No.
No.
Item
Item
Definition
Definition
1
ART
Availability Based Tariff
2
Act
The Electricity Act 2003
3
Agency
A term used in this Code to refer to Licensee /
Generating Stations that utilize the lntra State Transmission
System.
4
Apparatus
Electrical equipments and includes all machines,
fittings, accessories and appliances in which conductors are
used.
5
Area of Supply
"Area of Supply" means area designated
in the license for carrying out the licensed activity.
6
Automatic Voltage Regulator (AVR)
A continuously acting automatic excitation
control system to control the voltage of a Generating Unit
measured at the generator terminals
7
Black Start Procedure
The procedure necessary to bring back normalcy
in the Grid from a blackout
8
BIS
The Bureau of Indian Standards
9
Captive Power Plant (CPP)
A Power plant set up by any person to generate
electricity primarily for his own use and includes j a power
plant set up by any co-operative society or association of
persons for generating electricity primarily for use of members
of such co-operative ; societies or associations
10
CEA
The Central Electricity Authority
11
CERC
The Central Electricity Regulatory Commission
12
Central Transmission Utility (CTU)
Central Transmission Utility means any
Government company, which the Central Government may notify under
subsection (1) of Section 38 of the Act
13
Central Generating Station (CCS)
Power Station, which is owned and / or
controlled by Central Government
14
Code
'Code' means the Tamil Nadu Electricity Grid
Code in as much as this Code is concerned.
15
Co-generation
"Cogeneration" means a process, which
simultaneously produces two or more forms of useful energy
(including electricity).
16
Commission
Tamil Nadu Electricity Regulatory Commission.
17
Connection point
A point at which an agency's Plant and/or
Apparatus connects to the Infra State Transmission System.
18
Connection Agreement
An agreement setting out the terms relating to
the Connection to and / or use of the Transmission / Distribution
System.
19
Constituent
Any agency who is a member of the State
Electricity System
20
Consumer
Consumer means any person who is supplied with
electricity for his own use by a Licensee or the Government or by
any other person engaged in the business of supplying electricity
to the public under this Act or any other law for the time being
in force and includes any person whose premises are for the time
being connected for the purpose of receiving electricity with the
works of a Licensee, the Government or such other person, as the
case may be.
21
Demand
The demand in MW and MVA of electricity (i.e.
both Active and Apparent Power) unless otherwise stated
22
Disconnection
The act of physically separating User's or
customers electrical equipment from the System.
23
Distribution Licensee
"Distribution licensee" means a
licensee authorised to operate and maintain a distribution system
for supplying electricity to the consumers in his area of supply.
24
Distribution System
"Distribution System" means the system
of wires and associated facilities between the delivery points on
the transmission lines or the generating station connection and
the point of connection to the installation of the consumers.
25
Disturbance Recorder (DR)
A device provided to record the behavior of the
pre-selected digital and analog values of the system parameters
during an event.
26
Data Acquisition System (DAS)
A device provided to record the sequence of
operation in time, of the relays / equipments / system parameters
at a location.
27
Event
'Event' when used in conjunction with the
terminology 'Event Logger' means an unscheduled or unplanned
occurrence on a Grid, including faults, incidents and breakdowns
28
Event Logger
A device provided to record the sequence of
operation in (EL) time, of the relays / equipments ; at a
location during an event.
29
External Interconnection
Electric lines and electrical equipment used for
transmission of electricity between the Inter State and Intra
State Transmission System.
30
Forced Outage
An outage of a Generating Unit or a transmission
facility due to a fault or other reasons, which has not been
planned.
31
Generating Company
Means any company or body corporate or
association or body of individuals, whether incorporated or not,
or artificial juridical person, which owns or operates or
maintains a generating station.
32
Generating Unit
The combination of an electrical power generator
and its prime mover and all of its associated equipment, which
together constitutes a single generating machine.
33
Good Utility
Any of the practices, methods and acts engaged
in or Practices approved by a significant portion of the electric
utility industry during the relevant time period which could have
been expected to accomplish the desired results at a reasonable
cost consistent with good business practices, reliably, safely
and with expedition.
34
Governor Droop
In relation to the operation of the governor of
a Generating Unit, the percentage drop in system frequency which
would cause the Generating Unit under free governor action to
change its output from zero to full load.
