t\t\tcapping. If a computer method was chosen, description of\n\t\t\t\tprogrammes and parameters used. -Geostatistical methods are\n\t\t\t\textremely varied and shall be described in detail. The method\n\t\t\t\tchosen shall be justified. The geostatistical parameters,\n\t\t\t\tincluding the variogram, and their compatibility with the\n\t\t\t\tgeological interpretation shall be discussed. Experience gained\n\t\t\t\tin applying geostatistics to similar deposits should be taken\n\t\t\t\tinto account. -Data verification and /or validation\n\t\t\t\tprocedures used.\n15\nFurther work.\n- The nature and scale of planned further work (For example\n\t\t\t\ttests for lateral extensions or depth extensions or largescale\n\t\t\t\tstep-out drilling).\n16\nAnnexures/ enclosures to the report\nThe report shall include all relevant data including maps,\n\t\t\t\tsections, logs, analysis reports photographs etc. in support of\n\t\t\t\tthe estimates made\n17\nAny Other Information\nAny other information as may be available or required by any\n\t\t\t\tauthority.\nPart-V.\nS. No.\nS. No.\nCriteria\nCriteria\nExplanation\nExplanation\n1\nMineral Resource estimate for conversion to Mineral Reserve\n- Description of Mineral Resource estimate used as a basis for\n\t\t\t\tthe conversion to a Mineral reserve. - Clear statement as to\n\t\t\t\twhether the Mineral Resources are reported additional to, or\n\t\t\t\tinclusive of the Mineral Reserves. -The type and level of\n\t\t\t\tstudy undertaken to enable Mineral Resources to be converted to Mineral Reserves, that is Pre-feasibility/ Feasibility level.\n2\nCut off Parameters\n-The basis of the adopted cut-off grade(s) or quality\n\t\t\t\tparameters applied, including the basis, if appropriate, of\n\t\t\t\tequivalent metal formulae and the threshold values prescribed by\n\t\t\t\tIndian Bureau of Mines.\n3\nMining factors or assumptions.\n-The method and assumptions used to convert the Mineral\n\t\t\t\tResource to a Mineral Reserve (that is either by application of\n\t\t\t\tappropriate factors by optimisation or by preliminary or detailed\n\t\t\t\tdesign supported with conceptual plan for mining). -The choice\n\t\t\t\tof, the nature and the appropriateness of the selected mining\n\t\t\t\tmethod(s), the size of the selected mining unit (length, width,\n\t\t\t\theight) and other mining parameters including associated design\n\t\t\t\tissues such as pre-strip, access, and other associated\n\t\t\t\tdesignations. -The assumptions made regarding geotechnical\n\t\t\t\tparameters (For example pit slopes, stope sizes, and other geo\n\t\t\t\ttechnical parameters), grade control and pre-production\n\t\t\t\tdrilling. -The major assumptions made and Mineral Resource\n\t\t\t\tmodel used for pit optimisation (if appropriate). -The mining\n\t\t\t\tdilution factors, mining recovery factors, and minimum mining\n\t\t\t\twidth used. -The infrastructure requirements of the selected\n\t\t\t\tmining methods. Where available, the historic reliability of the\n\t\t\t\tperformance parameters.\n4\nMetallurgical factors or assumptions.\n-The metallurgical process proposed and the appropriateness of\n\t\t\t\tthat process to the type of deposit. -The nature, amount and\n\t\t\t\trepresentativeness of metallurgical test work undertaken and the\n\t\t\t\tmetallurgical recovery factors applied. -Any assumptions or\n\t\t\t\tallowances made for deleterious elements. -The existence of\n\t\t\t\tany bulk sample or pilot scale test work and the degree to which\n\t\t\t\tsuch samples are representative of the orebody as a whole. -The\n\t\t\t\ttonnages and grades reported for Mineral Reserves should state\n\t\t\t\tclearly whether these are in respect of material to the plant or\n\t\t\t\tafter recovery. Comment on existing plant and equipment,\n\t\t\t\tincluding an indication of replacement and salvage value\n5\nCost and revenue factors\n-The derivation of, or assumptions made, regarding projected\n\t\t\t\tcapital and operating costs. - The assumptions made regarding\n\t\t\t\trevenue including head grade, metal or commodity price\n\t\t\t\texchange rates, transportation and treatment charges, penalties,\n\t\t\t\tand other revenue factors. - The allowances made for royalties\n\t\t\t\tpayable, both Government and private. - Basic cash flow inputs\n\t\t\t\tfor a stated period.