{
    "id": 12342,
    "slug": "the-marble-development-and-conservation-rules-2002",
    "title": "The Marble Development And Conservation Rules, 2002",
    "short_title": "The Marble Development And Conservation Rules, 2002",
    "act_number": "Published vide Notification G.S.R. 369(E), dated 1",
    "act_year": 2002,
    "act_type": "CENTRAL",
    "location": "India (Central)",
    "law_status": "unknown",
    "enactment_date": null,
    "description": "The Marble Development And Conservation Rules, 2002",
    "preamble": "",
    "section_label": "Section",
    "sections": [
        {
            "number": "1",
            "title": "1. Short title and commencement.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 0
        },
        {
            "number": "2",
            "title": "2. Application.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 1
        },
        {
            "number": "3",
            "title": "3. Definitions.",
            "chapter": null,
            "content": "(a) \"Act\" means the Mines and Minerals (Development and Regulation) Act, 1957 (67 of 1957);\n(b) \"agent\", when used in relation to a quarry or mine, means any person whether appointed as such or not, who acts as the representative of the owner in respect of the management of the quarry or mine or any part thereof;\n(c) \"development\" means removing overburden or unproductive or waste materials as preparatory to mining;\n(d) \"drilling\" means the penetration of alluvial material, rocks or formations by holes for obtaining geological information and for drawing samples therefrom;\n(e) \"environment\" and \"environmental pollution\" shall have the same meanings respectively assigned to them in the Environment (Protection) Act, 1986 (29 of 1986);\n(f) \"Form\" means a Form set forth in Schedule to these rules;\n(g) \"geologist\" means a person having a post graduate degree in Geology from a University established or incorporated by or under an Act of Parliament or any institution recognised by the University Grants Commission established under section 4 of the University Grants Commission Act, 1956 (3 of 1956) or any qualification equivalent thereto and appointed in writing by the prospecting licensee, owner or agent to perform the duties of a geologist under these rules;\n(h) \"marble\" means crystalline metamorphosed calcareous or dolomitic rocks and serpentine rock types which are-\n(i) amenable to be recovered as dimensional stone; and\n(ii) capable of taking polish.\n(i) \"lease\" means a lease granted for the purpose of undertaking mining or quarrying operations for marble;\n(j) \"manager\" when used in relation to a mine or a quarry, means any person appointed by the owner or agent and includes the owner or the agent if he appoints himself to be such manager, under section 17 of the Mines Act, 1952 (35 of 1952);\n(k) \"mining engineer\" means a person having a Bachelor degree in mining engineering from a University established or incorporated by or under an Act of Parliament or including any institution recognised by the University Grants Commission established under section 4 of the University Grants Commission Act, 1956 (3 of 1956) or any qualification equivalent thereto and appointed in writing by the owner or agent to perform the duties of a mining engineer under these rules;\n(l) \"prospect\" means an area where existence of marble has been established;\n(m) \"prospecting license\" means a license granted for the purpose of undertaking any operation for the purpose of exploring, locating or proving marble deposits;\n(n) \"quarry\" means an open-cast working as defined in Mines Act, 1952 (35 of 1952);\n(o) \"recognised person\" means a qualified person granted recognition by the competent authority under these rules to prepare mining plan;\n(p) \"year\" means the twelve months period beginning from the first day of April and ending on the thirty-first day of March of the following year.\nChapter II\nProspecting and Mining of Marble\nProspecting and Mining of Marble",
            "footnote": "",
            "is_definition": true,
            "sort_order": 2
        },
        {
            "number": "4",
            "title": "4. Prospecting to precede mining operations.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 3
        },
        {
            "number": "5",
            "title": "5. Period for which prospecting license may be granted.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 4
        },
        {
            "number": "6",
            "title": "6. Period for which leases may be granted.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 5
