← Back to Directory
Minimum Rates of Wages in Scheduled Employments, 2009
Minimum Rates of Wages in Scheduled Employments, 2009
Sections
2. Notification No. 5/MW-401/07 L&R 1655, dated 1.6.2009.
Section 23. Notification No. 5/MW-405/07 L&R 1657, dated 1.6.2009.
Section 34. Notification No. 5/MW-402/09 L&R-1651, dated 1.6.2009.
Section 45. Notification No. 5/MW-403/09 L&R-1654, dated 1.6.2009.
Section 56. S.O. 212 dated 1st October, 2009.
Section 67. Notification. No. 5/M-W-402/09 L&R-3523, dated 29.9.2009.
Section 78. S.O. 214, dated 1st October, 2009.
Section 89. S.O. 208, dated 1st October, 2009.
Section 91. Name of Employment.-Domestic Workers Notification No:-4444, date 5th December, 2007.
Section 110. S.O. 206 dated 1st October, 2009.
Section 1011. S.O. 204, dated 1st October, 2009.
Section 1112. S.O. 55, dated 19th March, 2010.
Section 1213. S.O. 57, dated the 19th March, 2010.
Section 1314. S.O. 59, dated 19th March, 2010.
Section 1415. S.O. 61, dated the 19th March, 2010.
Section 15
minimum-rates-of-wages-in-scheduled-employments-2009.json
•
15 Sections
•
Bihar
{
"id": 15590,
"slug": "minimum-rates-of-wages-in-scheduled-employments-2009",
"title": "Minimum Rates of Wages in Scheduled Employments, 2009",
"short_title": "Minimum Rates of Wages in Scheduled Employments, 2009",
"act_number": "Notification NO.5/MW-401/09 L&E 1659, dated 1.6.20",
"act_year": 2009,
"act_type": "STATE",
"location": "Bihar",
"law_status": "unknown",
"enactment_date": null,
"description": "Minimum Rates of Wages in Scheduled Employments, 2009",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "2",
"title": "2. Notification No. 5/MW-401/07 L&R 1655, dated 1.6.2009.",
"chapter": null,
"content": "Schedule-1 (A)\nMonth & Year\nIndex No. Base Year (2001-100)\nLink Factor Change for base year\nChanged Index No. for base year (1960-100)\n1\n2\n3\n4\nJuly-08\n143\n4.63 x 4.93\n3264.11\nAugust-08\n145\n4.63 x 4.93\n3309.76\nSeptember-08\n146\n4.63 x 4.93\n3332.59\nOctober-08\n148\n4.63 x 4.93\n3378.24\nNovember-08\n148\n4.63 x 4.93\n3378.24\nDecember-08\n147\n4.63 x 4.93\n3355.41\nTotal\n-\n-\n20018.35\nAverage\n-\n-\n3336.40\nSchedule (B)\n1.\nName of Employment: -\nDomestic Servant\nNotification No.:- 4444\ndate: - 5.12.2007\nSchedule-II\nSl. No.\nCategories of Worker\nBasic Minimum Wage per month\nV.D.A. Effective date 1.4.2009\nTotal wage rom 1.4.09 (3 + 4) per month\nRemarks\n1\n2\n3\n4\n5\n6\n1.\nWashing the utensils (One hour)\nRs. 244.00\nRs. 59.00\nRs. 303.00\n–\n2.\nWashing the clothes/washing the Utensil (One hour)\nRs. 244.00\nRs. 59.00\nRs. 303.00\n–\n3.\nWashing the clothes/washing the utensil house keeping (A.\n\t\t\t\tHouse of 1000 Sq. ft.) (One hours)\nRs. 244.00\nRs. 59.00\nRs. 303.00\n–\n4.\nWashing the clothes/washing the utensils House Keeping and\n\t\t\t\tlooking after the children (Eight hours)\nRs. 1950.00\nRs. 471.00\nRs. 2421.00\n–\n5.\nWashing the clothes/washing the utensils House Keeping and\n\t\t\t\tlooking after the children/and taking to school and back other\n\t\t\t\tmiscellaneous domestic works. (Eight hours)\nRs. 1950.00\nRs. 471.00\nRs. 2421.00\n–",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "3",