\n6\nMarket assessment\n-The demand, supply and stock situation for the particular\n\t\t\t\tcommodity, consumption trends and factors likely to affect supply\n\t\t\t\tand demand into the future. -A customer and competitor\n\t\t\t\tanalysis along with the identification of likely market windows\n\t\t\t\tfor the product. -Price and volume forecasts and the basis for\n\t\t\t\tthese forecasts. -For industrial minerals the customer\n\t\t\t\tspecification, testing and acceptance requirements prior to a\n\t\t\t\tsupply contract.\n7\nOther modifying factors\n-The effect, if any, of natural risk, infrastructure,\n\t\t\t\tenvironmental, legal, marketing, social or governmental factors\n\t\t\t\ton the likely viability of a project and/or on the estimation and\n\t\t\t\tclassification of the Mineral Reserves. -The status of titles\n\t\t\t\tand approvals critical to the viability of the project, such as\n\t\t\t\tmining leases, discharge permits, government and statutory\n\t\t\t\tapprovals. -Environmental descriptions of anticipated\n\t\t\t\tliabilities. Location plans of mineral rights and titles.\n8\nClassification.\n-The basis for the classification of the Mineral Reserves into\n\t\t\t\tvarying confidence categories. - Finalization of estimates of\n\t\t\t\tgrade wise mineable quantities in contemplation with proposed\n\t\t\t\tpreliminary mine design/conceptual plan subject to all necessary\n\t\t\t\tapprovals/contracts have been confirmed or there are reasonable\n\t\t\t\texpectations that all such approvals/contracts will be obtained\n\t\t\t\twithin a reasonable time frame and with certification that\n\t\t\t\tEconomic viability is not affected by short-term adverse market\n\t\t\t\tconditions provided that longer?term forecasts remain positive.\nSchedule C\nFormat of Bank Guarantee for Performance Security\nFormat of Bank Guarantee for Performance Security\n[See rule 6(6)(b)]\n[See rule 6(6)(b)]\n[ Date ]\nThe Governor of [Name of State]\nWHEREAS\nA. [Name], a government [company/corporation]incorporated in India under the Companies Act, (1956/2013) with corporate identity number [CIN of the Applicant], whose registered office is at [address of registered office], India and principal place of business is at [address of principal place of business, if different from registered office] (the \"Applicant\") is required to provide an unconditional and irrevocable bank guarantee for an amount equal to INR [figures] (Indian Rupees [words]) as a performance security valid until [date of expiry of performance bank guarantee] (\"Expiry Date\").\nB. The Performance Security is required to be provided to The Governor of [Name of State], (the \"State\") for discharge of certain obligations under the [reference to the principal documents-mining lease, mine development and production agreement] dated, [date] with respect to [particulars of concession] (collectively the \"Concession Document\").\nC. We, [name of the bank] (the \"Bank\") at the request of the Applicant do hereby undertake to pay to the State an amount not exceeding INR [figures] (Indian Rupees [words]) (\"Guarantee Amount\") to secure the obligations of the Applicant under the Concession Document on demand from the State on the terms and conditions herein contained herein.",
"footnote": "",
"is_definition": false,
"sort_order": 35
},
{
"number": "1",
"title": "1. The Bank for the purpose hereof unconditionally and irrevocably undertakes to pay to the State without any demur, reservation, caveat, protest or recourse, immediately on receipt of first written demand from the State, a sum or sums (by way of one or more claims) not exceeding the Guarantee Amount in the aggregate without the State needing to prove or to show to the Bank grounds or reasons for such demand for the sum specified therein and notwithstanding any dispute or difference between the ",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 36
},
{
"number": "2",
"title": "2. The Bank acknowledges that any such demand by the State of the amounts payable by the Bank to the State shall be final, binding and conclusive evidence in respect of the amounts payable by Applicant to the State under the Concession Document.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 37
},
{
"number": "3",
"title": "3. The Bank hereby waives the necessity for the State from demanding the aforesaid amount or any part thereof from the Applicant and also waives any right that the Bank may have of first requiring the State to pursue its legal remedies against the Applicant, before presenting any written demand to the Bank for payment under this Guarantee.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 38