        },
        {
            "number": "7",
            "title": "7. Minimum and maximum area for grant of a mining lease.",
            "chapter": null,
            "content": "Chapter III\nProspecting Operations\nProspecting Operations",
            "footnote": "",
            "is_definition": false,
            "sort_order": 6
        },
        {
            "number": "8",
            "title": "8. Scheme of prospecting.",
            "chapter": null,
            "content": "(a) particulars of the area;\n(b) the scale of the plan and the area of geological mapping;\n(c) the number of pits, trenches, and boreholes which he proposes to put in the area and the locations thereof;\n(d) the particulars of the machines to be used;\n(e) the details of exploratory mining to be undertaken;\n(f) the number of samples proposed to be drawn and tested;\n(g) baseline information of prevailing environmental conditions before the beginning of the prospecting operations;\n(h) any other matter relevant for the preparation of a scheme of prospecting, as directed by the State Government or any person so authorised from time to time by a general or specific order.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 7
        },
        {
            "number": "9",
            "title": "9. Modification of scheme of prospecting.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 8
        },
        {
            "number": "10",
            "title": "10. Prospecting operations to be carried out in accordance with scheme of prospecting.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 9
        },
        {
            "number": "11",
            "title": "11. Report of prospecting operations.",
            "chapter": null,
            "content": "Chapter IV\nMining Plan\nMining Plan",
            "footnote": "",
            "is_definition": false,
            "sort_order": 10
        },
        {
            "number": "12",
            "title": "12. Mining plan as a pre-requisite to the grant of lease.",
            "chapter": null,
            "content": "(b) For the purpose of renewal of a mining lease up to an area of one hectare, the State Government shall specify a simplified scheme of mining to be submitted by the lessee for approval by the State Government or any other person authorised in this behalf.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 11
        },
        {
            "number": "13",
            "title": "13. Mining plan to be prepared by a recognised person.",
            "chapter": null,
            "content": "(i) a degree in mining engineering or a post-graduate degree in geology granted by a University established or incorporated by or under an Act of Parliament or any institution recognised by the University Grants Commission established under section 4 of the University Grants Commission Act, 1956 (3 of 1956) or any qualification equivalent thereto; and\n(ii) professional experience of five years of working in a supervisory capacity in the field of mining or mineral administration after obtaining a degree or qualification required under clause (i).",
            "footnote": "",
            "is_definition": false,
            "sort_order": 12
        },
        {
            "number": "14",
            "title": "14. Grant of recognition by State Government.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 13
        },
        {
            "number": "15",
            "title": "15. Approval and submission of mining plan.",
            "chapter": null,
            "content": "(i) the plan of the precise area showing the nature and extent of the marble deposit, spot or spots where the excavation is to be done in the first year and its extent, a detailed cross-section and detailed plan of spots of excavation based on the prospecting data gathered by the applicant and a tentative scheme of mining for the first five years of the lease;\n(ii) details of the geology and lithology of the precise area including marble reserves of the area;\n(iii) the extent of manual mining or mining by the use of machinery and mechanical devices on the precise area;\n(iv) the plan of the precise area showing natural water courses, limits of reserved and other forest areas and density of trees, if any, assessment of impact of mining activity on forest, land surface and environment including air and water pollution, details of scheme for restoration of the area by afforestation, land reclamation, use of pollution control devices and of such other measures as may be directed by the Central or the State Government from time to time;\n(v) annual programme and plan for excavation on the precise area from year to year for five years; and\n(vi) any other matter which the State Government or any person so authorised may require the applicant to provide in the mining plan.\nChapter V\nMining Operations\nMining Operations",
