(i) all licenses granted or renewed under the said rules and all fees imposed or levied thereof shall be deemed to have been granted, renewed or imposed or levied, as the case may be, under the corresponding provision of these rules; and
(ii) all approvals given and all powers conferred by or under any notification or rule shall, so far as they are consistent with the Act and these rules, be deemed to have been given or conferred by or under these rules.
Appendix-I
Appendix-I
[See rule 4(3)]
Application seeking approval of fabrication shop for pressure vessels, vapourisers or fittings
(i) date from which such vessels/vapouriser/fittings were manufacture;
(ii) for whom the vessels/vapouriser/fittings were fabricated and there approximate numbers;
(iii) details of the vessels/vapouriser/fittings manufactured.
(ii) Details of templates or gauges provided to check or test.
(iii) Steps taken to check the accuracy of testing and checking equipment and frequency of such checking.
(i) Proforma of records for various tests carried out by the inspecting and certifying organization; and
(ii) Proforma of tests and inspection certificate issued by the independent inspecting authority.
Signature -----
Name and designation
Appendix-II A
Appendix-II A
[See rules 2(viii) and 2 (xxviii)]
[See rules 2(viii) and 2 (xxviii)]
Qualification and Experience of Inspector or Competent Person
Qualification and Experience of Inspector or Competent Person
Sl. No.
Rule under which competency is recognized
Qualification and other requirements
Experience for the purpose
Minimum facilities
1.
Rules 6(1) and 13(2)
(1) Degree in chemical or Mechanical or
Metallurgical or Marine Engineering from a recognized university
or equivalent professional qualifications. (2) Physically fit
and mentally sound for carrying out tests and examination.
(1) A minimum experience of 10 years in design,
fabrication and stage-wise inspection during fabrication of
pressure vessels and equipments operating under pressure. (2)
He shall be - (2)(a) Conversant with the relevant codes of
fabrication and test procedures relating to pressure vessels and
their fittings. (b) Conversant with the statutory requirements
concerning design and safety of unfired pressure vessels.
Standard gauges and instruments conforming to
national/ international standards for test and examination at
every stage of fabrication. Either the Inspector shall have these
or these shall be available to him. The Inspector shall be
responsible for ensuring the quality and accuracy of these gauges
and instrument used by him. A documented system to ensure this
shall be maintained by the Inspector.
2.
Rule 18, 19, 33 and 43.
(1) Degree in Chemical or Mechanical Engineering
or Marine Engineering or Metallurgical Engineering or equivalent
professional qualifications. (2) Physically fit and mentally
sound for carrying out tests and examinations
(1) A minimum experience of 10 years in- (a)
Design and fabrication, erection , operation, maintenance
and; (b) testing examination and inspection of pressure
vessels or equipment operating under pressure. (2) He shall
be- (a) conversant with the relevant code of practice and test
procedures relating to pressure vessels; (b) conversant with
statutory requirements concerning safety of unfired pressure
vessels installations & transport vehicles. (c) conversant
with nondestructive testing techniques as are applicable to
pressure vessels. (d) able to identify defects and arrive at a
reliable conclusion with regard to the safety of pressure
vessels.
Standard gauges, pumps and gadgets for hydraulic
and pneumatic pressure tests, non-destructive tests, equipments
for ultrasonic thickness test, ultrasonic flaw detection magnetic
particle inspection and any other test that may be required by
Chief Controller in specific cases. Either the Competent Person
shall have these facilities or these shall be available to him.
The Competent Person shall be responsible for ensuring the
quality and accuracy of the gauges and equipments and the
competence of any person that may be employed for performing a
non-destructive test. Competent person intending to carry out
the inspection and testing of mobile pressure vessels meant for
transportation of flammable or toxic or corrosive gases under
Rule 18 and or 19 may have required facilities for carrying out
degassing, inspection and testing as stipulated in Appendix IIB
at his command. In case, if he does not have his own approved
degassing station, he may enter into agreement with owner of
approved degassing station to undertake degassing, periodic
inspection and testing of mobile pressure vessels meant for
transportation of flammable/ toxic/ corrosive gases
Note. - The constituent members of an organization shall fulfill the requirements under Column-3 individually and those under Column-4 collectively.
