    "act_title": "The Construction and Demolition Waste Management Rules, 2016",
    "act_slug": "the-construction-and-demolition-waste-management-rules-2016",
    "section_label": "Section",
    "section": {
        "number": "14",
        "title": "14. Accident reporting by the construction and demolition waste processing facilities.",
        "chapter": null,
        "content": "Form-V\nSchedule I\nCriteria for Site Selection for Storage and Processing or Recycling Facilities for construction and demolition Waste\nCriteria for Site Selection for Storage and Processing or Recycling Facilities for construction and demolition Waste\n[ See Rule 7(1)]\n[ See Rule 7(1)]\n(1) The concerned department in the State Government dealing with land shall be responsible for providing suitable sites for setting up of the storage, processing and recycling facilities for construction and demolition and hand over the sites to the concerned local authority for development, operation and maintenance, which shall ultimately be given to the operators by Competent Authority and wherever above Authority is not available, shall lie with the concerned local authority.\n(2) The Local authority shall co-ordinate (in consultation with Department of Urban Development of the State or the Union territory) with the concerned organizations for giving necessary approvals and clearances to the operators.\n(3) Construction and demolition waste shall be utilized in sanitary landfill for solid waste of the city or region as mentioned at Schedule I of these rule. Residues from construction and demolition waste processing or recycling industries shall be land filled in the sanitary landfill for solid waste.\n(4) The processing or recycling shall be large enough to last for 20-25 years (project based on-site recycling facilities).\n(5) The processing or recycling site shall be away from habitation clusters, forest areas, water bodies, monuments, National Parks, Wetlands and places of important cultural, historical or religious interest.\n(6) A buffer zone of no development shall be maintained around solid waste processing and disposal facility, exceeding five Tonnes per day of installed capacity. This will be maintained within the total area of the solid waste processing and disposal facility. The buffer zone shall be prescribed on case to case basis by the local authority in consultation with concerned State Pollution Control Board.\n(7) Processing or recycling site shall be fenced or hedged and provided with proper gate to monitor incoming vehicles or other modes of transportation.\n(8) The approach and or internal roads shall be concreted or paved so as to avoid generation of dust particles due to vehicular movement and shall be so designed to ensure free movement of vehicles and other machinery.\n(9) Provisions of weigh bridge to measure quantity of waste brought at landfill site, fire protection equipment and other facilities as may be required shall be provided.\n(10) Utilities such as drinking water and sanitary facilities (preferably washing/bathing facilities for workers) and lighting arrangements for easy landfill operations during night hours shall be provided and Safety provisions including health inspections of workers at landfill sites shall be carried out made.\n(11) In order to prevent pollution from processing or recycling operations, the following provisions shall be made, namely:\n(a) Provision of storm water drains to prevent stagnation of surface water;\n(b) Provision of paved or concreted surface in selected areas in the processing or recycling facility for minimizing dust and damage to the site.\n(c) Prevention of noise pollution from processing and recycling plant:\n(d) provision for treatment of effluent if any, to meet the discharge norms as per Environment (Protection) Rules, 1986.\n(12) Work Zone air quality at the Processing or Recycling site and ambient air quality at the vicinity shall be monitored.\n(13) The measurement of ambient noise shall be done at the interface of the facility with the surrounding area, i.e., at plant boundary.\n(14) The following projects shall be exempted from the norms of pollution from dust and noise as mentioned above:\n(15) A vegetative boundary shall be made around Processing or Recycling plant or site to strengthen the buffer zone.\nSchedule II\nApplication of materials made from construction and demolition waste and its products.\nApplication of materials made from construction and demolition waste and its products.\n[ See Rule 7(3)]\n[ See Rule 7(3)]\nSl. No.\nSl. No.\nParameters\nParameters\nCompliance Criteria\nCompliance Criteria\n1\n1\nDrainage layer in leachate\n\t\t\t\tcollection system at bottom of Sanitary Landfill Gas Collection\n\t\t\t\tLayer above the waste at top of Sanitary Landfill and Drainage\n\t\t\t\tLayer in top Cover System above Gas Collection Layer of Sanitary\n\t\t\t\tLandfill\nFor capping of sanitary landfill or dumpsite, drainage layer\n\t\t\t\tat the top\nOnly crushed and graded hard material (stone, concrete etc.)\n\t\t\t\tshall be used having coarse sand size graded material (2mm -\n\t\t\t\t4.75mm standard sieve size). Since the coarse sand particles will\n\t\t\t\tbe angular in shape (and not rounded as for riverbed sand),\n\t\t\t\tprotection layers of non-woven geo-textiles may be provided,\n\t\t\t\twherever required, to prevent puncturing of adjacent layers or\n\t\t\t\tcomponents.