35
High voltage DC System (HVDC)
High Voltage Direct Current System
36
IEC
International Electro Technical Commission, the
authority that approves the electricity industry standards used
on an international basis.
37
Independent Private Transmission Company (IPTC)
A licensed transmission agency, not owned /
controlled by the Central State Government, involved in the
business of transmission of electrical energy
38
Indian Electricity Grid Code (IEGC)
A document describing the philosophy and the
responsibilities for planning and operation of Indian power
system specified by the CERC in accordance with sub-section 1 (h)
of Section 79 of the Act.
39
Inter State Transmission System (ISTS)
Inter-State Transmission System includes
(i) Any system for the conveyance of electricity
by means of a main transmission line from the territory of one
State to another State
(ii) The conveyance of energy across the
territory of an intervening State as well as conveyance within
the State which is incidental to such inter-state transmission of
energy
(iii) The transmission of electricity within the
territory of State on a system built, owned, operated, maintained
or controlled by CTU.
40
Intra State Transmission System
The transmission system within the State of
Tamil Nadu for the transmission of electricity to various parts
of the State
41
Lean Period
That period in a day when electrical demand is
at it's lowest
42
Licensee
A person who has been granted a license under
section 14 of the Electricity Act, 2003 to supply or transmit or
trade electrical energy.
43
Load
The active, reactive or apparent power, as the
context requires, generated, transmitted or distributed or
consumed by a utility / installation
44
Maximum Continuous Rating (MCR)
The normal rated full load MW output capacity of
a generating unit, which can be sustained on a continuous basis
at specified conditions.
45
National Grid
The entire inter-connected electric power
network of the country, which would evolve after inter-connection
of regional Grids.
46
Operation
A scheduled or planned action relating to the
operation of the power system.
47
Outage
In relation to a generation / transmission
system/ distribution system or facility, an interruption of power
supply whether manually or through protective relaying in
connection with maintenance / breakdown / failure or defects.
48
Peak Period
That period in a day when electrical demand is
at its highest.
49
Pool Account
A business account for payments regarding
unscheduled interchanges (UI account) or and reactive energy
exchanges (Reactive Energy account), as the case may be.
50
Power Station / Power Plant
An installation of one or more Generating Units
(even when sited separately) owned and / or operated by the same
Generating Company and which may reasonably be considered as
being managed as a single integrated generating complex.
51
Prudent Utility Practices
Those practices, methods, techniques and
standards, as changed from time to time that are generally
accepted for use in the international electric utility industry,
taking into account conditions in India / Tamil Nadu, and
commonly used in prudent electric utility engineering and
operations to design, engineer, construct, test, operate and
maintain equipment lawfully, safely, efficiently and economically
as applicable to equipment of a certain size, service and type
and which practices, methods, standards and acts shall be
adjusted to the extent necessary, in order:
(a) to conform to operation and maintenance
guidelines recommended by the equipment manufacturers and
suppliers and according to the guidelines given in the Indian /
International Standards code of practice for such equipments.
(b) to ensure compliance with the Electricity
Act 2003, rules and other related laws.
(c) to take into account the site location,
including without limitation, the climatic, hydrological and
other environmental or general conditions thereof.
(d) to conform to energy conservation and
(e) to conform to the general safety standards.
52
Regional Energy Account (REA)
A regional energy account, for the settlement
and billing of "Capacity Charge” and "Energy
Charge".
53
Regional Grid
The important elements of constituent / user
systems including the ISTS which the RLDC supervises.
54
The Regional Load Despatch Centre (RLDC)
'Regional Load Despatch Centre.' means the
Centre established under sub-section (1) of Section 27 of the
Act.
55
Single Line Diagram (SLD)
Diagrams which are a schematic representation of
the HV/EHV apparatus and the connections to all external circuits
at a Connection Point incorporating numbering nomenclature and
labeling.
56
Site Common Drawing
Drawing prepared for each connection point which
incorporates layout drawings, electrical layout drawings, common
protection / control drawings and common service drawings.
57
Southern Region / Region
Region comprising of the States of Tamil Nadu,
Andhra Pradesh, Karnataka, Kerala and Pondicherry for the
integrated operation of the electricity system.
58
Spinning Reserve
Part loaded generating capacity with some
reserve margin that is synchronized to the system and is ready to
provide increased generation at short notice pursuant to despatch
instruction or instantaneously in response to a frequency drop.
