Schedule-1 (A)
Month & Year
Index No. Base Year (2001-100)
Link Factor Change for base year
Changed Index No. for base year (1960-100)
1
2
3
4
July-08
143
4.63 x 4.93
3264.11
August-08
145
4.63 x 4.93
3309.76
September-08
146
4.63 x 4.93
3332.59
October-08
148
4.63 x 4.93
3378.24
November-08
148
4.63 x 4.93
3378.24
December-08
147
4.63 x 4.93
3355.41
Total
-
-
20018.35
Average %
-
-
3336.40
Schedule-I(B)
Schedule-II
Sl.
Categories of Workers
Basic Minimum Wage date 1.4.09
V.D.A. Effective from 1.4.09
Total Wage (3+4)
Remarks
1
2
3
4
5
6
1.
Stone Breaking & stone Crushing Operations
General Work
1.
Unskilled
Rs.
89.00
Per day
13.00
102.00
2.
Semi-skilled
"
92.00
"
13.00
105.00
3.
Skilled
"
113.00
"
16.00
129.00
4.
Highly Skilled
"
138.00
"
19.00
157.00
5.
Clerical/Supervisory
"
2553.00
Per month
359.00
2912.00
Piece Work
(I)
Mining & Carrying by Bullock Cart.
(a)
Within up to quarter mile per 100 Cft-
"
193.00
27.00
220.00
(b)
For every above quarter mile of carrying per 100/-Cft.-
"
45.00
06.00
51.00
II.
Mining chelly breaking and transport by trolley per tub. of
25ft-
"
48.00
07.00
55.00
III.
Chelly breaker from boulder per 100/-Cft.
"
48.00
07.00
55.00
IV.
Ballast Breaker from boulder, per 100/- Cft.
(a)
2" x 3"
"
101.00
14.00
115.00
(b)
2" x 2.50"
"
125.00
18.00
143.00
(c)
1.50"x 2"
"
150.00
21.00
171.00
(d)
1"
"
248.00
35.00
283.00
V.
Breaking Ballast from telai per Box of 5 ft.
"
16.00
02.00
18.00
VI.
Chips Breaker.
(a)
Hand made chips of ¾4" Dn. per Cft.
"
08.00
01.00
09.00
(b)
Hand made chips of 1" Dn. per Cft.
"
08.00
01.00
09.00
VII.
Earth Cutting.
(a)
For soft earth per 90 Cft.
"
89.00
13.00
102.00
(b)
For hard earth per 75 Cft.
"
89.00
13.00
102.00
(c)
For highly hard earth, per 60 Cft.
"
89.00
13.00
102.00
Note :- Decision of 15% less earth cutting for women
worker, bet will get equal wage.
Note
VIII.
Borers and Drollers per ft. -
"
12.00
02.00
14.00
IX.
Mines (Including boulders carrying Head load within a quarter
mile.) per 25 Cft.
"
58.00
08.00
66.00
X.
Wagon Loaders full head of Board gauges wagon (500 cubic ft.)
per Wagon load.
"
160.00
22.00
182.00
XI.
Stone Set (Stone Bricks) per 100 Pcs.
(a)
Breaking Size (9" x 6" x 4")
"
195.00
27.00
222.00
(b)
Stone Set (Stone Bricks) Polishing
"
110.00
15.00
125.00
(c)
Stone Set (Stone Bricks) Casting & Transporting.
"
89.00
13.00
102.00
2.
Bidi Making Manufacture General Work
1.
Unskilled
Rs.
89.00
Per day
13.00
102.00
2.
Semiskilled
"
92.00
"
13.00
105.00
3.
Skilled
"
113.00
"
16.00
129.00
4.
Highly Skilled
"
138.00
"
19.00
157.00
5.
Clerical/Supervisory
"
2553.00
Per month
359.00
2912.00
Piece Work
Per thousand bidi provided that Where employers
earning at this rate is less than Rs. 43.00 per day he shall be
paid atleast Rs. 43.00 per that day subject to the condition
specified in the annexure hereto.
"
86.00
12.00
98.00
(a)
Labelling (Single) per lakh
"
110.00
15.00
125.00
(b)
Labelling (double) per lakh
"
114.00
16.00
130.00
II.
(c)
(1) Employees employed in Sekai by any process of Bidi other than tandoor, per lakh
"
53.00
07.00
60.00
(ii)
Sekai by Tandoor per lakh Bidi
"
54.00
08.00
62.00
(d)
Packing (Basket packing) per lakh
"
55.00
08.00
63.00
3.
Brick Manufactory-
General Work
1.
Unskilled
Rs.
89.00
Per day
13.00
102.00
2.
Semi-skilled
"
92.00
"
13.00
105.00
3.
Skilled
"
113.00
"
16.00
129.00
4.
Highly Skilled
"
138.00
"
19.00
157.00
5.
Clerical/Supervisory
"
2792.00
per month
359.00
2912.00
Piecework
II.
(i)
Brick moulders (inclusive of cutting earth kneading earth,
watering earth carrying earth to parria per thousand.
"
131.00
18.00
149.00
(ii)
Loading & unloading of Bricks in Bhattha per 1000 bricks
"
89.00
13.00
102.00
(iii)
Mistri
"
2553.00
Per month
392.00
3184.00
In Chimneys
(i)
Brick moulder (inclusive of cutting earth, kneading earth,
watering earth, and carrying earth to pariah & Pug mill per
thousand bricks
"
115.00
16.00
131.00
(ii)
Loading and Unloading of bricks (Unskilled Labour)
"
89.00
per day
13.00
102.00
(iii)
Fireman
"
2738.00
per month
385.00
3123.00
(iv)
Coalman/ Chowkidar/ Fire Khalasi and Rubishman
"
2310.00
per month
325.00
2635.00
(v)
Mate/Over Supervisor & Mistry
"
2616.00
per month
372.00
3018.00
(vi)
Munshi
"
2793.00
per month
392.00
3185.00
4.
