    "act_title": "Tamil Nadu Electricity Grid Code, 2005",
    "act_slug": "tamil-nadu-electricity-grid-code-2005",
    "section_label": "Section",
    "section": {
        "number": "2",
        "title": "2. Glossary and Definitions.",
        "chapter": null,
        "content": "No.\nNo.\nItem\nItem\nDefinition\nDefinition\n1\nART\nAvailability Based Tariff\n2\nAct\nThe Electricity Act 2003\n3\nAgency\nA term used in this Code to refer to Licensee /\n\t\t\t\tGenerating Stations that utilize the lntra State Transmission\n\t\t\t\tSystem.\n4\nApparatus\nElectrical equipments and includes all machines,\n\t\t\t\tfittings, accessories and appliances in which conductors are\n\t\t\t\tused.\n5\nArea of Supply\n\"Area of Supply\" means area designated\n\t\t\t\tin the license for carrying out the licensed activity.\n6\nAutomatic Voltage Regulator (AVR)\nA continuously acting automatic excitation\n\t\t\t\tcontrol system to control the voltage of a Generating Unit\n\t\t\t\tmeasured at the generator terminals\n7\nBlack Start Procedure\nThe procedure necessary to bring back normalcy\n\t\t\t\tin the Grid from a blackout\n8\nBIS\nThe Bureau of Indian Standards\n9\nCaptive Power Plant (CPP)\nA Power plant set up by any person to generate\n\t\t\t\telectricity primarily for his own use and includes j a power\n\t\t\t\tplant set up by any co-operative society or association of\n\t\t\t\tpersons for generating electricity primarily for use of members\n\t\t\t\tof such co-operative ; societies or associations\n10\nCEA\nThe Central Electricity Authority\n11\nCERC\nThe Central Electricity Regulatory Commission\n12\nCentral Transmission Utility (CTU)\nCentral Transmission Utility means any\n\t\t\t\tGovernment company, which the Central Government may notify under\n\t\t\t\tsubsection (1) of Section 38 of the Act\n13\nCentral Generating Station (CCS)\nPower Station, which is owned and / or\n\t\t\t\tcontrolled by Central Government\n14\nCode\n'Code' means the Tamil Nadu Electricity Grid\n\t\t\t\tCode in as much as this Code is concerned.\n15\nCo-generation\n\"Cogeneration\" means a process, which\n\t\t\t\tsimultaneously produces two or more forms of useful energy\n\t\t\t\t(including electricity).\n16\nCommission\nTamil Nadu Electricity Regulatory Commission.\n17\nConnection point\nA point at which an agency's Plant and/or\n\t\t\t\tApparatus connects to the Infra State Transmission System.\n18\nConnection Agreement\nAn agreement setting out the terms relating to\n\t\t\t\tthe Connection to and / or use of the Transmission / Distribution\n\t\t\t\tSystem.\n19\nConstituent\nAny agency who is a member of the State\n\t\t\t\tElectricity System\n20\nConsumer\nConsumer means any person who is supplied with\n\t\t\t\telectricity for his own use by a Licensee or the Government or by\n\t\t\t\tany other person engaged in the business of supplying electricity\n\t\t\t\tto the public under this Act or any other law for the time being\n\t\t\t\tin force and includes any person whose premises are for the time\n\t\t\t\tbeing connected for the purpose of receiving electricity with the\n\t\t\t\tworks of a Licensee, the Government or such other person, as the\n\t\t\t\tcase may be.\n21\nDemand\nThe demand in MW and MVA of electricity (i.e.\n\t\t\t\tboth Active and Apparent Power) unless otherwise stated\n22\nDisconnection\nThe act of physically separating User's or\n\t\t\t\tcustomers electrical equipment from the System.\n23\nDistribution Licensee\n\"Distribution licensee\" means a\n\t\t\t\tlicensee authorised to operate and maintain a distribution system\n\t\t\t\tfor supplying electricity to the consumers in his area of supply.\n24\nDistribution System\n\"Distribution System\" means the system\n\t\t\t\tof wires and associated facilities between the delivery points on\n\t\t\t\tthe transmission lines or the generating station connection and\n\t\t\t\tthe point of connection to the installation of the consumers.\n25\nDisturbance Recorder (DR)\nA device provided to record the behavior of the\n\t\t\t\tpre-selected digital and analog values of the system parameters\n\t\t\t\tduring an event.\n26\nData Acquisition System (DAS)\nA device provided to record the sequence of\n\t\t\t\toperation in time, of the relays / equipments / system parameters\n\t\t\t\tat a location.\n27\nEvent\n'Event' when used in conjunction with the\n\t\t\t\tterminology 'Event Logger' means an unscheduled or unplanned\n\t\t\t\toccurrence on a Grid, including faults, incidents and breakdowns\n28\nEvent Logger\nA device provided to record the sequence of\n\t\t\t\toperation in (EL) time, of the relays / equipments ; at a\n\t\t\t\tlocation during an event.\n29\nExternal Interconnection\nElectric lines and electrical equipment used for\n\t\t\t\ttransmission of electricity between the Inter State and Intra\n\t\t\t\tState Transmission System.