(1) A Certificate issued by the Goa State Pollution Control Board as to the fitness of the source of water for potable use.
(2) A Certificate obtained from the Directorate of Transport that body of water tanker transporting potable water have internal stainless steel linings or an undertaking to ensure compliance with this requirements positively within six months period from the date of application.
(3) No Objection Certificate obtained from the Directorate of Health Services on the suitability of the tanker for carrying potable water, to be submitted every six months.
(4) When an application under sub-rule (2) above is personally delivered, the counterfoil receipt for the application attached to the duplicate form shall be initialled and dated by the Officer receiving such application and handed over back to the person from whom such application is received. In other cases, the counterfoil shall be similarly initialled and dated and shall be dispatched to the applicant as soon as may be practicable after the application is received.
(5) The Ground Water Officer shall grant permission for transportation of ground water from a well in Non-Scheduled area in Form XI hereto.
(6) The Ground Water Officer or any person authorized by the Government shall carry out periodical inspection of quality of water at source of water and in the water tankers. Such inspections shall be carried out in general regularly with monthly interval during the monsoon period (June to September) and at intervals of three months during the remaining months of the year.
(7) No person shall be refused a permission to transport ground water from a well in Non-Scheduled area unless he has been given an opportunity of being heard. The decision regarding the grant or refusal of the permission to transport ground water from a source of water in the non-Scheduled area shall be intimated by the Ground Water Officer to the applicant as far as possible within a period of ninety days from the date of receipt of the application. Where it is not possible for the Ground Water Officer to grant the permission for transportation of ground water, the Ground Water Officer shall intimate the reasons therefore the applicant so that he may make a fresh application after curing the defects, if any, specified therein.]
Form-I
Form-I
[ See rule 3(1)]
Application for registration of well in the Scheduled area under section 5(1) of the Goa Ground Water Regulation Act, 2002 (Goa Act 1 of 2002).
1a.
(i)
Name of the Applicant
(Surname)
(First name)
(Middle name)
(ii)
Age in years
(iii)
Father's/Husband's name
(iv)
Full Address
1b.
(i)
State, Govt. body/Municipality//Panchayat/Community
(ii)
Full Address
2.
Name and address of owner of land, on which the well proposed
to register exists, if the Applicant himself is not the owner of
the land and in what capacity Applicant has applied
3.
Nature of Registration
New/Renewal
4.
If renewal, reference to original registration
5.
Location of the well
(i)
Survey number & sub-division number
(ii)
Name of the land
(iii)
Revenue Village/Village Panchayat
(iv)
Taluka
(v)
District
6.
Type of well
Open well/ dug well/ sunk well/ bore well/ tube well/ pond/
dug-cum-bore well/ filter point/ collector well/ infiltration
gallery.
7.
Details of the well
(A)
Diameter/size of the well
(B)
Depth of well (In case of dug-cum-bore well give details of
both the open and bore well)
(C)
Distance from the nearest well
8.
(i)
Year of construction
(ii)
Year of commissioning
9.
The device used for lifting the ground water
10.
Details of power supply
Section 9 • The Goa Ground Water Regulation Rules, 2003
9. Permission to sink a well in non-Scheduled area.
the-goa-ground-water-regulation-rules-2003-sec-9.json
•
Section 9
{
"act_title": "The Goa Ground Water Regulation Rules, 2003",
"act_slug": "the-goa-ground-water-regulation-rules-2003",
"section_label": "Section",
"section": {
"number": "9",
"title": "9. Permission to sink a well in non-Scheduled area.",
"chapter": null,
"content": "(1) A Certificate issued by the Goa State Pollution Control Board as to the fitness of the source of water for potable use.\n(2) A Certificate obtained from the Directorate of Transport that body of water tanker transporting potable water have internal stainless steel linings or an undertaking to ensure compliance with this requirements positively within six months period from the date of application.\n(3) No Objection Certificate obtained from the Directorate of Health Services on the suitability of the tanker for carrying potable water, to be submitted every six months.\n(4) When an application under sub-rule (2) above is personally delivered, the counterfoil receipt for the application attached to the duplicate form shall be initialled and dated by the Officer receiving such application and handed over back to the person from whom such application is received. In other cases, the counterfoil shall be similarly initialled and dated and shall be dispatched to the applicant as soon as may be practicable after the application is received.\n(5) The Ground Water Officer shall grant permission for transportation of ground water from a well in Non-Scheduled area in Form XI hereto.\n(6) The Ground Water Officer or any person authorized by the Government shall carry out periodical inspection of quality of water at source of water and in the water tankers. Such inspections shall be carried out in general regularly with monthly interval during the monsoon period (June to September) and at intervals of three months during the remaining months of the year.\n(7) No person shall be refused a permission to transport ground water from a well in Non-Scheduled area unless he has been given an opportunity of being heard. The decision regarding the grant or refusal of the permission to transport ground water from a source of water in the non-Scheduled area shall be intimated by the Ground Water Officer to the applicant as far as possible within a period of ninety days from the date of receipt of the application. Where it is not possible for the Ground Water Officer to grant the permission for transportation of ground water, the Ground Water Officer shall intimate the reasons therefore the applicant so that he may make a fresh application after curing the defects, if any, specified therein.]\nForm-I\nForm-I\n[ See rule 3(1)]\nApplication for registration of well in the Scheduled area under section 5(1) of the Goa Ground Water Regulation Act, 2002 (Goa Act 1 of 2002).\n1a.\n(i)\nName of the Applicant\n(Surname)\n(First name)\n(Middle name)\n(ii)\nAge in years\n(iii)\nFather's/Husband's name\n(iv)\nFull Address\n1b.\n(i)\nState, Govt. body/Municipality//Panchayat/Community\n(ii)\nFull Address\n2.\nName and address of owner of land, on which the well proposed\n\t\t\t\tto register exists, if the Applicant himself is not the owner of\n\t\t\t\tthe land and in what capacity Applicant has applied\n3.\nNature of Registration\nNew/Renewal\n4.\nIf renewal, reference to original registration\n5.\nLocation of the well\n(i)\nSurvey number & sub-division number\n(ii)\nName of the land\n(iii)\nRevenue Village/Village Panchayat\n(iv)\nTaluka\n(v)\nDistrict\n6.\nType of well\nOpen well/ dug well/ sunk well/ bore well/ tube well/ pond/\n\t\t\t\tdug-cum-bore well/ filter point/ collector well/ infiltration\n\t\t\t\tgallery.\n7.\nDetails of the well\n(A)\nDiameter/size of the well\n(B)\nDepth of well (In case of dug-cum-bore well give details of\n\t\t\t\tboth the open and bore well)\n(C)\nDistance from the nearest well\n8.\n(i)\nYear of construction\n(ii)\nYear of commissioning\n9.\nThe device used for lifting the ground water\n10.\nDetails of power supply",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
"prev_section": "8",
"next_section": "1"
}