Hair Cutting Saloon General Work
1.
Unskilled
Rs.
89.00
Per day
13.00
102.00
2.
Semi-skilled
"
92.00
"
13.00
105.00
3.
Skilled
"
113.00
"
16.00
129.00
4.
Highly Skilled
"
138.00
19.00
157.00
5.
Clerical/Supervisory
"
2553.00
Per month
359.00
2912.00
Piece Work
I.
Hair Cutting Per hair cutting
"
08.00
01.00
09.00
II.
Shaving Per shaving
"
03.000
0.00
03.00
III.
Hair cutting and Shaving per hair cutting & shaving.
"
09.00
01.00
10.00
IV.
Sar Mundan Per Sar Mundan-
"
07.00
01.00
08.00
V.
Hair Cutting of Children Per hair cutting-
"
07.00
01.00
08.00
VI.
Sar Malish Per Sarmalish -
"
03.00
00.00
03.00
VII.
Shampoo Per Shampoo-
"
07.00
01.00
08.00
VIII.
Hair Dyeing Per hair Dyeing-
"
31.00
04.00
35.00
5.
Loading & Unloading Operation General Work
1.
Unskilled
Rs.
89.00
Per day
13.00
102.00
2.
Semi-skilled
"
92.00
13.00
105.00
3.
Skilled
"
113.00
16.00
129.00
4.
Highly Skilled
"
138.00
19.00
157.00
5.
Clerical/Supervisory
"
2553.00
Per month
359.00
2912.00
Piecework
I.
Loading & UN loading of Bags, Gur Chakkies, Fertilizer
bales of cloths, Jute, Cotton etc. tin or drum of Kerosene Oil,
Mustard Oil, Coconut Oil and other oil, Dalda Molases, tar etc.
or any other load, not specified in this schedule from Godown or
Shop or storage place to railways wagon, truck, Bullock cart,
etc. or from one place to another place and vice-versa for
carrying loads every 200 meters or parts thereof per load of
"
89.00
Per day
13.00
102.00
(a)
Less than 20 kg.
"
01.00
Nil
01.00
(b)
From 20 to 65 Kg.
"
01.00
Nil
01.00
(c)
From 66Kg to 100 Kg.
"
03.00
Nil
03.00
(d)
From 101 Kg. and above (Rupees for every Two Kg load over 101
Kg)
"
04.00
01.00
05.00
(2)
(i)
Filling or weighing or welding of tins and drums or arranging
of Bags, tins, drums and other loads within the same premises
"
89.00
per day
13.00
102.00
(ii)
Filling or refilling or arranging of Bags, tins and other
load (per load of)-
"
89.00
13.00
102.00
(a)
40 Kg. to 65 Kg.
"
01.00
Nil
01.00
(b)
From 66 Kg. to 100 Kg.
"
03.00
Nil
03.00
(c)
101 Kg. and above (Rupees for every two Kg. load over 101
Kg.)
"
06.00
01.00
07.00
(iii)
Sewing of Bags or welding of tins or weighing of load above
10 Kg. on scale.
"
01.00
Nil
01.00
(3)
Loading and Unloading of Bamboo, wooden poles, Wooden logs,
fuel wood and loading unloading sugar cane:-
"
89.00
per day
13.00
102.00
(i)
Loading of Bamboo and Wooden Poles:-
(a)
Per Railway wagon
"
180.00
25.00
205.00
(b)
Per Truck
"
85.00
12.00
97.00
(c)
Per Tyre cart
"
25.00
04.00
29.00
(d)
Per bullock cart
"
17.00
02.00
19.00
(ii)
Loading of wooden logs and fuel woods:-
(a)
Per railways wagon
"
180.00
25.00
205.00
(b)
Per truck
"
85.00
12.00
97.00
(c)
Per tyre cart
"
25.00
04.00
29.00
(d)
Per Bullock Cart
"
17.00
02.00
19.00
(iii)
Unloading of Bamboo Wooden poles, wooden logs and wood:-
(a)
Per railways wagon
"
58.00
08.00
66.00
(b)
Per truck
"
25.00
04.00
29.00
(c)
Per tyre cart
"
08.00
01.00
09.00
(d)
Per Bullock cart
"
05.00
01.00
06.00
(iv)
Loading and Unloading of Sugar Cane. Per quintal
"
03.0
Nil
03.00
(4)
Loading and Unloading of Bricks, Fire Bricks, tiles, Fragile
wares made of cement or clay or glass, Boulders, Ballast, chelly
and coal.
"
89.00
per day
13.00
102.00
(i)
Loading and Unloading of Fire Bricks, tiles, fragile, wares
made of cement or clay or Glass:-
(a)
Per railways wagon
"
491.00
69.00
560.00
(b)
Per truck
"
213.00
30.00
243.00
(c)
Per tyre cart
"
62.00
09.00
71.00
(d)
Per Bullock cart
"
43.00
06.00
49.00
(ii)
Loading of Bricks:-
(a)
Per railway wagon
"
382.00
54.00
436.00
(b)
Per Truck
"
180.00
25.00
205.00
(c)
Per tyre cart
"
52.00
07.00
59.00
(d)
Per Bullock Cart
"
38.00
05.00
43.00
(iii)
Unloading of Bricks:-
(a)
Per railway wagon
"
252.00
35.00
287.00
(b)
Per Truck
"
122.00
17.00
139.00
(c)
Per tyre cart
"
38.00
05.00
43.00
(d)
Per Bullock Cart
"
25.00
04.00
29.00
(iv)
Loading & Unloading of Stone chips & Challi.