            "footnote": "",
            "is_definition": false,
            "sort_order": 14
        },
        {
            "number": "16",
            "title": "16. Mining plan as a pre-requisite to the commencement of mining operations.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 15
        },
        {
            "number": "17",
            "title": "17. Mining plan to be submitted by the existing lessee.",
            "chapter": null,
            "content": "(b) In case of existing mining leases upto one hectare, the State Government shall specify a simplified scheme of mining and every lessee shall submit such scheme of mining within a period of one year from the date of commencement of these rules to the State Government or any person authorised in this behalf by that Government for its approval.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 16
        },
        {
            "number": "18",
            "title": "18. Review of mining plan.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 17
        },
        {
            "number": "19",
            "title": "19. Mining operations to be in accordance with mining plan.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 18
        },
        {
            "number": "20",
            "title": "20. Prospecting and mining operations.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 19
        },
        {
            "number": "21",
            "title": "21. System of working.",
            "chapter": null,
            "content": "(a)\nFor small quarry or mine (having area upto one hectare):\n(i)\nCompressor\n...\none\n(ii)\nJackhammer or any other pneumatic or hydraulic drill\n...\none\n(iii)\nChain pulley block\n...\none\n(iv)\nWinch or 8 to 10 tonnes capacity crane\n...\none\n(v)\nWedges, chisels and hammers as needed\n...\n(vi)\nWater pump\n...\none\n(b)\nFor medium size quarry or mine (having area above one hectare\n\t\t\t\tand upto three hectares):\n(i)\nCompressors\n...\ntwo\n(ii)\nJackhammer or any other pneumatic or hydraulic drill\n...\nas needed\n(iii)\nMobile cranes (15 to 20 tonnes)\n...\none to two\n(iv)\nDerrick crane or Loader\n...\none\n(v)\nExcavator (0.3 cu.m. to 0.9 cu.m.)\n...\none\n(vi)\nTippers or Loaders\n...\ntwo\n(vii)\nWire saws or chain saws\n...\nas needed\n(viii)\nHydraulic jacks\n...\nas needed\n(c)\nFor large quarry or mine (having area more than three\n\t\t\t\thectares):\n(i)\nCompressors\n...\nthree to four\n(ii)\nMobile cranes (15 to 20 tonnes)\n...\nas needed\n(iii)\nDerrick crane (20 to 40 tonnes) or Loader\n...\nas needed\n(iv)\nExcavator (0.9 cu.m. to 1.1 cu.m.)\n...\nas needed\n(v)\nTippers or Loaders excavator\n...\ntwo for each\n(vi)\nWagon drills\n(vii)\nSlot liners\n...\nas needed\n(viii)\nLine drilling machines\n(ix)\nDiamond wire saws\n(x)\nChain saws or diamond belt saws\n(xi)\nHydraulic jacks",
            "footnote": "",
            "is_definition": false,
            "sort_order": 20
        },
        {
            "number": "22",
            "title": "22. Separate stacking of non-saleable marble.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 21
        },
        {
            "number": "23",
            "title": "23. Copies of plans and sections to be submitted.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 22
        },
        {
            "number": "24",
            "title": "24. Preparation of plans.",
            "chapter": null,
            "content": "Chapter VI\nSystematic And Scientific Mining\nSystematic And Scientific Mining",
            "footnote": "",
            "is_definition": false,
            "sort_order": 23
        },
        {
            "number": "25",
            "title": "25. Protection of environment.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 24
        },
        {
            "number": "26",
            "title": "26. Removal and utilisation of top soil.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 25
        },
        {
            "number": "27",
            "title": "27. Storage of overburden, waste rock, etc.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 26
        },
        {
            "number": "28",
            "title": "28. Reclamation and rehabilitation of lands.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 27
        },
        {