},
{
"number": "4",
"title": "4. The Bank further unconditionally agrees with the State that the State shall be at liberty, without the Bank's consent and without affecting in any manner the Bank's obligation under this Guarantee, from time to time to:",
"chapter": null,
"content": "(i) vary or modify the terms and conditions of the Concession Document;\n(ii) extend or postpone the time for performance of the obligations of the Applicant under the Concession Document, or\n(iii) forbear or enforce any of the rights exercisable by the State against the Applicant under the terms and conditions of the Concession Document, and the Bank shall not be relieved from its liability by reason of any such act or omission on the part of the State or any indulgence by the State to the Applicant or other thing whatsoever which under the law relating to sureties would, but for this provision, have the effect of relieving the Bank of its obligations under this Guarantee.",
"footnote": "",
"is_definition": false,
"sort_order": 39
},
{
"number": "5",
"title": "5. Any payment made hereunder shall be made free and clear of and without deduction for, or on account of, any present or future taxes, levies, imposts, duties, charges, fees, commissions, deductions or withholdings of any nature whatsoever.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 40
},
{
"number": "6",
"title": "6. The Bank agrees that State at its option shall be entitled to enforce this Guarantee against the Bank, as a principal debtor in the first instance without proceeding at the first instance against the Applicant.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 41
},
{
"number": "7",
"title": "7. The Bank further agree that the guarantee herein contained shall remain in full force and effect during the period that specified in the Concession Document and that it shall continue to be enforceable till all the obligations of the Applicant under or by virtue of the said Concession Document with respect to the Performance Security have been fully paid and its claims satisfied or discharged or till the State certifies that the terms and conditions of the Concession Document with respect to ",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 42
},
{
"number": "8",
"title": "8. The payment so made by the Bank under this Guarantee shall be a valid discharge of Bank's liability for payment thereunder and the State shall have no claim against the Bank for making such payment.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 43
},
{
"number": "9",
"title": "9. This Guarantee is subject to the laws of India. Any suit, action, or other proceedings arising out of this Guarantee or the subject matter hereof shall be subject to the exclusive jurisdiction of courts at the State of [respective State].",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 44
},
{
"number": "10",
"title": "10. The Bank has the power to issue this Guarantee in favour of the State. This guarantee will not be discharged due to the change in the constitution of the Bank",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 45
},
{
"number": "11",
"title": "11. The Bank undertakes not to revoke this Guarantee during its currency except with the previous consent of the State in writing.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 46
},
{
"number": "12",
"title": "12. The State may, with prior intimation to the Bank, assign the right under this Guarantee to any other departments, ministries or any governmental agencies, which may act in the name of the Governor. Save as provided in this clause, this Guarantee shall not by assignable or transferable.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 47
},
{
"number": "13",
"title": "13. Notwithstanding anything contained herein,",
"chapter": null,
"content": "(a) the liability of the bank under this bank guarantee shall not exceed the Guarantee Amount.\n(b) This bank guarantee shall be valid up to the Dateof Expiry.",
"footnote": "",
"is_definition": false,
"sort_order": 48
},
{
"number": "14",
"title": "14. The Bank is liable to pay the guaranteed amount or any part thereof under this bank guarantee only and only if the State serves upon the Bank a written claim or demand on or before the Expiry Date.",