\n30\nForced Outage\nAn outage of a Generating Unit or a transmission\n\t\t\t\tfacility due to a fault or other reasons, which has not been\n\t\t\t\tplanned.\n31\nGenerating Company\nMeans any company or body corporate or\n\t\t\t\tassociation or body of individuals, whether incorporated or not,\n\t\t\t\tor artificial juridical person, which owns or operates or\n\t\t\t\tmaintains a generating station.\n32\nGenerating Unit\nThe combination of an electrical power generator\n\t\t\t\tand its prime mover and all of its associated equipment, which\n\t\t\t\ttogether constitutes a single generating machine.\n33\nGood Utility\nAny of the practices, methods and acts engaged\n\t\t\t\tin or Practices approved by a significant portion of the electric\n\t\t\t\tutility industry during the relevant time period which could have\n\t\t\t\tbeen expected to accomplish the desired results at a reasonable\n\t\t\t\tcost consistent with good business practices, reliably, safely\n\t\t\t\tand with expedition.\n34\nGovernor Droop\nIn relation to the operation of the governor of\n\t\t\t\ta Generating Unit, the percentage drop in system frequency which\n\t\t\t\twould cause the Generating Unit under free governor action to\n\t\t\t\tchange its output from zero to full load.\n35\nHigh voltage DC System (HVDC)\nHigh Voltage Direct Current System\n36\nIEC\nInternational Electro Technical Commission, the\n\t\t\t\tauthority that approves the electricity industry standards used\n\t\t\t\ton an international basis.\n37\nIndependent Private Transmission Company (IPTC)\nA licensed transmission agency, not owned /\n\t\t\t\tcontrolled by the Central State Government, involved in the\n\t\t\t\tbusiness of transmission of electrical energy\n38\nIndian Electricity Grid Code (IEGC)\nA document describing the philosophy and the\n\t\t\t\tresponsibilities for planning and operation of Indian power\n\t\t\t\tsystem specified by the CERC in accordance with sub-section 1 (h)\n\t\t\t\tof Section 79 of the Act.\n39\nInter State Transmission System (ISTS)\nInter-State Transmission System includes\n(i) Any system for the conveyance of electricity\n\t\t\t\tby means of a main transmission line from the territory of one\n\t\t\t\tState to another State\n(ii) The conveyance of energy across the\n\t\t\t\tterritory of an intervening State as well as conveyance within\n\t\t\t\tthe State which is incidental to such inter-state transmission of\n\t\t\t\tenergy\n(iii) The transmission of electricity within the\n\t\t\t\tterritory of State on a system built, owned, operated, maintained\n\t\t\t\tor controlled by CTU.\n40\nIntra State Transmission System\nThe transmission system within the State of\n\t\t\t\tTamil Nadu for the transmission of electricity to various parts\n\t\t\t\tof the State\n41\nLean Period\nThat period in a day when electrical demand is\n\t\t\t\tat it's lowest\n42\nLicensee\nA person who has been granted a license under\n\t\t\t\tsection 14 of the Electricity Act, 2003 to supply or transmit or\n\t\t\t\ttrade electrical energy.\n43\nLoad\nThe active, reactive or apparent power, as the\n\t\t\t\tcontext requires, generated, transmitted or distributed or\n\t\t\t\tconsumed by a utility / installation\n44\nMaximum Continuous Rating (MCR)\nThe normal rated full load MW output capacity of\n\t\t\t\ta generating unit, which can be sustained on a continuous basis\n\t\t\t\tat specified conditions.\n45\nNational Grid\nThe entire inter-connected electric power\n\t\t\t\tnetwork of the country, which would evolve after inter-connection\n\t\t\t\tof regional Grids.\n46\nOperation\nA scheduled or planned action relating to the\n\t\t\t\toperation of the power system.\n47\nOutage\nIn relation to a generation / transmission\n\t\t\t\tsystem/ distribution system or facility, an interruption of power\n\t\t\t\tsupply whether manually or through protective relaying in\n\t\t\t\tconnection with maintenance / breakdown / failure or defects.\n48\nPeak Period\nThat period in a day when electrical demand is\n\t\t\t\tat its highest.\n49\nPool Account\nA business account for payments regarding\n\t\t\t\tunscheduled interchanges (UI account) or and reactive energy\n\t\t\t\texchanges (Reactive Energy account), as the case may be.\n50\nPower Station / Power Plant\nAn installation of one or more Generating Units\n\t\t\t\t(even when sited separately) owned and / or operated by the same\n\t\t\t\tGenerating Company and which may reasonably be considered as\n\t\t\t\tbeing managed as a single integrated generating complex.