            "number": "29",
            "title": "29. Precaution against air pollution.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 28
        },
        {
            "number": "30",
            "title": "30. Discharge of effluents.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 29
        },
        {
            "number": "31",
            "title": "31. Precaution against noise.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 30
        },
        {
            "number": "32",
            "title": "32. Permissible limits and standards.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 31
        },
        {
            "number": "33",
            "title": "33. Restoration of flora.",
            "chapter": null,
            "content": "Chapter VII\nEmployment Of Qualified Persons\nEmployment Of Qualified Persons",
            "footnote": "",
            "is_definition": false,
            "sort_order": 32
        },
        {
            "number": "34",
            "title": "34. Employment of mining engineer.",
            "chapter": null,
            "content": "(a) in the case of a mechanised marble quarry or mine, a whole-time mining engineer possessing the following qualifications, namely:-\n(i) degree in mining engineering with minimum one year's experience of working in mines including marble quarries or mines, or\n(ii) post graduate degree in geology with first class metalliferous mines manager's certificate or post graduate degree in geology with minimum three years' experience of working in supervisory capacity in mines including marble quarries or mines, or\n(iii) diploma in mining with first class metalliferous mines manager's certificate or diploma in mining with three year's experience in supervisory capacity in mines including marble quarries or mines, or\n(iv) first class metalliferous mines manager's certificate with minimum two years' experience of working in mines including marble quarries or mines after obtaining the certificate.\n(b) in the case of a marble quarry or mine lease other than the mechanised marble quarry or mine lease,-\n(i) a part-time mining engineer possessing qualification as specified under clause (a) above; or\n(ii) a part-time mining engineer, possessing a post graduate degree in geology or second class metalliferous mines manager's certificate, or\n(iii) a whole-time mining engineer possessing secondary school leaving certificate and mine foreman certificate with minimum five years' experience of working as mines foreman or mate in mines including marble quarries or mines.",
            "footnote": "",
            "is_definition": false,
            "sort_order": 33
        },
        {
            "number": "35",
            "title": "35. Duties of mining engineer.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 34
        },
        {
            "number": "36",
            "title": "36. Supply of materials, appliances and facilities.",
            "chapter": null,
            "content": "Chapter VIII\nNotices And Returns\nNotices And Returns",
            "footnote": "",
            "is_definition": false,
            "sort_order": 35
        },
        {
            "number": "37",
            "title": "37. Half yearly and annual returns.",
            "chapter": null,
            "content": "(a) a half yearly return in Form B for every half year ending 30th September and 31st March before the 15th of the following month for the preceding half yearly period;\n(b) an annual return in Form C which shall be submitted before the 1st July of each year for the preceding year:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 36
        },
        {
            "number": "38",
            "title": "38. Transfer of records of transferees.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 37
        },
        {
            "number": "39",
            "title": "39. Copies of notices and returns to be maintained.",
            "chapter": null,
            "content": "Chapter IX\nRevision And Penalty\nRevision And Penalty",
            "footnote": "",
            "is_definition": false,
            "sort_order": 38
        },
        {
            "number": "40",
            "title": "40. Revision.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 39
        },
        {
            "number": "41",
            "title": "41. Penalty.",
            "chapter": null,
            "content": "Chapter X\nMiscellaneous\nMiscellaneous",
            "footnote": "",
            "is_definition": false,
            "sort_order": 40
        },
        {
            "number": "42",