"chapter": null,
"content": "Schedule D\nFormat of Mining Lease Deed\nFormat of Mining Lease Deed\n[See rule 6(9)(a)]\n[See rule 6(9)(a)]\nLease\nPARTIES:\nThe Governor of [State]\nState Government\nBACKGROUND:\nAct",
"footnote": "",
"is_definition": false,
"sort_order": 49
},
{
"number": "1",
"title": "1. Definitions.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": true,
"sort_order": 50
},
{
"number": "2",
"title": "2. Grant of Lease",
"chapter": null,
"content": "2.1. The State Government hereby grants the lease to the lessee over an area described in Schedule E (\"Lease Area\") for conducting mining operations for a period of [time period], commencing from [date of commencement] with respect to following mineral(s), [name of the minerals] (\"Minerals\").\n2.2. The lease shall be with respect to all those the mines beds/veins seams of the Minerals situated lying and being in or under the Lease Area.\n2.3. Subject to the lessee paying the royalties and making other payments required to be paid and observing and performing all the covenants and agreements herein contained and on the part of the lessee to be observed and performed shall and may quietly hold and enjoy the rights and premises of the lease area for and during the term hereby granted without any unlawful interruption from or by the State Government, or any person rightfully claiming under it.",
"footnote": "",
"is_definition": false,
"sort_order": 51
},
{
"number": "3",
"title": "3. Rights and Obligations",
"chapter": null,
"content": "3.1. The rights and obligations of the State Government and the lessee shall be as specified in the Act and these rules and the Mine Development and Production Agreement dated [ date ].\n3.2. Without prejudice to the generality of the foregoing,\n(a) the lessee shall:\n(i) at all times comply with the provisions of the Act and these rules and any other applicable law;\n(ii) make prompt payment of royalty and any other payment required to be made by the lessee;\n(iii) pay such compensation as may be assessed by lawful authority in accordance with the law in force on the subject for all damage, injury, or disturbance which may be done by the lessee in exercise of the powers granted by this lease and to indemnify and keep indemnified fully and completely the State Government against all claims which may be by any person or persons in respect of any such damage, injury or disturbance and all costs and expenses in connection therewith;\n(iv) take measures, at his own expense, for the protection of environment like planting of trees, reclamation of mined land, use of pollution-control devices, and such other measures as may be prescribed by the Central or State Government from time to time;\n(v) without delay send to the Deputy Commissioner/Collector and the Department, a report of any accident causing death or serious bodily injury or serious injury to property or seriously affecting or endangering life or property which may occur in the course of the operations under this lease;\n(vi) weigh or cause to be weighed or measured upon some part of the lease area all minerals from time to time won from the lease area, with [number of days] prior notice being given to the Deputy Commissioner/Collector every such measuring or weighing in order that he or some person on his behalf may be present thereat;\n(vii) submit to the State Government and the Department a full report of the work done by the lessee and disclose all information acquired by the lessee in the course of the operations carried on under this lease regarding the geology and mineral resources of the area covered by the lease; and\n(viii) pay stamp duty and registration charges as may be applicable in respect of this deed.\n(b) the State Government shall:\n(i) have the right to appropriate any performance security provided by the lessee in accordance with terms of such performance security and require the lessee to replenish the performance security. In case the performance security has been provided through a security deposit after termination of the lease and fulfilment of all obligations of the lessee, such security deposit shall be returned to the lessee after appropriate deductions. It is clarified that the security deposit shall not carry any interest; and\n(ii) have the right to carry out or perform any work or matters which in accordance with the covenants in that behalf are to be carried out or performed by the lessee, but have not been so carried out or performed within the time specified In that behalf, and the lessee shall pay the State Government on demand all expenses which shall be incurred in such carrying out or performance of the same.