(a) all licenses granted or renewed under the said rules and all fees imposed or levied shall be deemed to have been granted, renewed or imposed or levied, as the case may be, under the corresponding provisions of these rules, and
(b) all approvals given and all powers conferred by or under any notification or rule shall, so far as they are consistent with the Act and these rules, be deemed to have been given or conferred by or under these rules.
SCHEDULE I
[See rule 3(1)]
TYPES AND STANDARDS OF CYLINDERS AND VALVES A. CYLINDERS AND CONTAINERS
(a) Cylinders. - Welded low carbon steel cylinders for low pressure liquefiable gases manufactured to IS: 3196, Part 1, Part 2 & Part 4, IS: 7142, AUTO LPG containers to IS: 14899, DA cylinders to IS: 7312 certified by Bureau of Indian Standards.
(b) Containers. - Tonne containers manufactured to BS: 1500, ASME Section VIII, Division 1, IS: 2825 by M/s. Asco Industrial Corporation, New Delhi, M/s. Indian Sugar and General Engg. Corporation, Yamunagar, M/s. Anup Engineering Ltd., Ahmedabad, M/s. Kosan Metal Products Pvt. Ltd., Mumbai, M/s. Meenakshi Associated Pvt. Ltd., Surajpur, Distt. Ghaziabad, M/s. Titanium Equipment and Anode Manufacturing Co. Ltd., Chennai, M/s. Expo Gas Containers Ltd., Mumbai and certified by an inspection authority approved by Chief Controller.
(a) Cylinders conforming to BS: 5045:Part 1: 1982 for Halon-1301 and FM 200 gas service as per approved drawings manufactured by M/s. Worthington Heiser Cylinders Gmbh, Austria-inspected and certified by Bureau Veritas.
(b) Cylinders conforming to BS:5045: Part I: 1982 for permanent and liquefiable gases as per approved drawings, manufactured by M/s. Worthington Heiser Cylinders Gmbh, Austria-inspected and certified by Bureau Veritas.
(c) Seamless steel cylinders for CNG gas on-board service to NZS:5454-1989 specification, having working pressure 200 Bar and test pressure 335 Bar manufactured by M/s. Worthington Cylinders Gmbh, Austria certified by M/s. Bureau Veritas as per approved drawings.
(a) Seamless steel cylinders for permanent gases (Air/Oxygen) conforming to BS: 5045:Part I:1982 manufactured by M/s. Faber Industries S.P.A., Italy-inspected and certified by Lloyd's as per approved drawings.
(b) Seamless steel cylinders for compressed and liquefiable gases conforming to DOT:3AA specification having water capacity 80.0 ltrs. & 120 ltrs. working pressure 79 Bar and test pressure 132 Bar, manufactured by M/s. Faber Industries S.P.A., Italy-inspected and certified by M/s. Lloyd's as per approved drawings.
(c) Seamless steel cylinders for CNG gas on-board service to NZS:5454-1989 having working pressure 200 Bar and test pressure 335 Bar manufactured by M/s. Faber Industries, S.P.A., Italy, certified by M/s. Lloyd's as per approved drawings.
(a) Aluminium alloy cylinders conforming to BS:5045:Pt. 3 or EN equivalent specification manufactured by M/s. Luxfur Gas Cylinders, UK-inspected and certified by Lloyd's or British Inspecting Engineers Ltd. as per approved drawings.
(b) Seamless steel cylinders for permanent and liquefiable gases conforming to BS:5045:Part I manufactured by M/s. UEF Chesterfield Cylinders, UK-inspected and certified by Lloyd's or Bureau Veritas or British Inspecting Engineering Ltd., or any other appropriate authority as per approved drawings.
(c) Seamless steel cylinders for permanent and liquefiable gases conforming to DOT:3T specification manufactured by M/s. UEF Chesterfield Cylinders, UK-inspected and certified by British Inspecting Engineers Ltd., as per approved drawings.
(d) Seamless steel cylinders for FM-200 gas service conforming to DOT:4BA:500 specification manufactured by M/s. Fike Protection & Systems, UK, having water capacity 650 pounds, filling ratio 1.04 super pressurised with Nitrogen at 19.72 Bar as per approved drawings.
(e) Seamless steel cylinders for CNG gas on-board service to BS:5045-1982: Part I having working pressure 200 Bar and test pressure 344 Bar manufactured by M/s. UEF Chesterfield Cylinders, Derbyshire, UK certified by M/s. British Inspection Engineers Ltd. as per approved drawings.
(a) Steel cylinders-inspected and certified by appropriate authority, conforming to specifications DOT:3A/3AA for permanent and liquefiable gases manufactured by (1) M/s. Norris Cylinder Co., (2) M/s. Taylor Wharton Co., (3) M/s. Worthington Cylinder Co., (4) M/s. Norristi Industries, (5) M/s. Harris Burg Steel Co., and (6) M/s. Pressed Steel Tank Co., as per approved drawings.
(b) Aluminium alloy cylinders conforming to DOT:3AL Specification manufactured by M/s. Luxfer Gas Cylinders, USA-inspected and certified by Authorised Testing Inc. or Arrowhead Inc., as per approved drawings.
B. VALVES
Note.
SCHEDULE II
[See rule 3(2)]
(A) The test and inspection certificates to be obtained from the Inspecting Authority in respect of cylinders manufactured in accordance with the approved design and specification or Code shall include the following particulars, namely:-
(B) The test and inspection certificates to be obtained from the Inspecting Authority in respect of valves manufactured in accordance with the approved design and specification or Code shall include the following particulars, namely:-
(a) Valve inlet connection..........................................
(b) Valve outlet connection.........................................
(c) Valve outlet number.............................................
(d) Hydraulic Pressure Test.........................................
(e) Pneumatic Proof Test............................................
(f) Tensile strength................................................
(g) Elongation per cent.............................................
(h) Impact strength.................................................
(i) Quantity offered for inspection.................................
(j) Quantity passed.................................................
(k) Quantity rejected and reasons for rejection.....................