Note. - The constituent members of an organization shall fulfill the requirements under Column-3 individually and those under Column-4 collectively.
Appendix-II B
Appendix-II B
[See rule 2 (xxvii)]
[See rule 2 (xxvii)]
Minimum required Facilities at Gas Tanker Degassing Station
Minimum required Facilities at Gas Tanker Degassing Station
LPG, Propane and other Flammable Gases:
(1) Minimum 7,500 litre water capacity static pressure vessel to hold compressed gas temporarily covered under license in Form LS-1A.
(2) Minimum safety distance of 30 metres around the vent stack to release the excess gas. The vent shall be at least 11 metres high & adequately supported and shall be provided with device to prevent reverse flow of the vent gas. The venting of the gases shall be kept to the bare minimum.
(3) Minimum 100 KL Water Storage Tank, connected pumps, piping and fittings, compressor etc with safety inter locks for carrying out the depressurising, de-gassing, purging, hydraulic test.
(4) Necessary facilities to carry out the Internal Visual Inspection, NDT and Hydraulic test as per the design code and re-commission/purge the vessel for safe re-filling of the gas for which it is licensed.
(5) Facilities to service/repair, calibrate, test and check the proper functioning of safety valves, excess flow valves, internal type excess flow valve, level gauges, pressure gauges, connected piping, valves and other fittings.
(6) Facilities for cold repair of dents and non pressure parts like baffle plates, replacement of corroded bolts/studs, nuts, gaskets, fitments of internal excess flow valves.
(7) Leveled hard ground, lifting jacks, ramps, proper illumination for the Tanker Parking Area, flammable gas detectors, oxygen content meter, and other safety equipments.
(8) Fire fighting facilities consisting of water monitors and sufficient numbers of DCP type fire extinguishers.
Toxic and or corrosive gases:
(1) Minimum 7,500 litre water capacity static pressure vessel to hold compressed gas temporarily, if required, covered under license in Form LS-1A.
(2) Direct venting of the gas in to the atmosphere is prohibited.
(3) Facility shall have the arrangement of dedicated water storage tanks for each type of gas, and shall be of adequate capacity to fill water in the mobile pressure vessels for dissolving the water soluble gases and neutralisation of the water used in this process.
(4) Efficient scrubbing and neutralisation system and connected facilities for safe disposal of the contaminated water.
(5) Facilities to service/repair, calibrate, test and check the proper functioning of safety valves, excess flow valves, internal type excess flow valve, level gauges, pressure gauges, connected piping, valves and other fittings.
(6) Facilities for cold repair of dents and non pressure parts like baffle plates, replacement of corroded bolts/studs, nuts, gaskets and fitment of internal excess flow valves.
(7) Leveled hard ground, lifting jacks, ramps, proper illumination for the Tanker Parking Area, flammable and toxic gas detectors, oxygen content meter and other safety equipments.
(8) Fire fighting facilities consisting of water monitors and sufficient numbers of DCP type fire extinguishers.
Procedure for obtaining prior approval for degassing station. -
(a) Mobile tankers for any flammable, toxic or corrosive gas, before being tested or examined under rules 18 or 19, shall be degassed to remove hazardous contents so as to ensure safety. Such degassing shall be carried out only at location approved by the Chief Controller either in plants or stations where such tankers are loaded or unloaded or in dedicated degassing station erected with facilities specified in this Appendix and approved by the Chief Controller;
(b) Any person intending to set up a dedicated Mobile tanker degassing station referred in clause (a), shall submit his application to the Chief Controller for obtaining prior approval along with a project report comprising of following information-
(i) introduction about his organization's status and capability to undertake the degassing job;
(ii) particulars of the site location, its accessibility, means of protection to prevent entry of unauthorized persons and its suitability for the specific purpose;
(iii) list of all facilities proposed to be provided including civil, mechanical electrical, degassing, fire fighting, pumps, compressors, communication etc;
(iv) step by step procedure to be followed for degassing and purging for the test and inspection;
(v) nature of deployment of technical manpower for supervision and execution of the job in safe manner;
(vi) four copies each of site, layout, Piping and Instrumentation (P&I), and other required drawing(s);
(vii) HAZOP study and Risk analysis report;
(viii) Three copies of layout drawing for obtaining prior approval under Form LS-1A;
(ix) NOC or consent letter of State Pollution Control Board if already obtained or same can be submitted along with the documents for grant of license in Form LS-1A; and
(x) A scrutiny fee as specified in clause (B) of the Schedule I for prior approval under Rule 46.
