← Back to Directory
The Gas Cylinders Rules, 2016
The Gas Cylinders Rules, 2016
Sections
1. Short title and commencement.
Section 12. Definitions.
Section 23. Filling, possession, import and transport of cylinder.
Section 34. Valve.
Section 45. Safety relief devices.
Section 56. Markings on cylinders.
Section 67. Markings on valve.
Section 78. Identification colour.
Section 89. Labeling of cylinders.
Section 910. Restriction on delivery or dispatch of cylinder.
Section 1011. Repairing of seamless gas cylinders during use.
Section 1112. Repairing of welded or brazed cylinders.
Section 1213. Prohibition of employment of children and intoxicated person.
Section 1314. Prohibition of smoking, fire, light and dangerous substances.
Section 1415. General precautions.
Section 1516. Special precautions against accidents.
Section 1617. Competent person to be in charge of operations.
Section 1718. Handling and use.
Section 1819. Restriction on filling.
Section 1920. Loading, unloading and transport of cylinders or cascade.
Section 2021. Storage of cylinders.
Section 2122. Electrical installations.
Section 2223. Purity of gas.
Section 2324. Cylinder subjected to the action of fire.
Section 2425. Ownership of cylinder.
Section 2526. Re-testing of cylinder.
Section 2627. Owner's record.
Section 2728. Conversion of cylinders.
Section 2829. License for import of gas cylinders.
Section 2930. Declaration by the master of ship or ship's agent.
Section 3031. Production of license for import.
Section 3132. Permission of the Commissioner of Customs.
Section 3233. Importation by land.
Section 3334. Importation by air.
Section 3435. Periodicity of examination and testing of cylinders.
Section 3536. Condemning of cylinder.
Section 3637. Additional requirements for dissolved acetylene cylinders.
Section 3738. Restriction on filling of dissolved acetylene in cylinders.
Section 3839. Examination of dissolved acetylene cylinders before filling.
Section 3940. License for compression of acetylene.
Section 4041. Record of dissolved acetylene cylinders.
Section 4142. Labeling of dissolved acetylene cylinders.
Section 4243. License for filling and possession.
Section 4344. No license needed for possession in certain cases.
Section 4445. Restriction on filling.
Section 4546. Working pressure and filling ratio.
Section 4647. Prior approval of specification and plan of premises proposed to be licensed.
Section 4748. No Objection Certificate.
Section 4849. Application for license or approval.
Section 4950. Grant of license or approval.
Section 5051. Period for which license may be granted or renewed.
Section 5152. Particulars of license or approval.
Section 5253. Prior approval necessary for alteration in the licensed premises.
Section 5354. Amendment and transfer of license or approval.
Section 5455. Renewal of license or revalidation of approval.
Section 5556. Refusal of license or approval.
Section 5657. Suspension and cancellation of license or approval.
Section 5758. Procedure on expiration, suspension or cancellation of license or approval.
Section 5859. Appeal.
Section 5960. Procedure on death or disability of licensee.
Section 6061. Loss of license or approval.
Section 6162. Production of license or approval on demand.
Section 6263. Procedure on report of infringement.
Section 6364. Executive control over authorities.
Section 6465. License fee and fee other than license fee.
Section 6566. Power to exempt.
Section 6667. Notice of accident.
Section 6768. Inquiry into accident.
Section 6869. Inquiry into more serious accident.
Section 6970. Dangerous practices.
Section 7071. Powers of inspection, search, seizure, detention and removal.
Section 711. The Chief Controller or Controller
Section 12. All District Magistrate
Section 23. All Magistrates subordinate to the District Magistrate
Section 34. The Commissioner of Police and all Police Officers of rank not below that of Sub Inspector
Section 472. Protection of action taken in good faith.
Section 7273. Repeal and Savings.
Section 731. Indian Origin
Section 12. Austrian Origin
Section 23. Argentina Origin.
Section 34. Chinese Origin.
Section 45. Italian Origin
Section 56. Spain Origin.
Section 67. Japan Origin.
Section 78. Polish Origin.
Section 89. U.K. Origin.
Section 910. USA Origin.
Section 1011. German Origin.
Section 1112. Norway Origin.
Section 1213. Sweden Origin.
Section 131. Indian origin.
Section 12. Italian origin.
Section 21. Place and date of inspection.
Section 12. Gas cylinders for ........................... gas
Section 23. Manufactured by .................................
Section 34. Location at ..........................................
Section 45. Manufactured for ................................
Section 56. Location for ........................................
Section 67. Quantity .........................................
Section 78. Serial Nos. from....to .......................... inclusive
Section 89. Specification to which the cylinders are manufactured ...........................
Section 910. Size ... mm. outside diameter mm ..................................................... long
Section 1011. Minimum wall thickness ....................
Section 1112. Neck end threading as per ................................... specification.
Section 1213. Process of manufacture (whether spun type, or billet pierced or welded).
Section 1314. Method of heat treatment ....................
Section 1415. Design working pressure in kg/cm 2 at 15°C or 65°C as the case may be
Section 1516. Hydrostatic test or hydrostatic stretch test pressure in kg/cm 2 .
Section 1617. Record of Hydrostatic test or Hydrostatic stretch test with date of test, in respect of each cylinder...........
Section 1718. Pneumatic test pressure in kg/cm 2 .......................................................
Section 1819. Result of pneumatic test ....................
Section 1920. Tare weight and water capacity of each cylinder ..........................................
Section 2021. Record of chemical analysis and physical properties of the steel used in the manufacture of cylinders.............
Section 2122. Manufacturer's identification marks ...........................................................
Section 2223. Inspector's mark ..................................
Section 2324. Markings stamped on the shoulder of the cylinders ..............................
Section 2425. Dated signature with stamp of the inspecting authority
Section 251. Manufactured by .......................................
Section 12. Location at ..........................................
Section 23. Manufactured for ...................................
Section 34. Location at .................................................
Section 45. Quantity ..................................................
Section 56. Specification ..........................................
Section 67. Results of inspection
Section 78. Date and signature with stamp of the inspecting authority ....................
Section 81. Management:
Section 12. Equipment:
Section 24. Quality management system.
Section 41. Condition of cylinders for test.
Section 12. Inspection of cylinders before carrying out hydrostatic/hydrostatic stretch test.
Section 23. Hydrostatic or hydrostatic stretch test or proof pressure test.
Section 35. Records of test.
Section 56. Validity of cylinder testing station and hot repair or reconditioning approvals of LPG and welded cylinders.
Section 61. Particulars marked with* are not required to be furnished if empty cylinders are desired to be imported.
Section 12. Manufacturers test and inspection certificates complete in all respects pertaining to each lot of cylinders valves shall accompany this application.
Section 23. In case cylinders are desired to be imported duly filled with gas, filler certificates in respect of sub-items (vi), (vii) and (viii) of items shall be furnished.
Section 31. Safety devices shall be provided in the acetylene cylinder filling and storage plants to ensure that the pressure, temperature and flow levels are maintained within safe limits.
Section 12. The equipments shall be designed, operated and maintained in such a way that during normal operation air or oxygen entry to the equipments is prevented, under pressure shall be prevented, air acetylene mixtures shall be safely eliminated by purging and excessive rise in temperature and pressure is prevented.
Section 23. Regulators shall conform to ISO-7291 and high pressure hoses shall conform to ISO-14113.Hoses for high pressure acetylene shall have burst pressure not less than 1000 bar (100 MPa).
Section 34. Flame arrestors or shut off devices shall be provided on all the strategic locations in the plant to arrest both ignition and the gas flow.
Section 45. Although the pressure in the filling manifolds may be 25 bar but while designing the manifolds possibility of acetylene decomposition and detonation resistance shall also be taken into the account.
Section 56. An efficient fire Protection System, Deluge system and Emergency response system for dissolved acetylene cylinder filling and storage plants shall be provided.
Section 67. Carbon Dioxide fire extinguishers shall not be used for extinguishing flammable gas fires due to the risk of static electricity generation. Dry Chemical Powder type fire extinguishers shall be installed at all the strategic locations in the acetylene filling and storage plant.
Section 78. Acetylene plants shall be equipped with emergency procedures for Calcium Carbide storage and transportation, Carbide fires, Carbide lime spillage and hot acetylene cylinder.
Section 89. Spray of cooling water over the hot cylinder shall be continued for a sustained period of time till acetylene cylinder is attaining cool.
Section 91. Construction details of LPG storage shed
Section 11. Transport of cylinders by vehicles: -
Section 12. Restriction on transport: -
Section 23. Loading and unloading for transport: -
Section 34. Protection of valves during transport: -
Section 45. Leaky cylinders: -
Section 5
the-gas-cylinders-rules-2016.json
•
151 Sections
•
India (Central)
{
"id": 11870,
"slug": "the-gas-cylinders-rules-2016",
"title": "The Gas Cylinders Rules, 2016",
"short_title": "The Gas Cylinders Rules, 2016",
"act_number": "Published vide Notification No. GSR. 1081(E), date",
"act_year": 2016,
"act_type": "CENTRAL",
"location": "India (Central)",
"law_status": "unknown",
"enactment_date": null,
"description": "The Gas Cylinders Rules, 2016",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "1. Short title and commencement.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "2",
"title": "2. Definitions.",
"chapter": null,
"content": "(i) \"Act\" means the Explosives Act, 1884 (4 of 1884);\n(ii) \"Auto LPG\" means liquefied petroleum gas meant for automotive fuel conforming to specification IS:14861;\n(iii) \"Chief Controller\" means the Chief Controller of Explosives;\n(iv) \"composite cylinder\" means a cylinder made of resin impregnated continuous filament wound over a metallic or a non-metallic liner. Composite cylinders using non-metallic liners are referred to as all composite cylinders;\n(v) \"compressed gas\" means any permanent gas, liquefiable gas or gas dissolved in liquid under pressure or gas mixture which in a closed gas cylinder exercises a pressure either exceeding 2.5 kgf/cm 2 abs (1.5 kgf/ cm 2 gauge) at + 15° C or a pressure exceeding 3kgf/ cm 2 abs (2 kgf/ cm 2 gauge) at + 50° C or both including cryogenic liquids;\n(vi) \"Conservator\" in relation to a port includes any person acting under the authority of the officer or body of person appointed to be Conservator of that port under section 7 of the Indian Ports Act, 1908 (15 of 1908);\n(vii) \"Controller\" includes the Joint Chief Controller of Explosives, the Deputy Chief Controller of Explosives, the Controller of Explosives and the Deputy Controller of Explosives;\n(viii) \"Compressed Bio Gas (CBG)\" means the mixture of hydrocarbon gases and vapours consisting mainly of Methane in gaseous form, which has been produced by the decomposition of animal and plant waste, purified and compressed for use as an automotive fuel and industrial application;\n(ix) \"Compressed Natural Gas (CNG)\" means mixtures of hydrocarbon gases and vapours, consisting mainly of Methane or suitable mixture of Hydrogen and Methane in gaseous form, which has been compressed for use as automotive fuel and industrial application and includes Compressed Bio Gas;\n(x) \"Composite CNG dispensing unit\" means an integrated unit comprising of CNG storage cascade, CNG compressor and CNG dispensing unit integrally attached with each other and installed inside an enclosure box;\n(xi) \"CNG mother station\" means CNG facilities connected with natural gas pipeline and having a compressor meant primarily to fill mobile cascade of daughter station and includes stationery cascade for CNG dispensing to vehicles;\n(xii) \"CNG online station\" means CNG facilities connected with natural gas pipeline and having a compressor primarily to fill stationary cascades for dispensing CNG to vehicles;\n(xiii) \"CNG daughter station\" means CNG facilities not connected to natural gas pipeline and receives CNG through mobile cascade;\n(xiv) \"CNG daughter booster station\" means CNG facilities not connected to natural gas pipeline and such CNG dispensing stations where mobile or stationary cascades are connected to the booster compressor for increase in discharge pressure for refueling of the vehicles;\n(xv) \"Critical temperature\" means the temperature above which gas cannot be liquefied by the application of pressure alone;\n(xvi) \"cryogenic container\" means a double walled insulated closed metal container having volume exceeding 500 ml but not exceeding 1000 liters intended for filling, storage and transport of cryogenic liquid fabricated as per codes approved by the Chief Controller;\n(xvii) \"cryogenic liquid\" means liquid form of permanent gas having normal boiling point below minus 150° C;\n(xviii) \"cylinder testing station\" means facilities and infrastructure for periodical testing and examination of cylinder;\n(xix) \"dissolved acetylene cylinder\" means a cylinder having a valve and with or without safety devices, containing porous mass, a solvent for the storage of dissolved acetylene and at least sufficient quantity of acetylene to saturate acetone as solvent at atmospheric pressure and at a temperature of + 15° C;\n(xx) \"dissolved gas\" means a gas which is dissolved under pressure in a fluid solvent appropriate to the particular gas;\n(xxi) \"district authority\" means-\n(a) a Commissioner of Police or Deputy Commissioner of Police in any town having a Commissioner of Police; and\n(b) in any other place, the District Magistrate;\n(xxii) \"District Magistrate\" includes an Additional District Magistrate, and in the States of Punjab and Haryana and in the Karaikal, Mahe and Yanam areas of the Union territory of Pondicherry, also includes a Sub- Divisional Magistrate;\n(xxiii) \"fee\" means the fee specified in Schedule V;\n(xxiv) \"filling pressure\" means the maximum permissible gauge pressure, converted to + 15° C, at which a gas cylinder for permanent gas or gas dissolved under pressure can be filled;\n(xxv) \"filling ratio\" means the ratio of the weight of a liquefiable gas introduced in the cylinder to the weight of the water that the cylinders will hold at 15° C;\n(xxvi) \"flammable gas\" means any gas which, if either a mixture of 13 percent or less (by volume) with air forms a flammable mixture or the flammability range with air is greater than 12 percent regardless of the lower limit and these limits shall be determined at atmospheric temperature and pressure;\nExplanation.