59
State Load Despatch Centre (SLDC)
The load despatch centre established under
section 31 (1) the Act, operating round the clock for the purpose
of managing the operation of the transmission system and
co-ordination of generation and drawal on a real time basis.
60
State Sub Load Centre (SSLDC)
State's Sub Load Centre for local control at
various places in Tamil Nadu.
61
Supervisory Control and Data Acquisition (SCADA)
'SCADA' means Supervisory Control and Data
Acquisition System that acquire data from remote locations over
communication links and process it at centralized control
location for monitoring, supervision, control as well as decision
support.
62
State Transmission Utility (STU)
"State Transmission Utility" means the
Board or the Government company specified as such by the State
Government under sub-section (1) of section 39.
63
Static VAR Compensator (SVC)
An electrical facility designed for the purpose
of generating or absorbing reactive power.
64
STS
State Transmission System
65
Supply
"Supply" in relation to electricity,
means the sale of electricity to a licensee or consumer
66
TNERC
Tamil Nadu Electricity Regulatory Commission
67
TNEGC
Tamil Nadu Electricity Grid Code
68
Transmission System
The system of EHT electric lines and electrical
equipment owned and / or operated by the STU and other
transmission licensees, for the purpose of the transmission of
electricity between power stations, external interconnections and
the distribution system.
69
Transmission License
A license granted by the Commission under
section 14 of the Act, to transmit electricity.
70
User
A person including the STU, Generating Company,
Licensee and Power Grid Corporation of India or any such entity
that uses the Transmission System and who must comply with the
provisions of the Grid Code.
71
Utility
"Utility" means the electrical lines
or electrical plant, and includes all lands, buildings, works and
materials attached thereto belonging to any person acting as a
generating company or licensee under the provisions of the Act.
Chapter 3
General
Section 2 • Tamil Nadu Electricity Grid Code, 2005
2. Glossary and Definitions.
tamil-nadu-electricity-grid-code-2005-sec-2.json
•
Section 2
{
"act_title": "Tamil Nadu Electricity Grid Code, 2005",
"act_slug": "tamil-nadu-electricity-grid-code-2005",
"section_label": "Section",
"section": {
"number": "2",
"title": "2. Glossary and Definitions.",
"chapter": null,
"content": "No.\nNo.\nItem\nItem\nDefinition\nDefinition\n1\nART\nAvailability Based Tariff\n2\nAct\nThe Electricity Act 2003\n3\nAgency\nA term used in this Code to refer to Licensee /\n\t\t\t\tGenerating Stations that utilize the lntra State Transmission\n\t\t\t\tSystem.\n4\nApparatus\nElectrical equipments and includes all machines,\n\t\t\t\tfittings, accessories and appliances in which conductors are\n\t\t\t\tused.\n5\nArea of Supply\n\"Area of Supply\" means area designated\n\t\t\t\tin the license for carrying out the licensed activity.\n6\nAutomatic Voltage Regulator (AVR)\nA continuously acting automatic excitation\n\t\t\t\tcontrol system to control the voltage of a Generating Unit\n\t\t\t\tmeasured at the generator terminals\n7\nBlack Start Procedure\nThe procedure necessary to bring back normalcy\n\t\t\t\tin the Grid from a blackout\n8\nBIS\nThe Bureau of Indian Standards\n9\nCaptive Power Plant (CPP)\nA Power plant set up by any person to generate\n\t\t\t\telectricity primarily for his own use and includes j a power\n\t\t\t\tplant set up by any co-operative society or association of\n\t\t\t\tpersons for generating electricity primarily for use of members\n\t\t\t\tof such co-operative ; societies or associations\n10\nCEA\nThe Central Electricity Authority\n11\nCERC\nThe Central Electricity Regulatory Commission\n12\nCentral Transmission Utility (CTU)\nCentral Transmission Utility means any\n\t\t\t\tGovernment company, which the Central Government may notify under\n\t\t\t\tsubsection (1) of Section 38 of the Act\n13\nCentral Generating Station (CCS)\nPower Station, which is owned and / or\n\t\t\t\tcontrolled by Central Government\n14\nCode\n'Code' means the Tamil Nadu Electricity Grid\n\t\t\t\tCode in as much as this Code is concerned.