\n51\nPrudent Utility Practices\nThose practices, methods, techniques and\n\t\t\t\tstandards, as changed from time to time that are generally\n\t\t\t\taccepted for use in the international electric utility industry,\n\t\t\t\ttaking into account conditions in India / Tamil Nadu, and\n\t\t\t\tcommonly used in prudent electric utility engineering and\n\t\t\t\toperations to design, engineer, construct, test, operate and\n\t\t\t\tmaintain equipment lawfully, safely, efficiently and economically\n\t\t\t\tas applicable to equipment of a certain size, service and type\n\t\t\t\tand which practices, methods, standards and acts shall be\n\t\t\t\tadjusted to the extent necessary, in order:\n(a) to conform to operation and maintenance\n\t\t\t\tguidelines recommended by the equipment manufacturers and\n\t\t\t\tsuppliers and according to the guidelines given in the Indian /\n\t\t\t\tInternational Standards code of practice for such equipments.\n(b) to ensure compliance with the Electricity\n\t\t\t\tAct 2003, rules and other related laws.\n(c) to take into account the site location,\n\t\t\t\tincluding without limitation, the climatic, hydrological and\n\t\t\t\tother environmental or general conditions thereof.\n(d) to conform to energy conservation and\n(e) to conform to the general safety standards.\n52\nRegional Energy Account (REA)\nA regional energy account, for the settlement\n\t\t\t\tand billing of \"Capacity Charge” and \"Energy\n\t\t\t\tCharge\".\n53\nRegional Grid\nThe important elements of constituent / user\n\t\t\t\tsystems including the ISTS which the RLDC supervises.\n54\nThe Regional Load Despatch Centre (RLDC)\n'Regional Load Despatch Centre.' means the\n\t\t\t\tCentre established under sub-section (1) of Section 27 of the\n\t\t\t\tAct.\n55\nSingle Line Diagram (SLD)\nDiagrams which are a schematic representation of\n\t\t\t\tthe HV/EHV apparatus and the connections to all external circuits\n\t\t\t\tat a Connection Point incorporating numbering nomenclature and\n\t\t\t\tlabeling.\n56\nSite Common Drawing\nDrawing prepared for each connection point which\n\t\t\t\tincorporates layout drawings, electrical layout drawings, common\n\t\t\t\tprotection / control drawings and common service drawings.\n57\nSouthern Region / Region\nRegion comprising of the States of Tamil Nadu,\n\t\t\t\tAndhra Pradesh, Karnataka, Kerala and Pondicherry for the\n\t\t\t\tintegrated operation of the electricity system.\n58\nSpinning Reserve\nPart loaded generating capacity with some\n\t\t\t\treserve margin that is synchronized to the system and is ready to\n\t\t\t\tprovide increased generation at short notice pursuant to despatch\n\t\t\t\tinstruction or instantaneously in response to a frequency drop.\n59\nState Load Despatch Centre (SLDC)\nThe load despatch centre established under\n\t\t\t\tsection 31 (1) the Act, operating round the clock for the purpose\n\t\t\t\tof managing the operation of the transmission system and\n\t\t\t\tco-ordination of generation and drawal on a real time basis.\n60\nState Sub Load Centre (SSLDC)\nState's Sub Load Centre for local control at\n\t\t\t\tvarious places in Tamil Nadu.\n61\nSupervisory Control and Data Acquisition (SCADA)\n'SCADA' means Supervisory Control and Data\n\t\t\t\tAcquisition System that acquire data from remote locations over\n\t\t\t\tcommunication links and process it at centralized control\n\t\t\t\tlocation for monitoring, supervision, control as well as decision\n\t\t\t\tsupport.\n62\nState Transmission Utility (STU)\n\"State Transmission Utility\" means the\n\t\t\t\tBoard or the Government company specified as such by the State\n\t\t\t\tGovernment under sub-section (1) of section 39.\n63\nStatic VAR Compensator (SVC)\nAn electrical facility designed for the purpose\n\t\t\t\tof generating or absorbing reactive power.\n64\nSTS\nState Transmission System\n65\nSupply\n\"Supply\" in relation to electricity,\n\t\t\t\tmeans the sale of electricity to a licensee or consumer\n66\nTNERC\nTamil Nadu Electricity Regulatory Commission\n67\nTNEGC\nTamil Nadu Electricity Grid Code\n68\nTransmission System\nThe system of EHT electric lines and electrical\n\t\t\t\tequipment owned and / or operated by the STU and other\n\t\t\t\ttransmission licensees, for the purpose of the transmission of\n\t\t\t\telectricity between power stations, external interconnections and\n\t\t\t\tthe distribution system.\n69\nTransmission License\nA license granted by the Commission under\n\t\t\t\tsection 14 of the Act, to transmit electricity.\n70\nUser\nA person including the STU, Generating Company,\n\t\t\t\tLicensee and Power Grid Corporation of India or any such entity\n\t\t\t\tthat uses the Transmission System and who must comply with the\n\t\t\t\tprovisions of the Grid Code.\n71\nUtility\n\"Utility\" means the electrical lines\n\t\t\t\tor electrical plant, and includes all lands, buildings, works and\n\t\t\t\tmaterials attached thereto belonging to any person acting as a\n\t\t\t\tgenerating company or licensee under the provisions of the Act.\nChapter 3\nGeneral",
        "footnote": "",
        "is_definition": true,
        "sort_order": 1
    },
    "prev_section": "1",
    "next_section": "3"
}