\n(xxvii) \"Form\" means a Form set forth in Schedule V;\n(xxiii) \"gas cylinder\" or \"cylinder\" means any closed metal container having a volume exceeding 500 ml but not exceeding 1000 liters intended for the storage and transport of compressed gas, including any liquefied petroleum gas (LPG) container or compressed natural gas (CNG) cylinder fitted to a motor vehicle as its fuel tank but not including any other such container fitted to a special transport or undercarriage and includes a composite cylinder and cryogenic container, however, the water capacity of cylinder used for storage of CNG, nitrogen, compressed air, etc., may exceed 1000 liters up to 3000 liters provided the diameter of such cylinder does not exceed 60 cm;\n(xxix) \"gas cylinders cascade\" means a battery of cylinders connected with each other, a tube trailer, multiple element gas containers and bundle of cylinders, conforming to the specifications BS EN-13769, BS EN-13807, ISO-10961 or any other specification accepted by the Chief Controller;\n(xxx) \"high pressure liquefiable gas\" means a liquefiable gas having a critical temperature between - 10° C and + 70° C;\n(xxxi) \"hot repair or reconditioning of the LPG cylinders or other welded cylinders\" means repair or replacement of valve protection ring, foot ring, other protective fitments and removal of permissible dents of LPG cylinders or other welded cylinder followed by heat treatment as per the standards or codes accepted by the Chief Controller;\n(xxxii) \"hydrostatic stretch test\" means subjecting the cylinder to a hydrostatic pressure equal to the test pressure of the cylinder and recording the permanent stretch undergone by the cylinder;\n(xxxiii) \"hydrostatic test\" means the test to which a cylinder is subjected to a hydrostatic pressure equal to the test pressure of the cylinder;\n(xxxiv) \"import\" means bringing into India by land, sea or air;\n(xxxv) \"inert gas\" means a gas which is resistant to chemical action under normally encountered conditions;\n(xxxvi) \"inspecting authority\" means a person having qualifications and experience in the field of design, manufacture and testing of gas cylinders, valves and LPG regulators and recognized by the Chief Controller as authority for inspection and certification of gas cylinder, valves and LPG regulators.;\n(xxxvii) \"installation\" means premises wherein a place has been specially prepared for the manufacture or filling or storage of compressed gas cylinders;\n(xxxviii) \"liquefiable gas\" means a gas that may be liquefied by pressure at -10° C but will be completely vaporised when in equilibrium with normal atmospheric pressure (760 mm. Hg) at 17.5°C which value shall be increased to 30°C for toxic gases;\n(xxxix) \"liquefied petroleum gas\" means any material, which comprises predominantly of any of the following hydrocarbons or mixture of them with vapour pressure not exceeding 16.87 kg/cm 2 (gauge) at 65° C; Propane (C3H8), propylene (C3H6), butane ((C4H10), (n-butane and iso-butane) and butylene (C4H8);\n(xl) \"low pressure liquefiable gas\" means a liquefiable gas having critical temperature higher than +70°C;\n(xli) \"manufacture of gas\" means filling of a cylinder with any compressed gas and also includes transfer of compressed gas from one cylinder to any other cylinder;\n(xlii) \"oxidising gas\" means a gas which gives up oxygen readily or removes hydrogen from a compound or attracts negative electrons;\n(xliii) \"permanent gas\" means a gas whose critical temperature is below -10°C that is to say a gas which cannot be liquefied under any pressure at a temperature above -10°C;\n(xliv) \"pneumatic test\" means the test to which a gas cylinder is subjected to a pneumatic pressure equal to the pneumatic test pressure or working pressure, as specified in the manufacturing code;\n(xlv) \"poisonous or toxic gas\" means a gas which has a maximum allowable concentration in air for human respiration not exceeding 100 mg/m3 at 15°C and 1 kgf/cm 2 absolute pressure;\n(xlvi) \"porous mass\" means single or multi-component substance introduced into, or formed in the cylinder shell, in order to fill it and due to its porosity allow the absorption of the solvent and the acetylene gas conforming to EN 13807 : 2003 - B.2.7;\n(xlvii) \"Schedule\" means the Schedule annexed to these rules;\n(xlviii) \"tare weight\" in relation to\n(a) acetylene cylinder, means the weight of the cylinder together with any fittings, permanently attached and includes the weight of valve any safety device, porous mass, requisite quantity of solvent for dissolving acetylene, and the weight of acetylene gas saturating the solvent at atmospheric pressure and temperature of 15°C;\n(b) liquefiable gas cylinder, means the weight of the cylinder together with any fittings permanently attached thereto and includes the weight of valve;\n(c) permanent gas cylinder, means the weight of the cylinder together with any fittings permanently attached thereto and excludes the weight of valve;\n(d) cryogenic container, means the weight of the container together with any fittings permanently attached thereto along with the weight of insulating material including the weight of the valves;\n(xlix) \"test pressure\" means the internal pressure required for the hydrostatic test or hydrostatic stretch test or pneumatic test of the cylinder as specified in the cylinder manufacturing codes;\n(l) \"transport\" means the moving of a cylinder filled with any compressed gas from one place to another;\n(li) \"water capacity\" means the volume of water in litres, a cylinder will hold at 150C;\n(lii) \"working pressure for low pressure liquefiable gas\" means the saturated vapour pressure at 650C ;\n(liii) \"working pressure for permanent gas\" means the internal pressure of the gas in the cylinder at a temperature of 15°C;\n(liv) \"yield strength\" means the stress corresponding to a permanent strain of 0.2 percent of the original gauge length in a tensile test.\nChapter II\nGeneral Provisions",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
{
"number": "3",
"title": "3. Filling, possession, import and transport of cylinder.",
"chapter": null,
"content": "(a) such cylinder and its valve have been constructed to a type and standard specified in Schedule I as amended from time to time by an order issued by Chief Controller;\n(b) the test and inspection certificates issued by the inspecting authority in respect of cylinder and its valve are made available to the Chief Controller and prior approval of the said authority is obtained.\n(i) total number and serial numbers of the cylinders;\n(ii) name and address of the manufacturer of the cylinders;\n(iii) specification of the cylinder and the valve;\n(iv) previous approval, if any;\n(v) the test and inspection certificates in respect of the cylinders;\n(vi) the test and inspection certificate pertaining to the valves fitted or to be fitted to the cylinder;\n(vii) a scrutiny fee as per Schedule V.\n(b) The Chief Controller may grant approval after making such inquiry, if any, as he may consider necessary, shall accord necessary permission for production of proto type;\n(c) The physical evaluation of the manufacturer such as, inspection, testing, quality control facilities and witnessing the type testing of the prototype may be carried out by technical officers nominated by the Chief Controller along with inspecting authority to assess the capability of the firm to undertake the manufacture of the product by a technical team which shall submit an inspection report along with its recommendations to the Chief Controller.\n(d) The Chief Controller on receipt of satisfactory compliance of the requirements specified in clauses (a) and (b) and after examining all the aspects of the inspection report, and making such inquiry, if any, as he may consider necessary, shall, subject to the other provisions of the Act and these rules, by an order in writing either grant the approval to the manufacturer initially for a period of one year which may further be extended after receipt of satisfactory performance report or refuse to grant the same.\n(e) In case of foreign manufacturers seeking approval, additional fees shall be paid as per Schedule V for physical evaluation of the unit:\n(f) While granting approval to a foreign manufacturer, his proven track record, manufacturing experience of ten years and widely distributed market share shall be considered before following the procedure laid down in sub-rule (3) (a) to (e) .\n(g) Scrutiny fee to seek subsequent approval for any change in respect of design drawing shall be paid as specified in Schedule V.\n(b) Scrutiny fee to seek subsequent approval for any change in respect of design drawing shall be paid as specified in Schedule V.\n(a) the cylinder has passed the hydrostatic test or hydrostatic stretch test, as the case may be, within the period specified in these rules and the pressure applied during the test shall be the test pressure marked on the cylinder;\n(b) the cylinder is not filled with-\n(i) any liquefiable gas in excess of the filling ratio specified in IS:3710 for low pressure liquefiable gases and IS:15975 for high pressure liquefiable gases;\n(ii) any permanent gas at a pressure in excess of the pressure for which the cylinder is designed;\n(c) a separate record of the cylinder tested and filled is maintained at the filling station;\n(d) the filled cylinders are removed from the filling station and shipped off as expeditiously as possible.",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "4",
"title": "4. Valve.",
"chapter": null,
"content": "i. in respect of industrial gas cylinder and CNG on-board cylinder, IS:3224;\nii. in respect of medical gas cylinder, IS:3745;\niii. in respect of cylinder used with breathing apparatus, IS:7302 as amended from time to time;\niv. in respect of cylinder used for filling liquefied petroleum gas, IS:8776 for cylinder of water capacity not exceeding five liters and, IS: 8737 for cylinder of water capacity exceeding five liters;\nv. in respect of auto LPG container IS:15100;\nvi. in respect of small refrigerant cylinder IS:12300\nvii. in respect of LPG regulators fitted to LPG cylinder, IS :9798 .\nviii. in respect of the valve fitted to the cryogenic container-Codes accepted by the Chief Controller.\nix. in respect of valve conforming to other standard as approved by the Chief Controller:",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "5",
"title": "5. Safety relief devices.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "6",
"title": "6. Markings on cylinders.",
"chapter": null,
"content": "(a) Every cylinder shall be clearly and permanently marked in accordance with following conditions by stamping, engraving or similar processes, namely:-\n(i) on the shoulder of the cylinder which shall be reinforced by forging or other means; or\n(ii) on such a part which is inseparably bound with the cylinder and which is not or only negligibly effected by the stresses due to the gas pressure within it;\n(b) the name plate shall not be affixed to the cylinder by soldering if there is a risk of corrosion or embitterment;\n(c) in conjunction with the original marking, space shall be provided for stamping the test date obtained at the periodic inspection;\n(d) markings shall be so carried out and the letters and numerals used shall be of such shape and size that the marking is clear and easily readable and does not give place for misreading.\n(a) Every cylinder shall be marked with the following markings, namely:--\n(i) Manufacturer's, owner's and inspector's marking and rotation number (these markings shall be registered with the Chief Controller);\n(ii) specification to which the cylinder has been made:\n(iii) a symbol to indicate the nature of heat treatment given to the cylinder during manufacture or after repairs;\n(iv) the date of the last hydrostatic test or hydrostatic stretch test, as the case may be, with the code mark of recognized testing station where the test was carried out and the code mark shall be registered with the Chief Controller and in the case of liquefied petroleum gas cylinders, the quarter and the year of test shall be given as an additional marking in a neck or on a shoulder plate;\n(v) working pressure and test pressure;\n(vi) tare weight.\n(vii) water capacity;\n(viii) marking \"H\" for Hydrogen and embritling gases;\n(ix) marking of expiry date on CNG On-board cylinders, other CNG cylinders, and auto LPG containers.\n(b) All the markings, except the manufacture's markings, which may be on the base, shall be stamped on the neck end of the cylinder: seamless cylinders having no foot ring or skirt shall be stamped with the manufacturer's marking on the neck end of the cylinder.",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "7",