SCHEDULE III
[See rule 3(3)]
PARTICULARS TO BE SUBMITTED BY PERSON DESIRING TO FABRICATE CYLINDER, VALVES AND OTHER FITTINGS
(i) Date from which such container/valves were manufactured.
(ii) For whom the container/valves were fabricated and their approximate numbers.
(iii) Details of the containers/valves manufactured.
3. Specification/ Codes proposed to be adopted for the manufacture of cylinders/containers/valves.
(ii) Details of templates/gauges provided to check/test.
(iii) Steps taken to check the accuracy of testing and checking equipment and frequency of such checking.
(i) Proforma of records for various tests carried out by the inspecting and certifying organisation, and (ii) Proforma of test and inspection certificate issued by the independent inspecting authority. 13. Whether the manufacturing unit has been certified under ISO or equivalent certification (if so, documentary evidence thereof to be attached).
(ii) Proforma of test and inspection certificate issued by the independent inspecting authority.
............................
Signature
Name and designation
SCHEDULE IV
(See rule 35)
A. FACILITIES REQUIRED FOR CYLINDER TESTING STATIONS
Note.
(i) have at least two years' experience in the examination of gas cylinder;
(ii) be at least 21 years of age;
(iii) be conversant with these rules, codes, specifications and/or regulations applying to the cylinders for which the test station is approved.
EQUIPMENT
(i) One set of these rules, codes, specifications and/or regulations applying to the cylinders, which the test station is authorised to test. All these rules, codes, specifications and/or regulations shall be maintained with all current amendments.
(ii) Hydrostatic test apparatus comprising pressurizing equipment, pressure gauge and volumetric measuring equipment in accordance with IS:5844-Hydrostatic stretch testing of compressed gas cylinders. The apparatus shall be equipped with at least two 15 cm diameter (minimum) working pressure gauges.
(iii) Non-destructive testing facilities like ultrasonic flaw detection, acoustic emission techniques, etc., for detection of stress corrosion cracks developed during the service.
(iv) Dead-weight pressure gauge tester of appropriate pressure range or a master pressure gauge of 15 cm minimum diameter covering the appropriate pressure range.
(v) Boroscope, extra-low voltage lamps to permit adequate internal viewing of cylinders and other lamps necessary for close examination of external surfaces.
(vi) Straightedges, templates, miscellaneous tool and gauges for measurement.
(vii) Weighing equipment, where applicable.
(viii) One set of standard test weights for the weighing machine, stamped by the relevant statutory authority.
(ix) Adequate cylinder handling equipment.
(x) Adequate cylinder draining equipment.
(xi) Facilities for internal drying of cylinders.
(xii) Marking and stamping equipment.
(i) Hydrostatic test apparatus in accordance with IS:5844. Volumetric equipment shall be capable of measuring a permanent change in volume of the cylinder under test of the order of 1/20,000 of its total capacity.
(ii) Weighing equipment error not greater than ±0.1 per cent.
(iii) Working pressure gauge error not greater than 1 per cent of the pressure.
(iv) Master pressure gauge error not greater than 0.25 per cent of the full-scale deflection.
(i) Working pressure gauge-1 month.
(ii) Master pressure gauge-6 months.
(iii) Weighing equipment-checked by test weight daily when in service.
(iv) Test weights-2 years.
(i) It shall have good lighting to permit ready external examination of gas cylinders, preferably including natural lighting.
(ii) It shall have adequate ventilation to remove residual gases from cylinders.
(iii) It shall provide sufficient space to permit safe working.
(iv) It shall be maintained in a clean dry condition.
B. TESTING OF CYLINDERS
(i) The cylinder contents shall be released in a safe manner keeping in mind dangers associated with the nature of the gas in the cylinder. Cylinders, which contain or may have been contaminated by poisonous or obnoxious substances, shall be emptied only by test stations properly equipped and experienced to handle the particular gas/substance. Such cylinders shall be clearly labelled that they have been contaminated.
(ii) The valve shall be opened and if no gas escapes and the port is not visibly blocked, a charge of low-pressure nitrogen or other inert gas shall be blown into the valve outlet. Discharge of gas after removal of the nitrogen supply indicates that the cylinder is empty. When no gas discharges the valves shall be treated as "obstructed". Where a cylinder has contained poisonous or obnoxious substances, and the valve is suspected of being obstructed, the gas shall be released within an approved appliance and the valves shall be removed in such a manner that the gas escapes without danger to the operator.
(iii) Should the valve be obstructed the contents of the cylinder shall be released in safe manner as stated in (i) above. Work on cylinders containing combustible gases shall be carried out in the open air.
Note.
(a) Approved blasting, rotary wire brushing;
(b) Burn out treatment carried out in a furnace at a temperature not exceeding 300°C for a period of not exceeding one hour after which all free rusts and any other foreign matter shall be removed by steam cleaning or washing with approved solvents.
(i) The cylinders shall be subjected to hydrostatic stretch test in accordance with IS: 5844. The test pressure applied to the cylinder shall be retained for a period of not less than 30 seconds.
(ii) The permanent stretch suffered by the cylinder due to application of test pressure shall not exceed the following limits, namely:-
(a) In the case of cylinder below 20 litres water capacity for non-corrosive gases 10% of the total stretch suffered during the test (b) In other cases 10% of the total stretch suffered during the test or 1/5000th of the original volume of the cylinder, whichever is less
(iii) Any reduction in pressure noticed during the retention of 30 seconds or any leakage, visible bulge or deformation should be treated as case of failure in the test.
(i) The cylinder shall be subjected to hydrostatic test in accordance with IS: 5844 by non-jacket method except that the volumetric changes during the test need not be measured.
(ii) The test pressure shall be retained for a period of not less than 30 seconds. Any reduction in pressure noticed during this retention period or any leakage, visible bulge or deformation shall be treated as case of failure in the test.
(a) Name of the manufacturer and the owner of the cylinder.
(b) Rotation Number.
(c) The specification to which the cylinder conforms.
(d) Date of original hydrostatic/hydrostatic stretch test.
(e) Test reports and certificates furnished by the manufacturer, if available.
(f) Test pressure.
(g) Maximum working pressure.
(h) Water capacity.
