← Back to Directory

The Goa Ground Water Regulation Rules, 2003

The Goa Ground Water Regulation Rules, 2003

Raw JSON API

Sections

1. Short title and commencement.

Section 1

2. Definitions.

Section 2

3. Registration of an existing well or permission for sinking a new well in the scheduled area.

Section 3

4. Grant of permission to transport ground water in the Scheduled area.

Section 4

5. Order for stopping extraction of water.

Section 5

6. Compounding of offences.

Section 6

7. Appellate Authority to hear the appeals.

Section 7

8. Requisition of wells.

Section 8

9. Permission to sink a well in non-Scheduled area.

Section 9

1. Type of pump: centrifugal/ turbine/ submersible/ jet/ compressor/ others 2. Horse Power 3. Pump capacity E. D. Power Supply Connection No.

Section 1

1. Name of the Applicant and address

Section 1

2. Location of well

Section 2

3. Entry Number & Date Signature of Receiving Officer

Section 3

1. Type of pump proposed 2. Horse Power 3. Pump capacity 4. Type of energy

Section 1

1. Name of the Applicant and address

Section 1

2. Location of well

Section 2

3. Entry Number & Date

Section 3

1. The certificate holder should not deviate in any way from specification regarding well, pump etc. mentioned above without pre-intimation and approval of the Ground Water Officer.

Section 1

2. The drawal of ground water under this license should not interfere with the normal activities of the locality nor should it cause any traffic hazard.

Section 2

3. The Ground Water Officer or any person duly authorized by him shall have the right to inspect the place with such assistance as may be necessary to satisfy itself or himself whether the condition of restrictions specified are complied.

Section 3

1. The Member Secretary, Ground Water Cell.

Section 1

2. The Assistant Engineer, Sub-Div. ......................, Works Div. ....................., DWR.

Section 2

1. Permit No.

Section 1

2. Type of well                                               Dug well/dug-cum-bore well/bore well/open well/tube well/others

Section 2

3. Details of the well

Section 3

4. The device approved for lifting the ground water

Section 4

1. The permit holder should not deviate any way from the specifications regarding well mentioned above.

Section 1

2. The Ground Water Officer or any persons duly authorized by it shall have the right to enter and inspect the place with such assistance as may be necessary to satisfy itself or himself whether the conditions and restrictions specified in the permit are being complied with.

Section 2

3. Any other conditions to be specified.

Section 3

4. The quantity of drawal of ground water allowed per day.

Section 4

5. Validity period of permit to sink a well.

Section 5

1. The Member Secretary, Ground Water Cell.

Section 1

2. The Assistant Engineer, Sub-Div...................., Works Div....................., DWR.

Section 2

1. The Member Secretary, Ground Water Cell.

Section 1

2. The Assistant Engineer, Sub-Div. .................., Works Div. ..................., DWR.

Section 2

1. The Member Secretary, Ground Water Cell.

Section 1

2. The Assistant Engineer, Sub-Div. ................, Works Div. ................, DWR.

Section 2

1. Type of pump proposed 2. Horse Power 3. Pump capacity 4. Type of energy

Section 1

1. Name of the Applicant and address

Section 1

2. Location of well

Section 2

3. Entry Number & Date

Section 3