Section 26 • The Dedicated Freight Corridor Railway General Rules, 2018
26. Semi-automatic home and starter, intermediate starter stop signals on double line.
the-dedicated-freight-corridor-railway-general-rules-2018-sec-26.json
•
Section 26
{
"act_title": "The Dedicated Freight Corridor Railway General Rules, 2018",
"act_slug": "the-dedicated-freight-corridor-railway-general-rules-2018",
"section_label": "Section",
"section": {
"number": "26",
"title": "26. Semi-automatic home and starter, intermediate starter stop signals on double line.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 30
},
"prev_section": "25",
"next_section": "27"
}