Appendix-III
Appendix-III
[See rule 12]
[See rule 12]
A. Application for recognition as competent person under the Static and Mobile Pressure Vessels (Unfired) Rules, 2016.
[See rules 18, 19, 33 and 43]
Section 72 • The Static and Mobile Pressure Vessels (Unfired) Rules, 2016
72. Repeal and Savings.
the-static-and-mobile-pressure-vessels-unfired-rules-2016-sec-72.json
•
Section 72
{
"act_title": "The Static and Mobile Pressure Vessels (Unfired) Rules, 2016",
"act_slug": "the-static-and-mobile-pressure-vessels-unfired-rules-2016",
"section_label": "Section",
"section": {
"number": "72",
"title": "72. Repeal and Savings.",
"chapter": null,
"content": "(i) all licenses granted or renewed under the said rules and all fees imposed or levied thereof shall be deemed to have been granted, renewed or imposed or levied, as the case may be, under the corresponding provision of these rules; and\n(ii) all approvals given and all powers conferred by or under any notification or rule shall, so far as they are consistent with the Act and these rules, be deemed to have been given or conferred by or under these rules.\nAppendix-I\nAppendix-I\n[See rule 4(3)]\nApplication seeking approval of fabrication shop for pressure vessels, vapourisers or fittings\n(i) date from which such vessels/vapouriser/fittings were manufacture;\n(ii) for whom the vessels/vapouriser/fittings were fabricated and there approximate numbers;\n(iii) details of the vessels/vapouriser/fittings manufactured.\n(ii) Details of templates or gauges provided to check or test.\n(iii) Steps taken to check the accuracy of testing and checking equipment and frequency of such checking.\n(i) Proforma of records for various tests carried out by the inspecting and certifying organization; and\n(ii) Proforma of tests and inspection certificate issued by the independent inspecting authority.\nSignature -----\nName and designation\nAppendix-II A\nAppendix-II A\n[See rules 2(viii) and 2 (xxviii)]\n[See rules 2(viii) and 2 (xxviii)]\nQualification and Experience of Inspector or Competent Person\nQualification and Experience of Inspector or Competent Person\nSl. No.\nRule under which competency is recognized\nQualification and other requirements\nExperience for the purpose\nMinimum facilities\n1.\nRules 6(1) and 13(2)\n(1) Degree in chemical or Mechanical or\n\t\t\t\tMetallurgical or Marine Engineering from a recognized university\n\t\t\t\tor equivalent professional qualifications. (2) Physically fit\n\t\t\t\tand mentally sound for carrying out tests and examination.\n(1) A minimum experience of 10 years in design,\n\t\t\t\tfabrication and stage-wise inspection during fabrication of\n\t\t\t\tpressure vessels and equipments operating under pressure. (2)\n\t\t\t\tHe shall be - (2)(a) Conversant with the relevant codes of\n\t\t\t\tfabrication and test procedures relating to pressure vessels and\n\t\t\t\ttheir fittings. (b) Conversant with the statutory requirements\n\t\t\t\tconcerning design and safety of unfired pressure vessels.\nStandard gauges and instruments conforming to\n\t\t\t\tnational/ international standards for test and examination at\n\t\t\t\tevery stage of fabrication. Either the Inspector shall have these\n\t\t\t\tor these shall be available to him. The Inspector shall be\n\t\t\t\tresponsible for ensuring the quality and accuracy of these gauges\n\t\t\t\tand instrument used by him. A documented system to ensure this\n\t\t\t\tshall be maintained by the Inspector.\n2.\nRule 18, 19, 33 and 43.