(i) Tare weight.
(j) Variation, if any, in the tare weight marked on the cylinder and actual tare weight.
(k) Condition of cylinder shell.
(l) Name of gas.
(m) Type of valve fitted, and
(n) Remarks, if any.
Note.
SCHEDULE V
(See rules 2(xx), 3, 28, 35, 47, 50, 53, 54, 61, 62 and 65)
ALL FEES SHALL BE PAID IN THE MANNER PRESCRIBED IN SUB-RULE (2) OF RULE 65
A. LICENSE FEES
Sl . No. Form of license Purpose for which granted Authority empowered to grant license Fees Rupees 1. D To import cylinder filled or intended to be filled with compressed gas Chief Controller For the first 100 nos. cylinders or part thereof. 500.00 Exceeding 100 nos. but not exceeding 500 nos. cylinders. 1,000.00 Exceeding 500 nos. of cylinders Rs. 2000 for every additional 500 nos. of cylinders or part thereof. 2. E To fill compressed gas in cylinders Chief Controller or Controller For each type of gas filled in the plant, namely (a) toxic, (b) non-toxic and non-flammable, (c) non-toxic and flammable, (d) dissolved acetylene gas, (e) non-toxic and flammable liquefiable gas other than LPG or (f) liquefied petroleum gas, as the case may be. 2,500.00 3. F (a) To store compressed gas in cylinders in storage shed attached to the filling premises Chief Controller or Controller (i) For toxic and flammable gases (permanent as well as liquefied). (b) To store compressed gas in cylinders in storage shed other than attached to the filling premises Controller Not exceeding 100 nos. cylinders. 500.00 Exceeding 100 nos. but not exceeding 500 nos. cylinders. 1,000.00 Exceeding 500 nos. of cylinders, Rs. 1,000 for every additional 500 nos. of cylinders or part thereof (ii) For non-toxic and non-flammable gases (permanent as well as liquefied): Not exceeding 500 nos. of cylinders.
Exceeding 500 nos. of cylinders, Rs. 1,000 for every additional 500 nos. of cylinders or part thereof (iii) For liquefied petroleum gases: 500.00 Exceeding 100 Kg. but not exceeding 500 Kg. 500.00 Exceeding 500 Kg. but not exceeding 2,000 Kg. 1,000.00 Exceeding 2,000 Kg. but not exceeding 5,000 Kg. 2,000.00 Exceeding 5,000 Kg. but not exceeding 10,000 Kg. 3,000.00 Exceeding 10,000 Kg. for Rs. 1,000 every additional 5,000 Kg. or part thereof. (iv) For acetylene gas contained in cylinders in dissolved state: Not exceeding 200 cylinders Rs. 500 for every additional 200 nos. of cylinders or part thereof 500.00 4. G To dispense CNG as automotive fuel from a mother station, daughter station or a CNG online station . Chief Controller 5,000.00
Sl . No.
Sl
. No.
Form of license
Form of license
Purpose for which granted
Purpose for which granted
Authority empowered to grant license
Authority empowered to grant license
Fees
Fees
Rupees
Rupees
1.
D
Chief Controller
500.00
1,000.00
2.
E
Chief Controller or Controller
2,500.00
3.
F
Chief Controller or Controller
Controller
500.00
1,000.00
500.00
500.00
1,000.00
2,000.00
3,000.00
500.00
4.
G
Chief Controller
5,000.00
Sl . No Purpose Fees Rupees 1. Issue of filling permission under clause B of sub-rule (2)(vii) of rule 3 Scrutiny fee for the first 100 nos.
of cylinders or part thereof Exceeding 100 nos. of cylinders Rs. 1,000 for every additional 500 cylinders or part thereof. 500.00 2. Approval of design for manufacture of cylinders or valves or regulators under sub-rule (4)(a) of rule 3 (a) Scrutiny fee (b) For subsequent approval of any change in the design 2,000.00 500.00 3. Conversion of cylinders under sub-rule
(2) of rule 28 Scrutiny fee for the first 10 nos. of cylinders or part thereof Exceeding 10 nos. of cylinders 200.00 500.00 4. Approval of cylinder testing station under rule 35 Scrutiny fee 2,000.00 5. Prior approval of specifications and plans under rule 47 or 53 Scrutiny fee 400.00 6. Amendment of license under rule 54 Amendment fee In the case of amendment involving licensed capacity, the difference in licence fee shall be added to the amendment fee mentioned above 400.00 7. Issue of duplicate copy of license under rule 61 Scrutiny fee 200.00 8. Issue of authenticated copy of license under rule 62 Scrutiny fee 400.00
Sl . No
Sl
. No
Purpose
Purpose
Fees
Fees
Rupees
Rupees
1.
500.00
2.
2,000.00
500.00
3.
200.00
500.00
4.
2,000.00
5.
400.00
6.
400.00
7.
200.00
8.
400.00
FORM A
FORM A
[See rule 30(2)]
Declaration to be made by the Master of a ship carrying Cylinder filled with compressed gas before entering a port or by the ship's agent
Name of ship...................................
Description of filled cylinders True chemical name and nature of the gas, i.e., whether flammable, corrosive or toxic Total quantity carried in the ship Quantity to be landed at port Remarks No.
of cylinders Kg .
or M 3 of gas No.
of cylinders Kg.
or M 3 of gas
Description of filled cylinders
Description of filled cylinders
True chemical name and nature of the gas, i.e., whether flammable, corrosive or toxic
True chemical name and nature of the gas, i.e., whether flammable, corrosive or toxic
Total quantity carried in the ship
Total quantity carried in the ship
Quantity to be landed at port
Quantity to be landed at port
Remarks
Remarks
No.
of cylinders
Kg .
or M 3 of gas
No.
of cylinders
Kg.
or M 3 of gas
...................................