"title": "3. Notification No. 5/MW-405/07 L&R 1657, dated 1.6.2009.",
"chapter": null,
"content": "Schedule-1 (A)\nMonth & Year\nIndex No. Base Year (2001-100)\nLink Factor Change for base year\nChanged Index No. for base year (1960-100)\n1\n2\n3\n4\nJuly-08\n143\n4.63 x 4.93\n3264.11\nAugust-08\n145\n4.63 x 4.93\n3309.76\nSeptember-08\n146\n4.63 x 4.93\n3332.59\nOctober-08\n148\n4.63 x 4.93\n3378.24\nNovember-08\n148\n4.63 x 4.93\n3378.24\nDecember-08\n147\n4.63 x 4.93\n3355.41\nTotal\n-\n-\n20018.35\nAverage\n-\n-\n3336.40\nSchedule -1 (B)\n1.\nName of Employment: -\nSales promotion of medicine\nNotification No.:- 3289\ndate: - 30.6.2008\nSchedule-II\nSl. No.\nCategories of Workers\nBasic Minimum Wage\nV.D.A. Effective date 1.4.2009\nTotal wage from 1.4.09 (3 + 4)\nRemarks\n1.\nUnskilled\nRs. 85.00 Per day\nRs. 8.00\nRs. 93.00 Per day\n–\n2.\nSemi skilled\nRs. 88.00 per day\nRs. 8.00\nRs. 96.00 per day\n–\n3.\nSkilled\nRs. 108.00 per day\nRs. 10.00\nRs. 118.00 per day\n–\n4.\nHighly Skilled\nRs. 132.00 per day\nRs. 13.00\nRs. 145.00 per day\n–\n5.\nSupervisory/ Clerical\nRs. 2454.00 per month\nRs. 236.00\nRs. 2690.00 per month\n–",
"footnote": "",
"is_definition": false,
"sort_order": 1
},
{
"number": "4",
"title": "4. Notification No. 5/MW-402/09 L&R-1651, dated 1.6.2009.",
"chapter": null,
"content": "Schedule-1-(A)\nMonth & Year\nIndex No. Base Year (2001-100)\nLink Factor Change for base year\nChanged Index No. for base year (1960-100)\n1\n2\n3\n4\nJuly-08\n143\n4.63 x 4.93\n3264.11\nAugust-08\n145\n4.63 x 4.93\n3309.76\nSeptember-08\n146\n4.63 x 4.93\n3332.59\nOctober-08\n148\n4.63 x 4.93\n3378.24\nNovember-08\n148\n4.63 x 4.93\n3378.24\nDecember-08\n147\n4.63 x 4.93\n3355.41\nTotal\n-\n-\n20018.35\nAverage\n-\n-\n3336.40\nSchedule-1 (B)\nAgriculture Operations-3325 dated 1.7.08\nSchedule-II\nSl\nCategory of Workers\nBasic Minimum Wages\nV.D.A. Effective Date 1.4.09\nTotal Wage from 1.4.09 (3 + 4)\nRemarks\n1\n2\n3\n4\n5\n6\n1.\nAll other agricultural operations except harvesting\n85.00 Per day\n12-00\nRs. 97-00 per day\n2.\nTractor Driver and Pump operator\nRs. 3066.00 Per month\n431-00\nRs.3497-00 per month\n3.\nTractor Khalasi / Pump Khalasi/ Choukidar/ Sipahi.\nRs. 2386.00 Per Month\n335-00\nRs. 2721-00 per month",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "5",
"title": "5. Notification No. 5/MW-403/09 L&R-1654, dated 1.6.2009.",
"chapter": null,