\n15\nCo-generation\n\"Cogeneration\" means a process, which\n\t\t\t\tsimultaneously produces two or more forms of useful energy\n\t\t\t\t(including electricity).\n16\nCommission\nTamil Nadu Electricity Regulatory Commission.\n17\nConnection point\nA point at which an agency's Plant and/or\n\t\t\t\tApparatus connects to the Infra State Transmission System.\n18\nConnection Agreement\nAn agreement setting out the terms relating to\n\t\t\t\tthe Connection to and / or use of the Transmission / Distribution\n\t\t\t\tSystem.\n19\nConstituent\nAny agency who is a member of the State\n\t\t\t\tElectricity System\n20\nConsumer\nConsumer means any person who is supplied with\n\t\t\t\telectricity for his own use by a Licensee or the Government or by\n\t\t\t\tany other person engaged in the business of supplying electricity\n\t\t\t\tto the public under this Act or any other law for the time being\n\t\t\t\tin force and includes any person whose premises are for the time\n\t\t\t\tbeing connected for the purpose of receiving electricity with the\n\t\t\t\tworks of a Licensee, the Government or such other person, as the\n\t\t\t\tcase may be.\n21\nDemand\nThe demand in MW and MVA of electricity (i.e.\n\t\t\t\tboth Active and Apparent Power) unless otherwise stated\n22\nDisconnection\nThe act of physically separating User's or\n\t\t\t\tcustomers electrical equipment from the System.\n23\nDistribution Licensee\n\"Distribution licensee\" means a\n\t\t\t\tlicensee authorised to operate and maintain a distribution system\n\t\t\t\tfor supplying electricity to the consumers in his area of supply.\n24\nDistribution System\n\"Distribution System\" means the system\n\t\t\t\tof wires and associated facilities between the delivery points on\n\t\t\t\tthe transmission lines or the generating station connection and\n\t\t\t\tthe point of connection to the installation of the consumers.\n25\nDisturbance Recorder (DR)\nA device provided to record the behavior of the\n\t\t\t\tpre-selected digital and analog values of the system parameters\n\t\t\t\tduring an event.\n26\nData Acquisition System (DAS)\nA device provided to record the sequence of\n\t\t\t\toperation in time, of the relays / equipments / system parameters\n\t\t\t\tat a location.\n27\nEvent\n'Event' when used in conjunction with the\n\t\t\t\tterminology 'Event Logger' means an unscheduled or unplanned\n\t\t\t\toccurrence on a Grid, including faults, incidents and breakdowns\n28\nEvent Logger\nA device provided to record the sequence of\n\t\t\t\toperation in (EL) time, of the relays / equipments ; at a\n\t\t\t\tlocation during an event.\n29\nExternal Interconnection\nElectric lines and electrical equipment used for\n\t\t\t\ttransmission of electricity between the Inter State and Intra\n\t\t\t\tState Transmission System.\n30\nForced Outage\nAn outage of a Generating Unit or a transmission\n\t\t\t\tfacility due to a fault or other reasons, which has not been\n\t\t\t\tplanned.\n31\nGenerating Company\nMeans any company or body corporate or\n\t\t\t\tassociation or body of individuals, whether incorporated or not,\n\t\t\t\tor artificial juridical person, which owns or operates or\n\t\t\t\tmaintains a generating station.\n32\nGenerating Unit\nThe combination of an electrical power generator\n\t\t\t\tand its prime mover and all of its associated equipment, which\n\t\t\t\ttogether constitutes a single generating machine.\n33\nGood Utility\nAny of the practices, methods and acts engaged\n\t\t\t\tin or Practices approved by a significant portion of the electric\n\t\t\t\tutility industry during the relevant time period which could have\n\t\t\t\tbeen expected to accomplish the desired results at a reasonable\n\t\t\t\tcost consistent with good business practices, reliably, safely\n\t\t\t\tand with expedition.\n34\nGovernor Droop\nIn relation to the operation of the governor of\n\t\t\t\ta Generating Unit, the percentage drop in system frequency which\n\t\t\t\twould cause the Generating Unit under free governor action to\n\t\t\t\tchange its output from zero to full load.