14. Accident reporting by the construction and demolition waste processing facilities.

Form-V
Schedule I
Criteria for Site Selection for Storage and Processing or Recycling Facilities for construction and demolition Waste
Criteria for Site Selection for Storage and Processing or Recycling Facilities for construction and demolition Waste
[ See Rule 7(1)]
[ See Rule 7(1)]
(1) The concerned department in the State Government dealing with land shall be responsible for providing suitable sites for setting up of the storage, processing and recycling facilities for construction and demolition and hand over the sites to the concerned local authority for development, operation and maintenance, which shall ultimately be given to the operators by Competent Authority and wherever above Authority is not available, shall lie with the concerned local authority.
(2) The Local authority shall co-ordinate (in consultation with Department of Urban Development of the State or the Union territory) with the concerned organizations for giving necessary approvals and clearances to the operators.
(3) Construction and demolition waste shall be utilized in sanitary landfill for solid waste of the city or region as mentioned at Schedule I of these rule. Residues from construction and demolition waste processing or recycling industries shall be land filled in the sanitary landfill for solid waste.
(4) The processing or recycling shall be large enough to last for 20-25 years (project based on-site recycling facilities).
(5) The processing or recycling site shall be away from habitation clusters, forest areas, water bodies, monuments, National Parks, Wetlands and places of important cultural, historical or religious interest.
(6) A buffer zone of no development shall be maintained around solid waste processing and disposal facility, exceeding five Tonnes per day of installed capacity. This will be maintained within the total area of the solid waste processing and disposal facility. The buffer zone shall be prescribed on case to case basis by the local authority in consultation with concerned State Pollution Control Board.
(7) Processing or recycling site shall be fenced or hedged and provided with proper gate to monitor incoming vehicles or other modes of transportation.
(8) The approach and or internal roads shall be concreted or paved so as to avoid generation of dust particles due to vehicular movement and shall be so designed to ensure free movement of vehicles and other machinery.
(9) Provisions of weigh bridge to measure quantity of waste brought at landfill site, fire protection equipment and other facilities as may be required shall be provided.
(10) Utilities such as drinking water and sanitary facilities (preferably washing/bathing facilities for workers) and lighting arrangements for easy landfill operations during night hours shall be provided and Safety provisions including health inspections of workers at landfill sites shall be carried out made.
(11) In order to prevent pollution from processing or recycling operations, the following provisions shall be made, namely:
(a) Provision of storm water drains to prevent stagnation of surface water;
(b) Provision of paved or concreted surface in selected areas in the processing or recycling facility for minimizing dust and damage to the site.
(c) Prevention of noise pollution from processing and recycling plant:
(d) provision for treatment of effluent if any, to meet the discharge norms as per Environment (Protection) Rules, 1986.
(12) Work Zone air quality at the Processing or Recycling site and ambient air quality at the vicinity shall be monitored.
(13) The measurement of ambient noise shall be done at the interface of the facility with the surrounding area, i.e., at plant boundary.
(14) The following projects shall be exempted from the norms of pollution from dust and noise as mentioned above:
(15) A vegetative boundary shall be made around Processing or Recycling plant or site to strengthen the buffer zone.
Schedule II
Application of materials made from construction and demolition waste and its products.
Application of materials made from construction and demolition waste and its products.
[ See Rule 7(3)]
[ See Rule 7(3)]
Sl. No.
Sl. No.
Parameters
Parameters
Compliance Criteria
Compliance Criteria
1
1
Drainage layer in leachate
collection system at bottom of Sanitary Landfill Gas Collection
Layer above the waste at top of Sanitary Landfill and Drainage
Layer in top Cover System above Gas Collection Layer of Sanitary
Landfill
For capping of sanitary landfill or dumpsite, drainage layer
at the top
Only crushed and graded hard material (stone, concrete etc.)
shall be used having coarse sand size graded material (2mm -
4.75mm standard sieve size). Since the coarse sand particles will
be angular in shape (and not rounded as for riverbed sand),
protection layers of non-woven geo-textiles may be provided,
wherever required, to prevent puncturing of adjacent layers or
components.