"content": "Schedule-1 (A)\nMonth & Year\nIndex No. Base Year (2001-100)\nLink Factor Change for base year\nChanged Index No. for base year (1960-100)\n1\n2\n3\n4\nJuly-08\n143\n4.63 x 4.93\n3264.11\nAugust-08\n145\n4.63 x 4.93\n3309.76\nSeptember-08\n146\n4.63 x 4.93\n3332.59\nOctober-08\n148\n4.63 x 4.93\n3378.24\nNovember-08\n148\n4.63 x 4.93\n3378.24\nDecember-08\n147\n4.63 x 4.93\n3355.41\nTotal\n-\n-\n20018.35\nAverage %\n-\n-\n3336.40\nSchedule-I(B)\nSchedule-II\nSl.\nCategories of Workers\nBasic Minimum Wage date 1.4.09\nV.D.A. Effective from 1.4.09\nTotal Wage (3+4)\nRemarks\n1\n2\n3\n4\n5\n6\n1.\nStone Breaking & stone Crushing Operations\nGeneral Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n\"\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiece Work\n(I)\nMining & Carrying by Bullock Cart.\n(a)\nWithin up to quarter mile per 100 Cft-\n\"\n193.00\n27.00\n220.00\n(b)\nFor every above quarter mile of carrying per 100/-Cft.-\n\"\n45.00\n06.00\n51.00\nII.\nMining chelly breaking and transport by trolley per tub. of\n\t\t\t\t\t25ft-\n\"\n48.00\n07.00\n55.00\nIII.\nChelly breaker from boulder per 100/-Cft.\n\"\n48.00\n07.00\n55.00\nIV.\nBallast Breaker from boulder, per 100/- Cft.\n(a)\n2\" x 3\"\n\"\n101.00\n14.00\n115.00\n(b)\n2\" x 2.50\"\n\"\n125.00\n18.00\n143.00\n(c)\n1.50\"x 2\"\n\"\n150.00\n21.00\n171.00\n(d)\n1\"\n\"\n248.00\n35.00\n283.00\nV.\nBreaking Ballast from telai per Box of 5 ft.\n\"\n16.00\n02.00\n18.00\nVI.\nChips Breaker.\n(a)\nHand made chips of ¾4\" Dn. per Cft.\n\"\n08.00\n01.00\n09.00\n(b)\nHand made chips of 1\" Dn. per Cft.\n\"\n08.00\n01.00\n09.00\nVII.\nEarth Cutting.\n(a)\nFor soft earth per 90 Cft.\n\"\n89.00\n13.00\n102.00\n(b)\nFor hard earth per 75 Cft.\n\"\n89.00\n13.00\n102.00\n(c)\nFor highly hard earth, per 60 Cft.\n\"\n89.00\n13.00\n102.00\nNote :- Decision of 15% less earth cutting for women\n\t\t\t\t\tworker, bet will get equal wage.\nNote\nVIII.\nBorers and Drollers per ft. -\n\"\n12.00\n02.00\n14.00\nIX.\nMines (Including boulders carrying Head load within a quarter\n\t\t\t\t\tmile.) per 25 Cft.\n\"\n58.00\n08.00\n66.00\nX.\nWagon Loaders full head of Board gauges wagon (500 cubic ft.)\n\t\t\t\t\tper Wagon load.\n\"\n160.00\n22.00\n182.00\nXI.\nStone Set (Stone Bricks) per 100 Pcs.\n(a)\nBreaking Size (9\" x 6\" x 4\")\n\"\n195.00\n27.00\n222.00\n(b)\nStone Set (Stone Bricks) Polishing\n\"\n110.00\n15.00\n125.00\n(c)\nStone Set (Stone Bricks) Casting & Transporting.\n\"\n89.00\n13.00\n102.00\n2.\nBidi Making Manufacture General Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemiskilled\n\"\n92.00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n\"\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiece Work\nPer thousand bidi provided that Where employers\n\t\t\t\t\tearning at this rate is less than Rs. 43.00 per day he shall be\n\t\t\t\t\tpaid atleast Rs. 43.00 per that day subject to the condition\n\t\t\t\t\tspecified in the annexure hereto.\n\"\n86.00\n12.00\n98.00\n(a)\nLabelling (Single) per lakh\n\"\n110.00\n15.00\n125.00\n(b)\nLabelling (double) per lakh\n\"\n114.00\n16.00\n130.00\nII.\n(c)\n(1) Employees employed in Sekai by any process of Bidi other than tandoor, per lakh\n\"\n53.00\n07.00\n60.00\n(ii)\nSekai by Tandoor per lakh Bidi\n\"\n54.00\n08.00\n62.00\n(d)\nPacking (Basket packing) per lakh\n\"\n55.00\n08.00\n63.00\n3.