(a)
Loading per 100 cft
"
31.00
04.00
35.00
(b)
Unloading per 100 cft
"
21.00
03.00
24.00
(v)
Loading & Unloading of Ballast & Boulders-
(a)
Loading per 100 Cft.
"
34.00
05.00
39.00
(b)
Unloading per 100 cft
"
21.00
03.00
24.00
5.
Loading, Unloading of Iron rods, G.I. Sheet, Iron Pipes, hume
pipe, Machineries equipments and other hard wires:-
"
89.00
per day
13.00
102.00
(1)
Loading-
(a)
Per railway wagon
"
430.00
60.00
490.00
(b)
Per Truck
"
199.00
28.00
227.00
(c)
Per tyre cart
"
58.00
08.00
66.00
(d)
Per Bullock Cart
"
49.00
07.00
56.00
(ii)
Unloading-
(a)
Per railway wagon
"
290.00
41.00
331.00
(b)
Per Truck
"
146.00
21.00
167.00
(c)
Per tyre cart
"
45.00
06.00
51.00
(d)
Per Bullock Cart
"
30.00
04.00
34.00
(6)
Loading and Unloading of coal
"
89.00
per day
13.00
102.00
(i)
Loading-
(a)
Per railway wagon (4 wheel (Wagon of 22 tones capacity)
"
173.00
24.00
197.00
(b)
Per truck 200 cft.
"
108.00
15.00
123.00
(c)
Per tyre Cart
"
30.00
04.00
34.00
(d)
Per Bullock Cart
"
25.00
04.00
29.00
(ii)
Unloading
(a)
Per railway wagon (Wagon of 22 tones capacity)
"
117.00
16.00
133.00
(b)
Per Truck (200 cft)
"
68.00
10.00
78.00
(c)
Per tyre cart
"
16.00
02.00
18.00
(d)
Per Bullock Cart
"
10.00
01.00
11.00
(7)
Loading and Unloading of lime and clay and earth etc-
(i)
Loading
"
89.00
per day
13.00
102.00
(a)
Per railway wagon (wagon of 22 tones capacity)
"
135.00
19.00
154.00
(b)
Per Truck (200 cft.)
"
79.00
11.00
90.00
(c)
Per tyre cart
"
39.00
05.00
44.00
(d)
Per Bullock cart
"
30.00
04.00
34.00
(ii)
Unloading-
(a)
Per railway wagon (4 wheel wagon of 22 tones capacity)
"
96.00
13.00
109.00
(b)
Per Truck (22 cft.)
"
42.00
06.00
48.00
(c)
Per tyre cart
"
21.00
03.00
24.00
(d)
Per Bullock cart
"
16.00
02.00
18.00
8.
Loading and Unloading of Cement per bag.
"
02.00
Nil
02.00
6.
Forestry and Timber in a Operation.
General Work
1.
Unskilled
Rs.
89.00
Per day
13.00
102.00
2.
Semi-skilled
"
92-00
"
13.00
105.00
3.
Skilled
"
113.00
"
16.00
129.00
4.
Highly Skilled
"
138.00
"
19.00
157.00
5.
Clerical/Supervisory
"
2553.00
Per month
359.00
2912.00
Piecework
(a)
Long cutter of various sizes falling demarking and stocking
at loading sites at copies forest, pole. (4" x 5") Per
cubic meter
"
02.00
Nil
02.00
(b)
Conversion of team line and fencing post per piece
"
03.00
Nil
03.00
(c)
Cutting conversion including Stacking at site of fire wood
(size per cubic meter)
"
26.00
04.00
30.00
(d)
Cutting and Collecting of bamboo (including siding) Per 100
piece.
(i)
Loggas
"
76.00
11.00
87.00
(ii)
Tonnas
"
62.00
08.00
70.00
(iii)
Sorahi
"
26.00
04.00
30.00
(e)
Charcoal Manufactory per bag (35 Kg)
"
20.00
03.00
23.00
(f)
Fodder Grass, or thatch grass or sewal grass (Per K.g.)
"
20.00
03.00
23.00
(g)
Sal seed & Bonhimia leaves collection (Per kg)
"
05.00
01.00
06.00
(7)
Silk Industry including-
Manufacture from pure silk, artificial silk and other staple
yarn.
General Work
1.
Unskilled
Rs.
89.00
Per day
13.00
102.00
2.
Semi-skilled
"
92.00
"
13.00
105.00
3.
Skilled
"
113.00
"
16.00
129.00
4.
Highly Skilled
"
138.00
"
19.00
157.00
5.
Clerical/Supervisory
"
2553.00
Per month
359.00
2912.00
Piece Work
(a)
Power loom weaver Per meter for plain-
"
05.00
01.00
06.00
cloth and per meter for Erimchek & other fine cloth
"
04.00
01.00
05.00
(b)
Handloom Weaver Per meter for Plain cloth-
"
07.00
01.00
08.00
Per Meter for Erimchek-Tusser mulberry and munga cloth-
"
09.00
01.00
10.00
(c)
Pin Wider
"
10.00
01.00
11.00
(i)
Power loom If prepared for cloth-
"
05.00
01.00
06.00
Per Kg. Hank, If prepared from care cloth
"
04.00
01.00
05.00
(ii)
Handloom per Kg
"
08.00
01.00
09.00
(d)
Bobbin Winder
(i)
Power loom-
Per kg if prepared hand cloth-
"
04.00
01.00
05.00
(ii)
Handloom per Kg.
