Assam Notified Urban Areas (Other than Guwahati) Building Rules, 2014

Assam Notified Urban Areas (Other than Guwahati) Building Rules, 2014

Raw JSON API

Sections

1. Short title, extent, application and commencement.

Section 1

2. Definitions.

Section 2

3. Notice.

Section 3

4. Information accompanying application.

Section 4

5. Size of Drawing Sheets and Colour of Plans.

Section 5

6. Plans to be submitted for building application.

Section 6

7. Layout Planin-case of Land Sub-division.

Section 7

8. Landscape Plan.

Section 8

9. Building Plan.

Section 9

10. Building Plan for Multi-storeyed Buildings / Special Buildings.

Section 10

11. Services Plan and Water Supply provisions.

Section 11

12. Signing of Plans.

Section 12

13. Notice for alteration.

Section 13

14. Repairs.

Section 14

15. Deviation during construction.

Section 15

16. Withdrawal of notice.

Section 16

17. Inspection on submission of application.

Section 17

18. Fees for permission.

Section 18

19. Grant of Permit or Refusal.

Section 19

20. Duration of sanction.

Section 20

21. Revocation of Permit.

Section 21

22. Notice for Inspection on work commencement.

Section 22

23. Completion Certificate.

Section 23

24. Occupancy Certificate.

Section 24

25. Part Occupancy Certificate.

Section 25

26. Existing Buildings.

Section 26

27. Modification of plans.

Section 27

28. Correspondence.

Section 28

29. Qualification and competence.

Section 29

30. Debarring or black-listing professionals indulged in professional misconduct.

Section 30

31. Provision to ensure compliance of sanctioned plan, etc.

Section 31

32. Un-authorised Construction.

Section 32

33. Pre-code Building Permit.

Section 33

34. Foundation and Structural design.

Section 34

35. Site Specification.

Section 35

36. Means of access.

Section 36

37. Plinth.

Section 37

38. Floor.

Section 38

39. Brick Wall.

Section 39

40. Wattle created wall.

Section 40

41. Boundary wall/Compound wall.

Section 41

42. Number of rooms.

Section 42

43. Minimum sizes of rooms.

Section 43

44. Slope of pitched roofs.

Section 44

45. Latrines and Lavatories (in general).

Section 45

46. Served Latrine.

Section 46

47. Septic tanks.

Section 47

48. Location of Septic Tank's Sub-surface Absorption System.

Section 48

49. Requirements of Septic tank.

Section 49

50. Bathrooms.

Section 50

51. Kitchen.

Section 51

52. Open space for ventilation.

Section 52

53. Ventilation of rooms.

Section 53

54. Height Regulation.

Section 54

55. Corridors and Passage.

Section 55

56. Post, Post plate, Truss etc .

Section 56

57. Water supply.

Section 57

58. Standard for RCC wells for drinking water.

Section 58

59. Basement.

Section 59

60. Numbering of houses.

Section 60

61. Barrier-free building.

Section 61

62. Electricity and Telephone Connection.

Section 62

63. Staircases.

Section 63

64. Layout and open space.

Section 64

65. Parking space.

Section 65

66. Regulation for Residential use.

Section 66

67. Regulation for commercial buildings.

Section 67

68. Regulations for buildings to be used for Whole Sale purposes shall be as follows.

Section 68

69. Regulation for Public and Semi Public Use Buildings shall be as follows.

Section 69

70. Regulation for Industrial Buildings shall be as follows.

Section 70

71. Regulation for Special Use Buildings shall be as specified below.

Section 71

72. Regulations for development of U- type building.

Section 72

73. Minimum plot size of builders other than Apartments.

Section 73

74. FAR, Coverage and width of access.

Section 74

75. Additional Area Calculations.

Section 75

76. Additional Requirement for Multi-storeyed and Special Buildings.

Section 76

77. Cinemas, Theatres and Assembly Hall.

Section 77

78. Factories and building of the ware house class.

Section 78

79. Special regulations for construction in hilly areas.

Section 79

80. Environmental aspects and landscaping.

Section 80

81. Earmarking/reservation of Dwelling Units (DU) for Economically Weaker Section (EWS)/Low Income Group (LIG).

Section 81

82. Conservation and Harvesting of Rain water.

Section 82

83. Re-use of Recycled/Waste Water.

Section 83

84. Regular notification/updates.

Section 84

85. Additional FAR scheme for widening of roads and improvement of junction.

Section 85

86. Structural design.

Section 86

87. For General Structural Safety.

Section 87

88. For Cyclone/Wind Storm Protection.

Section 88

89. For earthquake protection.

Section 89

90. For protection from Landslide Hazard.

Section 90

91. Structural Design Basis Report.

Section 91

92. Seismic Strengthening and Retrofitting.

Section 92

93. Review of Structural Design.

Section 93

94. Certification regarding structural safety in design.