\nBrick Manufactory-\nGeneral Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n\"\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2792.00\nper month\n359.00\n2912.00\nPiecework\nII.\n(i)\nBrick moulders (inclusive of cutting earth kneading earth,\n\t\t\t\t\twatering earth carrying earth to parria per thousand.\n\"\n131.00\n18.00\n149.00\n(ii)\nLoading & unloading of Bricks in Bhattha per 1000 bricks\n\"\n89.00\n13.00\n102.00\n(iii)\nMistri\n\"\n2553.00\nPer month\n392.00\n3184.00\nIn Chimneys\n(i)\nBrick moulder (inclusive of cutting earth, kneading earth,\n\t\t\t\t\twatering earth, and carrying earth to pariah & Pug mill per\n\t\t\t\t\tthousand bricks\n\"\n115.00\n16.00\n131.00\n(ii)\nLoading and Unloading of bricks (Unskilled Labour)\n\"\n89.00\nper day\n13.00\n102.00\n(iii)\nFireman\n\"\n2738.00\nper month\n385.00\n3123.00\n(iv)\nCoalman/ Chowkidar/ Fire Khalasi and Rubishman\n\"\n2310.00\nper month\n325.00\n2635.00\n(v)\nMate/Over Supervisor & Mistry\n\"\n2616.00\nper month\n372.00\n3018.00\n(vi)\nMunshi\n\"\n2793.00\nper month\n392.00\n3185.00\n4.\nHair Cutting Saloon General Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiece Work\nI.\nHair Cutting Per hair cutting\n\"\n08.00\n01.00\n09.00\nII.\nShaving Per shaving\n\"\n03.000\n0.00\n03.00\nIII.\nHair cutting and Shaving per hair cutting & shaving.\n\"\n09.00\n01.00\n10.00\nIV.\nSar Mundan Per Sar Mundan-\n\"\n07.00\n01.00\n08.00\nV.\nHair Cutting of Children Per hair cutting-\n\"\n07.00\n01.00\n08.00\nVI.\nSar Malish Per Sarmalish -\n\"\n03.00\n00.00\n03.00\nVII.\nShampoo Per Shampoo-\n\"\n07.00\n01.00\n08.00\nVIII.\nHair Dyeing Per hair Dyeing-\n\"\n31.00\n04.00\n35.00\n5.\nLoading & Unloading Operation General Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiecework\nI.\nLoading & UN loading of Bags, Gur Chakkies, Fertilizer\n\t\t\t\t\tbales of cloths, Jute, Cotton etc. tin or drum of Kerosene Oil,\n\t\t\t\t\tMustard Oil, Coconut Oil and other oil, Dalda Molases, tar etc.\n\t\t\t\t\tor any other load, not specified in this schedule from Godown or\n\t\t\t\t\tShop or storage place to railways wagon, truck, Bullock cart,\n\t\t\t\t\tetc. or from one place to another place and vice-versa for\n\t\t\t\t\tcarrying loads every 200 meters or parts thereof per load of\n\"\n89.00\nPer day\n13.00\n102.00\n(a)\nLess than 20 kg.\n\"\n01.00\nNil\n01.00\n(b)\nFrom 20 to 65 Kg.\n\"\n01.00\nNil\n01.00\n(c)\nFrom 66Kg to 100 Kg.\n\"\n03.00\nNil\n03.00\n(d)\nFrom 101 Kg. and above (Rupees for every Two Kg load over 101\n\t\t\t\t\tKg)\n\"\n04.00\n01.00\n05.00\n(2)\n(i)\nFilling or weighing or welding of tins and drums or arranging\n\t\t\t\t\tof Bags, tins, drums and other loads within the same premises\n\"\n89.00\nper day\n13.00\n102.00\n(ii)\nFilling or refilling or arranging of Bags, tins and other\n\t\t\t\t\tload (per load of)-\n\"\n89.00\n13.00\n102.00\n(a)\n40 Kg. to 65 Kg.