"
08.00
01.00
09.00
(e)
Cutting & Shaping
"
(i)
Staple per than of 12 meter-
"
04.00
01.00
05.00
8.
Earth Cutting Operation-
(a)
For every 90 cubic of soft earth
"
89.00
13.00
102.00
(b)
For every 75 cubic ft. of hard earth-
"
89.00
13.00
102.00
(c)
For every 60 cubic ft. of highly hard earth.-
"
89.00
13.00
102.00
Note :- Decision of 15% less earth cutting for women
worker, but will gate equal wage.
Note :- Decision of 15% less earth cutting for women
worker, but will gate equal wage.
9.
Tea Plantation-
General Work
1.
Unskilled
Rs.
89.00
Per day
13.00
102.00
2.
Semi-skilled
"
92.00
"
13.00
105.00
3.
Skilled
"
113.00
"
16.00
129.00
4.
Highly skilled
"
138.00
"
19.00
157.00
5.
Clerical/Supervisory
"
2553.00
Per month
359.00
2912.00
Piecework
(a)
Plucker per plucking of one Kg. of green Leaves-
"
04.0
01.00
05.00
(b)
Person engaged in hocking- for preparing 40 nails in a land
measuring 0.133 acre.
"
13.00
02.00
15.00
(c)
Person engaged in weeding and forking per 100 tea bush-
"
13.00
02.00
15.00
10.
Lac Manufactory-
General Work
1.
Unskilled
Rs.
89.00
Per day
13.00
102.00
2.
Semi-skilled
"
92.00
"
13.00
105.00
3.
Skilled
"
113.00
"
16.00
129.00
4.
Highly Skilled
"
138.00
"
19.00
157.00
5.
Clerical/Supervisory
"
2553.00
Per month
359.00
2912.00
Piecework
(a)
Karigar for melting 40 Kg. of seed lac. -
"
56.00
08.00
64.00
(b)
Belwaia for melting 40 Kg. of seed lac
"
46.00
06.00
52.00
(c)
Pherwaia for melting 40 Kg. of seed lac
"
28.00
04.00
32.00
(d)
Kamin & Ghogiahin for washing &
separating 40 Kg. of seed lac from bhushi, Mullama sand.
"
14.00
02.00
16.00
(e)
Karahia and Karahia ghasander and Mayandarior washing of 40 Kg of seed lac through washing Machine.
"
13.00
02.00
15.00
(f)
Tailor (Khalifa)
(i)
when using own-machine. (per Bhatta)-
"
08.00
01.00
09.00
(ii)
when using employer's machine (per Bhatta)
"
04.00
01.00
05.00
(iii)
Crusher per 40 Kg. of Stick lac-
"
09.00
01.00
10.00
(h)
Breaker per 40 Kg. of stick lac-
"
08.00
01.00
09.00
11.
Power loom Industry.-
General Work
1.
Unskilled
Rs.
89.00
Per day
13.00
102.00
2.
Semi-skilled
"
92.00
13.00
105.00
3.
Skilled
"
113.00
16.00
129.00
4.
Highly Skilled
"
138.00
19.00
157.00
5.
Clerical/Supervisory
"
2553.00
Per month
359.00
2912.00
Piecework
pick-
26
"
05.00
01.00
06.00
28-
"
05.00
01.00
06.00
30-
"
05.00
01.00
06.00
32-
"
05.00
01.00
06.00
34-
"
05.00
01.00
06.00
36-
"
06.00
01.00
07.00
40-
"
07.00
01.00
08.00
42-
"
07.00
01.00
08.00
44-
"
08.00
01.00
09.00
46-
"
08.00
01.00
09.00
48-
"
08.00
01.00
09.00
50-
"
08.00
01.00
09.00
52-
"
09.00
01.00
10.00
12.
Plucking and Processing- Kendu leaves General Work
1.
Unskilled
Rs.
89.00
Per day
13.00
102.00
2.
Semi-skilled
"
92.00
"
13.00
105.00
3.
Skilled
"
113.00
"
16.00
129.00
4.
Highly Skilled
"
138.00
"
19.00
157.00
5.
Clerical/Supervisory
"
2553.00
Per month
359.00
2912.00
Piecework
(a)
Plucking of leaves per 50,000 leaves or 60 paise per 50
leaves.
"
327.00
46.00
373.00
(b)
Packing of Bags
Per small bags-
"
05.00
01.00
06.00
Per big bags-
"
10.00
01.00
11.00
(c)
Grading and bundling per bind of 5 Kg
"
