(a) automatic change of sequence of aspects behind the train in three-aspect signalling territory
(b) automatic change of sequence of aspects behind the train in four-aspect signalling territory
E- Other fixed signals and Markers
Section 27 • The Dedicated Freight Corridor Railway General Rules, 2018
27. Illustrative diagram.
the-dedicated-freight-corridor-railway-general-rules-2018-sec-27.json
•
Section 27
{
"act_title": "The Dedicated Freight Corridor Railway General Rules, 2018",
"act_slug": "the-dedicated-freight-corridor-railway-general-rules-2018",
"section_label": "Section",
"section": {
"number": "27",
"title": "27. Illustrative diagram.",
"chapter": null,
"content": "(a) automatic change of sequence of aspects behind the train in three-aspect signalling territory\n(b) automatic change of sequence of aspects behind the train in four-aspect signalling territory\nE- Other fixed signals and Markers",
"footnote": "",
"is_definition": false,
"sort_order": 31
},
"prev_section": "26",
"next_section": "28"
}