\n\"\n01.00\nNil\n01.00\n(b)\nFrom 66 Kg. to 100 Kg.\n\"\n03.00\nNil\n03.00\n(c)\n101 Kg. and above (Rupees for every two Kg. load over 101\n\t\t\t\t\tKg.)\n\"\n06.00\n01.00\n07.00\n(iii)\nSewing of Bags or welding of tins or weighing of load above\n\t\t\t\t\t10 Kg. on scale.\n\"\n01.00\nNil\n01.00\n(3)\nLoading and Unloading of Bamboo, wooden poles, Wooden logs,\n\t\t\t\t\tfuel wood and loading unloading sugar cane:-\n\"\n89.00\nper day\n13.00\n102.00\n(i)\nLoading of Bamboo and Wooden Poles:-\n(a)\nPer Railway wagon\n\"\n180.00\n25.00\n205.00\n(b)\nPer Truck\n\"\n85.00\n12.00\n97.00\n(c)\nPer Tyre cart\n\"\n25.00\n04.00\n29.00\n(d)\nPer bullock cart\n\"\n17.00\n02.00\n19.00\n(ii)\nLoading of wooden logs and fuel woods:-\n(a)\nPer railways wagon\n\"\n180.00\n25.00\n205.00\n(b)\nPer truck\n\"\n85.00\n12.00\n97.00\n(c)\nPer tyre cart\n\"\n25.00\n04.00\n29.00\n(d)\nPer Bullock Cart\n\"\n17.00\n02.00\n19.00\n(iii)\nUnloading of Bamboo Wooden poles, wooden logs and wood:-\n(a)\nPer railways wagon\n\"\n58.00\n08.00\n66.00\n(b)\nPer truck\n\"\n25.00\n04.00\n29.00\n(c)\nPer tyre cart\n\"\n08.00\n01.00\n09.00\n(d)\nPer Bullock cart\n\"\n05.00\n01.00\n06.00\n(iv)\nLoading and Unloading of Sugar Cane. Per quintal\n\"\n03.0\nNil\n03.00\n(4)\nLoading and Unloading of Bricks, Fire Bricks, tiles, Fragile\n\t\t\t\t\twares made of cement or clay or glass, Boulders, Ballast, chelly\n\t\t\t\t\tand coal.\n\"\n89.00\nper day\n13.00\n102.00\n(i)\nLoading and Unloading of Fire Bricks, tiles, fragile, wares\n\t\t\t\t\tmade of cement or clay or Glass:-\n(a)\nPer railways wagon\n\"\n491.00\n69.00\n560.00\n(b)\nPer truck\n\"\n213.00\n30.00\n243.00\n(c)\nPer tyre cart\n\"\n62.00\n09.00\n71.00\n(d)\nPer Bullock cart\n\"\n43.00\n06.00\n49.00\n(ii)\nLoading of Bricks:-\n(a)\nPer railway wagon\n\"\n382.00\n54.00\n436.00\n(b)\nPer Truck\n\"\n180.00\n25.00\n205.00\n(c)\nPer tyre cart\n\"\n52.00\n07.00\n59.00\n(d)\nPer Bullock Cart\n\"\n38.00\n05.00\n43.00\n(iii)\nUnloading of Bricks:-\n(a)\nPer railway wagon\n\"\n252.00\n35.00\n287.00\n(b)\nPer Truck\n\"\n122.00\n17.00\n139.00\n(c)\nPer tyre cart\n\"\n38.00\n05.00\n43.00\n(d)\nPer Bullock Cart\n\"\n25.00\n04.00\n29.00\n(iv)\nLoading & Unloading of Stone chips & Challi.\n(a)\nLoading per 100 cft\n\"\n31.00\n04.00\n35.00\n(b)\nUnloading per 100 cft\n\"\n21.00\n03.00\n24.00\n(v)\nLoading & Unloading of Ballast & Boulders-\n(a)\nLoading per 100 Cft.\n\"\n34.00\n05.00\n39.00\n(b)\nUnloading per 100 cft\n\"\n21.00\n03.00\n24.00\n5.\nLoading, Unloading of Iron rods, G.I. Sheet, Iron Pipes, hume\n\t\t\t\t\tpipe, Machineries equipments and other hard wires:-\n\"\n89.00\nper day\n13.00\n102.00\n(1)\nLoading-\n(a)\nPer railway wagon\n\"\n430.00\n60.00\n490.00\n(b)\nPer Truck\n\"\n199.00\n28.00\n227.00\n(c)\nPer tyre cart\n\"\n58.00\n08.00\n66.00\n(d)\nPer Bullock Cart\n\"\n49.00\n07.00\n56.00\n(ii)\nUnloading-\n(a)\nPer railway wagon\n\"\n290.00\n41.00\n331.00\n(b)\nPer Truck\n\"\n146.00\n21.00\n167.00\n(c)\nPer tyre cart\n\"\n45.00\n06.00\n51.00\n(d)\nPer Bullock Cart\n\"\n30.00\n04.00\n34.00\n(6)\nLoading and Unloading of coal\n\"\n89.00\nper day\n13.00\n102.00\n(i)\nLoading-\n(a)\nPer railway wagon (4 wheel (Wagon of 22 tones capacity)\n\"\n173.00\n24.00\n197.00\n(b)\nPer truck 200 cft.