10.00
01.00
11.00
The 29th September, 2009
Section 5 • Minimum Rates of Wages in Scheduled Employments, 2009
5. Notification No. 5/MW-403/09 L&R-1654, dated 1.6.2009.
minimum-rates-of-wages-in-scheduled-employments-2009-sec-5.json
•
Section 5
{
"act_title": "Minimum Rates of Wages in Scheduled Employments, 2009",
"act_slug": "minimum-rates-of-wages-in-scheduled-employments-2009",
"section_label": "Section",
"section": {
"number": "5",
"title": "5. Notification No. 5/MW-403/09 L&R-1654, dated 1.6.2009.",
"chapter": null,
"content": "Schedule-1 (A)\nMonth & Year\nIndex No. Base Year (2001-100)\nLink Factor Change for base year\nChanged Index No. for base year (1960-100)\n1\n2\n3\n4\nJuly-08\n143\n4.63 x 4.93\n3264.11\nAugust-08\n145\n4.63 x 4.93\n3309.76\nSeptember-08\n146\n4.63 x 4.93\n3332.59\nOctober-08\n148\n4.63 x 4.93\n3378.24\nNovember-08\n148\n4.63 x 4.93\n3378.24\nDecember-08\n147\n4.63 x 4.93\n3355.41\nTotal\n-\n-\n20018.35\nAverage %\n-\n-\n3336.40\nSchedule-I(B)\nSchedule-II\nSl.\nCategories of Workers\nBasic Minimum Wage date 1.4.09\nV.D.A. Effective from 1.4.09\nTotal Wage (3+4)\nRemarks\n1\n2\n3\n4\n5\n6\n1.\nStone Breaking & stone Crushing Operations\nGeneral Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n\"\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiece Work\n(I)\nMining & Carrying by Bullock Cart.\n(a)\nWithin up to quarter mile per 100 Cft-\n\"\n193.00\n27.00\n220.00\n(b)\nFor every above quarter mile of carrying per 100/-Cft.-\n\"\n45.00\n06.00\n51.00\nII.\nMining chelly breaking and transport by trolley per tub. of\n\t\t\t\t\t25ft-\n\"\n48.00\n07.00\n55.00\nIII.\nChelly breaker from boulder per 100/-Cft.\n\"\n48.00\n07.00\n55.00\nIV.\nBallast Breaker from boulder, per 100/- Cft.\n(a)\n2\" x 3\"\n\"\n101.00\n14.00\n115.00\n(b)\n2\" x 2.50\"\n\"\n125.00\n18.00\n143.00\n(c)\n1.50\"x 2\"\n\"\n150.00\n21.00\n171.00\n(d)\n1\"\n\"\n248.00\n35.00\n283.00\nV.\nBreaking Ballast from telai per Box of 5 ft.\n\"\n16.00\n02.00\n18.00\nVI.\nChips Breaker.\n(a)\nHand made chips of ¾4\" Dn. per Cft.\n\"\n08.00\n01.00\n09.00\n(b)\nHand made chips of 1\" Dn. per Cft.\n\"\n08.00\n01.00\n09.00\nVII.\nEarth Cutting.\n(a)\nFor soft earth per 90 Cft.\n\"\n89.00\n13.00\n102.00\n(b)\nFor hard earth per 75 Cft.\n\"\n89.00\n13.00\n102.00\n(c)\nFor highly hard earth, per 60 Cft.\n\"\n89.00\n13.00\n102.00\nNote :- Decision of 15% less earth cutting for women\n\t\t\t\t\tworker, bet will get equal wage.\nNote\nVIII.\nBorers and Drollers per ft. -\n\"\n12.00\n02.00\n14.00\nIX.\nMines (Including boulders carrying Head load within a quarter\n\t\t\t\t\tmile.) per 25 Cft.\n\"\n58.00\n08.00\n66.00\nX.\nWagon Loaders full head of Board gauges wagon (500 cubic ft.)\n\t\t\t\t\tper Wagon load.\n\"\n160.00\n22.00\n182.00\nXI.\nStone Set (Stone Bricks) per 100 Pcs.\n(a)\nBreaking Size (9\" x 6\" x 4\")\n\"\n195.00\n27.00\n222.00\n(b)\nStone Set (Stone Bricks) Polishing\n\"\n110.00\n15.00\n125.00\n(c)\nStone Set (Stone Bricks) Casting & Transporting.\n\"\n89.00\n13.00\n102.00\n2.\nBidi Making Manufacture General Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemiskilled\n\"\n92.00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n\"\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiece Work\nPer thousand bidi provided that Where employers\n\t\t\t\t\tearning at this rate is less than Rs. 43.00 per day he shall be\n\t\t\t\t\tpaid atleast Rs. 43.00 per that day subject to the condition\n\t\t\t\t\tspecified in the annexure hereto.\n\"\n86.00\n12.00\n98.00\n(a)\nLabelling (Single) per lakh\n\"\n110.00\n15.00\n125.00\n(b)\nLabelling (double) per lakh\n\"\n114.00\n16.00\n130.00\nII.\n(c)\n(1) Employees employed in Sekai by any process of Bidi other than tandoor, per lakh\n\"\n53.00\n07.00\n60.00\n(ii)\nSekai by Tandoor per lakh Bidi\n\"\n54.00\n08.00\n62.00\n(d)\nPacking (Basket packing) per lakh\n\"\n55.00\n08.00\n63.00\n3.\nBrick Manufactory-\nGeneral Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n\"\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2792.00\nper month\n359.00\n2912.00\nPiecework\nII.