Section 19 • THE ANDHRA PRADESH MUNICIPAL TRAMWAYS (CONSTRUCTION, OPERATION AND MAINTENANCE) ACT, 2008
Section 19. Power to enter for inspection, measurement etc.,
19. Power to enter for inspection, measurement etc., - The tramway operator or any person authorized by it may, with a view to making survey or ascertaining the nature or condition of any land or building for the purpose of construction of tramway system or any other work connected therewith, at any reasonable hour during the day and after giving reasonable notice to the owner or occupier enter upon or enter into such land or building, in, along, over or near the tramway system alignment to,-
{
"act_title": "THE ANDHRA PRADESH MUNICIPAL TRAMWAYS (CONSTRUCTION, OPERATION AND MAINTENANCE) ACT, 2008",
"act_slug": "the-andhra-pradesh-municipal-tramways-construction-operation-and-maintenance-act-2008",
"section_label": "Section",
"section": {
"number": "19",
"title": "Section 19. Power to enter for inspection, measurement etc.,",
"chapter": null,
"content": "19. Power to enter for inspection, measurement etc., - The tramway operator or any person authorized by it may, with a view to making survey or ascertaining the nature or condition of any land or building for the purpose of construction of tramway system or any other work connected therewith, at any reasonable hour during the day and after giving reasonable notice to the owner or occupier enter upon or enter into such land or building, in, along, over or near the tramway system alignment to,-",
"footnote": "",
"is_definition": false,
"sort_order": 1380
},
"prev_section": "18",
"next_section": "19"
}