            "title": "42. Facilities for undertaking research or training.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 41
        },
        {
            "number": "43",
            "title": "43. Territorial jurisdiction.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 42
        },
        {
            "number": "44",
            "title": "44. Obligation to supply other information.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 43
        },
        {
            "number": "45",
            "title": "45. Provisions of these rules to be applicable to Government.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 44
        },
        {
            "number": "46",
            "title": "46. Applicability of the provisions of Minor Mineral Concession Rules framed by the State Government.",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 45
        },
        {
            "number": "47",
            "title": "47. Delegation of powers.",
            "chapter": null,
            "content": "Schedule\nForm A\nForm A\nYearly Report Of Prospecting Operations Carried Out\nYearly Report Of Prospecting Operations Carried Out\n(See rule 11)\nState Government concerned or any person so authorised under rule 47",
            "footnote": "",
            "is_definition": false,
            "sort_order": 46
        },
        {
            "number": "1",
            "title": "1. Type of the marble for which prospecting operations has been granted : (a) (b) 2. Name and address of the licencee : 3. Particulars of the prospecting licencee : (i) Date of execution : (ii) Period : Years From : Tso : (iii) Area under licence\n: Hectares (iv) No. and date assigned by State Government to Prospecting Licencee. No. Date : 4. Location of the prospecting licenced area : (i) Topo Sheet Number : (ii) Cadastral Survey or Khasra Number : (iii) Village : Taluka/Tehsil : District : Stat",
            "chapter": null,
            "content": "(i) Name and address:\n(ii) Qualification:\n(iii) Date of appointment:\n(iv) Stgatus of employment Whole-time Part-time 6. Status of Prospecting Operation In Progress (Please tick (√) mark one of the boxes whichever is applicable). Completed Abandoned\nPart-time\n(a) Geoligical mapping Area in Hectare Scale (b) Pitting (i) No. of pits (ii) Grid Pattern (iii) Depth (Mts.) Average Maximum Minimum (c) Trenching (i) No. of trenches (with interval) (ii) Length (Mts) Average Maximum Minimum\n(a) Geoligical mapping\nArea in Hectare\nScale\n(b) Pitting\n(i) No. of pits\n(ii) Grid Pattern\n(iii) Depth (Mts.) Average\nMaximum\nMinimum\n(c) Trenching\n(i) No. of trenches (with interval)\n(ii) Length (Mts) Average\nMaximum\nMinimum\n(d) No. and size of samples\n(e) Drilling\n(i) No. of boreholes completed during the year (with size of core)\n(ii) No. of borholes in progress\n(iii) Total yearly drilling (Mts.)\n(f) Particulars of drilling machines Type Make Capacity No.\nof drills\n(f) Particulars of drilling machines\n(f) Particulars of drilling machines\nType\nMake\nCapacity\nNo.\nof drills\n(g) Details of samples tested\n(i) No. of samples tested\n(ii) Complete report\nSignature...................................................\nName in full................................................\nDesignation................................................\nNote.\nForm B\nForm B\nHalf Yearly Return\nHalf Yearly Return\nMine/Quarry Code :...............................\n[See rule 37(1)(a)] For the half year ending..........20......... (i) Type of the marble worked: (ii) Name(s) of other mineral(s), if any: To,\nFor the half year ending..........20.........\n(i) Type of the marble worked:\n(ii) Name(s) of other mineral(s), if any:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 47
        },
        {
            "number": "1",
            "title": "1. Name and Location of the Quarry/Mine Name of the quarry/mine Village\n: Post Office : Taluka/Tehsil\n: District\n: State 2. Name and address of the Lessee/Quarry/Mine owner Name\n: Address\n: 3. Lease details Area in heactares : Date of execution Period\n(Years) : Date of starting mining operations 4. No. of days the quarry/mine worked during the half yearly period : 5. Indicate reasons for work stoppage due to strike, lockout, monsoon, non-availability of labour, less demand, etc., and number of d",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 48
        },
        {
            "number": "1",
            "title": "1. Name and Location of the Quarry/Mine",
            "chapter": null,
            "content": "Name of the quarry/mine\nVillage\n:\nPost Office :\nTaluka/Tehsil\n:\nDistrict\n:\nState",