\n(i)\nBrick moulders (inclusive of cutting earth kneading earth,\n\t\t\t\t\twatering earth carrying earth to parria per thousand.\n\"\n131.00\n18.00\n149.00\n(ii)\nLoading & unloading of Bricks in Bhattha per 1000 bricks\n\"\n89.00\n13.00\n102.00\n(iii)\nMistri\n\"\n2553.00\nPer month\n392.00\n3184.00\nIn Chimneys\n(i)\nBrick moulder (inclusive of cutting earth, kneading earth,\n\t\t\t\t\twatering earth, and carrying earth to pariah & Pug mill per\n\t\t\t\t\tthousand bricks\n\"\n115.00\n16.00\n131.00\n(ii)\nLoading and Unloading of bricks (Unskilled Labour)\n\"\n89.00\nper day\n13.00\n102.00\n(iii)\nFireman\n\"\n2738.00\nper month\n385.00\n3123.00\n(iv)\nCoalman/ Chowkidar/ Fire Khalasi and Rubishman\n\"\n2310.00\nper month\n325.00\n2635.00\n(v)\nMate/Over Supervisor & Mistry\n\"\n2616.00\nper month\n372.00\n3018.00\n(vi)\nMunshi\n\"\n2793.00\nper month\n392.00\n3185.00\n4.\nHair Cutting Saloon General Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiece Work\nI.\nHair Cutting Per hair cutting\n\"\n08.00\n01.00\n09.00\nII.\nShaving Per shaving\n\"\n03.000\n0.00\n03.00\nIII.\nHair cutting and Shaving per hair cutting & shaving.\n\"\n09.00\n01.00\n10.00\nIV.\nSar Mundan Per Sar Mundan-\n\"\n07.00\n01.00\n08.00\nV.\nHair Cutting of Children Per hair cutting-\n\"\n07.00\n01.00\n08.00\nVI.\nSar Malish Per Sarmalish -\n\"\n03.00\n00.00\n03.00\nVII.\nShampoo Per Shampoo-\n\"\n07.00\n01.00\n08.00\nVIII.\nHair Dyeing Per hair Dyeing-\n\"\n31.00\n04.00\n35.00\n5.\nLoading & Unloading Operation General Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiecework\nI.\nLoading & UN loading of Bags, Gur Chakkies, Fertilizer\n\t\t\t\t\tbales of cloths, Jute, Cotton etc. tin or drum of Kerosene Oil,\n\t\t\t\t\tMustard Oil, Coconut Oil and other oil, Dalda Molases, tar etc.\n\t\t\t\t\tor any other load, not specified in this schedule from Godown or\n\t\t\t\t\tShop or storage place to railways wagon, truck, Bullock cart,\n\t\t\t\t\tetc. or from one place to another place and vice-versa for\n\t\t\t\t\tcarrying loads every 200 meters or parts thereof per load of\n\"\n89.00\nPer day\n13.00\n102.00\n(a)\nLess than 20 kg.\n\"\n01.00\nNil\n01.00\n(b)\nFrom 20 to 65 Kg.\n\"\n01.00\nNil\n01.00\n(c)\nFrom 66Kg to 100 Kg.\n\"\n03.00\nNil\n03.00\n(d)\nFrom 101 Kg. and above (Rupees for every Two Kg load over 101\n\t\t\t\t\tKg)\n\"\n04.00\n01.00\n05.00\n(2)\n(i)\nFilling or weighing or welding of tins and drums or arranging\n\t\t\t\t\tof Bags, tins, drums and other loads within the same premises\n\"\n89.00\nper day\n13.00\n102.00\n(ii)\nFilling or refilling or arranging of Bags, tins and other\n\t\t\t\t\tload (per load of)-\n\"\n89.00\n13.00\n102.00\n(a)\n40 Kg. to 65 Kg.\n\"\n01.00\nNil\n01.00\n(b)\nFrom 66 Kg. to 100 Kg.\n\"\n03.00\nNil\n03.00\n(c)\n101 Kg. and above (Rupees for every two Kg. load over 101\n\t\t\t\t\tKg.)\n\"\n06.00\n01.00\n07.00\n(iii)\nSewing of Bags or welding of tins or weighing of load above\n\t\t\t\t\t10 Kg. on scale.\n\"\n01.00\nNil\n01.00\n(3)\nLoading and Unloading of Bamboo, wooden poles, Wooden logs,\n\t\t\t\t\tfuel wood and loading unloading sugar cane:-\n\"\n89.00\nper day\n13.00\n102.00\n(i)\nLoading of Bamboo and Wooden Poles:-\n(a)\nPer Railway wagon\n\"\n180.00\n25.00\n205.00\n(b)\nPer Truck\n\"\n85.00\n12.00\n97.00\n(c)\nPer Tyre cart\n\"\n25.00\n04.00\n29.00\n(d)\nPer bullock cart\n\"\n17.00\n02.00\n19.00\n(ii)\nLoading of wooden logs and fuel woods:-\n(a)\nPer railways wagon\n\"\n180.00\n25.00\n205.00\n(b)\nPer truck\n\"\n85.00\n12.00\n97.00\n(c)\nPer tyre cart\n\"\n25.00\n04.00\n29.00\n(d)\nPer Bullock Cart\n\"\n17.00\n02.00\n19.00\n(iii)\nUnloading of Bamboo Wooden poles, wooden logs and wood:-\n(a)\nPer railways wagon\n\"\n58.00\n08.00\n66.00\n(b)\nPer truck\n\"\n25.00\n04.00\n29.00\n(c)\nPer tyre cart\n\"\n08.00\n01.00\n09.00\n(d)\nPer Bullock cart\n\"\n05.00\n01.00\n06.00\n(iv)\nLoading and Unloading of Sugar Cane. Per quintal\n\"\n03.0\nNil\n03.00\n(4)\nLoading and Unloading of Bricks, Fire Bricks, tiles, Fragile\n\t\t\t\t\twares made of cement or clay or glass, Boulders, Ballast, chelly\n\t\t\t\t\tand coal.