\n\"\n108.00\n15.00\n123.00\n(c)\nPer tyre Cart\n\"\n30.00\n04.00\n34.00\n(d)\nPer Bullock Cart\n\"\n25.00\n04.00\n29.00\n(ii)\nUnloading\n(a)\nPer railway wagon (Wagon of 22 tones capacity)\n\"\n117.00\n16.00\n133.00\n(b)\nPer Truck (200 cft)\n\"\n68.00\n10.00\n78.00\n(c)\nPer tyre cart\n\"\n16.00\n02.00\n18.00\n(d)\nPer Bullock Cart\n\"\n10.00\n01.00\n11.00\n(7)\nLoading and Unloading of lime and clay and earth etc-\n(i)\nLoading\n\"\n89.00\nper day\n13.00\n102.00\n(a)\nPer railway wagon (wagon of 22 tones capacity)\n\"\n135.00\n19.00\n154.00\n(b)\nPer Truck (200 cft.)\n\"\n79.00\n11.00\n90.00\n(c)\nPer tyre cart\n\"\n39.00\n05.00\n44.00\n(d)\nPer Bullock cart\n\"\n30.00\n04.00\n34.00\n(ii)\nUnloading-\n(a)\nPer railway wagon (4 wheel wagon of 22 tones capacity)\n\"\n96.00\n13.00\n109.00\n(b)\nPer Truck (22 cft.)\n\"\n42.00\n06.00\n48.00\n(c)\nPer tyre cart\n\"\n21.00\n03.00\n24.00\n(d)\nPer Bullock cart\n\"\n16.00\n02.00\n18.00\n8.\nLoading and Unloading of Cement per bag.\n\"\n02.00\nNil\n02.00\n6.\nForestry and Timber in a Operation.\nGeneral Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92-00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n\"\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiecework\n(a)\nLong cutter of various sizes falling demarking and stocking\n\t\t\t\t\tat loading sites at copies forest, pole. (4\" x 5\") Per\n\t\t\t\t\tcubic meter\n\"\n02.00\nNil\n02.00\n(b)\nConversion of team line and fencing post per piece\n\"\n03.00\nNil\n03.00\n(c)\nCutting conversion including Stacking at site of fire wood\n\t\t\t\t\t(size per cubic meter)\n\"\n26.00\n04.00\n30.00\n(d)\nCutting and Collecting of bamboo (including siding) Per 100\n\t\t\t\t\tpiece.\n(i)\nLoggas\n\"\n76.00\n11.00\n87.00\n(ii)\nTonnas\n\"\n62.00\n08.00\n70.00\n(iii)\nSorahi\n\"\n26.00\n04.00\n30.00\n(e)\nCharcoal Manufactory per bag (35 Kg)\n\"\n20.00\n03.00\n23.00\n(f)\nFodder Grass, or thatch grass or sewal grass (Per K.g.)\n\"\n20.00\n03.00\n23.00\n(g)\nSal seed & Bonhimia leaves collection (Per kg)\n\"\n05.00\n01.00\n06.00\n(7)\nSilk Industry including-\n\t\t\t\t\tManufacture from pure silk, artificial silk and other staple\n\t\t\t\t\tyarn.\nGeneral Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n\"\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiece Work\n(a)\nPower loom weaver Per meter for plain-\n\"\n05.00\n01.00\n06.00\ncloth and per meter for Erimchek & other fine cloth\n\"\n04.00\n01.00\n05.00\n(b)\nHandloom Weaver Per meter for Plain cloth-\n\"\n07.00\n01.00\n08.00\nPer Meter for Erimchek-Tusser mulberry and munga cloth-\n\"\n09.00\n01.00\n10.00\n(c)\nPin Wider\n\"\n10.00\n01.00\n11.00\n(i)\nPower loom If prepared for cloth-\n\"\n05.00\n01.00\n06.00\nPer Kg. Hank, If prepared from care cloth\n\"\n04.00\n01.00\n05.00\n(ii)\nHandloom per Kg\n\"\n08.00\n01.00\n09.00\n(d)\nBobbin Winder\n(i)\nPower loom-\nPer kg if prepared hand cloth-\n\"\n04.00\n01.00\n05.00\n(ii)\nHandloom per Kg.