\n35\nHigh voltage DC System (HVDC)\nHigh Voltage Direct Current System\n36\nIEC\nInternational Electro Technical Commission, the\n\t\t\t\tauthority that approves the electricity industry standards used\n\t\t\t\ton an international basis.\n37\nIndependent Private Transmission Company (IPTC)\nA licensed transmission agency, not owned /\n\t\t\t\tcontrolled by the Central State Government, involved in the\n\t\t\t\tbusiness of transmission of electrical energy\n38\nIndian Electricity Grid Code (IEGC)\nA document describing the philosophy and the\n\t\t\t\tresponsibilities for planning and operation of Indian power\n\t\t\t\tsystem specified by the CERC in accordance with sub-section 1 (h)\n\t\t\t\tof Section 79 of the Act.\n39\nInter State Transmission System (ISTS)\nInter-State Transmission System includes\n(i) Any system for the conveyance of electricity\n\t\t\t\tby means of a main transmission line from the territory of one\n\t\t\t\tState to another State\n(ii) The conveyance of energy across the\n\t\t\t\tterritory of an intervening State as well as conveyance within\n\t\t\t\tthe State which is incidental to such inter-state transmission of\n\t\t\t\tenergy\n(iii) The transmission of electricity within the\n\t\t\t\tterritory of State on a system built, owned, operated, maintained\n\t\t\t\tor controlled by CTU.\n40\nIntra State Transmission System\nThe transmission system within the State of\n\t\t\t\tTamil Nadu for the transmission of electricity to various parts\n\t\t\t\tof the State\n41\nLean Period\nThat period in a day when electrical demand is\n\t\t\t\tat it's lowest\n42\nLicensee\nA person who has been granted a license under\n\t\t\t\tsection 14 of the Electricity Act, 2003 to supply or transmit or\n\t\t\t\ttrade electrical energy.\n43\nLoad\nThe active, reactive or apparent power, as the\n\t\t\t\tcontext requires, generated, transmitted or distributed or\n\t\t\t\tconsumed by a utility / installation\n44\nMaximum Continuous Rating (MCR)\nThe normal rated full load MW output capacity of\n\t\t\t\ta generating unit, which can be sustained on a continuous basis\n\t\t\t\tat specified conditions.\n45\nNational Grid\nThe entire inter-connected electric power\n\t\t\t\tnetwork of the country, which would evolve after inter-connection\n\t\t\t\tof regional Grids.\n46\nOperation\nA scheduled or planned action relating to the\n\t\t\t\toperation of the power system.\n47\nOutage\nIn relation to a generation / transmission\n\t\t\t\tsystem/ distribution system or facility, an interruption of power\n\t\t\t\tsupply whether manually or through protective relaying in\n\t\t\t\tconnection with maintenance / breakdown / failure or defects.\n48\nPeak Period\nThat period in a day when electrical demand is\n\t\t\t\tat its highest.\n49\nPool Account\nA business account for payments regarding\n\t\t\t\tunscheduled interchanges (UI account) or and reactive energy\n\t\t\t\texchanges (Reactive Energy account), as the case may be.\n50\nPower Station / Power Plant\nAn installation of one or more Generating Units\n\t\t\t\t(even when sited separately) owned and / or operated by the same\n\t\t\t\tGenerating Company and which may reasonably be considered as\n\t\t\t\tbeing managed as a single integrated generating complex.\n51\nPrudent Utility Practices\nThose practices, methods, techniques and\n\t\t\t\tstandards, as changed from time to time that are generally\n\t\t\t\taccepted for use in the international electric utility industry,\n\t\t\t\ttaking into account conditions in India / Tamil Nadu, and\n\t\t\t\tcommonly used in prudent electric utility engineering and\n\t\t\t\toperations to design, engineer, construct, test, operate and\n\t\t\t\tmaintain equipment lawfully, safely, efficiently and economically\n\t\t\t\tas applicable to equipment of a certain size, service and type\n\t\t\t\tand which practices, methods, standards and acts shall be\n\t\t\t\tadjusted to the extent necessary, in order:\n(a) to conform to operation and maintenance\n\t\t\t\tguidelines recommended by the equipment manufacturers and\n\t\t\t\tsuppliers and according to the guidelines given in the Indian /\n\t\t\t\tInternational Standards code of practice for such equipments.