(i) three copies of a properly drawn plan of the licensed premises showing in distinct colour or colours the proposed alteration and the reasons thereof;
(ii) piping and instrumentation diagram for the vessels, equipments and system proposed to be installed;
(iii) any other documents specified by the Chief Controller or Controller; and
(iv) a scrutiny fee as specified in clause (B) of the Schedule I.
Section 53 • The Static and Mobile Pressure Vessels (Unfired) Rules, 2016
53. Prior approval necessary for alteration in the licensed premises.
the-static-and-mobile-pressure-vessels-unfired-rules-2016-sec-53.json
•
Section 53
{
"act_title": "The Static and Mobile Pressure Vessels (Unfired) Rules, 2016",
"act_slug": "the-static-and-mobile-pressure-vessels-unfired-rules-2016",
"section_label": "Section",
"section": {
"number": "53",
"title": "53. Prior approval necessary for alteration in the licensed premises.",
"chapter": null,
"content": "(i) three copies of a properly drawn plan of the licensed premises showing in distinct colour or colours the proposed alteration and the reasons thereof;\n(ii) piping and instrumentation diagram for the vessels, equipments and system proposed to be installed;\n(iii) any other documents specified by the Chief Controller or Controller; and\n(iv) a scrutiny fee as specified in clause (B) of the Schedule I.",
"footnote": "",
"is_definition": false,
"sort_order": 53
},
"prev_section": "52",
"next_section": "54"
}