← Back to Directory

UPERC (Captive and Renewable Energy Generating Plants) Regulations, 2014

UPERC (Captive and Renewable Energy Generating Plants) Regulations, 2014

Raw JSON API

Sections

1. Short Title and commencement.

Section 1

2. Scope and extent of application.

Section 2

3. Tariff determination.

Section 3

4. Tariff for renewable energy based generating plants.

Section 4

5. Approval of Power Purchase Agreement.

Section 5

6. Definitions.

Section 6

7. General Power to Amend.

Section 7

8. Power to Relax.

Section 8

9. Object.

Section 9

10. Generation from Captive Power Plants.

Section 10

11. General conditions for Captive Generating Plants.

Section 11

12. Obligations of the Captive Generating Plant.

Section 12

13. Duties of the Captive Generating Plant.

Section 13

14. Open Access.

Section 14

15. Transmission charges and wheeling charges.

Section 15

16. Surcharge and Additional Surcharge.

Section 16

17. Sale of Power.

Section 17

18. Tariff.

Section 18

19. Purchase of Electricity.

Section 19

20. Capacity of the Plant & Location.

Section 20

21. Environmental Clearance.

Section 21

22. Object.

Section 22

23. Renewable Energy Source based Generation and Co-generation.

Section 23

24. General conditions for Renewable Energy sources based Generation.

Section 24

1. All the Generating Stations existing prior to 1.4.14 generating electricity from RE source based Generation in the State of Uttar Pradesh as on the date of notification of these Regulations irrespective of their connectivity with the grid or distribution system.

Section 1

2. These Regulations shall apply for all new projects to be commissioned after 1.4.14 within Uttar Pradesh for generation and sale of electricity from such projects based on RE sources to all distribution licensees within Uttar Pradesh and where tariff, for a generating station or a unit thereof based on RE sources.

Section 2

3. All provisions of these Regulations except for those relating to supply in the grid and tariff shall also apply to plants having no connectivity with the grid.

Section 3

25. Eligibility of Renewable Energy Generating Plants.

Section 25

26. Capacity of Renewable Energy Generating Plants.

Section 26

27. Environmental and other Clearances.

Section 27

28. Obligations of Renewable Energy Generating Plants.

Section 28

29. Duties of Renewable Energy based Generating Plants.

Section 29

30. Sale of Power.

Section 30

31. Tariff.

Section 31

2. The tariff for supply of electricity during the period of synchronization and the commissioning of the unit shall be equal to the variable cost.

Section 2

3. However, in case of small hydro plants and other renewable energy based plants, the tariff for supply of electricity during the period of synchronization and the commissioning of unit shall be equal to the 50 percent of the tariff.

Section 3

32. Open Access.

Section 32

33. Transmission Charges and Wheeling Charges.

Section 33

34. Surcharge and Additional Surcharge.

Section 34

35. Purchase of Electricity by the Plant.

Section 35

36. Evacuation of Power.

Section 36

37. Maintenance of Transmission lines and Equipment.

Section 37

38. Metering Arrangement.

Section 38

39. Energy Accounting and Billing.

Section 39

40. Banking of Power.

Section 40

41. Payment Mechanism.

Section 41

42. Miscellaneous Provisions.

Section 42

43. Repeal.

Section 43

1. Variable cost applicable for new plants or existing plants, as the case may be.

Section 1

2. Incentive @ 50 paisa per unit.

Section 2

1. Incentive @ 50 paise per kWh

Section 1