2
2
Daily cover
Fines from construction and
demolition processed waste having size up to 2 mm shall be used
for daily cover over the fresh waste.
Use of construction and demolition
fines as landfill cover shall be mandatory where such material is
available. Fresh soil (sweet earth) shall not be used for such
places and borrow-pits shall not be allowed. Exception - soil
excavated during construction of the same landfill.
During hot windy days in summer months, some fugitive dust
problems may arise. These can be minimized by mixing with local
soil wherever available for limited period.
3
3
Civil construction in a sanitary landfill
Non-structural applications, such as kerb stones, drain
covers, paving blocks in pedestrian areas.
Schedule III
Time-frame for Planning and Implementation
Time-frame for Planning and Implementation
[ See Rule 13]
[ See Rule 13]
Sl. No.
Sl. No.
Compliance Criteria
Compliance Criteria
Cities with population of 01 million and above
Cities with population of 01 million and above
Cities with population of 0.5-01 million
Cities with population of 0.5-01 million
Cities with population of less than 0.5
million
Cities with population of less than 0.5
million
1
Formulation of policy by State Government
12 months
12 months
12 months
2
Identification of sites for collection and processing facility
18 months
18 months
18 months
3
Commissioning and implementation of the facility
18 months
24 months
36 months
4
Monitoring by SPCBs
3 times a year - once in 4 months
2 times a year - once in 6 months
2 times a year - once in 6 months
*The time Schedule is effective from the date of notification of these rules.
*The time Schedule is effective from the date of notification of these rules.
Form - I
Form - I
[ See Rule 7 (2)]
[ See Rule 7 (2)]
Application for obtaining authorization
Application for obtaining authorization
Correspondence address
Telephone No.
Fax No.
Nodal Officer and designation (Officer authorized by the
competent authority or agency responsible for operation of
processing or recycling or disposal facility)
Authorization applied for (Please tick mark)
Setting up of processing or recycling facility of construction
and demolition waste
Detailed proposal of construction
and demolition waste processing or recycling facility to include
the following
Location of
site approved and allotted by the Competent Authority.
Average
quantity (in tons per day) and composition of construction and
demolition waste to be handled at the specific site.
Details of
construction and demolition waste processing or recycling
technology to be used.
Quantity of
construction and demolition waste to be processed per day.
Site clearance
from Prescribed Authority.
Salient points
of agreement between competent authority or local authority and
operating agency (attach relevant document).
Plan for utilization of recycled
product.
Expected
amount of process rejects and plan for its disposal (e.g.,
sanitary landfill for solid waste).
Measures to be
taken for prevention and control of environmental pollution.
Investment on
project and expected returns.
Measures to be
taken for safety of workers working in the processing or
recycling plant.
Any preventive plan for accident during the collection,
transportation and treatment including processing and recycling
should be informed to the Competent Authority (Local Authority)
or Prescribed Authority
Date:
Date:
Signature of Nodal Officer
Signature of Nodal Officer
Form-II
Form-II
[ See Rule (7) (3)]
[ See Rule (7) (3)]
Format for Issue of Authorization to the Operator
Format for Issue of Authorization to the Operator
File No.: ____________
Date : ______________
Ref : Your application number _________________________ Dated. ............
Date:
Date:
(Member
Secretary)
(Member
Secretary)
Place:
Place:
State Pollution Control Board/ Pollution
Control Committee
State Pollution Control Board/
Pollution
Control Committee
Form -III
Form -III
[ See Rule 8(2)]
[ See Rule 8(2)]
Format of Annual Report to be submitted by Local Authority to the State Pollution Control Board
Format of Annual Report to be submitted by Local Authority to the State Pollution Control Board
(i) Name of the City or Town.........................
(ii) Population.....................
(iii) Name and address of local authority or competent authority
Telephone No. : ....................................
Fax : .................................................
Email ID: ...........................................
Website: ............................................
(iv) Name of In-charge or Nodal Officer dealing with construction and demolition wastes management with designation ......................................................