\n(1) Degree in Chemical or Mechanical Engineering\n\t\t\t\tor Marine Engineering or Metallurgical Engineering or equivalent\n\t\t\t\tprofessional qualifications. (2) Physically fit and mentally\n\t\t\t\tsound for carrying out tests and examinations\n(1) A minimum experience of 10 years in- (a)\n\t\t\t\tDesign and fabrication, erection , operation, maintenance\n\t\t\t\tand; (b) testing examination and inspection of pressure\n\t\t\t\tvessels or equipment operating under pressure. (2) He shall\n\t\t\t\tbe- (a) conversant with the relevant code of practice and test\n\t\t\t\tprocedures relating to pressure vessels; (b) conversant with\n\t\t\t\tstatutory requirements concerning safety of unfired pressure\n\t\t\t\tvessels installations & transport vehicles. (c) conversant\n\t\t\t\twith nondestructive testing techniques as are applicable to\n\t\t\t\tpressure vessels. (d) able to identify defects and arrive at a\n\t\t\t\treliable conclusion with regard to the safety of pressure\n\t\t\t\tvessels.\nStandard gauges, pumps and gadgets for hydraulic\n\t\t\t\tand pneumatic pressure tests, non-destructive tests, equipments\n\t\t\t\tfor ultrasonic thickness test, ultrasonic flaw detection magnetic\n\t\t\t\tparticle inspection and any other test that may be required by\n\t\t\t\tChief Controller in specific cases. Either the Competent Person\n\t\t\t\tshall have these facilities or these shall be available to him.\n\t\t\t\tThe Competent Person shall be responsible for ensuring the\n\t\t\t\tquality and accuracy of the gauges and equipments and the\n\t\t\t\tcompetence of any person that may be employed for performing a\n\t\t\t\tnon-destructive test. Competent person intending to carry out\n\t\t\t\tthe inspection and testing of mobile pressure vessels meant for\n\t\t\t\ttransportation of flammable or toxic or corrosive gases under\n\t\t\t\tRule 18 and or 19 may have required facilities for carrying out\n\t\t\t\tdegassing, inspection and testing as stipulated in Appendix IIB\n\t\t\t\tat his command. In case, if he does not have his own approved\n\t\t\t\tdegassing station, he may enter into agreement with owner of\n\t\t\t\tapproved degassing station to undertake degassing, periodic\n\t\t\t\tinspection and testing of mobile pressure vessels meant for\n\t\t\t\ttransportation of flammable/ toxic/ corrosive gases\nNote. - The constituent members of an organization shall fulfill the requirements under Column-3 individually and those under Column-4 collectively.\nNote. - The constituent members of an organization shall fulfill the requirements under Column-3 individually and those under Column-4 collectively.\nAppendix-II B\nAppendix-II B\n[See rule 2 (xxvii)]\n[See rule 2 (xxvii)]\nMinimum required Facilities at Gas Tanker Degassing Station\nMinimum required Facilities at Gas Tanker Degassing Station\nLPG, Propane and other Flammable Gases:\n(1) Minimum 7,500 litre water capacity static pressure vessel to hold compressed gas temporarily covered under license in Form LS-1A.\n(2) Minimum safety distance of 30 metres around the vent stack to release the excess gas. The vent shall be at least 11 metres high & adequately supported and shall be provided with device to prevent reverse flow of the vent gas. The venting of the gases shall be kept to the bare minimum.\n(3) Minimum 100 KL Water Storage Tank, connected pumps, piping and fittings, compressor etc with safety inter locks for carrying out the depressurising, de-gassing, purging, hydraulic test.\n(4) Necessary facilities to carry out the Internal Visual Inspection, NDT and Hydraulic test as per the design code and re-commission/purge the vessel for safe re-filling of the gas for which it is licensed.\n(5) Facilities to service/repair, calibrate, test and check the proper functioning of safety valves, excess flow valves, internal type excess flow valve, level gauges, pressure gauges, connected piping, valves and other fittings.\n(6) Facilities for cold repair of dents and non pressure parts like baffle plates, replacement of corroded bolts/studs, nuts, gaskets, fitments of internal excess flow valves.