"title": "7. Markings on valve.",
"chapter": null,
"content": "i. the specification of the valve;\nii. year and month or quarter of manufacture\niii. manufacturer's symbol;\niv. working pressure;\nv. the name or chemical symbol of the gas for which the valve is to be used;\nvi. the type of screw threads on the outlet, in case of left handed as (L.H.);\nvii. inspector's stamp;\nviii. where dip tubes are provided, special indications shall be given by a clear and durable marking on the valve or on a badge fixed between the valve and the cylinder and the total length in millimeter of the tube shall also be indicated.",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "8",
"title": "8. Identification colour.",
"chapter": null,
"content": "Name of the gas contained in the cylinder\nName of the gas contained in the cylinder\nColour of the cylinder shell\nColour of the cylinder shell\nColour of band at neck end of cylinder\nColour of band at neck end of cylinder\nNon-flammable and non-toxic\nWhite\nNon-flammable but toxic\nWhite\nYellow (IS 5 shade No.356).\nFlammable but non-toxic including other than the LPG\nWhite\nRed (IS 5 Shade No.537)\nFlammable and toxic\nWhite\nRed and Yellow (IS 5 shade Nos. 537 and 356)\nGas mixture (not covered in IS:4379 or IS:3933)\nMajor gas colour\nMinor gas colour with and width approximately 1/5 th of the cylinder length\nFire Extinguishers\nRed\nRed (IS:5 shades 536 and 538)\nNote. - The cylinders intended for gas mixtures shall be marked with the words \"Gas Mixture ' or \"Mixed Gas\" and in addition, the cylinders shall be marked with the names (symbols, if necessary) of the components of the mixture by stamping, if the cylinders are intended for the permanent use of the particular gas mixture, or by painting, if the cylinders are intended for the casual use of the particular gas mixture.",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "9",
"title": "9. Labeling of cylinders.",
"chapter": null,
"content": "\"Warning\"\n\"Warning\"\nGas Cylinders, Rules, 2016\nGas Cylinders, Rules, 2016\n(i) Do not change the colour of this cylinder.\n(ii) This cylinder shall not be filled with any gas other than the one it now contains.\n(iii) No flammable material should be stored in the close vicinity of this cylinder or in the same room in which it is kept.\n(iv) No oil or similar lubricant shall be used on the valves or other fittings of this cylinder.\n(v) Please look for the next date of test, which is marked on a metal ring inserted between the valve and the neck of the cylinder, and if this date is over, do not accept the cylinder for filling.",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "10",
"title": "10. Restriction on delivery or dispatch of cylinder.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "11",
"title": "11. Repairing of seamless gas cylinders during use.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "12",
"title": "12. Repairing of welded or brazed cylinders.",
"chapter": null,
"content": "(a) the defects have been removed by grinding, chipping, gouging or other approved methods;\n(b) the repairing is carried out by a certified welder at the premises of a manufacturer of cylinders or premises approved by the Chief Controller under supervision of a qualified and experienced person;\n(c) the cylinder is properly heat-treated after the repairs ;\n(d) the welded or brazed seams of the cylinder are radio graphed if the cylinder was originally required to be radio graphed after its manufacture;\n(e) after repairs and heat-treatment, the cylinder is subjected to the same pneumatic and hydrostatic test or hydrostatic stretch test as was done at the time of manufacture.",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
{
"number": "13",
"title": "13. Prohibition of employment of children and intoxicated person.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "14",
"title": "14. Prohibition of smoking, fire, light and dangerous substances.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
{
"number": "15",
"title": "15. General precautions.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 14
},
{
"number": "16",
"title": "16. Special precautions against accidents.",
"chapter": null,
"content": "(a) comply with the provisions of these rules and the conditions of any license relating thereto;\n(b) observe all precautions for the prevention of accident by fire or explosion;\n(c) prevent any person from committing any acts referred to in sub-rule (1).",
"footnote": "",
"is_definition": false,
"sort_order": 15
},
{
"number": "17",
"title": "17. Competent person to be in charge of operations.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 16
},
{
"number": "18",
"title": "18. Handling and use.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 17
},
{
"number": "19",
"title": "19. Restriction on filling.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
{
"number": "20",
"title": "20. Loading, unloading and transport of cylinders or cascade.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 19
},
{
"number": "21",
"title": "21. Storage of cylinders.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 20
},
{
"number": "22",
"title": "22. Electrical installations.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 21
},
{
"number": "23",
"title": "23. Purity of gas.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 22
},
{
"number": "24",
"title": "24. Cylinder subjected to the action of fire.",
"chapter": null,
"content": "(b) If deleterious structural changes in the material due to the action of heat of the fire are apprehended to have taken place, the cylinder shall have to be subjected to proper heat treatment, followed by hydrostatic test or hydrostatic stretch test, as the case may be, before the cylinder is taken into use.",
"footnote": "",
"is_definition": false,
"sort_order": 23
},
{
"number": "25",
"title": "25. Ownership of cylinder.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 24
},
{
"number": "26",
"title": "26. Re-testing of cylinder.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 25
},
{
"number": "27",
"title": "27. Owner's record.",
"chapter": null,
"content": "(i) cylinder manufacturer's name and the rotation number;\n(ii) the specification number to which the cylinder is manufactured;\n(iii) date of original hydrostatic test or hydrostatic stretch test or pneumatic test;\n(iv) cylinder manufacturer's test and inspection certificate;\n(v) number and date of letter of approval granted by the Chief Controller.",
"footnote": "",
"is_definition": false,
"sort_order": 26
},
{
"number": "28",
"title": "28. Conversion of cylinders.",
"chapter": null,
"content": "(i) documentary evidence indicating that the cylinders have been purchased by him;\n(ii) an authenticated copy of letter permitting filling of the cylinders in the past;\n(iii) a statement in duplicate, showing manufacturer's serial numbers of the cylinders in ascending order;\n(iv) a certificate to the effect that the cylinders had not been converted to any other gas service in the past;\n(v) scrutiny fee as specified in Schedule V.\nChapter III\nImportation of Cylinders, Valves and LPG Regulators\nPart I\nGeneral",
"footnote": "",
"is_definition": false,
"sort_order": 27
},
{
"number": "29",
"title": "29. License for import of gas cylinders.",
"chapter": null,
"content": "Part II\nImportation by Sea",
"footnote": "",
"is_definition": false,
"sort_order": 28
},
{
"number": "30",
"title": "30. Declaration by the master of ship or ship's agent.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 29
},
{
"number": "31",
"title": "31. Production of license for import.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 30
},
{
"number": "32",
"title": "32. Permission of the Commissioner of Customs.",
"chapter": null,
"content": "Part III\nImportation by Land",
"footnote": "",
"is_definition": false,
"sort_order": 31
},
{
"number": "33",
"title": "33. Importation by land.",
"chapter": null,
"content": "Part IV\nImportation by AIR",
"footnote": "",
"is_definition": false,
"sort_order": 32
},
{
"number": "34",
"title": "34. Importation by air.",
"chapter": null,
"content": "Chapter IV\nExamination and Testing of Cylinders",
"footnote": "",
"is_definition": false,
"sort_order": 33
},
{
"number": "35",
"title": "35. Periodicity of examination and testing of cylinders.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 34
},
{
"number": "36",
"title": "36. Condemning of cylinder.",
"chapter": null,
"content": "Chapter V\nDissolved Acetylene Gas Cylinders",
"footnote": "",
"is_definition": false,
"sort_order": 35
},
{
"number": "37",
"title": "37. Additional requirements for dissolved acetylene cylinders.",
"chapter": null,
"content": "(i) The porous substance shall fill as completely as possible the cylinder into which the acetylene is compressed.\n(ii) The porosity of the substance shall not exceed ninety two percent and in no case shall be less than seventy five percent.\n(iii) Any solvent used shall not be capable of chemical reaction with the acetylene gas or with the porous substance or with the metal of the cylinder.\n(iv) If acetone is used as a solvent it shall comply with the requirements of IS: 170, the quantity of acetone including the gas in solution shall be such that the cylinder meets the requirements of additional tests specified in IS: 7312.\n(v) The valves of the cylinders shall not contain more than seventy percent copper in their composition.\n(vi) The pressure in the cylinder shall not exceed 16 kgf/cm 2 at a temperature of 15°C.\n(vii) Every cylinder shall before being filled with porous mass be tested by hydrostatic pressure to a pressure of not less than 60 kgf/cm 2 . This pressure may be reduced to 53 kgf/cm 2 if the cylinder is fitted with fusible plug. No cylinder which shows a permanent stretch in excess of 7-1/2 percent of the total stretch suffered during hydrostatic stretch test shall be allowed.\n(viii) The safety relief device if fitted shall operate at a pressure of 53 kgf/cm 2 or at a temperature of 100° C + 4° C/ - 2° C.\n(ix) Every cylinder shall have permanently and conspicuously marked upon it or upon a brass plate soldered to it the name of the manufacturer and the words \"Acetylene properly compressed into porous substance\" and shall bear the following markings, namely:-\n(a) Serial number and identification of manufacturer;\n(b) number of the standard;\n(c) test pressure;\n(d) the date of hydrostatic stretch test with code mark of the place where the test was carried out;\n(e) date of filling of porous mass;\n(f) water capacity;\n(g) a symbol to indicate the nature of heat treatment;\n(h) identification of porous mass and porosity percentage;\n(i) tare weight (inclusive of valve);\n(j) inspector's official mark;\n(k) maximum gas capacity.",
"footnote": "",
"is_definition": false,
"sort_order": 36
},
{
"number": "38",
"title": "38. Restriction on filling of dissolved acetylene in cylinders.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 37
},
{
"number": "39",
"title": "39. Examination of dissolved acetylene cylinders before filling.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 38
},
{
"number": "40",
"title": "40. License for compression of acetylene.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 39
},
{
"number": "41",
"title": "41. Record of dissolved acetylene cylinders.",
"chapter": null,
"content": "(a) for each charge,-\n(i) the date of charging of the cylinder;\n(ii) the empty cylinder weight without gas;\n(iii) the weight of solvent charged before gas charging;\n(iv) full weight of the cylinder;\n(b) the dates on which solvent has been added;\n(c) the dates on which the cylinder has been thoroughly examined as provided in rule 39, the results of each such examination and the name of the person carrying out such examination, and in the case of cylinders first issued by the firm, the tare weight of the cylinder including porous substance and acetone or other solvent, the nature of the solvent and the maximum pressure allowed in the cylinder.",
"footnote": "",
"is_definition": false,
"sort_order": 40
},
{
"number": "42",
"title": "42. Labeling of dissolved acetylene cylinders.",
"chapter": null,
"content": "(a) date of last filling of gas in the cylinder;\n(b) weight of gas filled;\n(c) full cylinder weight;\n(d) the name of the company filling the gas on the last date of the filling.\nChapter VI\nFilling and Possession",
"footnote": "",
"is_definition": false,
"sort_order": 41
},
{
"number": "43",
"title": "43. License for filling and possession.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 42
},
{
"number": "44",
"title": "44. No license needed for possession in certain cases.",
"chapter": null,
"content": "(a) possession of any cylinder filled with a compressed gas by a carrier or other person for the purpose of transport in accordance with the provisions of these rules;\n(b) possession of cylinders for own use and not meant for sale or trading filled with,-\n(i) any flammable and non-toxic gas when the total number of cylinders containing such gas does not exceed twenty five or the total weight of gas does not exceed 200 kg., whichever is less, at a time;\n(ii) any non-flammable non-toxic gas when the total number of such cylinders does not exceed two hundred at a time;\n(iii) any toxic gas when the total quantity of such cylinders does not exceed five at a time;\n(iv) acetylene gas contained in cylinder in dissolved state when the total quantity of such cylinder does not exceed twenty five at a time.\n(c) The provisions of sub-clause 44(b) shall not be applicable for liquefied petroleum gas when the total quantity of gas does not exceed 100 kg at a time for own use, distribution or sale from a sales room belonging to the dealer or distributor of respective oil marketing company.",
"footnote": "",
"is_definition": false,
"sort_order": 43
},
{
"number": "45",
"title": "45. Restriction on filling.",
"chapter": null,
"content": "(a) are of approved type and standard as per rule 3 and has been specifically approved for filling by the Chief Controller;\n(b) have passed the examination and test specified in rule 35; and\n(c) conform to the provisions of rules 4,5,6,7 and 8.",