\n\"\n89.00\nper day\n13.00\n102.00\n(i)\nLoading and Unloading of Fire Bricks, tiles, fragile, wares\n\t\t\t\t\tmade of cement or clay or Glass:-\n(a)\nPer railways wagon\n\"\n491.00\n69.00\n560.00\n(b)\nPer truck\n\"\n213.00\n30.00\n243.00\n(c)\nPer tyre cart\n\"\n62.00\n09.00\n71.00\n(d)\nPer Bullock cart\n\"\n43.00\n06.00\n49.00\n(ii)\nLoading of Bricks:-\n(a)\nPer railway wagon\n\"\n382.00\n54.00\n436.00\n(b)\nPer Truck\n\"\n180.00\n25.00\n205.00\n(c)\nPer tyre cart\n\"\n52.00\n07.00\n59.00\n(d)\nPer Bullock Cart\n\"\n38.00\n05.00\n43.00\n(iii)\nUnloading of Bricks:-\n(a)\nPer railway wagon\n\"\n252.00\n35.00\n287.00\n(b)\nPer Truck\n\"\n122.00\n17.00\n139.00\n(c)\nPer tyre cart\n\"\n38.00\n05.00\n43.00\n(d)\nPer Bullock Cart\n\"\n25.00\n04.00\n29.00\n(iv)\nLoading & Unloading of Stone chips & Challi.\n(a)\nLoading per 100 cft\n\"\n31.00\n04.00\n35.00\n(b)\nUnloading per 100 cft\n\"\n21.00\n03.00\n24.00\n(v)\nLoading & Unloading of Ballast & Boulders-\n(a)\nLoading per 100 Cft.\n\"\n34.00\n05.00\n39.00\n(b)\nUnloading per 100 cft\n\"\n21.00\n03.00\n24.00\n5.\nLoading, Unloading of Iron rods, G.I. Sheet, Iron Pipes, hume\n\t\t\t\t\tpipe, Machineries equipments and other hard wires:-\n\"\n89.00\nper day\n13.00\n102.00\n(1)\nLoading-\n(a)\nPer railway wagon\n\"\n430.00\n60.00\n490.00\n(b)\nPer Truck\n\"\n199.00\n28.00\n227.00\n(c)\nPer tyre cart\n\"\n58.00\n08.00\n66.00\n(d)\nPer Bullock Cart\n\"\n49.00\n07.00\n56.00\n(ii)\nUnloading-\n(a)\nPer railway wagon\n\"\n290.00\n41.00\n331.00\n(b)\nPer Truck\n\"\n146.00\n21.00\n167.00\n(c)\nPer tyre cart\n\"\n45.00\n06.00\n51.00\n(d)\nPer Bullock Cart\n\"\n30.00\n04.00\n34.00\n(6)\nLoading and Unloading of coal\n\"\n89.00\nper day\n13.00\n102.00\n(i)\nLoading-\n(a)\nPer railway wagon (4 wheel (Wagon of 22 tones capacity)\n\"\n173.00\n24.00\n197.00\n(b)\nPer truck 200 cft.\n\"\n108.00\n15.00\n123.00\n(c)\nPer tyre Cart\n\"\n30.00\n04.00\n34.00\n(d)\nPer Bullock Cart\n\"\n25.00\n04.00\n29.00\n(ii)\nUnloading\n(a)\nPer railway wagon (Wagon of 22 tones capacity)\n\"\n117.00\n16.00\n133.00\n(b)\nPer Truck (200 cft)\n\"\n68.00\n10.00\n78.00\n(c)\nPer tyre cart\n\"\n16.00\n02.00\n18.00\n(d)\nPer Bullock Cart\n\"\n10.00\n01.00\n11.00\n(7)\nLoading and Unloading of lime and clay and earth etc-\n(i)\nLoading\n\"\n89.00\nper day\n13.00\n102.00\n(a)\nPer railway wagon (wagon of 22 tones capacity)\n\"\n135.00\n19.00\n154.00\n(b)\nPer Truck (200 cft.)\n\"\n79.00\n11.00\n90.00\n(c)\nPer tyre cart\n\"\n39.00\n05.00\n44.00\n(d)\nPer Bullock cart\n\"\n30.00\n04.00\n34.00\n(ii)\nUnloading-\n(a)\nPer railway wagon (4 wheel wagon of 22 tones capacity)\n\"\n96.00\n13.00\n109.00\n(b)\nPer Truck (22 cft.)\n\"\n42.00\n06.00\n48.00\n(c)\nPer tyre cart\n\"\n21.00\n03.00\n24.00\n(d)\nPer Bullock cart\n\"\n16.00\n02.00\n18.00\n8.\nLoading and Unloading of Cement per bag.\n\"\n02.00\nNil\n02.00\n6.\nForestry and Timber in a Operation.\nGeneral Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92-00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n\"\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiecework\n(a)\nLong cutter of various sizes falling demarking and stocking\n\t\t\t\t\tat loading sites at copies forest, pole. (4\" x 5\") Per\n\t\t\t\t\tcubic meter\n\"\n02.00\nNil\n02.00\n(b)\nConversion of team line and fencing post per piece\n\"\n03.00\nNil\n03.00\n(c)\nCutting conversion including Stacking at site of fire wood\n\t\t\t\t\t(size per cubic meter)\n\"\n26.00\n04.00\n30.00\n(d)\nCutting and Collecting of bamboo (including siding) Per 100\n\t\t\t\t\tpiece.\n(i)\nLoggas\n\"\n76.00\n11.00\n87.00\n(ii)\nTonnas\n\"\n62.00\n08.00\n70.00\n(iii)\nSorahi\n\"\n26.00\n04.00\n30.00\n(e)\nCharcoal Manufactory per bag (35 Kg)\n\"\n20.00\n03.00\n23.00\n(f)\nFodder Grass, or thatch grass or sewal grass (Per K.g.)