\n3.3. In the event of the existence of a state of war or emergency (of which existence the President of India shall be the sole judge and a notification to this effect in the Gazette of India shall be conclusive proof) the State Government with the consent of the Central Government shall from time to time and at all times during the said term have the right (to be exercised by a notice in writing to the lessee/lessees) forthwith take possession and control of the works, plant, machinery and premises of the Lessee on or in connection with the lease area or the operations under this lease and during such possession or control, the lessee shall conform to and obey all directions given by or on behalf of the Central Government or State Government regarding the use of employment of such works, plants, premises and minerals, provided that fair compensation, which shall be determined in default of agreement by the State Government shall be paid to the lessee for all loss or damage sustained by him/them by reason or in consequence of the exercises of the powers conferred by this clause and provided also that the exercise of such power shall not terminate the said term hereby granted or affect the terms and provisions of this clause.\n3.4. Every notice required to be given to the lessee shall be given in writing to such person as may be nominated by the lessee and such nomination shall be informed to the State Government in writing. If no such nomination is made then the notice shall be goven to the lessee by registered post/speed post addressed to the Lessee at the address shown in the application for the lease or at such other address in India as the lessee may designate from time to time and every such service shall be deemed to be proper and valid service upon the lessee and shall not be questioned or challenged by him.",
"footnote": "",
"is_definition": false,
"sort_order": 52
},
{
"number": "4",
"title": "4. Governing Law",
"chapter": null,
"content": "Schedule E\nFormat of Application for Revision or Passing of Order\nFormat of Application for Revision or Passing of Order\n[See rule 24(1)]\n[See rule 24(1)]\nS. No.\nS. No.\nDetails of Item\nDetails of Item\nParticulars\nParticulars\n1.\nName of applicant (In case of a firm or other association\n\t\t\t\tof individuals, provide names of each person constituting the\n\t\t\t\tfirm or the association of individuals, as the case may be.)\n2.\nAddress of the Applicant (In case of a firm or other\n\t\t\t\tassociation of individuals, provide addresses of each person\n\t\t\t\tconstituting the firm or the association of individuals, as the\n\t\t\t\tcase may be.)\n3.\nStatus of the applicant • Individual • Firm • Other association of individuals • Company\n4.\nPurpose of the application (Review of an order passed /\n\t\t\t\tRequest for passing of an order where such an order has not been\n\t\t\t\tpassed within the time period specified)\n5.\nIn case of review of an order, date of communication of the\n\t\t\t\torder to the applicant; or In case of request for passing\n\t\t\t\tof an order, the date on which the time period for passing such\n\t\t\t\torder expired.\n6.\nApplication fee payable\n7.\nName of bank, demand draft or challan number with date,\n\t\t\t\tthrough which application fee has been paid.\n8.\nMineral or minerals for which the application is filed\n9.\nDetails of area with respect to which the application in filed\n10.\nWhether the application is filed within the specified time\n\t\t\t\tperiod.\nYes/No\n11.\nIf not, the reasons for not presenting it within the specified\n\t\t\t\tlimit and seeking condonation of delay.\n12.\nName and complete address of the party/parties impleaded\n13.\nNumber of copies of petition attached (Petition is to be\n\t\t\t\tsubmitted in triplicate if no party is impleaded. Besides these,\n\t\t\t\tfor each party impleaded one additional copy is to be enclosed)\n14.\nGrounds of revision\nYours faithfully,\nSignature of the applicant\nSignature of the applicant\nInstructions to applicants.\n(b) The corporate authorisation of the authorised signatory of the applicant (which is a company) must be enclosed with the application. Any change in such corporate authorisation must be immediately intimated to the State Government.\nSchedule F\nNotice of Change In Particulars\nNotice of Change In Particulars\n[See rule 28]\n[See rule 28]\nImportant\nImportant\n1. (i) Name(s) of the mineral (s) worked\n(ii) Name(s) of other minerals if any, for which lease has been granted:\n2. (i) Name of the mine\n(ii) Change in the name of mines, if any: (Indicate old name and reason of change)\n3. (i) Name and address of the lessee/owner:\n(ii) Change in Name and address of the lessee/owner\n(Indicate old name and reason of change)",
