Every person who intends to have the following facilities, namely:
(i) an approach to private property from the road infrastructure;
(ii) laying of service such as pipeline, electrical cables, telephone cables etc. either along or across the road or bridge;
(iii) mining activities within 50 metres from either side of existing road or 500 metres upstream or downstream of a bridge;
(iv) carrying out any private or commercial activity within the acquired and controlled area;
(v) display of hoardings within the acquired and controlled area;
(vi) installation of hand pumps within the acquired and controlled area;
(vii) parking of accidental vehicles/machinery on the road upto 48 hours; and
(viii) temporary stacking of materials/goods on the road for a period not exceeding 48 hours, shall apply for permission in writing to the Executive Engineer-in-charge of the road infrastructure within his jurisdiction in respect of respect of facility under clauses (i) to (vi) above and to the Junior Engineer-in-charge in respect of facility under clauses (vii) and (viii) of this section and every such application for permission shall be in the prescribed manner:
Section 14 • THE UTTARAKHAND ROAD INFRASTRUCTURE PROTECTION ACT, 2014
Section 14
the-uttarakhand-road-infrastructure-protection-act-2014-sec-14.json
•
Section 14
{
"act_title": "THE UTTARAKHAND ROAD INFRASTRUCTURE PROTECTION ACT, 2014",
"act_slug": "the-uttarakhand-road-infrastructure-protection-act-2014",
"section_label": "Section",
"section": {
"number": "14",
"title": "Section 14",
"chapter": null,
"content": "Every person who intends to have the following facilities, namely:\n(i) an approach to private property from the road infrastructure;\n(ii) laying of service such as pipeline, electrical cables, telephone cables etc. either along or across the road or bridge;\n(iii) mining activities within 50 metres from either side of existing road or 500 metres upstream or downstream of a bridge;\n(iv) carrying out any private or commercial activity within the acquired and controlled area;\n(v) display of hoardings within the acquired and controlled area;\n(vi) installation of hand pumps within the acquired and controlled area;\n(vii) parking of accidental vehicles/machinery on the road upto 48 hours; and\n(viii) temporary stacking of materials/goods on the road for a period not exceeding 48 hours, shall apply for permission in writing to the Executive Engineer-in-charge of the road infrastructure within his jurisdiction in respect of respect of facility under clauses (i) to (vi) above and to the Junior Engineer-in-charge in respect of facility under clauses (vii) and (viii) of this section and every such application for permission shall be in the prescribed manner:",
"footnote": "",
"is_definition": false,
"sort_order": 880
},
"prev_section": "13",
"next_section": "14"
}