\n(7) Leveled hard ground, lifting jacks, ramps, proper illumination for the Tanker Parking Area, flammable gas detectors, oxygen content meter, and other safety equipments.\n(8) Fire fighting facilities consisting of water monitors and sufficient numbers of DCP type fire extinguishers.\nToxic and or corrosive gases:\n(1) Minimum 7,500 litre water capacity static pressure vessel to hold compressed gas temporarily, if required, covered under license in Form LS-1A.\n(2) Direct venting of the gas in to the atmosphere is prohibited.\n(3) Facility shall have the arrangement of dedicated water storage tanks for each type of gas, and shall be of adequate capacity to fill water in the mobile pressure vessels for dissolving the water soluble gases and neutralisation of the water used in this process.\n(4) Efficient scrubbing and neutralisation system and connected facilities for safe disposal of the contaminated water.\n(5) Facilities to service/repair, calibrate, test and check the proper functioning of safety valves, excess flow valves, internal type excess flow valve, level gauges, pressure gauges, connected piping, valves and other fittings.\n(6) Facilities for cold repair of dents and non pressure parts like baffle plates, replacement of corroded bolts/studs, nuts, gaskets and fitment of internal excess flow valves.\n(7) Leveled hard ground, lifting jacks, ramps, proper illumination for the Tanker Parking Area, flammable and toxic gas detectors, oxygen content meter and other safety equipments.\n(8) Fire fighting facilities consisting of water monitors and sufficient numbers of DCP type fire extinguishers.\nProcedure for obtaining prior approval for degassing station. -\n(a) Mobile tankers for any flammable, toxic or corrosive gas, before being tested or examined under rules 18 or 19, shall be degassed to remove hazardous contents so as to ensure safety. Such degassing shall be carried out only at location approved by the Chief Controller either in plants or stations where such tankers are loaded or unloaded or in dedicated degassing station erected with facilities specified in this Appendix and approved by the Chief Controller;\n(b) Any person intending to set up a dedicated Mobile tanker degassing station referred in clause (a), shall submit his application to the Chief Controller for obtaining prior approval along with a project report comprising of following information-\n(i) introduction about his organization's status and capability to undertake the degassing job;\n(ii) particulars of the site location, its accessibility, means of protection to prevent entry of unauthorized persons and its suitability for the specific purpose;\n(iii) list of all facilities proposed to be provided including civil, mechanical electrical, degassing, fire fighting, pumps, compressors, communication etc;\n(iv) step by step procedure to be followed for degassing and purging for the test and inspection;\n(v) nature of deployment of technical manpower for supervision and execution of the job in safe manner;\n(vi) four copies each of site, layout, Piping and Instrumentation (P&I), and other required drawing(s);\n(vii) HAZOP study and Risk analysis report;\n(viii) Three copies of layout drawing for obtaining prior approval under Form LS-1A;\n(ix) NOC or consent letter of State Pollution Control Board if already obtained or same can be submitted along with the documents for grant of license in Form LS-1A; and\n(x) A scrutiny fee as specified in clause (B) of the Schedule I for prior approval under Rule 46.\nAppendix-III\nAppendix-III\n[See rule 12]\n[See rule 12]\nA. Application for recognition as competent person under the Static and Mobile Pressure Vessels (Unfired) Rules, 2016.\n[See rules 18, 19, 33 and 43]",
"footnote": "",
"is_definition": false,
"sort_order": 72
},
"prev_section": "71",
"next_section": "1"
}