Section 94

95. Constructional Safety.

Section 95

96. Quality Control and Inspection.

Section 96

97. Control of Signs (hoardings), transmission tower, telephone tower and outdoor display structures.

Section 97

98. Maintenance of Buildings.

Section 98

99. Protective Measures in Natural Hazard-Prone Areas.

Section 99

100. Green Building Criteria.

Section 100

101. Essential requirements.

Section 101

102. Requirements for registration and competence of professionals.

Section 102

103. Builder/ Constructor entity.

Section 103

104. Group or Agency.

Section 104

105. Annual Rate of License/ Enrolment Fees of Technical Personnel.

Section 105

106. Procedure for Application or License/ Enrolment in the Authority.

Section 106

107. Duties and responsibilities of Licensed Technical Personnel.

Section 107

108. Penal action against defaulting Architects/ Engineers/ Groups/ Supervisors.

Section 108

1. The site to be shown to the concern Zonal Engineer within 7 days.

Section 1

2. You are to contact to office counter of the building permission branch within 30 (thirty) days from the date of submission for further information.

Section 2

1. This Permit shall remain valid up to two years only from the date of issue of the permit.

Section 1

2. The Permit is not transferable.

Section 2

3. The owner upon commencement of his work under a no-objection certificate shall give Notice to MB/TC that he has started his work and Authority shall cause inspection of the work to be made within 14 days following receipt of notice to verify that the building has been erected in accordance with the sanctioned plans.

Section 3

4. Shall the MB/TC determine at any stage that the layout or the construction is not proceeding according to the sanctioned plan or is in violation of any provision of the Act, it shall serve a notice on the applicant requiring him to stay further execution until correction has been made in accordance with the approved plan.

Section 4

5. If the Permit holder fails to comply with the requirements at any stage of construction the MB/TC is empowered to cancel the building permit issued.

Section 5

6. Every person who erects or re-erects any building shall within one month of the completion of the work deliver to the MB/TC a notice in writing of such completion and shall give him all necessary facilities for the inspection of such works as provided in the Building Bye-laws.

Section 6

7. Whenever asked by the MB/TC or his subordinates, the Permit holder shall produce the Permit along with the copy of the approved plan for verification.

Section 7

8. In the event of reclamation of the plot for construction of building/boundary wall the reclamation level shall not exceed the level of the nearest P.W.D. or MB/TC Road. For preparation of hilly land for construction, retaining wall has to be constructed on the excavated earth and spoils shall be adequately guarded to prevent erosion.

Section 8

2. N.O.C. from Director of FIRE Service is to obtained for the building.

Section 2

3. Necessary fire fighting facilities are to be provided in and around the building.

Section 3

4. The Road side drain along with the Road is to be constructed at the cost of the builder connecting main outlet of the area.

Section 4

5. Before installation of Deep Tube Well, N.O.C. from Central Ground Water Board is to be obtained.

Section 5

7. At least 2 nos. of DUST BIN are to be placed near the plot at the cost of the builder.

Section 7

8. Planning of minimum 10 nos. of evergreen trees inside the plot on the date of commencement of construction and be maintained.

Section 8

9. The owner through the licensed architect, engineer, as the case may be (RTP) who has supervised the construction, shall give notice to the Authority regarding completion of work and obtain "Occupancy Certificate" before occupying the building.

Section 9

1. The building/s has/have been constructed according to the sanctioned plan.

Section 1

2. The building/s has/have been constructed as per approved plan and design as per detailed architectural drawings and specifications prepared by Architect on Record.

Section 2

3. Construction has been done under our supervision / guidance and adheres to the drawings submitted.

Section 3

1. The building/s has/have been constructed according to the sanctioned plan.

Section 1

2. The building/s has/have been constructed as per

Section 2

3. All materials used in the construction have been tested as provided in specifications and a record of test reports has been kept.

Section 3

1. Design

Section 1

2. Foundation

Section 2

1. Location of Building

Section 1

2. Details of completed work floor wise

Section 2

3. Enclosed : As-built plan

Section 3