\n2\n2\nDaily cover\nFines from construction and\n\t\t\t\tdemolition processed waste having size up to 2 mm shall be used\n\t\t\t\tfor daily cover over the fresh waste.\nUse of construction and demolition\n\t\t\t\tfines as landfill cover shall be mandatory where such material is\n\t\t\t\tavailable. Fresh soil (sweet earth) shall not be used for such\n\t\t\t\tplaces and borrow-pits shall not be allowed. Exception - soil\n\t\t\t\texcavated during construction of the same landfill.\nDuring hot windy days in summer months, some fugitive dust\n\t\t\t\tproblems may arise. These can be minimized by mixing with local\n\t\t\t\tsoil wherever available for limited period.\n3\n3\nCivil construction in a sanitary landfill\nNon-structural applications, such as kerb stones, drain\n\t\t\t\tcovers, paving blocks in pedestrian areas.\nSchedule III\nTime-frame for Planning and Implementation\nTime-frame for Planning and Implementation\n[ See Rule 13]\n[ See Rule 13]\nSl. No.\nSl. No.\nCompliance Criteria\nCompliance Criteria\nCities with population of 01 million and above\nCities with population of 01 million and above\nCities with population of 0.5-01 million\nCities with population of 0.5-01 million\nCities with population of less than 0.5\n\t\t\t\tmillion\nCities with population of less than 0.5\n\t\t\t\tmillion\n1\nFormulation of policy by State Government\n12 months\n12 months\n12 months\n2\nIdentification of sites for collection and processing facility\n18 months\n18 months\n18 months\n3\nCommissioning and implementation of the facility\n18 months\n24 months\n36 months\n4\nMonitoring by SPCBs\n3 times a year - once in 4 months\n2 times a year - once in 6 months\n2 times a year - once in 6 months\n*The time Schedule is effective from the date of notification of these rules.\n*The time Schedule is effective from the date of notification of these rules.\nForm - I\nForm - I\n[ See Rule 7 (2)]\n[ See Rule 7 (2)]\nApplication for obtaining authorization\nApplication for obtaining authorization\nCorrespondence address\nTelephone No.\nFax No.\nNodal Officer and designation (Officer authorized by the\n\t\t\t\tcompetent authority or agency responsible for operation of\n\t\t\t\tprocessing or recycling or disposal facility)\nAuthorization applied for (Please tick mark)\nSetting up of processing or recycling facility of construction\n\t\t\t\tand demolition waste\nDetailed proposal of construction\n\t\t\t\tand demolition waste processing or recycling facility to include\n\t\t\t\tthe following\nLocation of\n\t\t\t\tsite approved and allotted by the Competent Authority.\nAverage\n\t\t\t\tquantity (in tons per day) and composition of construction and\n\t\t\t\tdemolition waste to be handled at the specific site.\nDetails of\n\t\t\t\tconstruction and demolition waste processing or recycling\n\t\t\t\ttechnology to be used.\nQuantity of\n\t\t\t\tconstruction and demolition waste to be processed per day.\nSite clearance\n\t\t\t\tfrom Prescribed Authority.\nSalient points\n\t\t\t\tof agreement between competent authority or local authority and\n\t\t\t\toperating agency (attach relevant document).\nPlan for utilization of recycled\n\t\t\t\tproduct.\nExpected\n\t\t\t\tamount of process rejects and plan for its disposal (e.g.,\n\t\t\t\tsanitary landfill for solid waste).\nMeasures to be\n\t\t\t\ttaken for prevention and control of environmental pollution.\nInvestment on\n\t\t\t\tproject and expected returns.\nMeasures to be\n\t\t\t\ttaken for safety of workers working in the processing or\n\t\t\t\trecycling plant.\nAny preventive plan for accident during the collection,\n\t\t\t\ttransportation and treatment including processing and recycling\n\t\t\t\tshould be informed to the Competent Authority (Local Authority)\n\t\t\t\tor Prescribed Authority\nDate:\nDate:\nSignature of Nodal Officer\nSignature of Nodal Officer\nForm-II\nForm-II\n[ See Rule (7) (3)]\n[ See Rule (7) (3)]\nFormat for Issue of Authorization to the Operator\nFormat for Issue of Authorization to the Operator\nFile No.: ____________\nDate : ______________\nRef : Your application number _________________________ Dated. ............\nDate:\nDate:\n(Member\n\t\t\t\tSecretary)\n(Member\n\t\t\t\tSecretary)\nPlace:\nPlace:\nState Pollution Control Board/ Pollution\n\t\t\t\tControl Committee\nState Pollution Control Board/\nPollution\n\t\t\t\tControl Committee\nForm -III\nForm -III\n[ See Rule 8(2)]\n[ See Rule 8(2)]\nFormat of Annual Report to be submitted by Local Authority to the State Pollution Control Board\nFormat of Annual Report to be submitted by Local Authority to the State Pollution Control Board\n(i) Name of the City or Town.........................\n(ii) Population.....................\n(iii) Name and address of local authority or competent authority\nTelephone No. : ....................................\nFax : .................................................\nEmail ID: ...........................................\nWebsite: ............................................\n(iv) Name of In-charge or Nodal Officer dealing with construction and demolition wastes management with designation ......................................................",
        "footnote": "",
        "is_definition": false,
        "sort_order": 13
    },
    "prev_section": "13",
    "next_section": "1"
}