Signature of Master/Agent of ship
(with official stamp)
FORM B
FORM B
(See rules 49 and 54)
Application for the grant/amendment of a license to import cylinders
(i) Applicant's calling (ii) Applicant's full postal address (iii) Telephone No. (s) and E-mail 2. Particulars of storage license held by: (i) Number and date of storage license issued by the Chief Controller /Controller (ii) Renewed/valid upto (iii) Capacity of storage as per above license 3. Description of the cylinders to be imported:
(ii) Applicant's full postal address (iii) Telephone No. (s) and E-mail 2. Particulars of storage license held by:
(iii) Telephone No. (s) and E-mail
(i) Number and date of storage license issued by the Chief Controller /Controller
(ii) Renewed/valid upto
(iii) Capacity of storage as per above license
(i) Number of cylinders (ii) Specification of cylinders (iii) Manufactured by (iv) Inspected and tested by (v) Specification of the valves fitted to the cylinders (vi) *Filled with..................(True chemical name of the gas) (vii) *Filling pressure at 15°C if filled with permanent gas or dissolved acetylene (viii) *Filling ratio, if filled with a liquefiable gas (ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................ 5. Name of the port 6. Remarks Date of application........................ .............................. Signature of applicant Postal address of the applicant Note. - 1. Particulars marked with * are not required to be furnished if empty cylinders are desired to be imported. 2. Manufacturers test and inspection certificates complete in all respects pertaining to each lot of cylinders and valve shall accompany this application. 3. In case cylinders are desired to be imported duly filled with gas, filler certificates in respect of items 3(vi), (vii) and (ix) shall be furnished. FORM C (See rules 49, 54 and 55) Application for the grant/amendment/renewal of a license to fill and/or store compressed gas in cylinders Documents listed overleaf must be enclosed with this application, if it is for the grant of a license in Forms 'E', 'F' and 'G'. The replies to be given in this column.
(ii) Specification of cylinders (iii) Manufactured by (iv) Inspected and tested by (v) Specification of the valves fitted to the cylinders (vi) *Filled with..................(True chemical name of the gas) (vii) *Filling pressure at 15°C if filled with permanent gas or dissolved acetylene (viii) *Filling ratio, if filled with a liquefiable gas (ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................ 5. Name of the port 6. Remarks Date of application........................ .............................. Signature of applicant Postal address of the applicant Note. - 1. Particulars marked with * are not required to be furnished if empty cylinders are desired to be imported. 2. Manufacturers test and inspection certificates complete in all respects pertaining to each lot of cylinders and valve shall accompany this application. 3. In case cylinders are desired to be imported duly filled with gas, filler certificates in respect of items 3(vi), (vii) and (ix) shall be furnished. FORM C (See rules 49, 54 and 55) Application for the grant/amendment/renewal of a license to fill and/or store compressed gas in cylinders Documents listed overleaf must be enclosed with this application, if it is for the grant of a license in Forms 'E', 'F' and 'G'. The replies to be given in this column.
(iii) Manufactured by (iv) Inspected and tested by (v) Specification of the valves fitted to the cylinders (vi) *Filled with..................(True chemical name of the gas) (vii) *Filling pressure at 15°C if filled with permanent gas or dissolved acetylene (viii) *Filling ratio, if filled with a liquefiable gas (ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................ 5. Name of the port 6. Remarks Date of application........................ .............................. Signature of applicant Postal address of the applicant Note. - 1. Particulars marked with * are not required to be furnished if empty cylinders are desired to be imported. 2. Manufacturers test and inspection certificates complete in all respects pertaining to each lot of cylinders and valve shall accompany this application. 3. In case cylinders are desired to be imported duly filled with gas, filler certificates in respect of items 3(vi), (vii) and (ix) shall be furnished.
(iv) Inspected and tested by (v) Specification of the valves fitted to the cylinders (vi) *Filled with..................(True chemical name of the gas) (vii) *Filling pressure at 15°C if filled with permanent gas or dissolved acetylene (viii) *Filling ratio, if filled with a liquefiable gas (ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................ 5. Name of the port 6. Remarks Date of application........................ .............................. Signature of applicant Postal address of the applicant Note. - 1. Particulars marked with * are not required to be furnished if empty cylinders are desired to be imported. 2. Manufacturers test and inspection certificates complete in all respects pertaining to each lot of cylinders and valve shall accompany this application.
(v) Specification of the valves fitted to the cylinders (vi) *Filled with..................(True chemical name of the gas) (vii) *Filling pressure at 15°C if filled with permanent gas or dissolved acetylene (viii) *Filling ratio, if filled with a liquefiable gas (ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................ 5. Name of the port 6. Remarks Date of application........................ .............................. Signature of applicant Postal address of the applicant Note. - 1. Particulars marked with * are not required to be furnished if empty cylinders are desired to be imported.
(vi) *Filled with..................(True chemical name of the gas) (vii) *Filling pressure at 15°C if filled with permanent gas or dissolved acetylene (viii) *Filling ratio, if filled with a liquefiable gas (ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................ 5. Name of the port 6. Remarks Date of application........................
(vii) *Filling pressure at 15°C if filled with permanent gas or dissolved acetylene (viii) *Filling ratio, if filled with a liquefiable gas (ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................ 5. Name of the port 6. Remarks
(viii) *Filling ratio, if filled with a liquefiable gas (ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................ 5. Name of the port
(ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................
(x) Rotation numbers of cylinders
..............................
Signature of applicant
Postal address of the applicant
Note.
FORM C
FORM C
(See rules 49, 54 and 55) Application for the grant/amendment/renewal of a license to fill and/or store compressed gas in cylinders Documents listed overleaf must be enclosed with this application, if it is for the grant of a license in Forms 'E', 'F' and 'G'.