\n\"\n20.00\n03.00\n23.00\n(g)\nSal seed & Bonhimia leaves collection (Per kg)\n\"\n05.00\n01.00\n06.00\n(7)\nSilk Industry including-\n\t\t\t\t\tManufacture from pure silk, artificial silk and other staple\n\t\t\t\t\tyarn.\nGeneral Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n\"\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiece Work\n(a)\nPower loom weaver Per meter for plain-\n\"\n05.00\n01.00\n06.00\ncloth and per meter for Erimchek & other fine cloth\n\"\n04.00\n01.00\n05.00\n(b)\nHandloom Weaver Per meter for Plain cloth-\n\"\n07.00\n01.00\n08.00\nPer Meter for Erimchek-Tusser mulberry and munga cloth-\n\"\n09.00\n01.00\n10.00\n(c)\nPin Wider\n\"\n10.00\n01.00\n11.00\n(i)\nPower loom If prepared for cloth-\n\"\n05.00\n01.00\n06.00\nPer Kg. Hank, If prepared from care cloth\n\"\n04.00\n01.00\n05.00\n(ii)\nHandloom per Kg\n\"\n08.00\n01.00\n09.00\n(d)\nBobbin Winder\n(i)\nPower loom-\nPer kg if prepared hand cloth-\n\"\n04.00\n01.00\n05.00\n(ii)\nHandloom per Kg.\n\"\n08.00\n01.00\n09.00\n(e)\nCutting & Shaping\n\"\n(i)\nStaple per than of 12 meter-\n\"\n04.00\n01.00\n05.00\n8.\nEarth Cutting Operation-\n(a)\nFor every 90 cubic of soft earth\n\"\n89.00\n13.00\n102.00\n(b)\nFor every 75 cubic ft. of hard earth-\n\"\n89.00\n13.00\n102.00\n(c)\nFor every 60 cubic ft. of highly hard earth.-\n\"\n89.00\n13.00\n102.00\nNote :- Decision of 15% less earth cutting for women\n\t\t\t\t\tworker, but will gate equal wage.\nNote :- Decision of 15% less earth cutting for women\n\t\t\t\t\tworker, but will gate equal wage.\n9.\nTea Plantation-\nGeneral Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly skilled\n\"\n138.00\n\"\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiecework\n(a)\nPlucker per plucking of one Kg. of green Leaves-\n\"\n04.0\n01.00\n05.00\n(b)\nPerson engaged in hocking- for preparing 40 nails in a land\n\t\t\t\t\tmeasuring 0.133 acre.\n\"\n13.00\n02.00\n15.00\n(c)\nPerson engaged in weeding and forking per 100 tea bush-\n\"\n13.00\n02.00\n15.00\n10.\nLac Manufactory-\nGeneral Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n\"\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiecework\n(a)\nKarigar for melting 40 Kg. of seed lac. -\n\"\n56.00\n08.00\n64.00\n(b)\nBelwaia for melting 40 Kg. of seed lac\n\"\n46.00\n06.00\n52.00\n(c)\nPherwaia for melting 40 Kg. of seed lac\n\"\n28.00\n04.00\n32.00\n(d)\nKamin & Ghogiahin for washing &\n\t\t\t\t\tseparating 40 Kg. of seed lac from bhushi, Mullama sand.\n\"\n14.00\n02.00\n16.00\n(e)\nKarahia and Karahia ghasander and Mayandarior washing of 40 Kg of seed lac through washing Machine.\n\"\n13.00\n02.00\n15.00\n(f)\nTailor (Khalifa)\n(i)\nwhen using own-machine. (per Bhatta)-\n\"\n08.00\n01.00\n09.00\n(ii)\nwhen using employer's machine (per Bhatta)\n\"\n04.00\n01.00\n05.00\n(iii)\nCrusher per 40 Kg. of Stick lac-\n\"\n09.00\n01.00\n10.00\n(h)\nBreaker per 40 Kg. of stick lac-\n\"\n08.00\n01.00\n09.00\n11.\nPower loom Industry.-\nGeneral Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiecework\npick-\n26\n\"\n05.00\n01.00\n06.00\n28-\n\"\n05.00\n01.00\n06.00\n30-\n\"\n05.00\n01.00\n06.00\n32-\n\"\n05.00\n01.00\n06.00\n34-\n\"\n05.00\n01.00\n06.00\n36-\n\"\n06.00\n01.00\n07.00\n40-\n\"\n07.00\n01.00\n08.00\n42-\n\"\n07.00\n01.00\n08.00\n44-\n\"\n08.00\n01.00\n09.00\n46-\n\"\n08.00\n01.00\n09.00\n48-\n\"\n08.00\n01.00\n09.00\n50-\n\"\n08.00\n01.00\n09.00\n52-\n\"\n09.00\n01.00\n10.00\n12.\nPlucking and Processing- Kendu leaves General Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n\"\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiecework\n(a)\nPlucking of leaves per 50,000 leaves or 60 paise per 50\n\t\t\t\t\tleaves.\n\"\n327.00\n46.00\n373.00\n(b)\nPacking of Bags\nPer small bags-\n\"\n05.00\n01.00\n06.00\nPer big bags-\n\"\n10.00\n01.00\n11.00\n(c)\nGrading and bundling per bind of 5 Kg\n\"\n10.00\n01.00\n11.00\nThe 29th September, 2009",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
"prev_section": "4",
"next_section": "6"
}