a. Banking of energy upto 100%, as agreed between the plant and the Distribution Licensee, shall be allowed.
b. Withdrawal of power shall be allowed only during the period other than 17:00 hrs.to 22:00 Hrs.
c. The plants shall provide ABT compliant Special Energy Meters and the monthly settlement of energy sales shall be done based on:
i. Power supplied during the peak hours as per SEM meter readings
ii. Power banked as per daily schedules given for banking of power during the month.
d. The banking as well as withdrawal of banked energy shall be subject to day ahead scheduling.
e. The power withdrawn by the plant as ascertained by SEM readings, which could not be considered as withdrawal from banked power, shall be considered as power purchased by the plant.
f. Provided that in case of purchase of power by these plants in case the plant is not in a position to generate electricity to meet the requirement in the event of emergency or shut down or maintenance of the plant including supply to township housing the operating staff, from a Distribution Licensee of the area in which the plant is located, shall be charged only on actual demand and energy purchased under appropriate category of the rate schedule of tariff. This shall apply only to those generators who have entered into PPA with the Distribution Licensee.
g. A Generating Plant shall be allowed to withdraw power that was banked during a particular financial year in the same year or during the following financial year.
h. The banked power remaining unutilized on the expiry of the following financial year would be treated as sale and the financial settlement shall be made at the scheduled tariff for the year during which the power was banked. No banking charges shall be deducted from such unutilized banked energy.
i. Banking charges shall be 12.5% of the energy banked
i. The withdrawal of banked energy, subject to deduction of banking charges of 12.5%, shall be allowed during the period other than 17:00 Hrs. to 22:00 Hrs, specified as peak hours.
ii. The plant shall provide ABT compliant special energy meters and the monthly settlement of energy shall be in the following manner;
a. A maximum of 75%, as agreed between such plants and the Distribution Licensee, of the energy supplied to the Licensee during the day shall be considered as banked energy and the remaining as energy sold to the Licensee,
b. Withdrawal of banked energy shall be subject to deduction of 12.5% of the banked energy as banking charges payable to the Licensee,
c. The demand posed by the plant in KVA while purchasing power from Distribution Licensee combined with demand due to withdrawal of banked energy by the captive plant shall be considered as the total demand (maximum demand) posed by the captive plant and the same shall not exceed the contracted demand which the plant has agreed to purchase from the Distribution Licensee:
d. The withdrawal of banked energy shall be adjusted against the energy purchased from the Distribution Licensee. The balance energy supplied by the Distribution Licensee shall be billed at rate of energy charges specified by the Commission, from time to time, in appropriate rate schedule of retail tariff.
iii. The banking as well as withdrawal of power shall be subject to day ahead scheduling.
iv. The captive plant shall be allowed to withdraw power that was banked during a particular financial year either in the same year or during the following financial year.
v. The banked energy remaining unutilized on the expiry of the following financial year would be treated as sale to the Distribution Licensee and the financial settlement shall be made at the rate specified by the Commission for the year during which the power was banked. No banking charges shall be deducted from such unutilized banked energy.
Section 40 • UPERC (Captive and Renewable Energy Generating Plants) Regulations, 2014
40. Banking of Power.
uperc-captive-and-renewable-energy-generating-plants-regulations-2014-sec-40.json
•
Section 40
{
"act_title": "UPERC (Captive and Renewable Energy Generating Plants) Regulations, 2014",
"act_slug": "uperc-captive-and-renewable-energy-generating-plants-regulations-2014",
"section_label": "Section",
"section": {
"number": "40",
"title": "40. Banking of Power.",
"chapter": null,
"content": "a. Banking of energy upto 100%, as agreed between the plant and the Distribution Licensee, shall be allowed.\nb. Withdrawal of power shall be allowed only during the period other than 17:00 hrs.to 22:00 Hrs.\nc. The plants shall provide ABT compliant Special Energy Meters and the monthly settlement of energy sales shall be done based on:\ni. Power supplied during the peak hours as per SEM meter readings\nii. Power banked as per daily schedules given for banking of power during the month.\nd. The banking as well as withdrawal of banked energy shall be subject to day ahead scheduling.\ne. The power withdrawn by the plant as ascertained by SEM readings, which could not be considered as withdrawal from banked power, shall be considered as power purchased by the plant.\nf. Provided that in case of purchase of power by these plants in case the plant is not in a position to generate electricity to meet the requirement in the event of emergency or shut down or maintenance of the plant including supply to township housing the operating staff, from a Distribution Licensee of the area in which the plant is located, shall be charged only on actual demand and energy purchased under appropriate category of the rate schedule of tariff. This shall apply only to those generators who have entered into PPA with the Distribution Licensee.\ng. A Generating Plant shall be allowed to withdraw power that was banked during a particular financial year in the same year or during the following financial year.\nh. The banked power remaining unutilized on the expiry of the following financial year would be treated as sale and the financial settlement shall be made at the scheduled tariff for the year during which the power was banked. No banking charges shall be deducted from such unutilized banked energy.\ni. Banking charges shall be 12.5% of the energy banked\ni. The withdrawal of banked energy, subject to deduction of banking charges of 12.5%, shall be allowed during the period other than 17:00 Hrs. to 22:00 Hrs, specified as peak hours.\nii. The plant shall provide ABT compliant special energy meters and the monthly settlement of energy shall be in the following manner;\na. A maximum of 75%, as agreed between such plants and the Distribution Licensee, of the energy supplied to the Licensee during the day shall be considered as banked energy and the remaining as energy sold to the Licensee,\nb. Withdrawal of banked energy shall be subject to deduction of 12.5% of the banked energy as banking charges payable to the Licensee,\nc. The demand posed by the plant in KVA while purchasing power from Distribution Licensee combined with demand due to withdrawal of banked energy by the captive plant shall be considered as the total demand (maximum demand) posed by the captive plant and the same shall not exceed the contracted demand which the plant has agreed to purchase from the Distribution Licensee:\nd. The withdrawal of banked energy shall be adjusted against the energy purchased from the Distribution Licensee. The balance energy supplied by the Distribution Licensee shall be billed at rate of energy charges specified by the Commission, from time to time, in appropriate rate schedule of retail tariff.\niii. The banking as well as withdrawal of power shall be subject to day ahead scheduling.\niv. The captive plant shall be allowed to withdraw power that was banked during a particular financial year either in the same year or during the following financial year.\nv. The banked energy remaining unutilized on the expiry of the following financial year would be treated as sale to the Distribution Licensee and the financial settlement shall be made at the rate specified by the Commission for the year during which the power was banked. No banking charges shall be deducted from such unutilized banked energy.",
"footnote": "",
"is_definition": false,
"sort_order": 44
},
"prev_section": "39",
"next_section": "41"
}