Application for the grant/amendment/renewal of a license to fill and/or store compressed gas in cylinders
Section 73 • The Gas Cylinders Rules, 2004
73. Repeal and savings
the-gas-cylinders-rules-2004-sec-73.json
•
Section 73
{
"act_title": "The Gas Cylinders Rules, 2004",
"act_slug": "the-gas-cylinders-rules-2004",
"section_label": "Section",
"section": {
"number": "73",
"title": "73. Repeal and savings",
"chapter": null,
"content": "(a) all licenses granted or renewed under the said rules and all fees imposed or levied shall be deemed to have been granted, renewed or imposed or levied, as the case may be, under the corresponding provisions of these rules, and\n(b) all approvals given and all powers conferred by or under any notification or rule shall, so far as they are consistent with the Act and these rules, be deemed to have been given or conferred by or under these rules.\nSCHEDULE I\n[See rule 3(1)]\nTYPES AND STANDARDS OF CYLINDERS AND VALVES A. CYLINDERS AND CONTAINERS\n(a) Cylinders. - Welded low carbon steel cylinders for low pressure liquefiable gases manufactured to IS: 3196, Part 1, Part 2 & Part 4, IS: 7142, AUTO LPG containers to IS: 14899, DA cylinders to IS: 7312 certified by Bureau of Indian Standards.\n(b) Containers. - Tonne containers manufactured to BS: 1500, ASME Section VIII, Division 1, IS: 2825 by M/s. Asco Industrial Corporation, New Delhi, M/s. Indian Sugar and General Engg. Corporation, Yamunagar, M/s. Anup Engineering Ltd., Ahmedabad, M/s. Kosan Metal Products Pvt. Ltd., Mumbai, M/s. Meenakshi Associated Pvt. Ltd., Surajpur, Distt. Ghaziabad, M/s. Titanium Equipment and Anode Manufacturing Co. Ltd., Chennai, M/s. Expo Gas Containers Ltd., Mumbai and certified by an inspection authority approved by Chief Controller.\n(a) Cylinders conforming to BS: 5045:Part 1: 1982 for Halon-1301 and FM 200 gas service as per approved drawings manufactured by M/s. Worthington Heiser Cylinders Gmbh, Austria-inspected and certified by Bureau Veritas.\n(b) Cylinders conforming to BS:5045: Part I: 1982 for permanent and liquefiable gases as per approved drawings, manufactured by M/s. Worthington Heiser Cylinders Gmbh, Austria-inspected and certified by Bureau Veritas.\n(c) Seamless steel cylinders for CNG gas on-board service to NZS:5454-1989 specification, having working pressure 200 Bar and test pressure 335 Bar manufactured by M/s. Worthington Cylinders Gmbh, Austria certified by M/s. Bureau Veritas as per approved drawings.\n(a) Seamless steel cylinders for permanent gases (Air/Oxygen) conforming to BS: 5045:Part I:1982 manufactured by M/s. Faber Industries S.P.A., Italy-inspected and certified by Lloyd's as per approved drawings.\n(b) Seamless steel cylinders for compressed and liquefiable gases conforming to DOT:3AA specification having water capacity 80.0 ltrs. & 120 ltrs. working pressure 79 Bar and test pressure 132 Bar, manufactured by M/s. Faber Industries S.P.A., Italy-inspected and certified by M/s. Lloyd's as per approved drawings.\n(c) Seamless steel cylinders for CNG gas on-board service to NZS:5454-1989 having working pressure 200 Bar and test pressure 335 Bar manufactured by M/s. Faber Industries, S.P.A., Italy, certified by M/s. Lloyd's as per approved drawings.\n(a) Aluminium alloy cylinders conforming to BS:5045:Pt. 3 or EN equivalent specification manufactured by M/s. Luxfur Gas Cylinders, UK-inspected and certified by Lloyd's or British Inspecting Engineers Ltd. as per approved drawings.\n(b) Seamless steel cylinders for permanent and liquefiable gases conforming to BS:5045:Part I manufactured by M/s. UEF Chesterfield Cylinders, UK-inspected and certified by Lloyd's or Bureau Veritas or British Inspecting Engineering Ltd., or any other appropriate authority as per approved drawings.\n(c) Seamless steel cylinders for permanent and liquefiable gases conforming to DOT:3T specification manufactured by M/s. UEF Chesterfield Cylinders, UK-inspected and certified by British Inspecting Engineers Ltd., as per approved drawings.\n(d) Seamless steel cylinders for FM-200 gas service conforming to DOT:4BA:500 specification manufactured by M/s. Fike Protection & Systems, UK, having water capacity 650 pounds, filling ratio 1.04 super pressurised with Nitrogen at 19.72 Bar as per approved drawings.\n(e) Seamless steel cylinders for CNG gas on-board service to BS:5045-1982: Part I having working pressure 200 Bar and test pressure 344 Bar manufactured by M/s. UEF Chesterfield Cylinders, Derbyshire, UK certified by M/s. British Inspection Engineers Ltd. as per approved drawings.\n(a) Steel cylinders-inspected and certified by appropriate authority, conforming to specifications DOT:3A/3AA for permanent and liquefiable gases manufactured by (1) M/s. Norris Cylinder Co., (2) M/s. Taylor Wharton Co., (3) M/s. Worthington Cylinder Co., (4) M/s. Norristi Industries, (5) M/s. Harris Burg Steel Co., and (6) M/s. Pressed Steel Tank Co., as per approved drawings.\n(b) Aluminium alloy cylinders conforming to DOT:3AL Specification manufactured by M/s. Luxfer Gas Cylinders, USA-inspected and certified by Authorised Testing Inc. or Arrowhead Inc., as per approved drawings.\nB. VALVES\nNote.\nSCHEDULE II\n[See rule 3(2)]\n(A) The test and inspection certificates to be obtained from the Inspecting Authority in respect of cylinders manufactured in accordance with the approved design and specification or Code shall include the following particulars, namely:-\n(B) The test and inspection certificates to be obtained from the Inspecting Authority in respect of valves manufactured in accordance with the approved design and specification or Code shall include the following particulars, namely:-\n(a) Valve inlet connection..........................................\n(b) Valve outlet connection.........................................\n(c) Valve outlet number.............................................\n(d) Hydraulic Pressure Test.........................................\n(e) Pneumatic Proof Test............................................\n(f) Tensile strength................................................\n(g) Elongation per cent.............................................\n(h) Impact strength.................................................\n(i) Quantity offered for inspection.................................\n(j) Quantity passed.................................................\n(k) Quantity rejected and reasons for rejection.....................