\n(b) to ensure compliance with the Electricity\n\t\t\t\tAct 2003, rules and other related laws.\n(c) to take into account the site location,\n\t\t\t\tincluding without limitation, the climatic, hydrological and\n\t\t\t\tother environmental or general conditions thereof.\n(d) to conform to energy conservation and\n(e) to conform to the general safety standards.\n52\nRegional Energy Account (REA)\nA regional energy account, for the settlement\n\t\t\t\tand billing of \"Capacity Charge” and \"Energy\n\t\t\t\tCharge\".\n53\nRegional Grid\nThe important elements of constituent / user\n\t\t\t\tsystems including the ISTS which the RLDC supervises.\n54\nThe Regional Load Despatch Centre (RLDC)\n'Regional Load Despatch Centre.' means the\n\t\t\t\tCentre established under sub-section (1) of Section 27 of the\n\t\t\t\tAct.\n55\nSingle Line Diagram (SLD)\nDiagrams which are a schematic representation of\n\t\t\t\tthe HV/EHV apparatus and the connections to all external circuits\n\t\t\t\tat a Connection Point incorporating numbering nomenclature and\n\t\t\t\tlabeling.\n56\nSite Common Drawing\nDrawing prepared for each connection point which\n\t\t\t\tincorporates layout drawings, electrical layout drawings, common\n\t\t\t\tprotection / control drawings and common service drawings.\n57\nSouthern Region / Region\nRegion comprising of the States of Tamil Nadu,\n\t\t\t\tAndhra Pradesh, Karnataka, Kerala and Pondicherry for the\n\t\t\t\tintegrated operation of the electricity system.\n58\nSpinning Reserve\nPart loaded generating capacity with some\n\t\t\t\treserve margin that is synchronized to the system and is ready to\n\t\t\t\tprovide increased generation at short notice pursuant to despatch\n\t\t\t\tinstruction or instantaneously in response to a frequency drop.\n59\nState Load Despatch Centre (SLDC)\nThe load despatch centre established under\n\t\t\t\tsection 31 (1) the Act, operating round the clock for the purpose\n\t\t\t\tof managing the operation of the transmission system and\n\t\t\t\tco-ordination of generation and drawal on a real time basis.\n60\nState Sub Load Centre (SSLDC)\nState's Sub Load Centre for local control at\n\t\t\t\tvarious places in Tamil Nadu.\n61\nSupervisory Control and Data Acquisition (SCADA)\n'SCADA' means Supervisory Control and Data\n\t\t\t\tAcquisition System that acquire data from remote locations over\n\t\t\t\tcommunication links and process it at centralized control\n\t\t\t\tlocation for monitoring, supervision, control as well as decision\n\t\t\t\tsupport.\n62\nState Transmission Utility (STU)\n\"State Transmission Utility\" means the\n\t\t\t\tBoard or the Government company specified as such by the State\n\t\t\t\tGovernment under sub-section (1) of section 39.\n63\nStatic VAR Compensator (SVC)\nAn electrical facility designed for the purpose\n\t\t\t\tof generating or absorbing reactive power.\n64\nSTS\nState Transmission System\n65\nSupply\n\"Supply\" in relation to electricity,\n\t\t\t\tmeans the sale of electricity to a licensee or consumer\n66\nTNERC\nTamil Nadu Electricity Regulatory Commission\n67\nTNEGC\nTamil Nadu Electricity Grid Code\n68\nTransmission System\nThe system of EHT electric lines and electrical\n\t\t\t\tequipment owned and / or operated by the STU and other\n\t\t\t\ttransmission licensees, for the purpose of the transmission of\n\t\t\t\telectricity between power stations, external interconnections and\n\t\t\t\tthe distribution system.\n69\nTransmission License\nA license granted by the Commission under\n\t\t\t\tsection 14 of the Act, to transmit electricity.\n70\nUser\nA person including the STU, Generating Company,\n\t\t\t\tLicensee and Power Grid Corporation of India or any such entity\n\t\t\t\tthat uses the Transmission System and who must comply with the\n\t\t\t\tprovisions of the Grid Code.\n71\nUtility\n\"Utility\" means the electrical lines\n\t\t\t\tor electrical plant, and includes all lands, buildings, works and\n\t\t\t\tmaterials attached thereto belonging to any person acting as a\n\t\t\t\tgenerating company or licensee under the provisions of the Act.\nChapter 3\nGeneral",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
"prev_section": "1",
"next_section": "3"
}