"footnote": "",
"is_definition": false,
"sort_order": 44
},
{
"number": "46",
"title": "46. Working pressure and filling ratio.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 45
},
{
"number": "47",
"title": "47. Prior approval of specification and plan of premises proposed to be licensed.",
"chapter": null,
"content": "(a) specification and plan drawn to scale in triplicate clearly indicating -\n(i) the manner in which the provisions prescribed in these rules shall be complied with;\n(ii) the premises proposed to be licensed, the area of which shall be distinctly coloured or otherwise marked;\n(iii) the surrounding area lying within 100 metres of the edge of all facilities which are proposed to be licensed;\n(b) a scrutiny fee of as specified in Schedule V.",
"footnote": "",
"is_definition": false,
"sort_order": 46
},
{
"number": "48",
"title": "48. No Objection Certificate.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 47
},
{
"number": "49",
"title": "49. Application for license or approval.",
"chapter": null,
"content": "(a) in Form 'B' along with following document for a license prescribed in sub-rule (1) of rule 51; and\n(b) in Form 'C' along with following document for a license prescribed in sub-rule (2) of rule 51.\n(i) fee as per Schedule V;\n(ii) application in Schedule III for the manufacture of cylinders, valves and LPG regulators along with all the relevant documents;\n(iii) the ISO accreditation or equivalent certificate issued by any nationally or internationally recognized agency within a period of one year from the date of approval;\n(iv) list of relevant code, specification and technical literature available;\n(v) ownership proof for legal and physical possession of the land, where such facilities are proposed to be set up;\n(vi) detailed report on manufacturer, inspection and testing proposed to be followed;\n(vii) design drawing scheme of manufacture and testing of cylinder, valve and, regulator proposed to be manufactured duly vetted by Bureau of Indian Standard or any other recognized third party inspection agency; and\n(viii) organizational set up of the applicant with specific reference to qualifications and experience of the personnel engaged in the manufacture of cylinder, valve and LPG regulator;\n(i) fee as per Schedule V;\n(ii) ownership proof for legal and physical possession of the land, where such facilities are proposed to be set up;\n(iii) applicant's name and full address with telephone numbers and E-mail address;\n(iv) proposed location of cylinder testing station or hot repairing facilities;\n(v) six copies of each site and layout plan showing the area for degassing in case of flammable gas cylinder testing station and details of neutralization facilities in case of toxic gas cylinder testing and location of various testing equipments in the cylinder testing shop;\n(vi) specification or code proposed to be adopted for the testing and examination of cylinder or hot repair of LPG or welded cylinder;\n(vii) organizational set up of the applicant with specific reference to qualification and experience of the personnel engaged in the testing of cylinder or hot repair of cylinder.\n(viii) quality control check or test carried out at each stage of testing and examination of cylinders or hot repair of LPG or welded cylinder;\n(ix) details of template or gauge provided to check or test;\n(x) steps taken to check the accuracy of testing and checking equipment and frequency of such checking;\n(xi) equipment available for carrying out non-destructive examination such as Gama ray or X-ray equipment, viewer, etc., for radiographic examination, ultrasonic flaw detector, equipments for dye penetration and magnetic particle tests, etc;\n(xii) proforma of the record and certificate for various test carried out by the cylinder testing station or hot repairing shop;\n(xiii) the ISO accreditation certificate issued by any nationally or internationally recognized agency within a period of one year from the date of approval; and\n(xiv) list of relevant code, specification and technical literature available;",
"footnote": "",
"is_definition": false,
"sort_order": 48
},
{
"number": "50",
"title": "50. Grant of license or approval.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 49
},
{
"number": "51",
"title": "51. Period for which license may be granted or renewed.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 50
},
{
"number": "52",
"title": "52. Particulars of license or approval.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 51
},
{
"number": "53",
"title": "53. Prior approval necessary for alteration in the licensed premises.",
"chapter": null,
"content": "(a) three copies of a properly drawn plan to scale, of the licensed premises showing in distinct colours the proposed alterations and the reason thereof;\n(b) scrutiny fee as per Schedule V.",
"footnote": "",
"is_definition": false,
"sort_order": 52
},
{
"number": "54",
"title": "54. Amendment and transfer of license or approval.",
"chapter": null,
"content": "(i) an application duly filled in and signed in Form 'B' if the license has been granted in Form 'D' and in Form 'C' if the license has been granted in Form 'E', 'F' or 'G';\n(ii) the license sought to be amended together with the approved plans attached to it;\n(iii) where any alterations in the licensed premises have been carried out, three copies of the properly drawn plans showing the alterations sanctioned under rule 53 by the Chief Controller or Controller;\n(iv) fee for the amendment of the license as specified in sub-rule(2) of Rule 65.\n(i) a letter signed by the holder of the license indicating the full name and postal address of the person to whom he intends to transfer the license and give complete possession of the licensed premises;\n(ii) the license sought to be transferred together with the approved plan or plans attached to it;\n(iii) an application in Form 'C' duly filled and signed by the person to whom the license is sought to be transferred; and\n(iv) fee as per schedule V in the manner prescribed in rule 65.",
"footnote": "",
"is_definition": false,
"sort_order": 53
},
{
"number": "55",
"title": "55. Renewal of license or revalidation of approval.",
"chapter": null,
"content": "(a) if the application with accompaniments required under sub-rule (4) is not received within the time specified in sub-rule (5) but received not later than three months the license or approval shall be renewed or revalidated only on payment of a fee amounting to twice the fee ordinarily payable;\n(b) if such an application with accompaniments is received by the Chief Controller or Controller after three months from the date of expiry but not later than one year from the date of expiry, the license or approval may, without prejudice to any other action that may be taken in this behalf, be renewed or revalidated on payment of late fee at the rate of one year license or approval fee for every delay of three months or part thereof:\n(i) renewal or revalidation application or request on company letter head duly signed by director or occupier or authorized signatory of the company;\n(ii) payment of the renewal or revalidation fees as prescribed in Schedule V;\n(iii) manufacture report or testing record or repairing records for entire period of validity of approval, valid ISO accreditation certificate issued by any Nationally and Internationally accredited agency for the entire period of validity of the approval before the expiry of the approval;\n(iv) an undertaking signed by director or occupier or authorized signatory of the company to the effect that there is no change in the organizational set up and technical manpower during the period of validity of approval;\n(v) original approval copy; and\n(vi) any other documents as specified by the Chief Controller.",
"footnote": "",
"is_definition": false,
"sort_order": 54
},
{
"number": "56",
"title": "56. Refusal of license or approval.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 55
},
{
"number": "57",
"title": "57. Suspension and cancellation of license or approval.",
"chapter": null,
"content": "(a) the holder of the license or approval shall be given an opportunity of being heard;\n(b) the maximum period of suspension under sub-rule (1) shall not exceed three months; and\n(c) the suspension of a license or approval shall not debar the holder of the license from applying for its renewal in accordance with the provisions of rule 55.\n(a) where the license is suspended by the licensing authority as an interim measure for violation of any of the provisions of the Act or these rules, or of any condition contained in such license or approval or in his opinion such violation is likely to cause imminent danger to the public:\n(b) where the license or approval is suspended or canceled by the Central Government, if the Government considers that in the public interest or in the interest of the security of the State such opportunity should not be given.",
"footnote": "",
"is_definition": false,
"sort_order": 56
},
{
"number": "58",
"title": "58. Procedure on expiration, suspension or cancellation of license or approval.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 57
},
{
"number": "59",
"title": "59. Appeal.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 58
},
{
"number": "60",
"title": "60. Procedure on death or disability of licensee.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 59
},
{
"number": "61",
"title": "61. Loss of license or approval.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 60
},
{
"number": "62",
"title": "62. Production of license or approval on demand.",
"chapter": null,
"content": "(a) on payment of a fee as per Schedule-V in the manner prescribed in rule 65 for each authenticated copy; and\n(b) on the submission of a copy of the plan identical with the approved plan attached to the license or approval.",
"footnote": "",
"is_definition": false,
"sort_order": 61
},
{
"number": "63",
"title": "63. Procedure on report of infringement.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 62
},
{
"number": "64",
"title": "64. Executive control over authorities.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 63
},
{
"number": "65",
"title": "65. License fee and fee other than license fee.",
"chapter": null,
"content": "Chapter VII",
"footnote": "",
"is_definition": false,
"sort_order": 64
},
{
"number": "66",
"title": "66. Power to exempt.",
"chapter": null,
"content": "Chapter VIII\nAccidents and Inquiries",
"footnote": "",
"is_definition": false,
"sort_order": 65
},
{
"number": "67",
"title": "67. Notice of accident.",
"chapter": null,
"content": "(a) to the Chief Controller or Controller under whose jurisdiction the area falls by Fax, e-mail followed by a letter giving particulars of the occurrence within twelve hours;\n(b) to the District Authority concerned;\n(c) to the officer-in-charge of the nearest Police Station by the quickest mode of communication.",
"footnote": "",
"is_definition": false,
"sort_order": 66
},
{
"number": "68",
"title": "68. Inquiry into accident.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 67
},
{
"number": "69",
"title": "69. Inquiry into more serious accident.",
"chapter": null,
"content": "Chapter IX\nPowers",
"footnote": "",
"is_definition": false,
"sort_order": 68
},
{
"number": "70",
"title": "70. Dangerous practices.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 69
},
{
"number": "71",
"title": "71. Powers of inspection, search, seizure, detention and removal.",
"chapter": null,
"content": "Table\nTable\nOfficers\nOfficers\nArea\nArea\n(1)\n(2)",
"footnote": "",
"is_definition": false,
"sort_order": 70
},
{
"number": "1",
"title": "1. The Chief Controller or Controller",
"chapter": null,
"content": "The whole of India",
"footnote": "",
"is_definition": false,
"sort_order": 71
},
{
"number": "2",
"title": "2. All District Magistrate",
"chapter": null,
"content": "Their respective Districts",
"footnote": "",
"is_definition": false,
"sort_order": 72
},
{
"number": "3",
"title": "3. All Magistrates subordinate to the District Magistrate",
"chapter": null,
"content": "Their respective jurisdiction",
"footnote": "",
"is_definition": false,
"sort_order": 73
},
{
"number": "4",
"title": "4. The Commissioner of Police and all Police Officers of rank\n\t\t\t\tnot below that of Sub Inspector",
"chapter": null,
"content": "Their respective jurisdiction",
"footnote": "",
"is_definition": false,
"sort_order": 74
},
{
"number": "72",
"title": "72. Protection of action taken in good faith.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 75
},
{
"number": "73",
"title": "73. Repeal and Savings.",
"chapter": null,
"content": "(a) all licenses or approvals granted or renewed under the said rules and all fees imposed or levied shall be, deemed to have been granted, renewed or imposed or levied, as the case may be under the corresponding provisions of these rules; and\n(b) all approvals given and all powers conferred by or under any notification or rule shall, so far as they are consistent with the Act and these rules be deemed to have been given or conferred by or under these rules.\nSchedule I\n[See rule 3(1)]\nTypes and Standards of Cylinders or Valves and LPG Regulators\nTypes and Standards of Cylinders or Valves and LPG Regulators\nA. Cylinders and Containers\nA. Cylinders and Containers",
"footnote": "",
"is_definition": false,
"sort_order": 76
},
{
"number": "1",
"title": "1. Indian Origin",
"chapter": null,
"content": "(a) Cylinders. - Welded low carbon steel cylinders for low pressure liquefiable gases manufactured to IS:3196 Part 1, Part 2 & Part 4, IS:7142, auto LPG containers to IS:14899, DA cylinders to IS:7312 Cryogenic containers manufactured to EN-1251, EN 13458, ASME SEC VIII Div I and AD 2000 MB composite cylinders manufactured to EN-14427,IS0-11119-3 and EN -12245 or any other specification accepted by the Chief Controller certified by Bureau of Indian Standards or any other inspection authority approved by the Chief Controller.\n(a) Cylinders.\n(b) Containers. - Tonners or containers manufactured to BS:1500, ASME Section VIII Division 1, IS:2825 by M/s. Asco Industrial Corporation, New Delhi, M/s. Indian Sugar and General Engg. Corporation, Yamunagar, M/s. Anup Engineering Ltd., Ahmedabad, M/s. Kosan Metal Products Pvt. Ltd., Mumbai, M/s. Meenakshi Associated Pvt. Ltd., Surajpur Dist. Ghaziabad, M/s. Titanium Equipment and Anode Manufacturing Co. Ltd., Chennai, M/s. Expo Gas Containers Ltd., Mumbai, and certified by an inspection authority approved by Chief Controller\n(b) Containers.",