\nSCHEDULE III\n[See rule 3(3)]\nPARTICULARS TO BE SUBMITTED BY PERSON DESIRING TO FABRICATE CYLINDER, VALVES AND OTHER FITTINGS\n(i) Date from which such container/valves were manufactured.\n(ii) For whom the container/valves were fabricated and their approximate numbers.\n(iii) Details of the containers/valves manufactured.\n3. Specification/ Codes proposed to be adopted for the manufacture of cylinders/containers/valves.\n(ii) Details of templates/gauges provided to check/test.\n(iii) Steps taken to check the accuracy of testing and checking equipment and frequency of such checking.\n(i) Proforma of records for various tests carried out by the inspecting and certifying organisation, and (ii) Proforma of test and inspection certificate issued by the independent inspecting authority. 13. Whether the manufacturing unit has been certified under ISO or equivalent certification (if so, documentary evidence thereof to be attached).\n(ii) Proforma of test and inspection certificate issued by the independent inspecting authority.\n............................\nSignature\nName and designation\nSCHEDULE IV\n(See rule 35)\nA. FACILITIES REQUIRED FOR CYLINDER TESTING STATIONS\nNote.\n(i) have at least two years' experience in the examination of gas cylinder;\n(ii) be at least 21 years of age;\n(iii) be conversant with these rules, codes, specifications and/or regulations applying to the cylinders for which the test station is approved.\nEQUIPMENT\n(i) One set of these rules, codes, specifications and/or regulations applying to the cylinders, which the test station is authorised to test. All these rules, codes, specifications and/or regulations shall be maintained with all current amendments.\n(ii) Hydrostatic test apparatus comprising pressurizing equipment, pressure gauge and volumetric measuring equipment in accordance with IS:5844-Hydrostatic stretch testing of compressed gas cylinders. The apparatus shall be equipped with at least two 15 cm diameter (minimum) working pressure gauges.\n(iii) Non-destructive testing facilities like ultrasonic flaw detection, acoustic emission techniques, etc., for detection of stress corrosion cracks developed during the service.\n(iv) Dead-weight pressure gauge tester of appropriate pressure range or a master pressure gauge of 15 cm minimum diameter covering the appropriate pressure range.\n(v) Boroscope, extra-low voltage lamps to permit adequate internal viewing of cylinders and other lamps necessary for close examination of external surfaces.\n(vi) Straightedges, templates, miscellaneous tool and gauges for measurement.\n(vii) Weighing equipment, where applicable.\n(viii) One set of standard test weights for the weighing machine, stamped by the relevant statutory authority.\n(ix) Adequate cylinder handling equipment.\n(x) Adequate cylinder draining equipment.\n(xi) Facilities for internal drying of cylinders.\n(xii) Marking and stamping equipment.\n(i) Hydrostatic test apparatus in accordance with IS:5844. Volumetric equipment shall be capable of measuring a permanent change in volume of the cylinder under test of the order of 1/20,000 of its total capacity.\n(ii) Weighing equipment error not greater than ±0.1 per cent.\n(iii) Working pressure gauge error not greater than 1 per cent of the pressure.\n(iv) Master pressure gauge error not greater than 0.25 per cent of the full-scale deflection.\n(i) Working pressure gauge-1 month.\n(ii) Master pressure gauge-6 months.\n(iii) Weighing equipment-checked by test weight daily when in service.\n(iv) Test weights-2 years.\n(i) It shall have good lighting to permit ready external examination of gas cylinders, preferably including natural lighting.\n(ii) It shall have adequate ventilation to remove residual gases from cylinders.\n(iii) It shall provide sufficient space to permit safe working.\n(iv) It shall be maintained in a clean dry condition.\nB. TESTING OF CYLINDERS\n(i) The cylinder contents shall be released in a safe manner keeping in mind dangers associated with the nature of the gas in the cylinder. Cylinders, which contain or may have been contaminated by poisonous or obnoxious substances, shall be emptied only by test stations properly equipped and experienced to handle the particular gas/substance. Such cylinders shall be clearly labelled that they have been contaminated.\n(ii) The valve shall be opened and if no gas escapes and the port is not visibly blocked, a charge of low-pressure nitrogen or other inert gas shall be blown into the valve outlet. Discharge of gas after removal of the nitrogen supply indicates that the cylinder is empty. When no gas discharges the valves shall be treated as \"obstructed\". Where a cylinder has contained poisonous or obnoxious substances, and the valve is suspected of being obstructed, the gas shall be released within an approved appliance and the valves shall be removed in such a manner that the gas escapes without danger to the operator.\n(iii) Should the valve be obstructed the contents of the cylinder shall be released in safe manner as stated in (i) above. Work on cylinders containing combustible gases shall be carried out in the open air.\nNote.\n(a) Approved blasting, rotary wire brushing;\n(b) Burn out treatment carried out in a furnace at a temperature not exceeding 300°C for a period of not exceeding one hour after which all free rusts and any other foreign matter shall be removed by steam cleaning or washing with approved solvents.\n(i) The cylinders shall be subjected to hydrostatic stretch test in accordance with IS: 5844. The test pressure applied to the cylinder shall be retained for a period of not less than 30 seconds.\n(ii) The permanent stretch suffered by the cylinder due to application of test pressure shall not exceed the following limits, namely:-\n(a) In the case of cylinder below 20 litres water capacity for non-corrosive gases 10% of the total stretch suffered during the test (b) In other cases 10% of the total stretch suffered during the test or 1/5000th of the original volume of the cylinder, whichever is less\n(iii) Any reduction in pressure noticed during the retention of 30 seconds or any leakage, visible bulge or deformation should be treated as case of failure in the test.\n(i) The cylinder shall be subjected to hydrostatic test in accordance with IS: 5844 by non-jacket method except that the volumetric changes during the test need not be measured.\n(ii) The test pressure shall be retained for a period of not less than 30 seconds. Any reduction in pressure noticed during this retention period or any leakage, visible bulge or deformation shall be treated as case of failure in the test.