½"
or 15 mm
Rs. 100.00
¾"
or 20 mm
Rs. 200.00
1"
or 25 mm
Rs. 300.00
2"
or 50 mm
Rs. 500.00
3"
or 80 mm
Rs. 1,000.00
4"
or 100 mm
Rs. 1,2000.00
6"
or 150 mm
Rs. 2,000.00
8"
or 200 mm
Rs. 4,000.00
10"
or 250 mm
Rs. 6,000.00
12"
or 3000 mm
Rs. 8,000.00
Schedule A
Form 'A'
Form 'A'
(See Bye-law 5)
Name __________________
Address ________________
Signature of applicant and owner (or his recognised agent) of the house or premises.
Description of premises
Particulars of connection
(i) Approximate length and diameter of service pipe ___________________
(ii) No. and diameter of taps_________________________
(iii) No. and details of sanitary fittings
(iv) No. and details of hot water is ______________purpose for which water is required ________and
Signature
(Signature of Plumber)
Cost of Connection
(To be supplied in by office)
Total Rs.________________
Note. - In case material is supplied by owner, labour rates will be provided.
Form B
Form B
(See Bye-law 6)
Form of completion Report
Form of completion Report
(The following to be filled in by the plumbers)
Signature of Plumbers.
Form C
Form C
(See Bye-law 14)
Register of service and repair of water meter
Period of service
In service
Meter reading
Put in Service
Taken off
Months and days
At date of issue
At date of return
Litres recovered
1
2
3
4
5
6
In less recovered in meter reading book
Reason for return
Nature of repair to meter
Cost of material and labour
Total
Remarks
7
8
9
10
11
12
Form D
Form D
(See Bye-law 17)
Register of testing of water meter
Date of Test
Full bore test ____________________
Percentage of Gallons
Slow test _____________
Percentage on
Remarks
Meter reading
Meter reading
At Start
At Finish
Schedule (B)
(See bye-laws 6, 7, 10, 24, 27 and 40)
(a) Use any water fittings, which is of such nature or is so arranged or connected, as to cause or permit or likely to cause or permit waste or misuse or erroneous measurement or contamination or revernation in pipes;
(b) Use any waste fitting which is not in accordance with such of the particulars and requirements of these regulations as may be applicable to it; or
(c) Arrange, connect, disconnect, alter or renew any water fitting in contravention of any requirement of these regulations.
Section 45 • The Faridabad Complex Water-Supply Bye-laws
45. Security Deposits.
the-faridabad-complex-water-supply-bye-laws-sec-45.json
•
Section 45
{
"act_title": "The Faridabad Complex Water-Supply Bye-laws",
"act_slug": "the-faridabad-complex-water-supply-bye-laws",
"section_label": "Section",
"section": {
"number": "45",
"title": "45. Security Deposits.",
"chapter": null,
"content": "½\"\nor 15 mm\nRs. 100.00\n¾\"\nor 20 mm\nRs. 200.00\n1\"\nor 25 mm\nRs. 300.00\n2\"\nor 50 mm\nRs. 500.00\n3\"\nor 80 mm\nRs. 1,000.00\n4\"\nor 100 mm\nRs. 1,2000.00\n6\"\nor 150 mm\nRs. 2,000.00\n8\"\nor 200 mm\nRs. 4,000.00\n10\"\nor 250 mm\nRs. 6,000.00\n12\"\nor 3000 mm\nRs. 8,000.00\nSchedule A\nForm 'A'\nForm 'A'\n(See Bye-law 5)\nName __________________\nAddress ________________\nSignature of applicant and owner (or his recognised agent) of the house or premises.\nDescription of premises\nParticulars of connection\n(i) Approximate length and diameter of service pipe ___________________\n(ii) No. and diameter of taps_________________________\n(iii) No. and details of sanitary fittings\n(iv) No. and details of hot water is ______________purpose for which water is required ________and\nSignature\n(Signature of Plumber)\nCost of Connection\n(To be supplied in by office)\nTotal Rs.________________\nNote. - In case material is supplied by owner, labour rates will be provided.\nForm B\nForm B\n(See Bye-law 6)\nForm of completion Report\nForm of completion Report\n(The following to be filled in by the plumbers)\nSignature of Plumbers.\nForm C\nForm C\n(See Bye-law 14)\nRegister of service and repair of water meter\nPeriod of service\nIn service\nMeter reading\nPut in Service\nTaken off\nMonths and days\nAt date of issue\nAt date of return\nLitres recovered\n1\n2\n3\n4\n5\n6\nIn less recovered in meter reading book\nReason for return\nNature of repair to meter\nCost of material and labour\nTotal\nRemarks\n7\n8\n9\n10\n11\n12\nForm D\nForm D\n(See Bye-law 17)\nRegister of testing of water meter\nDate of Test\nFull bore test ____________________\nPercentage of Gallons\nSlow test _____________\nPercentage on\nRemarks\nMeter reading\nMeter reading\nAt Start\nAt Finish\nSchedule (B)\n(See bye-laws 6, 7, 10, 24, 27 and 40)\n(a) Use any water fittings, which is of such nature or is so arranged or connected, as to cause or permit or likely to cause or permit waste or misuse or erroneous measurement or contamination or revernation in pipes;\n(b) Use any waste fitting which is not in accordance with such of the particulars and requirements of these regulations as may be applicable to it; or\n(c) Arrange, connect, disconnect, alter or renew any water fitting in contravention of any requirement of these regulations.",
"footnote": "",
"is_definition": false,
"sort_order": 40
},
"prev_section": "44",
"next_section": "2"
}