            "footnote": "",
            "is_definition": false,
            "sort_order": 49
        },
        {
            "number": "2",
            "title": "2. Name and address of the Lessee/Quarry/Mine owner",
            "chapter": null,
            "content": "Name\n:\nAddress\n:",
            "footnote": "",
            "is_definition": false,
            "sort_order": 50
        },
        {
            "number": "3",
            "title": "3. Lease details",
            "chapter": null,
            "content": "Area in heactares :\nDate of execution\nPeriod\n(Years) :\nDate of starting mining operations",
            "footnote": "",
            "is_definition": false,
            "sort_order": 51
        },
        {
            "number": "4",
            "title": "4. No. of days the quarry/mine worked during the half yearly period :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 52
        },
        {
            "number": "5",
            "title": "5. Indicate reasons for work stoppage due to strike, lockout, monsoon, non-availability of labour, less demand, etc., and number of days of work stoppage for each of these factors.",
            "chapter": null,
            "content": "Reasons\nNo.\nof days",
            "footnote": "",
            "is_definition": false,
            "sort_order": 53
        },
        {
            "number": "6",
            "title": "6. Production, Despatches, Stocks and pit's Mouth Value :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 54
        },
        {
            "number": "7",
            "title": "7. Production of Raw blocks, Despatches, Stocks and Pit's Mouth Value\n(Unit:cu.m/tones) :",
            "chapter": null,
            "content": "Items Total Weight-wise/Size-wise break up a) Opening Stock b) Production c) Despatches (i) Direct Exports (ii) Domestic sale d) Closing stock e) Pit's Mouth Value (Rs.) 7.1 Waste and Rejects (Unit : Cu.M/tonnes) Item During the half year (a) Quantity of waste generated as overburden (b) Quantity of waste generated incidental to mining of raw blocks (c) Quantity of waste generated as rejected blocks and dressing rejects (d) Despatches of waste and rejects (in accordance with above classification)\nTotal\nWeight-wise/Size-wise break up\nDuring the half year\nType of Machinery No.\nof units Engine Horse Power of each unit No.\nof hours worked (a) (b) (c) (d)\nNo.\nof units\nEngine Horse Power of each unit\nNo.\nof hours worked",
            "footnote": "",
            "is_definition": false,
            "sort_order": 55
        },
        {
            "number": "10",
            "title": "10. Export of Dimensional Blocks : During the half yearly period : Quantity\n(in MT) : Value\n(in Rs.) : 11. Domestic Sale of dimensional Blocks : During the Half yearly period : Quantity\n(in MT) : Value\n(in Rs.) : 12. Reasons for increase/decrease in production During the current half year as compared to the preceding half year :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 56
        },
        {
            "number": "10",
            "title": "10. Export of Dimensional Blocks :",
            "chapter": null,
            "content": "During the half yearly period :\nQuantity\n(in MT) :\nValue\n(in Rs.) :",
            "footnote": "",
            "is_definition": false,
            "sort_order": 57
        },
        {
            "number": "11",
            "title": "11. Domestic Sale of dimensional Blocks :",
            "chapter": null,
            "content": "During the Half yearly period :\nQuantity\n(in MT) :\nValue\n(in Rs.) :",
            "footnote": "",
            "is_definition": false,
            "sort_order": 58
        },
        {
            "number": "12",
            "title": "12. Reasons for increase/decrease in production",
            "chapter": null,
            "content": "During the current half year as compared to the preceding half year :\nSignature...................................................\nName in full................................................\nDesignation : Owner/Agent/Mining Engineer/Manager.\nForm C\nForm C\nAnnual Return\nAnnual Return\n[See rule 37(1)(b)]\nMine/Quarry Code : .....................\n(For the  year 1st April, 20.......to 31st March, 20........)\n(i) Type of the marble work:\n(ii) Name(s) of other mineral(s), if any:\nName of the Mine/Quarry Village : Post Office : Taluka/Tehsil : District : State :\nName of the Mine/Quarry\nVillage :\nPost Office :\nTaluka/Tehsil :\nDistrict :\nState :\nArea in heactares : Date of Examination Periods :\nArea in heactares :\nDate of Examination\nPeriods :",