\n(a) Name of the manufacturer and the owner of the cylinder.\n(b) Rotation Number.\n(c) The specification to which the cylinder conforms.\n(d) Date of original hydrostatic/hydrostatic stretch test.\n(e) Test reports and certificates furnished by the manufacturer, if available.\n(f) Test pressure.\n(g) Maximum working pressure.\n(h) Water capacity.\n(i) Tare weight.\n(j) Variation, if any, in the tare weight marked on the cylinder and actual tare weight.\n(k) Condition of cylinder shell.\n(l) Name of gas.\n(m) Type of valve fitted, and\n(n) Remarks, if any.\nNote.\nSCHEDULE V\n(See rules 2(xx), 3, 28, 35, 47, 50, 53, 54, 61, 62 and 65)\nALL FEES SHALL BE PAID IN THE MANNER PRESCRIBED IN SUB-RULE (2) OF RULE 65\nA. LICENSE FEES\nSl . No. Form of license Purpose for which granted Authority empowered to grant license Fees Rupees 1. D To import cylinder filled or intended to be filled with compressed gas Chief Controller For the first 100 nos. cylinders or part thereof. 500.00 Exceeding 100 nos. but not exceeding 500 nos. cylinders. 1,000.00 Exceeding 500 nos. of cylinders Rs. 2000 for every additional 500 nos. of cylinders or part thereof. 2. E To fill compressed gas in cylinders Chief Controller or Controller For each type of gas filled in the plant, namely (a) toxic, (b) non-toxic and non-flammable, (c) non-toxic and flammable, (d) dissolved acetylene gas, (e) non-toxic and flammable liquefiable gas other than LPG or (f) liquefied petroleum gas, as the case may be. 2,500.00 3. F (a) To store compressed gas in cylinders in storage shed attached to the filling premises Chief Controller or Controller (i) For toxic and flammable gases (permanent as well as liquefied). (b) To store compressed gas in cylinders in storage shed other than attached to the filling premises Controller Not exceeding 100 nos. cylinders. 500.00 Exceeding 100 nos. but not exceeding 500 nos. cylinders. 1,000.00 Exceeding 500 nos. of cylinders, Rs. 1,000 for every additional 500 nos. of cylinders or part thereof (ii) For non-toxic and non-flammable gases (permanent as well as liquefied): Not exceeding 500 nos. of cylinders.\nExceeding 500 nos. of cylinders, Rs. 1,000 for every additional 500 nos. of cylinders or part thereof (iii) For liquefied petroleum gases: 500.00 Exceeding 100 Kg. but not exceeding 500 Kg. 500.00 Exceeding 500 Kg. but not exceeding 2,000 Kg. 1,000.00 Exceeding 2,000 Kg. but not exceeding 5,000 Kg. 2,000.00 Exceeding 5,000 Kg. but not exceeding 10,000 Kg. 3,000.00 Exceeding 10,000 Kg. for Rs. 1,000 every additional 5,000 Kg. or part thereof. (iv) For acetylene gas contained in cylinders in dissolved state: Not exceeding 200 cylinders Rs. 500 for every additional 200 nos. of cylinders or part thereof 500.00 4. G To dispense CNG as automotive fuel from a mother station, daughter station or a CNG online station . Chief Controller 5,000.00\nSl . No.\nSl\n. No.\nForm of license\nForm of license\nPurpose for which granted\nPurpose for which granted\nAuthority empowered to grant license\nAuthority empowered to grant license\nFees\nFees\nRupees\nRupees\n1.\nD\nChief Controller\n500.00\n1,000.00\n2.\nE\nChief Controller or Controller\n2,500.00\n3.\nF\nChief Controller or Controller\nController\n500.00\n1,000.00\n500.00\n500.00\n1,000.00\n2,000.00\n3,000.00\n500.00\n4.\nG\nChief Controller\n5,000.00\nSl . No Purpose Fees Rupees 1. Issue of filling permission under clause B of sub-rule (2)(vii) of rule 3 Scrutiny fee for the first 100 nos.\nof cylinders or part thereof Exceeding 100 nos. of cylinders Rs. 1,000 for every additional 500 cylinders or part thereof. 500.00 2. Approval of design for manufacture of cylinders or valves or regulators under sub-rule (4)(a) of rule 3 (a) Scrutiny fee (b) For subsequent approval of any change in the design 2,000.00 500.00 3. Conversion of cylinders under sub-rule\n(2) of rule 28 Scrutiny fee for the first 10 nos. of cylinders or part thereof Exceeding 10 nos. of cylinders 200.00 500.00 4. Approval of cylinder testing station under rule 35 Scrutiny fee 2,000.00 5. Prior approval of specifications and plans under rule 47 or 53 Scrutiny fee 400.00 6. Amendment of license under rule 54 Amendment fee In the case of amendment involving licensed capacity, the difference in licence fee shall be added to the amendment fee mentioned above 400.00 7. Issue of duplicate copy of license under rule 61 Scrutiny fee 200.00 8. Issue of authenticated copy of license under rule 62 Scrutiny fee 400.00\nSl . No\nSl\n. No\nPurpose\nPurpose\nFees\nFees\nRupees\nRupees\n1.\n500.00\n2.\n2,000.00\n500.00\n3.\n200.00\n500.00\n4.\n2,000.00\n5.\n400.00\n6.\n400.00\n7.\n200.00\n8.\n400.00\nFORM A\nFORM A\n[See rule 30(2)]\nDeclaration to be made by the Master of a ship carrying Cylinder filled with compressed gas before entering a port or by the ship's agent\nName of ship...................................\nDescription of filled cylinders True chemical name and nature of the gas, i.e., whether flammable, corrosive or toxic Total quantity carried in the ship Quantity to be landed at port Remarks No.\nof cylinders Kg .\nor M 3 of gas No.\nof cylinders Kg.\nor M 3 of gas\nDescription of filled cylinders\nDescription of filled cylinders\nTrue chemical name and nature of the gas, i.e., whether flammable, corrosive or toxic\nTrue chemical name and nature of the gas, i.e., whether flammable, corrosive or toxic\nTotal quantity carried in the ship\nTotal quantity carried in the ship\nQuantity to be landed at port\nQuantity to be landed at port\nRemarks\nRemarks\nNo.\nof cylinders\nKg .\nor M 3 of gas\nNo.\nof cylinders\nKg.\nor M 3 of gas\n...................................\nSignature of Master/Agent of ship\n(with official stamp)\nFORM B\nFORM B\n(See rules 49 and 54)\nApplication for the grant/amendment of a license to import cylinders\n(i) Applicant's calling (ii) Applicant's full postal address (iii) Telephone No. (s) and E-mail 2. Particulars of storage license held by: (i) Number and date of storage license issued by the Chief Controller /Controller (ii) Renewed/valid upto (iii) Capacity of storage as per above license 3. Description of the cylinders to be imported:\n(ii) Applicant's full postal address (iii) Telephone No. (s) and E-mail 2. Particulars of storage license held by:\n(iii) Telephone No. (s) and E-mail\n(i) Number and date of storage license issued by the Chief Controller /Controller\n(ii) Renewed/valid upto\n(iii) Capacity of storage as per above license\n(i) Number of cylinders (ii) Specification of cylinders (iii) Manufactured by (iv) Inspected and tested by (v) Specification of the valves fitted to the cylinders (vi) *Filled with..................