"footnote": "",
"is_definition": false,
"sort_order": 77
},
{
"number": "2",
"title": "2. Austrian Origin",
"chapter": null,
"content": "(a) Cylinders conforming to BS:5045:Part 1:1982 for Halon-130I and FM 200 gas service as per approved drawings manufactured by M/s. Worthington Heiser Cylinders Gmbh, Austria - Inspected and certified by Bureau Veritas.\n(b) Cylinders conforming to BS: 5045: PartI: 1982 for permanent and liquefiable gases as per approved drawings manufactured by M/s. Worthington Heiser Cylinders Gmbh, Austria-inspected and certified by Bureau Veritas.\n(c) Seamless steel cylinders for CNG gas on-board service to ISO:11439-2000 specification, having working pressure 200 Bar and test pressure 335 Bar manufactured by M/s. Worthington Cylinders GmbH, Austria certified by M/s. Bureau Veritas as per approved drawings.\n(d) Cylinders conforming to EN:1964:1/1S0:9809-1 & EN: 1964:2/ISO:9809-2 for permanent and liquefiable gases as per approved drawings, manufactured by M/s. Worthington Heiser Cylinders Gmbh, Austria inspected and certified by Bureau Veritas.",
"footnote": "",
"is_definition": false,
"sort_order": 78
},
{
"number": "3",
"title": "3. Argentina Origin.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 79
},
{
"number": "4",
"title": "4. Chinese Origin.",
"chapter": null,
"content": "(a) Seamless steel cylinders for high pressure gas cylinders conforming to IS:7285(Part1)2004, IS:7285(Part2)2004 & ISO:9809-1 specification manufactured by M/s. Beijing Tianhai Industry Co. Ltd., Beijing, China - inspected and certified by Lloyds Register as per approved drawings.\n(b) Seamless steel cylinders for high pressure gas cylinders conforming to IS:7285 (Part2)2004 and ISO 9809-1 specification manufactured by M/s. Zhejiang Jindun Pressure Vessel Company Ltd China - inspected and certified by M/s Bureau Veritas -Certified by BIS as per approved drawings.\n(c) Seamless steel cylinders for high pressure gas cylinders conforming to ISO: 9801-3 specification manufactured by M/s. Zhejiang Jindun Pressure Vessel Company Ltd China - inspected and certified by M/s Bureau Veritas.",
"footnote": "",
"is_definition": false,
"sort_order": 80
},
{
"number": "5",
"title": "5. Italian Origin",
"chapter": null,
"content": "(a) Seamless steel cylinders for permanent gases (Air/Oxygen) conforming to BS: 5045: Part 1:1982 manufactured by M/s. Faber Industries S.P.A., Italy - inspected and certified by Lloyd's as per approved drawings.\n(b) Seamless steel cylinders for compressed and liquefiable gases conforming to DOT: 3AA specification having water capacity 80.0 ltrs. & 120 ltrs. Working pressure 79 Bar and test pressure 132 Bar, manufactured by M/s. Faber Industries S.P.A., Italy- inspected and certified by M/s. Lloyd's as per approved drawings.\n(c) Seamless steel cylinders for CNG gas on-board service to ISO: 11439 having working pressure 200 Bar and test pressure 335 Bar manufactured by M/s. Faber Industries, S.p.a., Italy, certified by M/s. Lloyd's as per approved drawings.",
"footnote": "",
"is_definition": false,
"sort_order": 81
},
{
"number": "6",
"title": "6. Spain Origin.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 82
},
{
"number": "7",
"title": "7. Japan Origin.",
"chapter": null,
"content": "(a) Steel cylinders manufactured by M/s Showa Koatsu Kogyo Co. Ltd. - inspected and certified by Company's own Inspector or KHK or Lloyd' or Bureau Veritas conforming to specifications DOT:3AA:1800 and above, JIS;B:8241 relating to Manganese Steel for permanent gases and DOT:3A/DOT:3AA for liquefiable gases as per approved drawings.\n(b) Steel cylinders manufactured by Kanto Koatsu -Yoki manufacturing Co. Ltd. - inspected and certified by company's own inspector or KHK or Bureau Veritas conforming to High Pressure Gas Safety Law Japan as per approved drawing.",
"footnote": "",
"is_definition": false,
"sort_order": 83
},
{
"number": "8",
"title": "8. Polish Origin.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 84
},
{
"number": "9",
"title": "9. U.K. Origin.",
"chapter": null,
"content": "(a) Aluminum alloy cylinders conforming to BS: 5045:Pt. 3 or EN equivalent specification manufactured by M/s. Luxfur gas Cylinders, UK - inspected and certified by Lloyd's or British Inspecting Engineers Ltd. as per approved drawings.\n(b) Seamless steel cylinders for permanent and Liquefiable gases conforming to BS:5045:Part I manufactured by M/s. UEF Chesterfield Cylinders, UK - inspected and certified by Lloyd's or Bureau Veritas or British Inspecting Engineering Ltd., or any other appropriate authority as per approved drawings.\n(c) Seamless steel cylinders for permanent and liquefiable gases conforming to DOT: 3T specification manufactured by UEF Chesterfield Cylinders UD - inspected and certified by British Inspecting Engineers Ltd., as per approved drawings.\n(d) Seamless steel cylinders for FM-200 gas service conforming to DOT:4BA:500 specification manufactured by M/s. Fike Protection & Systems, U.K., having water capacity 650 pounds, filling ratio 1.04 super pressurised with Nitrogen at 19.72 Bar as per approved drawing.\n(e) Seamless steel cylinders for CNG gas on-board service to BS:5045-1982 Part 1 having working pressure 200 Bar and test pressure 344 Bar manufactured by M/s. UEF Chesterfield Cylinder, Derbyshire, UK certified by M/s. British Inspection Engineers Limited as per approved drawings.\n(f) Carbon Composite cylinders (accessory to breathing apparatus) conforming to EN: 12245 Specification manufactured by M/s Dragger Safety UK Limited, inspected and tested by M/s Lloyd's Register as per approved drawings.",
"footnote": "",
"is_definition": false,
"sort_order": 85
},
{
"number": "10",
"title": "10. USA Origin.",
"chapter": null,
"content": "(a) Steel cylinders - inspected and certified by appropriate authority, conforming to specifications DOT: 3A/3AA for permanent and liquefiable gases manufactured by (1) M/s. Norris Cylinder Co., (2) M/s. Taylor Wharton Co., (3) M/s. Worthington Cylinder Co., (4) M/s. Norris Industries, (6) M/s. Harris Burg Steel Co. and (7) M/s. Pressed Steel Tank Co., as per approved drawings.\n(b) Aluminum lined fully wrapped, carbon fiber composite type 3 CNG cylinders conforming to ISO:11439/ECER- 110, EC 79, EN:12245-2009 manufactured by M/s. Luxfer Gas Cylinders GMBH inspected and certified by M/s. TUV Nord.\n(c) Tube cylinders conforming to ISO: 11120-1999 manufactured by M/s CP industries, inspected and certified by British inspecting Engineers Ltd as per approved drawing.\n(d) Carbon fiber reinforced plastic full composite cylinders conforming to DOT-SP 10945-2216 manufactured by Structural Composite Industries, inspected and certified by M/s TH Cochrane Laboratories Ltd. To be used for water mist fire fighting system as per approved drawing.\n(e) Fully wrapped carbon composite aluminum lined CNG cylinders conforming to ANSI NGV2-2000 Type 3&FMB SS304 specification manufactured by M/s Luxfer Gas Cylinders, inspected and certified by M/s Authorized Testing Inc ./Arrowhead Industrial Services Inc., as per approved drawing.",
"footnote": "",
"is_definition": false,
"sort_order": 86
},
{
"number": "11",
"title": "11. German Origin.",
"chapter": null,
"content": "(a) Seamless steel cylinders for permanent and liquefiable gas service conforming to BS:5045/1/CM/S & DOT:3AA manufactured by M/s. Mannesmann Cylinders Systems Gmbh, Germany - inspected and certified by Lloyd's or TUV or any other authority as per approved drawings.\n(b) Aluminum lined fully wrapped carbon fibre composite type 3 CNG cylinders conforming to ISO: 11439/ECER-110, EN: 12245-2009 manufactured by M/s Dynetek Europe GmbH, inspected and certified by M/s TUV Norde.",
"footnote": "",
"is_definition": false,
"sort_order": 87
},
{
"number": "12",
"title": "12. Norway Origin.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 88
},
{
"number": "13",
"title": "13. Sweden Origin.",
"chapter": null,
"content": "B. Valves\nB. Valves",
"footnote": "",
"is_definition": false,
"sort_order": 89
},
{
"number": "1",
"title": "1. Indian origin.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 90
},
{
"number": "2",
"title": "2. Italian origin.",
"chapter": null,
"content": "Note: \"approved\" means approved by Chief Controller.\nNote:\nNote: An updated list of all the approvals is available on website http://peso.gov.in\nNote:\nSchedule II\n[See rule 3(2)]\n[See rule 3(2)]",
"footnote": "",
"is_definition": false,
"sort_order": 91
},
{
"number": "1",
"title": "1. Place and date of inspection.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 92
},
{
"number": "2",
"title": "2. Gas cylinders for ........................... gas",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 93
},
{
"number": "3",
"title": "3. Manufactured by .................................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 94
},
{
"number": "4",
"title": "4. Location at ..........................................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 95
},
{
"number": "5",
"title": "5. Manufactured for ................................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 96
},
{
"number": "6",
"title": "6. Location for ........................................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 97
},
{
"number": "7",
"title": "7. Quantity .........................................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 98
},
{
"number": "8",
"title": "8. Serial Nos. from....to .......................... inclusive",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 99
},
{
"number": "9",
"title": "9. Specification to which the cylinders are manufactured ...........................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 100
},
{
"number": "10",
"title": "10. Size ... mm. outside diameter mm ..................................................... long",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 101
},
{
"number": "11",
"title": "11. Minimum wall thickness ....................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 102
},
{
"number": "12",
"title": "12. Neck end threading as per ................................... specification.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 103
},
{
"number": "13",
"title": "13. Process of manufacture (whether spun type, or billet pierced or welded).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 104
},
{
"number": "14",
"title": "14. Method of heat treatment ....................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 105
},
{
"number": "15",
"title": "15. Design working pressure in kg/cm 2 at 15°C or 65°C as the case may be",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 106
},
{
"number": "16",
"title": "16. Hydrostatic test or hydrostatic stretch test pressure in kg/cm 2 .",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 107
},
{
"number": "17",
"title": "17. Record of Hydrostatic test or Hydrostatic stretch test with date of test, in respect of each cylinder...........",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 108
},
{
"number": "18",
"title": "18. Pneumatic test pressure in kg/cm 2 .......................................................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 109
},
{
"number": "19",
"title": "19. Result of pneumatic test ....................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 110
},
{
"number": "20",
"title": "20. Tare weight and water capacity of each cylinder ..........................................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 111
},
{
"number": "21",
"title": "21. Record of chemical analysis and physical properties of the steel used in the manufacture of cylinders.............",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 112
},
{
"number": "22",
"title": "22. Manufacturer's identification marks ...........................................................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 113
},
{
"number": "23",
"title": "23. Inspector's mark ..................................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 114
},
{
"number": "24",
"title": "24. Markings stamped on the shoulder of the cylinders ..............................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 115
},
{
"number": "25",
"title": "25. Dated signature with stamp of the inspecting authority",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 116
},
{
"number": "1",
"title": "1. Manufactured by .......................................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 117
},
{
"number": "2",
"title": "2. Location at ..........................................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 118
},
{
"number": "3",
"title": "3. Manufactured for ...................................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 119
},
{
"number": "4",
"title": "4. Location at .................................................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 120
},
{
"number": "5",
"title": "5. Quantity ..................................................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 121
},
{
"number": "6",
"title": "6. Specification ..........................................",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 122
},
{
"number": "7",
"title": "7. Results of inspection",
"chapter": null,
"content": "(a) Valve inlet connection ...............\n(b) Valve outlet connection ...............\n(c) Valve outlet number ..................\n(d) Hydraulic Pressure Test ..................\n(e) Pneumatic Proof Test .................\n(f) Tensile strength ..........................\n(g) Elongation per cent ......................\n(h) Impact strength ..........................\n(i) Quantity offered for inspection ....................\n(j) Quantity passed ......................\n(k) Quantity rejected and reasons for rejection ......",
