The Marble Development And Conservation Rules, 2002

The Marble Development And Conservation Rules, 2002

Raw JSON API

Sections

1. Short title and commencement.

Section 1

2. Application.

Section 2

3. Definitions.

Section 3

4. Prospecting to precede mining operations.

Section 4

5. Period for which prospecting license may be granted.

Section 5

6. Period for which leases may be granted.

Section 6

7. Minimum and maximum area for grant of a mining lease.

Section 7

8. Scheme of prospecting.

Section 8

9. Modification of scheme of prospecting.

Section 9

10. Prospecting operations to be carried out in accordance with scheme of prospecting.

Section 10

11. Report of prospecting operations.

Section 11

12. Mining plan as a pre-requisite to the grant of lease.

Section 12

13. Mining plan to be prepared by a recognised person.

Section 13

14. Grant of recognition by State Government.

Section 14

15. Approval and submission of mining plan.

Section 15

16. Mining plan as a pre-requisite to the commencement of mining operations.

Section 16

17. Mining plan to be submitted by the existing lessee.

Section 17

18. Review of mining plan.

Section 18

19. Mining operations to be in accordance with mining plan.

Section 19

20. Prospecting and mining operations.

Section 20

21. System of working.

Section 21

22. Separate stacking of non-saleable marble.

Section 22

23. Copies of plans and sections to be submitted.

Section 23

24. Preparation of plans.

Section 24

25. Protection of environment.

Section 25

26. Removal and utilisation of top soil.

Section 26

27. Storage of overburden, waste rock, etc.

Section 27

28. Reclamation and rehabilitation of lands.

Section 28

29. Precaution against air pollution.

Section 29

30. Discharge of effluents.

Section 30

31. Precaution against noise.

Section 31

32. Permissible limits and standards.

Section 32

33. Restoration of flora.

Section 33

34. Employment of mining engineer.

Section 34

35. Duties of mining engineer.

Section 35

36. Supply of materials, appliances and facilities.

Section 36

37. Half yearly and annual returns.

Section 37

38. Transfer of records of transferees.

Section 38

39. Copies of notices and returns to be maintained.

Section 39

40. Revision.

Section 40

41. Penalty.

Section 41

42. Facilities for undertaking research or training.

Section 42

43. Territorial jurisdiction.

Section 43

44. Obligation to supply other information.

Section 44

45. Provisions of these rules to be applicable to Government.

Section 45

46. Applicability of the provisions of Minor Mineral Concession Rules framed by the State Government.

Section 46

47. Delegation of powers.

Section 47

1. Type of the marble for which prospecting operations has been granted : (a) (b) 2. Name and address of the licencee : 3. Particulars of the prospecting licencee : (i) Date of execution : (ii) Period : Years From : Tso : (iii) Area under licence : Hectares (iv) No. and date assigned by State Government to Prospecting Licencee. No. Date : 4. Location of the prospecting licenced area : (i) Topo Sheet Number : (ii) Cadastral Survey or Khasra Number : (iii) Village : Taluka/Tehsil : District : Stat

Section 1

1. Name and Location of the Quarry/Mine Name of the quarry/mine Village : Post Office : Taluka/Tehsil : District : State 2. Name and address of the Lessee/Quarry/Mine owner Name : Address : 3. Lease details Area in heactares : Date of execution Period (Years) : Date of starting mining operations 4. No. of days the quarry/mine worked during the half yearly period : 5. Indicate reasons for work stoppage due to strike, lockout, monsoon, non-availability of labour, less demand, etc., and number of d

Section 1

1. Name and Location of the Quarry/Mine

Section 1

2. Name and address of the Lessee/Quarry/Mine owner

Section 2

3. Lease details

Section 3

4. No. of days the quarry/mine worked during the half yearly period :

Section 4

5. Indicate reasons for work stoppage due to strike, lockout, monsoon, non-availability of labour, less demand, etc., and number of days of work stoppage for each of these factors.

Section 5

6. Production, Despatches, Stocks and pit's Mouth Value :

Section 6

7. Production of Raw blocks, Despatches, Stocks and Pit's Mouth Value (Unit:cu.m/tones) :

Section 7

10. Export of Dimensional Blocks : During the half yearly period : Quantity (in MT) : Value (in Rs.) : 11. Domestic Sale of dimensional Blocks : During the Half yearly period : Quantity (in MT) : Value (in Rs.) : 12. Reasons for increase/decrease in production During the current half year as compared to the preceding half year :

Section 10

10. Export of Dimensional Blocks :

Section 10

11. Domestic Sale of dimensional Blocks :

Section 11

12. Reasons for increase/decrease in production

Section 12

5. Indicate reason(s) for work stoppage due to strike, lockout, monsoon, non-availability of labour, less demand, etc., and number of days of work stoppage for each of these factors. Reasons : No. of days :

Section 5

5. Indicate reason(s) for work stoppage due to strike, lockout, monsoon, non-availability of labour, less demand, etc., and number of days of work stoppage for each of these factors.

Section 5