"footnote": "",
"is_definition": false,
"sort_order": 53
},
{
"number": "4",
"title": "4. Particulars of the Mining Lease:",
"chapter": null,
"content": "(i) Date of execution:\n(ii)Period: ____________ Years, from _____________ to_______________\n(iii) Areas under lease:_________________ hectares/acres",
"footnote": "",
"is_definition": false,
"sort_order": 54
},
{
"number": "5",
"title": "5. Location of the Mining Lease:",
"chapter": null,
"content": "(i) Village_____________Distt.______________Taluka/Tahsil_______________\n(ii) Post Office _________ Police Station __________ Distt._______________\n(iii)Nearest railway station ______________ Distance ____________________\n(iv)Nearest Rest House/Dak Bungalow _________________________",
"footnote": "",
"is_definition": false,
"sort_order": 55
},
{
"number": "6",
"title": "6. Particulars of Agent: Name and address:",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 56
},
{
"number": "7",
"title": "7. Particulars of the Manager of the mine: Name and address",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 57
},
{
"number": "8",
"title": "8. Particulars of Mining Engineer employed in the mines:",
"chapter": null,
"content": "(i) Name and address:\n(ii) Qualification :\n(iii) Date of appointment :\n(iv) Status of employment: Whole time Part time",
"footnote": "",
"is_definition": false,
"sort_order": 58
},
{
"number": "9",
"title": "9. Letter No. and date through which the mining plan was approved by the Atomic Minerals for Directorate for Exploration and Research",
"chapter": null,
"content": "No. of Approval Letter and date of Approval:",
"footnote": "",
"is_definition": false,
"sort_order": 59
},
{
"number": "10",
"title": "10. Any other specific information",
"chapter": null,
"content": "Place:\nSignature :\nDate:\nName in full:\nDesignation: Owner/Agent/\nManager/ Mining\nEngineer\n(Strike out the items which are not applicable)\nSchedule G\nRegister of Mining Leases\nRegister of Mining Leases\n[See rule 32]\n[See rule 32]\nS. No.\nS. No.\nDetails of Item\nDetails of Item\nParticulars\nParticulars\n1.\nSerial No.\n2.\nName of applicant (In case of a firm or other association\n of individuals, provide names of each person constituting the\n firm or the association of individuals, as the case may be.)\n3.\nAddress of the applicant (In case of a firm or other\n association of individuals, provide addresses of each person\n constituting the firm or the association of individuals, as the\n case may be.)\n4.\nStatus of the applicant • Individual • Firm • Other association of individuals • Company\n5.\nDate of application\n6.\nDate on which application was received by Receiving Officer\n7.\nNumber and date of grant of lease\n8.\nDate of execution of mining lease\n9.\nDetails of area\nDistrict\nVillage\nTaluka\nKhasra No.\nGeo co-ordinates of the area as per Differential Geographical\n Positioning System.\nSurvey of India Toposheet number\n10.\nMineral (s) for which the mining lease has been granted\n11.\nMineral or minerals added to the mining lease with date\n12.\nExtent of the area for which mining lease has been granted\n (Ha)\n13.\nPeriod for which granted\n14.\nDate and period of renewal\n15.\nDate of change together with details of change that take place\n in name, or other particulars of the holder of mining lease.\n16.\nDate from which the area is available for re-grant\n17.\nRemarks, if any\n18.",
"footnote": "",
"is_definition": false,
"sort_order": 60
}
],
"metadata": {
"Act ID": "Last Updated 23rd February, 2019 [act2934]",
"Act Number": "Published vide Notification No. G.S.R. 677(E), 11th July, 2016",
"Enactment Date": "",
"Act Year": "2016",
"Short Title": "Atomic Minerals Concession Rules, 2016",
"Type": "CENTRAL",
"Location": "India (Central)"
},
"updated_at": "2026-09-29 21:55:17"
}