"footnote": "",
"is_definition": false,
"sort_order": 123
},
{
"number": "8",
"title": "8. Date and signature with stamp of the inspecting authority ....................",
"chapter": null,
"content": "Schedule III\n[See rule 3(3)]\n[See rule 3(3)]\n(i) Date from which such container/valves were manufactured.\n(ii) For whom the container/valves were fabricated and their approximate numbers.\n(iii) Details of the containers/valves manufactured.\n(ii) Details of templates/gauges provided to check/test.\n(iii) Steps taken to check the accuracy of testing and checking equipment and frequency of such checking.\ni) Proforma of records for various tests carried out by the inspecting and certifying organization, and\nii) Proforma of test and inspection certificate issued by the independent inspecting authority.\nSignature\nName and designation\nSchedule IV\n[See rule 35]\n[See rule 35]\nA. Facilities required for cylinder testing stations.\nA. Facilities required for cylinder testing stations.",
"footnote": "",
"is_definition": false,
"sort_order": 124
},
{
"number": "1",
"title": "1. Management:",
"chapter": null,
"content": "1.1 General requirement. - The personnel, equipments, inspection procedures, recording organization shall be adequate and the test station will be operated with safe operating conditions. The procedures and testing shall ensure that cylinders, which fail to meet the requirements and intent of these rules, are not returned into normal service. All personnel shall fully recognize their individual responsibilities and that the minimum inspectional requirement shall not be lowered for any reason whatsoever.\n1.1 General requirement.\nNote. - The area of responsibility shall be divided into three separate functions as indicated below. The numbers of personnel employed shall, however, be related to the quantum of work.\nNote.\n1.2 Manager. - The manager responsible for the working of the test station shall be properly qualified; his qualifications shall include training on the dangers associated with gas cylinders, purpose of inspection, test methods, equipment, test requirements, and recording of test results, and he shall have appropriate technical qualification in Mechanical or Chemical Engineering. He shall also be conversant with the codes, specifications or regulations applying to the cylinders for which the test station is approved.\n1.2 Manager.\n1.3 Supervisor. - The Supervisor shall possess the following qualifications, namely-\n1.3 Supervisor.\n(i) have at least two years' experience in the examination of gas cylinder;\n(ii) be at least 21 years of age;\n(iii) be conversant with these rules, codes, specifications or regulations applying to the cylinders for which the test station is approved.\n1.4 Operator. - Personnel conducting inspections and tests shall have qualifications and experience suitable for the work on which they are engaged. They shall be trained to understand the dangers associated with gas cylinders and the purpose and method of inspection.\n1.4 Operator.",
"footnote": "",
"is_definition": false,
"sort_order": 125
},
{
"number": "2",
"title": "2. Equipment:",
"chapter": null,
"content": "2.1 Type of equipment. - The test station shall have adequate equipment to carry out cleaning, inspection, testing and painting of cylinder as required under these rules and shall contain-\n2.1 Type of equipment.\n(i) one set of these rules, codes, specifications or regulations applying to the cylinders, which the test station is authorized to test. All these rules, codes, specifications and/or regulations shall be maintained with all current amendments.\n(ii) hydrostatic test apparatus comprising pressurizing equipment, pressure gauge and volumetric measuring equipment in accordance with IS:5844-hydrostatic stretch testing of compressed gas cylinders and the apparatus shall be equipped with at least two 15cm diameter (minimum) working pressure gauges one being used as test gauge and other as master gauge.\nNote: Cryogenic container shall be tested pneumatically at 1.1 times of the design pressure or as per the code accepted by the Chief Controller.\n(iii) non-destructive testing facilities like ultrasonic flaw detection with gauging measurement, acoustic emission techniques, etc. for detection of stress corrosion cracks or fatigue cracks developed during the service.\n(iv) dead-weight pressure gauge tester of appropriate pressure range or a master pressure gauge of 15cm minimum diameter covering the appropriate pressure range.\n(v) boroscope, extra-low voltage lamps to permit adequate internal viewing of cylinder and other lamp necessary for close examination of external surfaces.\n(vi) straight edge, template, miscellaneous tool and gauges for measurement.\n(vii) weighing equipment, where applicable.\n(viii) one set of standard test weight for the weighing machine, stamped by the relevant statutory authority.\n(ix) Adequate cylinder handling equipment.\n(x) Adequate cylinder draining equipment.\n(xi) Facilities for internal drying cylinders.\n(xii) Marking and stamping equipment.\n(xiii) Facilities for capturing photograph of the cylinder identification details.\n(xiv) Hardness testing tools.\n(xv) Painting booth fitted with exhaust fan of suitable capacity and draft.\n2.2 Accuracy. - The accuracy of equipment shall be as follows: -\n2.2 Accuracy.\n(i) Hydrostatic test apparatus in accordance with IS: 5844. Volumetric equipment shall be capable of measuring a permanent change in volume of the cylinder under test of the order of 1/20,000 of its total capacity.\n(ii) weighing equipment error not greater than +0.1 per cent.\n(iii) Working pressure gauge error not greater than 1 per cent of the pressure.\n(iv) Master pressure gauge error not greater than 0.25 per cent of the full-scale deflection.\n2.3 Calibration. - Calibration of equipment shall be carried out at periods not exceeding the following-\n2.3 Calibration.\n(i) Working pressure gauge - one month.\n(ii) Master pressure gauge - six months.\n(iii) Weighing equipment-checked by test weight daily when in service.\n(iv) Test weights - two years.\n3 Working conditions.\n(i) It shall have good lighting to permit ready external examination of gas cylinders, preferably including natural lighting.\n(ii) It shall have adequate ventilation to remove residual gases from cylinders.\n(iii) It shall provide sufficient space to permit safe working.\n(iv) It shall be maintained in a clean dry condition.",
"footnote": "",
"is_definition": false,
"sort_order": 126
},
{
"number": "4",
"title": "4. Quality management system.",
"chapter": null,
"content": "B. Testing of cylinders\nB. Testing of cylinders",
"footnote": "",
"is_definition": false,
"sort_order": 127
},
{
"number": "1",
"title": "1. Condition of cylinders for test.",
"chapter": null,
"content": "(i) The cylinder contents shall be released in a safe manner keeping in mind dangers associated with the nature of the gas in the cylinder. Cylinders, which contain or may have been contaminated by poisonous or obnoxious substances, shall be emptied only by test stations properly equipped and experienced to handle the particular gas or substance. Such cylinders shall be clearly labeled that they have been contaminated.\n(ii) The valve shall be opened and if no gas escapes and the port is not visibly blocked, a charge of low-pressure nitrogen or other inert gas shall be blown into the valve outlet. Discharge of gas after removal of the nitrogen supply indicated the cylinder is empty. When no gas discharges the valves shall be treated as \"obstructed\". Where a cylinder has contained poisonous or obnoxious substances, and the valve is suspected of being obstructed, the gas shall be released within an approved appliance and the valves shall be removed in such a manner that the gas escapes without danger to the operator.\n(iii) Should the valve be obstructed the contents of the cylinder shall be released in safe manner as stated in (i) above work on cylinders containing combustible gases shall be carried out in the open air in the degassing area.\nNote. - A suitable method of dealing with a valve in which the spindle cannot be removed is to drill a 1/16th in (1.6 mm) diameter hole with a hand drill through the valve body to the gas passage below the spindle seating. Alternatively, a fine-tooth hacksaw may be used. Drilling or sawing must be stopped immediately upon the first sign of escaping gas. A continuous jet of water must be directed on to the cutting tools and the operator must wear personal protective equipments (PPE).\nNote.",
"footnote": "",
"is_definition": false,
"sort_order": 128
},
{
"number": "2",
"title": "2. Inspection of cylinders before carrying out hydrostatic/hydrostatic stretch test.",
"chapter": null,
"content": "(a) Shot blasting, rotary wire brushing;\n(b) Burn out treatment carried out in a furnace at a temperature not exceeding 300°C for a period of not exceeding one hour after which all free rusts and any other foreign matter shall be removed by steam cleaning or washing with approved solvents.",
"footnote": "",
"is_definition": false,
"sort_order": 129
},
{
"number": "3",
"title": "3. Hydrostatic or hydrostatic stretch test or proof pressure test.",
"chapter": null,
"content": "(i) The cylinders shall be subjected to hydrostatic stretch test in accordance with IS: 5844. The test pressure applied to the cylinder shall be retained for a period of not less than 30 seconds.\n(ii) The permanent stretch suffered by the cylinder due to application of test pressure shall not exceed 10% of the total stretch Suffered during the test.\n(iii) Any reduction in pressure noticed during the retention of 30 seconds or any leakage, visible bulge or deformation should be treated as case of failure in the test.\n(i) The cylinder shall be subjected to hydrostatic test in accordance with IS: 5844 by non-jacket method except that the volumetric changes during the test need not be measured.\n(ii) The test pressure shall be retained for a period of not less than 30 seconds. Any reduction in pressure noticed during this retention period or any leakage, visible bulge or deformation shall be treated as case of failure in the test.\n4.",
"footnote": "",
"is_definition": false,
"sort_order": 130
},
{
"number": "5",
"title": "5. Records of test.",
"chapter": null,
"content": "(a) Name of the manufacturer and the owner of the cylinder.\n(b) Rotation Number/cylinder serial number.\n(c) The specification to which the cylinder conforms.\n(d) Date of original hydrostatic/hydrostatic stretch test.\n(e) Test reports and certificates furnished by the manufacturer, if available.\n(f) Test pressure.\n(g) Maximum working pressure.\n(h) Water capacity.\n(i) Tare weight.\n(j) Variation, if any, in the tare weight marked on the cylinder and actual tare weight.\n(k) Condition of cylinder shell.\n(1) Name of gas.\n(m) Type of valve fitted, and\n(n) Remarks, if any.\nNote. - (1) The above particulars shall form the history card or record for each cylinder and all changes from time to time shall be indicated therein.\n(2) The test station shall adopt procedures, which fully comply with the requirements of these rules and guidelines issued by Chief Controller from time to time.",
"footnote": "",
"is_definition": false,
"sort_order": 131
},
{
"number": "6",
"title": "6. Validity of cylinder testing station and hot repair or reconditioning approvals of LPG and welded cylinders.",
"chapter": null,
"content": "Schedule V\nAll the fees shall be paid in the manner prescribed in sub rule (2) of rule 65\n[See rules 3, 12, 28, 35, 47, 49, 50, 53, 54, 55, 59, 61, 62 and 65]\nSl. No.\nForm of License\nPurpose for which granted\nAuthority empowered to grant license\nFees\nRupees\n1\nD\nTo import cylinder filled or intended to be filled with\n\t\t\t\tcompressed gas to import valves and regulators for LPG\nChief Controller\nFor the first 100 nos. cylinders or part thereof. Exceeding\n\t\t\t\t100 nos. but not exceeding 500 nos. Cylinders. Exceeding 500\n\t\t\t\tnos. of cylinders Rs.4000/- for every additional 500 nos. of\n\t\t\t\tcylinders or part thereof. Scrutiny fees for Import of Valves\n\t\t\t\tand LPG Regulators each application.\n2000 4000 1000\n2\nE\nTo fill compressed gas in cylinders\nChief Controller or Controller\nFor each type of gas filled in the plant, namely (a) toxic,\n\t\t\t\t(b) non-toxic and nonflammable, (c) non-toxic and flammable, (d)\n\t\t\t\tdissolved acetylene gas, (e) non-toxic and flammable liquefiable\n\t\t\t\tgas other than LPG or (f) liquefied petroleum gas, as the case\n\t\t\t\tmay be.\n5000\n3\nF\na. To store compressed gas in cylinders in storage shed\n\t\t\t\tattached to the filling premises\nChief Controller or Controller\n(i) For toxic and flammable gases\n\t\t\t\t(permanent as well as liquefied). Not exceeding 100 nos.\n\t\t\t\tcylinders.\nExceeding 100 nos. but not\n\t\t\t\texceeding 500 nos. cylinders\nExceeding 500 nos. of cylinders, Rs.4000/- for every\n\t\t\t\tadditional 500 nos. of cylinders or part thereof.\n2000\n4000\nb. To store compressed gas in cylinders in storage shed other\n\t\t\t\tthan attached to the filling premises\nController\n(ii) For non-toxic and non-flammable gases (permanent as well\n\t\t\t\tas liquefied):\nNot exceeding 500 nos. of cylinders Exceeding 500 nos. of\n\t\t\t\tcylinders, Rs.4000/-\n2000\nfor every additional 500 nos. of cylinders or part thereof.\n(iii) For liquefied petroleum gases:\nExceeding 100 Kg. But not exceeding 500 kgs\n1000\nExceeding 500 Kg. But not exceeding 2000 kgs\n2000\nExceeding 2000 Kg. But not exceeding 5000 kgs\n4000\nExceeding 5000 Kg. But not exceeding 10,000 Kgs\n6000\nExceeding 10,000 Kg. Rs. 2000/- every additional 5000 Kg. or\n\t\t\t\tpart thereof.\n(vi) For acetylene gas contained in cylinders in dissolved\n\t\t\t\tstate\n2000\nNot exceeding 200 cylinders\nExceeding 200 nos. of cylinders Rs. 2000/-for every additional\n\t\t\t\t200 nos. of cylinders or part thereof.\n4\nG\nTo dispense CNG as automotive fuel from a mother station,\n\t\t\t\tdaughter station or a CNG online station\nChief Controller\nTo dispense CNG as automotive fuel from a mother station,\n\t\t\t\tdaughter station or a CNG online station\n10000\nB. Fees Other than License Fees\nSl. No.