(a) such cylinder and its valve have been constructed to a type and standard specified in Schedule I as amended from time to time by an order issued by Chief Controller;
(b) the test and inspection certificates issued by the inspecting authority in respect of cylinder and its valve are made available to the Chief Controller and prior approval of the said authority is obtained.
(i) total number and serial numbers of the cylinders;
(ii) name and address of the manufacturer of the cylinders;
(iii) specification of the cylinder and the valve;
(iv) previous approval, if any;
(v) the test and inspection certificates in respect of the cylinders;
(vi) the test and inspection certificate pertaining to the valves fitted or to be fitted to the cylinder;
(vii) a scrutiny fee as per Schedule V.
(b) The Chief Controller may grant approval after making such inquiry, if any, as he may consider necessary, shall accord necessary permission for production of proto type;
(c) The physical evaluation of the manufacturer such as, inspection, testing, quality control facilities and witnessing the type testing of the prototype may be carried out by technical officers nominated by the Chief Controller along with inspecting authority to assess the capability of the firm to undertake the manufacture of the product by a technical team which shall submit an inspection report along with its recommendations to the Chief Controller.
(d) The Chief Controller on receipt of satisfactory compliance of the requirements specified in clauses (a) and (b) and after examining all the aspects of the inspection report, and making such inquiry, if any, as he may consider necessary, shall, subject to the other provisions of the Act and these rules, by an order in writing either grant the approval to the manufacturer initially for a period of one year which may further be extended after receipt of satisfactory performance report or refuse to grant the same.
(e) In case of foreign manufacturers seeking approval, additional fees shall be paid as per Schedule V for physical evaluation of the unit:
(f) While granting approval to a foreign manufacturer, his proven track record, manufacturing experience of ten years and widely distributed market share shall be considered before following the procedure laid down in sub-rule (3) (a) to (e) .
(g) Scrutiny fee to seek subsequent approval for any change in respect of design drawing shall be paid as specified in Schedule V.
(b) Scrutiny fee to seek subsequent approval for any change in respect of design drawing shall be paid as specified in Schedule V.
(a) the cylinder has passed the hydrostatic test or hydrostatic stretch test, as the case may be, within the period specified in these rules and the pressure applied during the test shall be the test pressure marked on the cylinder;
(b) the cylinder is not filled with-
(i) any liquefiable gas in excess of the filling ratio specified in IS:3710 for low pressure liquefiable gases and IS:15975 for high pressure liquefiable gases;
(ii) any permanent gas at a pressure in excess of the pressure for which the cylinder is designed;
(c) a separate record of the cylinder tested and filled is maintained at the filling station;
(d) the filled cylinders are removed from the filling station and shipped off as expeditiously as possible.
Section 3 • The Gas Cylinders Rules, 2016
3. Filling, possession, import and transport of cylinder.
the-gas-cylinders-rules-2016-sec-3.json
•
Section 3
{
"act_title": "The Gas Cylinders Rules, 2016",
"act_slug": "the-gas-cylinders-rules-2016",
"section_label": "Section",
"section": {
"number": "3",
"title": "3. Filling, possession, import and transport of cylinder.",
"chapter": null,
"content": "(a) such cylinder and its valve have been constructed to a type and standard specified in Schedule I as amended from time to time by an order issued by Chief Controller;\n(b) the test and inspection certificates issued by the inspecting authority in respect of cylinder and its valve are made available to the Chief Controller and prior approval of the said authority is obtained.\n(i) total number and serial numbers of the cylinders;\n(ii) name and address of the manufacturer of the cylinders;\n(iii) specification of the cylinder and the valve;\n(iv) previous approval, if any;\n(v) the test and inspection certificates in respect of the cylinders;\n(vi) the test and inspection certificate pertaining to the valves fitted or to be fitted to the cylinder;\n(vii) a scrutiny fee as per Schedule V.\n(b) The Chief Controller may grant approval after making such inquiry, if any, as he may consider necessary, shall accord necessary permission for production of proto type;\n(c) The physical evaluation of the manufacturer such as, inspection, testing, quality control facilities and witnessing the type testing of the prototype may be carried out by technical officers nominated by the Chief Controller along with inspecting authority to assess the capability of the firm to undertake the manufacture of the product by a technical team which shall submit an inspection report along with its recommendations to the Chief Controller.\n(d) The Chief Controller on receipt of satisfactory compliance of the requirements specified in clauses (a) and (b) and after examining all the aspects of the inspection report, and making such inquiry, if any, as he may consider necessary, shall, subject to the other provisions of the Act and these rules, by an order in writing either grant the approval to the manufacturer initially for a period of one year which may further be extended after receipt of satisfactory performance report or refuse to grant the same.\n(e) In case of foreign manufacturers seeking approval, additional fees shall be paid as per Schedule V for physical evaluation of the unit:\n(f) While granting approval to a foreign manufacturer, his proven track record, manufacturing experience of ten years and widely distributed market share shall be considered before following the procedure laid down in sub-rule (3) (a) to (e) .\n(g) Scrutiny fee to seek subsequent approval for any change in respect of design drawing shall be paid as specified in Schedule V.\n(b) Scrutiny fee to seek subsequent approval for any change in respect of design drawing shall be paid as specified in Schedule V.\n(a) the cylinder has passed the hydrostatic test or hydrostatic stretch test, as the case may be, within the period specified in these rules and the pressure applied during the test shall be the test pressure marked on the cylinder;\n(b) the cylinder is not filled with-\n(i) any liquefiable gas in excess of the filling ratio specified in IS:3710 for low pressure liquefiable gases and IS:15975 for high pressure liquefiable gases;\n(ii) any permanent gas at a pressure in excess of the pressure for which the cylinder is designed;\n(c) a separate record of the cylinder tested and filled is maintained at the filling station;\n(d) the filled cylinders are removed from the filling station and shipped off as expeditiously as possible.",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
"prev_section": "2",
"next_section": "4"
}