            "footnote": "",
            "is_definition": false,
            "sort_order": 59
        },
        {
            "number": "5",
            "title": "5. Indicate reason(s) for work stoppage due to strike, lockout, monsoon, non-availability of labour, less demand, etc., and number of days of work stoppage for each of these factors. Reasons\n: No.\nof days :",
            "chapter": null,
            "content": "",
            "footnote": "",
            "is_definition": false,
            "sort_order": 60
        },
        {
            "number": "5",
            "title": "5. Indicate reason(s) for work stoppage due to strike, lockout, monsoon, non-availability of labour, less demand, etc., and number of days of work stoppage for each of these factors.",
            "chapter": null,
            "content": "Reasons\n:\nNo.\nof days :\nDescription Fully employed Partly employed a. Graduate Mining Engineer b. Diploma Mining Engineer c. Geologist d. Other administrative, clerical and technical supervisory staff\nFully employed\nPartly employed\n6.2 Labour employment : Male Female (a) Average daily employment (b) Wages (Rs.)\n6.2 Labour employment :\nMale\nFemale\n(a) Average daily employment\n(b) Wages (Rs.)\nItems Total a. Opening Stock b. Production c. Despatches (i) Direct Exports (ii) Domestic sale d. Closing stock e. Pit's Mouth Value(Rs.)\nTotal\nItem During the year Cumulative total a) Quantity of waste generated as overburden b) Quantity of waste generated incidental to mining of raw blocks c) Quantity of waste generated as rejected blocks and dressing rejects d) Despatches of waste and rejects (in accordance with above classification)\nDuring the year\nCumulative total\nType of Machinery No.\nof units Engine Horse Power of each unit No.\nof hours worked (a) (b) (c) (d)\nType of Machinery\nNo.\nof units\nEngine Horse Power of each unit\nNo.\nof hours worked\nQuantity Cost(Rs.) (i) Fuel(Lt.): (ii) Electricity (KWH) (iii) Other Materials:\nQuantity\nCost(Rs.)\n................................................................................................\nName and Signature of Owner/Agent/Mining Engineer/Manager\nNote.\n(b) Average daily employment is obtained by dividing the number of man days worked by the number of working days. (c) Wage includes all cash payments including bonuses. Employers' contributions to provident funds, welfare activities etc. Concessions in kind should not be included in wages (d) The Pit's Mouth Value should represent the sale value of the marble at the pit head. In case of sales effected on F.O.R or F.O.B or any other basis, pit head sale value should be arrived at after deducting all the expenses incurred from quarry/mine to railway station or port or other point of sale, as the case may be (such as expenses on transportation, loading and unloading charges, railway freight, sampling and analysis, port handling, export duty and cess).\n(c) Wage includes all cash payments including bonuses. Employers' contributions to provident funds, welfare activities etc. Concessions in kind should not be included in wages (d) The Pit's Mouth Value should represent the sale value of the marble at the pit head. In case of sales effected on F.O.R or F.O.B or any other basis, pit head sale value should be arrived at after deducting all the expenses incurred from quarry/mine to railway station or port or other point of sale, as the case may be (such as expenses on transportation, loading and unloading charges, railway freight, sampling and analysis, port handling, export duty and cess).\n(d) The Pit's Mouth Value should represent the sale value of the marble at the pit head. In case of sales effected on F.O.R or F.O.B or any other basis, pit head sale value should be arrived at after deducting all the expenses incurred from quarry/mine to railway station or port or other point of sale, as the case may be (such as expenses on transportation, loading and unloading charges, railway freight, sampling and analysis, port handling, export duty and cess).",
            "footnote": "",
            "is_definition": false,
            "sort_order": 61
        }
    ],
    "metadata": {
        "Act ID": "16/751",
        "Act Number": "Published vide Notification G.S.R. 369(E), dated 15.5.2002, published in the Gazette of India, Extraordinary, Part 2, Section 3(i), dated 15.5.2002.",
        "Enactment Date": "",
        "Act Year": "2002",
        "Short Title": "The Marble Development And Conservation Rules, 2002",
        "Type": "CENTRAL",
        "Location": "India (Central)"
    },
    "updated_at": "2026-09-29 21:55:18"
}