\nPurpose\nFees (Proposed)\nRupees (Proposed)\n1\nIssue of filling permission under clause B of sub-rule (1) of\n\t\t\t\trule 3\nScrutiny fee for the first 100 nos. of cylinders or part\n\t\t\t\tthereof.\n1000\nExceeding 100 nos. of cylinders Rs.2000/- for every additional\n\t\t\t\t500 cylinders or part thereof\n1000\nNote : Fee applicable for the cylinders filled and meant for\n\t\t\t\texport purpose irrespective of the nos of cylinder, scrutiny fee\n\t\t\t\tOnly\n2\nApproval of design for manufacture of cylinder or valve or LPG\n\t\t\t\tregulators under sub-rule (3) of rule 3\n(a) Scrutiny fee for grant of manufacturing unit approval,\n\t\t\t\twith one year validity fee for the first time\n10000\n(b) For subsequent approval of new design\n2000\n(c) For subsequent approval of any change in design\n1000\n(d) Annual fee for renewal of cylinder, valve and LPG,\n\t\t\t\tregulator manufacturing units.\n2000\nApproval of design for manufacture of cylinder, valve, LPG\n\t\t\t\tregulator under sub rule 3(4) by foreign manufacturer\n(a) Scrutiny fee for grant of approval for manufacturing unit\n\t\t\t\twith one year validity fee for the first time.\n6,50,000\n(b) For subsequent approval of new design\n65000\n(c) For subsequent approval of any change in design\n13000\n(d) Annual fees for renewal of cylinders, valves and,\n\t\t\t\tregulators manufacturing units.\n32500\n3\nConversion of cylinder under sub-rule (2) of rule 28\nScrutiny fee for the first 10 nos. of cylinders or part\n\t\t\t\tthereof.\n400\nExceeding 10 nos. of cylinders Rs. 1000/- for every 100\n\t\t\t\tnumbers of Cylinders\n4\nApproval of cylinder testing station under rule 35 and hot\n\t\t\t\trepair of welded or brazed cylinder under rule 12\nScrutiny fee with one year validity fee for the first time\n10000\nAnnual renewal fee for cylinder testing or hot repair\n\t\t\t\tapproval.\n2000\n5\nPrior approval of specifications and plans under rule 47 or 53\nScrutiny fee\n1000\n6\nAmendment of license under rule 54\nScrutiny fee\n1000\n7\nIssue of duplicate copy of license under rule 61\nScrutiny fee\n1000\n8\nIssue of authenticated copy of license under rule 62\nScrutiny fee\n1000\n9\nFor appeal against order of a licensing authority licencing\n\t\t\t\tauthority if such appeal is preferred to central Govt. or Chief\n\t\t\t\tController\nScrutiny fee\n1000\nForm A\n[See rule 30(2)]\nDeclaration to be made by the Master of Ship carrying cylinders filled with compressed gas/es before entering a port or by the ship's agent.\nName of ship ..............\nDescription of the filled cylinders\nName and nature of the gas i.e. whether non\n\t\t\t\ttoxic, flammable, corrosive or toxic\nTotal quantity carried in the ship\nQuantity to be landed at port\nRemarks\nNo. of Cylinders\nKg. or M3 of gas\nNo. of Cylinders\nKg. or M3 of gas\nDated the day of ,20\nSignature of Master/ Agent of ship\n(with official stamp)\nForm B\nForm B\n(See rules 49 and 54)\n(See rules 49 and 54)\nApplication for the grant/amendment/renewal/duplicate copy of a license to import gas cylinders, valves and LPG regulators\n(ii) Applicant's full postal address with PIN Code\n(iii) Applicant's phone/mobile no.\n(iv) Applicant's E-mail\n(i) Storage license number or approval number issued by the Chief Controller/Controller:\n(ii) Renewed/valid up to:\n(iii) Capacity of the storage as per above license:\n(iv) Address for storage of Cylinders:\n(i) Number of Cylinders/Valves/LPG regulators:\n(ii) Specification of cylinders/Valves/LPG regulators:\n(iii) Name of the Manufacturer:\n(iv) Inspected and tested by:\n(v) Specification of the valves fitted to the cylinders:\n(vi)*Filled with (in case of cylinders only) ___\n(True chemical name of the gas)\n(vii)*Filling pressure at 15 C if filled with permanent gas or dissolved acetylene:\n(viii) *Filling ratio, if filled with a liquefiable gas (in case of cylinders only)\n(ix) Date of last hydraulic test in case of cylinders:\n(x) Rotation numbers of cylinders/Sr. no. of valves/LPG regulators:\nSignature of Applicant\nNote:-",
"footnote": "",
"is_definition": false,
"sort_order": 132
},
{
"number": "1",
"title": "1. Particulars marked with* are not required to be furnished if empty cylinders are desired to be imported.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 133
},
{
"number": "2",
"title": "2. Manufacturers test and inspection certificates complete in all respects pertaining to each lot of cylinders valves shall accompany this application.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 134
},
{
"number": "3",
"title": "3. In case cylinders are desired to be imported duly filled with gas, filler certificates in respect of sub-items (vi), (vii) and (viii) of items shall be furnished.",
"chapter": null,
"content": "Form C\nForm C\n(See Rules 49, 54 and 55)\nApplication for the grant/ amendment/ renewal/ duplicate copy of a license to fill and/or store compressed gas/es in cylinders:\n1.\nApplicant's details:\n---------------------------------------------\n(i)\nName in which license required **\n---------------------------------------------\n(ii)\nApplicant's full postal address with PIN Code\n---------------------------------------------\n(iii)\nApplicant's telephone/ mobile numbers:\n---------------------------------------------\n(iv)\nApplicant's email ID:\n---------------------------------------------\n2.\nLocation of the premises where compressed gas/es are to be\n\t\t\t\tfilled and stored:\n(i)\nSurvey No./ plot number :\n---------------------------------------------\n(ii)\nTown or village:\n---------------------------------------------\n(iii)\nDistrict:\n---------------------------------------------\n(iv)\nState: --------------\n---------------------------------------------\n(v)\nPIN Code:\n---------------------------------------------\n(vi)\nTelephone numbers:\n---------------------------------------------\n3.\nName and Nature of each compressed gas proposed to be\n\t\t\t\tfilled/stored:\nType of the Gas Name of the gas No. of filling points Numbers of the filled cylinders/ Kgs of gas/es\n\t\t\t\tproposed to be stored. (i) Toxic (ii) non-toxic and non-flammable (iii) non-toxic and flammable (iv) dissolved acetylene gas (v) non-toxic and flammable liquefiable gas other than LPG or (vi) liquefied petroleum gas:\nType of the Gas\nName of the gas\nNo. of filling points\nNumbers of the filled cylinders/ Kgs of gas/es\n\t\t\t\tproposed to be stored.\n(i) Toxic\n(ii) non-toxic and non-flammable\n(iii) non-toxic and flammable\n(iv) dissolved acetylene gas\n(v) non-toxic and flammable liquefiable gas other than LPG or\n(vi) liquefied petroleum gas:\n4.\nName and Nature of each compressed gas already filled/stored (applicable in case of amendment):\nType of the Gas Name of the gas No. of filling points Numbers of the filled cylinders/ Kgs of gas/es\n\t\t\t\tproposed to be stored. (i) Toxic (ii) non-toxic and non-flammable (iii) non-toxic and flammable (iv) dissolved acetylene gas (v) non-toxic and flammable liquefiable gas other than LPG or (vi) liquefied petroleum gas:\nType of the Gas\nName of the gas\nNo. of filling points\nNumbers of the filled cylinders/ Kgs of gas/es\n\t\t\t\tproposed to be stored.\n(i) Toxic\n(ii) non-toxic and non-flammable\n(iii) non-toxic and flammable\n(iv) dissolved acetylene gas\n(v) non-toxic and flammable liquefiable gas other than LPG or\n(vi) liquefied petroleum gas:\n5\nNumber of the license/s held for the Premises (not applicable in new case)\n---------------------------------------------\n6\nParticulars of NOC issued by District Authority where applicable\n---------------------------------------------\n7\nParticulars of CNG Dispensers/ Cascade & Compressors\n---------------------------------------------\n(In case of Form 'G' license)\nNote: In the case of application for grant or amendment of license in Form 'G', particulars of the compressor, CNG cylinder cascades, CNG dispensers, etc. shall also be furnished.\nI hereby declare that the statements made above have been checked up by me and are true and I undertake to abide by the norms and conditions of the license, which will be granted to me.\nDate of application\nSignature and designation of the applicant\n(i) Four copies of specifications and plans approved under rule 47 (Not required for renewal of a license without amendments)\n(ii) License together with approved plans and specifications attached thereto. (Not required for the first grant of a license)\n(iii) Requisite amount of license fee for the grant, amendment or renewal of a license paid in the manner specified in Rule 65.\n(iv) Documentary evidence in support of legal physical possession of the premises proposed to be licensed, copies of lease agreement, partnership deed/ memorandum and article of association, approval/ clearance/ permit as applicable from the Local Administration etc.\n(v) An undertaking stating that all necessary clearances from revenue, fire, local administration, etc. have been obtained and the construction of the premises has been completed as per approved plan complying with all relevant requirements under these rules.\n(vi) No Objection Certificate from the District Authority under rule 48 in the case of application for license in Form F for storage of flammable, Toxic and/ or corrosive gases for the purpose of sale /trade or Form 'G'\n(vii) HAZOP Study or Disaster Management Plan in case of toxic and/or corrosive or flammable gases.\n(viii) SOP regarding toxic gas handling.\n(ix) Documents required to be submitted for renewal of cylinder manufacturing permission, valve manufacturing permission, LPG regulator manufacturing permission, cylinder testing permission and hot repairing permission-\n(a) Renewal fees as prescribed in Schedule V\n(b) An undertaking duly signed by director or authorized signatory of the company to effect that there are no changes in the organizational set up, plant machinery and manpower.\n(c) Performance report for the period of last validity of the permission.\n(d) Copy of valid ISO Certificate duly issued by BIS or any other accredited agency.\n(e) Compliance of any other condition, if any imposed by the approving authority at the time of grant/ renewal of the approvals.\nForm D\nForm D\n(See rules 50, 51 and 54)\n(See rules 50, 51 and 54)\nLicense to import Gas Cylinders, Valves and LPG regulators by Sea\nLicense to import Gas Cylinders, Valves and LPG regulators by Sea\nNo. _____ Fee Rs\nDescription of the Cylinders/ Valves, LPG regulators\nDescription of the Cylinders/ Valves, LPG regulators\n(a) W.C.\n(b) W.P.\n(c) T.P.\nConditions of License\nConditions of License\nForm E\nForm E\n(See rules 50, 51 and 54)\n(See rules 50, 51 and 54)\nLicense to fill compressed gas in cylinder\nLicense to fill compressed gas in cylinder\nChief Controller/ Controller of Explosives\nDescription and location of the licensed premises\nDescription and location of the licensed premises\n(a) Toxic\n(b) non-toxic and non-flammable\n(c) non-toxic and flammable\n(d) dissolved acetylene gas\n(e) non-toxic and flammable liquefiable gas other than LPG.\n(f) Liquefied petroleum gas\nSpace for Endorsement of Renewals\nSpace for Endorsement of Renewals\nThis license should be renewable without any\n\t\t\t\tconcession in fee for ten years in the absence of contraventions\n\t\t\t\tof Explosives Act, 1884 or Gas Cylinders Rules, 2016, framed\n\t\t\t\tthere under or of the conditions of the this license.\nDate of renewal\nDate of expiry\nSignature and office stamp of the licensing authority\nConditions\nConditions\n(i) such cylinder has been approved in writing by the Chief Controller for filling;\n(ii) the cylinder has been examined and tested as required under the relevant rules.\nAdditional requirements for dissolved acetylene cylinder filling and storage plants:-",
"footnote": "",
"is_definition": false,
"sort_order": 135
},
{
"number": "1",
"title": "1. Safety devices shall be provided in the acetylene cylinder filling and storage plants to ensure that the pressure, temperature and flow levels are maintained within safe limits.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 136
},
{
"number": "2",
"title": "2. The equipments shall be designed, operated and maintained in such a way that during normal operation air or oxygen entry to the equipments is prevented, under pressure shall be prevented, air acetylene mixtures shall be safely eliminated by purging and excessive rise in temperature and pressure is prevented.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 137
},
{
"number": "3",
"title": "3. Regulators shall conform to ISO-7291 and high pressure hoses shall conform to ISO-14113.Hoses for high pressure acetylene shall have burst pressure not less than 1000 bar (100 MPa).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 138
},
{
"number": "4",
"title": "4. Flame arrestors or shut off devices shall be provided on all the strategic locations in the plant to arrest both ignition and the gas flow.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 139
},
{
"number": "5",
"title": "5. Although the pressure in the filling manifolds may be 25 bar but while designing the manifolds possibility of acetylene decomposition and detonation resistance shall also be taken into the account.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 140
},
{
"number": "6",
"title": "6. An efficient fire Protection System, Deluge system and Emergency response system for dissolved acetylene cylinder filling and storage plants shall be provided.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 141
},
{
"number": "7",
"title": "7. Carbon Dioxide fire extinguishers shall not be used for extinguishing flammable gas fires due to the risk of static electricity generation. Dry Chemical Powder type fire extinguishers shall be installed at all the strategic locations in the acetylene filling and storage plant.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 142
},
{
"number": "8",
"title": "8. Acetylene plants shall be equipped with emergency procedures for Calcium Carbide storage and transportation, Carbide fires, Carbide lime spillage and hot acetylene cylinder.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 143
},
{
"number": "9",
"title": "9. Spray of cooling water over the hot cylinder shall be continued for a sustained period of time till acetylene cylinder is attaining cool.",