(True chemical name of the gas) (vii) *Filling pressure at 15°C if filled with permanent gas or dissolved acetylene (viii) *Filling ratio, if filled with a liquefiable gas (ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................ 5. Name of the port 6. Remarks Date of application........................ .............................. Signature of applicant Postal address of the applicant Note. - 1. Particulars marked with * are not required to be furnished if empty cylinders are desired to be imported. 2. Manufacturers test and inspection certificates complete in all respects pertaining to each lot of cylinders and valve shall accompany this application. 3. In case cylinders are desired to be imported duly filled with gas, filler certificates in respect of items 3(vi), (vii) and (ix) shall be furnished. FORM C (See rules 49, 54 and 55) Application for the grant/amendment/renewal of a license to fill and/or store compressed gas in cylinders Documents listed overleaf must be enclosed with this application, if it is for the grant of a license in Forms 'E', 'F' and 'G'. The replies to be given in this column.\n(ii) Specification of cylinders (iii) Manufactured by (iv) Inspected and tested by (v) Specification of the valves fitted to the cylinders (vi) *Filled with..................(True chemical name of the gas) (vii) *Filling pressure at 15°C if filled with permanent gas or dissolved acetylene (viii) *Filling ratio, if filled with a liquefiable gas (ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................ 5. Name of the port 6. Remarks Date of application........................ .............................. Signature of applicant Postal address of the applicant Note. - 1. Particulars marked with * are not required to be furnished if empty cylinders are desired to be imported. 2. Manufacturers test and inspection certificates complete in all respects pertaining to each lot of cylinders and valve shall accompany this application. 3. In case cylinders are desired to be imported duly filled with gas, filler certificates in respect of items 3(vi), (vii) and (ix) shall be furnished. FORM C (See rules 49, 54 and 55) Application for the grant/amendment/renewal of a license to fill and/or store compressed gas in cylinders Documents listed overleaf must be enclosed with this application, if it is for the grant of a license in Forms 'E', 'F' and 'G'. The replies to be given in this column.\n(iii) Manufactured by (iv) Inspected and tested by (v) Specification of the valves fitted to the cylinders (vi) *Filled with..................(True chemical name of the gas) (vii) *Filling pressure at 15°C if filled with permanent gas or dissolved acetylene (viii) *Filling ratio, if filled with a liquefiable gas (ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................ 5. Name of the port 6. Remarks Date of application........................ .............................. Signature of applicant Postal address of the applicant Note. - 1. Particulars marked with * are not required to be furnished if empty cylinders are desired to be imported. 2. Manufacturers test and inspection certificates complete in all respects pertaining to each lot of cylinders and valve shall accompany this application. 3. In case cylinders are desired to be imported duly filled with gas, filler certificates in respect of items 3(vi), (vii) and (ix) shall be furnished.\n(iv) Inspected and tested by (v) Specification of the valves fitted to the cylinders (vi) *Filled with..................(True chemical name of the gas) (vii) *Filling pressure at 15°C if filled with permanent gas or dissolved acetylene (viii) *Filling ratio, if filled with a liquefiable gas (ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................ 5. Name of the port 6. Remarks Date of application........................ .............................. Signature of applicant Postal address of the applicant Note. - 1. Particulars marked with * are not required to be furnished if empty cylinders are desired to be imported. 2. Manufacturers test and inspection certificates complete in all respects pertaining to each lot of cylinders and valve shall accompany this application.\n(v) Specification of the valves fitted to the cylinders (vi) *Filled with..................(True chemical name of the gas) (vii) *Filling pressure at 15°C if filled with permanent gas or dissolved acetylene (viii) *Filling ratio, if filled with a liquefiable gas (ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................ 5. Name of the port 6. Remarks Date of application........................ .............................. Signature of applicant Postal address of the applicant Note. - 1. Particulars marked with * are not required to be furnished if empty cylinders are desired to be imported.\n(vi) *Filled with..................(True chemical name of the gas) (vii) *Filling pressure at 15°C if filled with permanent gas or dissolved acetylene (viii) *Filling ratio, if filled with a liquefiable gas (ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................ 5. Name of the port 6. Remarks Date of application........................\n(vii) *Filling pressure at 15°C if filled with permanent gas or dissolved acetylene (viii) *Filling ratio, if filled with a liquefiable gas (ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................ 5. Name of the port 6. Remarks\n(viii) *Filling ratio, if filled with a liquefiable gas (ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................ 5. Name of the port\n(ix) Date of last hydraulic stretch test (x) Rotation numbers of cylinders 4. Cylinders proposed to be stored at................\n(x) Rotation numbers of cylinders\n..............................\nSignature of applicant\nPostal address of the applicant\nNote.\nFORM C\nFORM C\n(See rules 49, 54 and 55) Application for the grant/amendment/renewal of a license to fill and/or store compressed gas in cylinders Documents listed overleaf must be enclosed with this application, if it is for the grant of a license in Forms 'E', 'F' and 'G'.\nApplication for the grant/amendment/renewal of a license to fill and/or store compressed gas in cylinders",
"footnote": "",
"is_definition": false,
"sort_order": 81
},
"prev_section": "72",
"next_section": "1"
}