(i) in G+3 building and above, the owner is required to hand over an area of 10% of the total built-up area to the sanctioning authority by way of a notarized affidavit. The 10% area handed over to the Authority shall be released on submission of Completion Certificate by owner alongwith the Occupancy Certificate issued by authority;
(ii) for buildings upto G+2, two times the property tax shall be levied if occupancy certificate is not obtained by the owner for Authority.
Section 31 • Assam Notified Urban Areas (Other than Guwahati) Building Rules, 2014
31. Provision to ensure compliance of sanctioned plan, etc.
assam-notified-urban-areas-other-than-guwahati-building-rules-2014-2014-sec-31.json
•
Section 31
{
"act_title": "Assam Notified Urban Areas (Other than Guwahati) Building Rules, 2014",
"act_slug": "assam-notified-urban-areas-other-than-guwahati-building-rules-2014-2014",
"section_label": "Section",
"section": {
"number": "31",
"title": "31. Provision to ensure compliance of sanctioned plan, etc.",
"chapter": null,
"content": "(i) in G+3 building and above, the owner is required to hand over an area of 10% of the total built-up area to the sanctioning authority by way of a notarized affidavit. The 10% area handed over to the Authority shall be released on submission of Completion Certificate by owner alongwith the Occupancy Certificate issued by authority;\n(ii) for buildings upto G+2, two times the property tax shall be levied if occupancy certificate is not obtained by the owner for Authority.",
"footnote": "",
"is_definition": false,
"sort_order": 30
},
"prev_section": "30",
"next_section": "32"
}