"chapter": null,
"content": "Safety distance table for acetylene plant\nSafety distance table for acetylene plant\nFrom\nFrom\nTo\nTo\nDistance in Meter\nDistance in Meter\nAcetylene plant\nFactory boundary wall, buildings adjacent properties, office\n\t\t\t\tbuilding etc.\n15\nAcetylene plant\nPressure vessels containing cryogenic liquid storage\n15\nAcetylene plant\nOxygen manufacturing plant\n30\nAcetylene plant\nAir compressor air intake point\n90\nLime sludge drying pits\nBoundary wall and acetylene generation unit\n9\nAcetylene plant\nNon flame proof electrical fittings\n15\nForm F\nForm F\n(See rules 50, 51 and 54)\n(See rules 50, 51 and 54)\nLicense to store compressed gas in cylinders\nLicense No.\n\t\t\t\t..........................................................\nFee Rs. .............................\nType of gas\nQuantity\n(a) toxic\n....................................\n(b) non-toxic and non-flammable\n....................................\n(c) Non-toxic and flammable\n....................................\n(d) Dissolved acetylene gas\n....................................\n(e) Non-toxic and flammable liquefiable gas other than LPG\n....................................\n(f) Liquefied petroleum gas\n....................................\n(Survey No/ Plot number) (Name of street) (Village or town) (Police Station)\n(District)\nSpace for Endorsement of Renewals\nThis license shall be renewable without any Date\n\t\t\tof concession in fee for ten years in the absence renewal of\n\t\t\tcontraventions of Explosives Act, 1884 or Gas Cylinders Rules,\n\t\t\t2016, framed there under or of the conditions of this license.\nDate of expiry\nSignature and stamp of the licensing authority\n--------------------------------\n--------------------------------\nConditions\nConditions",
"footnote": "",
"is_definition": false,
"sort_order": 144
},
{
"number": "1",
"title": "1. Construction details of LPG storage shed",
"chapter": null,
"content": "(a) LPG cylinder storage shed shall be constructed from any non flammable material having floor area of minimum 11 square meter for 1000 Kgs of LPG storage. Mastic flooring conforming to IS-1195/1196 shall be provided in the LPG cylinder storage shed .The ventilator area shall be minimum 10 % of the floor area. Minimum safety distances as specified in table given in condition 5a of Form F license shall be maintained and minimum 1.8 M high brick masonry compound wall shall be provided all around the LPG storage shed maintaining minimum safety distances as specified in condition 5a of form F license. Compound wall gate width shall not be more than 1.2 M. Dedicated LPG cylinder truck parking area in front of LPG cylinder storage shed shall be provided, which shall be surrounded by an industrial type of fencing of minimum 2.0 m height.\n(b) The licensed premises shall not be used for any purpose other than for keeping of compressed gas filled in cylinders.\nQuantity of compressed gas in Cylinder Minimum distance to be kept clear 0 -- 101 -- 101 -- 2000 3 2001 -- 3000 4 3001 -- 4000 5 4001 -- 6000 6 6001 -- 8000 7 8001 -- 10000 8 10001 --\n\t\t\t12000 9 12001 --\n\t\t\t20000 12 over 20000 15\nQuantity of compressed gas in Cylinder\nQuantity of compressed gas in Cylinder\nMinimum distance to be kept clear\nMinimum distance to be kept clear\n0 -- 101\n--\n101 -- 2000\n3\n2001 -- 3000\n4\n3001 -- 4000\n5\n4001 -- 6000\n6\n6001 -- 8000\n7\n8001 -- 10000\n8\n10001 --\n\t\t\t12000\n9\n12001 --\n\t\t\t20000\n12\nover 20000\n15\n(b) Minimum 3.0 m clear safety distances shall be maintained all around toxic gas and flammable gas storage shed other than LPG .An industrial type fencing of height not less than 2.0 M shall be provided all around the cylinder storage shed.\nNote. - Suitable space for parking of truck and unloading or loading of cylinders shall be provided by the licensee.\nNote.\n(i) filled cylinder shall be stored vertically and not be stacked more than 2 high;\n(ii) empty cylinder if stored vertically, shall not be stacked more than 3 high and; if stored horizontally, shall not be stacked more than 5 high;\n(iii) the pile of the cylinder shall be kept stable by using chocks at the ends;\n(iv) at least 60 centimeter wide gangway, to permit access and maneuvering of cylinders, shall be left between stacks of single or double rows and between stacks and walls,\n(b) No person shall smoke in the storage shed or carry matches, fuses, mobile phones or other appliances producing ignition in the premises. Conspicuous 'No smoking signs in Hindi, English and the regional language shall be pasted or hung up at prominent places outside the storage shed.\nForm G\nForm G\n(See rules 50, 51 and 54)\n(See rules 50, 51 and 54)\n'License to dispense compressed natural gas or compressed Bio Gas in a CNG/CBG dispensing station as automotive fuel\nLicense No.\n\t\t\t\t......................................................\nFee Rs.\n\t\t\t\t......................................................\nChief Controller of Explosives\nDescription and location of the licensed premises\nDescription and location of the licensed premises\nSpace for Endorsement of Renewals\nSpace for Endorsement of Renewals\nThis license should be renewable without any\n\t\t\t\tconcession in fee for ten years in the absence of contraventions\n\t\t\t\tof Explosives Act, 1884 or Gas Cylinders Rules, 2016 framed there\n\t\t\t\tunder or of the conditions of the this license.\nDate of renewal\nDate of expiry\nSignature and office stamp of the licensing authority\nConditions\nConditions\n(i) Dedicated flooding type fire fighting system for CNG or CBG cascade storage and compressor kept on RCC structure operatable from ground level or automatic shall be provided.\n(ii) An analysis report showing 4 hours fire resistant rating as per IS-1642-1989 shall be conducted by reputed agency and its report shall be enclosed along with other documents.\n(iii) Risk analysis report prepared by a reputed engineering agency and its report shall be enclosed along with other documents.\n(iv) The structural adequacy with respect to the superstructure with reference to static and dynamic load/vibrations on full operation of all the equipment shall be carried out by a reputed structural engineer and its report shall be enclosed along with other documents.\n(v) A HAZOP study shall be carried out by a reputed engineering firm and its report shall be enclosed along with other documents.\n(vi) Minimum two stair cases opposite to each other for proper access to the CNG equipment area shall be provided.\n(vii) CCTV camera shall be provided for close monitoring of the station min retention of minimum 24 Hrs recording.\n(viii) Emergency stop buttons shall be provided on ground level and roof level.\nB\nTable I A\nTable I A\nInter Distances\nFrom buildings and outer boundaries to gas storage units\nTotal capacity of gas storage cascade\n\t\t\t\tunits (in liters)\nTotal capacity of gas storage cascade\n\t\t\t\tunits (in liters)\nMinimum distance from buildings and\n\t\t\t\tboundaries (in meters)\nMinimum distance from buildings and\n\t\t\t\tboundaries (in meters)\nUp to 4500\n2.5\n4500 to\n\t\t\t\t10000\n4.0\n10000 to\n\t\t\t\t100000\n10.0\nTable I B\nTable I B\nMinimum 1.0 m inter distances shall be maintained between two cascades\nMinimum 1.0 m inter distances shall be maintained between two cascades\nNote. - If on the side(s) towards boundary of the installation, the clearance as above is not available, the same may be reduced to 2 meters provided a 4 H-FRR RCC wall of adequate height and length covering the cylinder cascades is constructed at the boundary and adequate clear space is available on the other side of the wall.\nTable II\nTable II\nInter distances between various facilities in the CNG fueling station\nSl. No.\nSl. No.\nDistance from (in meters)\nDistance from (in meters)\nCNG/ CBG Compressor\nCNG/ CBG Compressor\nCNG/ CBG dispensing Unit\nCNG/ CBG dispensing Unit\nStorage Cascade\nStorage Cascade\nOuter Boundary wall/ CLF*\nOuter Boundary wall/ CLF*\nMS/ HSD Dispenser\nMS/ HSD Dispenser\nVent of MS/ HSD u/g storage tanks\nVent of MS/ HSD u/g storage tanks\nFilling Point of MS/ HSD\nFilling Point of MS/ HSD\n1\nCNG/ CBG compressor\n-\n3\n2\n3\n6\n6\nT-1 (Min-3)\n2\nCNG/ CBG dispensing Unit\n3\n-\n2\n4\n6\n4\n-do-\n3\nStorage cascade\n2\n2\n-\nT-1\nT-1 (Min-6)\nT-1(Min-4)\n-do-\n4\nOuter boundary wall/ CLF*\n3\n4\nT-1\n-\n6\n4\n-do-\n5\nMS/ HSD Dispenser\n6\n6\nT-1 (Min-6)\n6\n-\n6\n-do\n6\nVent of MS/ HSD u/g storage tanks\n6\n4\nT-1 (Min-4)\n4\n6\n-\n6\n7\nFilling point of MS/ HSD\nT-1 (Min-3)\n*CLF - Chain Link Fencing.\nNote:-\n(i) T-I denotes Table-I.\n(ii) Distances shown as \"-\" shall be any distance necessary for operational convenience.\n(iii) A suitable curbing platform shall be provided curbing platform shall be provided at the base of the dispensing unit to prevent vehicles from coming too near the unit.\n(iv) A CNG or CBG cascade having cylinders of total water capacity not exceeding 4500 liters can be mounted on top of the compressor super structure. The assembly shall observe 3-meter clearance around and also from the dispensing unit and it can be reduced to 2 meter as per Note-I of Table - I.\nLocation Type of extinguishers Dispensing Unit 1x10 Kg DCP Compressor (On-line) 1x10 Kg DCP (mother station) 1x70 Kg DCP CNG storage 1x10 Kg DCP Cascade refueling area 1x10 Kg DCP MCC/ Electrical installation 1x4.5 Kg CO 2 per 25 Sq. M. floor area\nLocation\nLocation\nType of extinguishers\nType of extinguishers\nDispensing Unit\n1x10 Kg DCP\nCompressor (On-line)\n1x10 Kg DCP\n(mother station)\n1x70 Kg DCP\nCNG storage\n1x10 Kg DCP\nCascade refueling area\n1x10 Kg DCP\nMCC/ Electrical installation\n1x4.5 Kg CO 2 per 25 Sq. M. floor area\nSchedule VI\n(See rule 20)",
"footnote": "",
"is_definition": false,
"sort_order": 145
},
{
"number": "1",
"title": "1. Transport of cylinders by vehicles: -",
"chapter": null,
"content": "(a) The cylinders filled with any compressed gas shall not be transported by a bicycle or any other two wheeled mechanically propelled vehicle.\n(b) The cylinders shall be so transported as not to project in the horizontal plane beyond the sides or ends of the vehicle by which they are transported.\n(c) There shall be no sharp projections on the inside of the vehicle.\n(d) The cylinders shall be adequately secured to prevent their falling off the vehicle and being subjected to rough handling, excessive shocks or local stresses.\n(e) The cylinders transported in vehicles shall be blocked or braced and be so secured to prevent movement, striking each other or falling down.\n(f) The cylinders filled with any compressed gas shall not be transported along with any other article of a highly flammable or corrosive nature.",
"footnote": "",
"is_definition": false,
"sort_order": 146
},
{
"number": "2",
"title": "2. Restriction on transport: -",
"chapter": null,
"content": "(a) The cylinders containing flammable gases shall not be transported along with the cylinder containing any other type of compressed gas.\n(b) The cylinders containing toxic or corrosive gas shall not be transported along with food- stuffs.\n(c) Acetylene cylinders shall not be transported in closed vehicle\n(d) Thin wall cylinders shall not be transported in horizontal position. Notwithstanding anything contained in clause (a) above, DA cylinder not exceeding twenty five in numbers may be transported along with nontoxic non-flammable gases taking due precautions.",
"footnote": "",
"is_definition": false,
"sort_order": 147
},
{
"number": "3",
"title": "3. Loading and unloading for transport: -",
"chapter": null,
"content": "(a) No lifting magnet shall be used in loading or unloading of cylinder filled with any compressed gas.\n(b) Where any such operation is carried on by means of a crane or a fork-lift truck, a proper cradle with chains or wire rope slings shall be used.",
"footnote": "",
"is_definition": false,
"sort_order": 148
},
{
"number": "4",
"title": "4. Protection of valves during transport: -",
"chapter": null,
"content": "(a) Every cylinder containing compressed gas shall, when transported, have its valve protected against damage in the manner provided in sub-rules (b) and (c) unless it is securely packed in a box or crate.\n(b) Where the design of the cylinder does not provide for the valve lying wholly below the level of the body of the cylinder, a stout metal cap, metal cover or a protective metal ring or grill of a design approved by the Chief Controller shall be provided, the design being such that the cap or cover or ring or grill is nowhere in close proximity to any part of the valve or valve body.\n(c) Where metal caps or metal covers are provided, to protect valves fitted to cylinder other than those containing highly toxic gases like Hydrogen Cyanide, Phosgene, Cyanogen, Cyanogen Chloride, it shall be provided with a vent of such size so as to prevent any gas pressure inside the cap or covers.\n(d) The cylinder containing highly toxic gases like Hydrogen Cyanide, Phosgene, Cyanogen, Cyanogen Chloride gases, shall have their valves protected with gas-tight metal caps or covers.\n(e) Nothing in sub-rules (1), (2) and (3) shall apply to cylinders containing oxygen or nitrous oxide for medical purpose having water capacity not exceeding 5 litres.",
"footnote": "",
"is_definition": false,
"sort_order": 149
},
{
"number": "5",
"title": "5. Leaky cylinders: -",
"chapter": null,
"content": "(a) No person shall tender or transport any leaky cylinder.\n(b) Any cylinder containing a flammable or toxic gas, which develops a leak during transport shall promptly be removed to an isolated open place away from any source of ignition and the person responsible for transportation shall immediately contact the filler or the consignor as the case may be, for necessary advice.",
"footnote": "",
"is_definition": false,
"sort_order": 150
}
],
"metadata": {
"Act ID": "act2989",
"Act Number": "Published vide Notification No. GSR. 1081(E), dated 22nd November, 2016",
"Enactment Date": "",
"Act Year": "2016",
"Short Title": "The Gas Cylinders Rules, 2016",
"Type": "CENTRAL",
"Location": "India (Central)"
},
"updated_at": "2026-09-29 21:55:17"
}