\n\"\n08.00\n01.00\n09.00\n(e)\nCutting & Shaping\n\"\n(i)\nStaple per than of 12 meter-\n\"\n04.00\n01.00\n05.00\n8.\nEarth Cutting Operation-\n(a)\nFor every 90 cubic of soft earth\n\"\n89.00\n13.00\n102.00\n(b)\nFor every 75 cubic ft. of hard earth-\n\"\n89.00\n13.00\n102.00\n(c)\nFor every 60 cubic ft. of highly hard earth.-\n\"\n89.00\n13.00\n102.00\nNote :- Decision of 15% less earth cutting for women\n\t\t\t\t\tworker, but will gate equal wage.\nNote :- Decision of 15% less earth cutting for women\n\t\t\t\t\tworker, but will gate equal wage.\n9.\nTea Plantation-\nGeneral Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly skilled\n\"\n138.00\n\"\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiecework\n(a)\nPlucker per plucking of one Kg. of green Leaves-\n\"\n04.0\n01.00\n05.00\n(b)\nPerson engaged in hocking- for preparing 40 nails in a land\n\t\t\t\t\tmeasuring 0.133 acre.\n\"\n13.00\n02.00\n15.00\n(c)\nPerson engaged in weeding and forking per 100 tea bush-\n\"\n13.00\n02.00\n15.00\n10.\nLac Manufactory-\nGeneral Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n\"\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiecework\n(a)\nKarigar for melting 40 Kg. of seed lac. -\n\"\n56.00\n08.00\n64.00\n(b)\nBelwaia for melting 40 Kg. of seed lac\n\"\n46.00\n06.00\n52.00\n(c)\nPherwaia for melting 40 Kg. of seed lac\n\"\n28.00\n04.00\n32.00\n(d)\nKamin & Ghogiahin for washing &\n\t\t\t\t\tseparating 40 Kg. of seed lac from bhushi, Mullama sand.\n\"\n14.00\n02.00\n16.00\n(e)\nKarahia and Karahia ghasander and Mayandarior washing of 40 Kg of seed lac through washing Machine.\n\"\n13.00\n02.00\n15.00\n(f)\nTailor (Khalifa)\n(i)\nwhen using own-machine. (per Bhatta)-\n\"\n08.00\n01.00\n09.00\n(ii)\nwhen using employer's machine (per Bhatta)\n\"\n04.00\n01.00\n05.00\n(iii)\nCrusher per 40 Kg. of Stick lac-\n\"\n09.00\n01.00\n10.00\n(h)\nBreaker per 40 Kg. of stick lac-\n\"\n08.00\n01.00\n09.00\n11.\nPower loom Industry.-\nGeneral Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiecework\npick-\n26\n\"\n05.00\n01.00\n06.00\n28-\n\"\n05.00\n01.00\n06.00\n30-\n\"\n05.00\n01.00\n06.00\n32-\n\"\n05.00\n01.00\n06.00\n34-\n\"\n05.00\n01.00\n06.00\n36-\n\"\n06.00\n01.00\n07.00\n40-\n\"\n07.00\n01.00\n08.00\n42-\n\"\n07.00\n01.00\n08.00\n44-\n\"\n08.00\n01.00\n09.00\n46-\n\"\n08.00\n01.00\n09.00\n48-\n\"\n08.00\n01.00\n09.00\n50-\n\"\n08.00\n01.00\n09.00\n52-\n\"\n09.00\n01.00\n10.00\n12.\nPlucking and Processing- Kendu leaves General Work\n1.\nUnskilled\nRs.\n89.00\nPer day\n13.00\n102.00\n2.\nSemi-skilled\n\"\n92.00\n\"\n13.00\n105.00\n3.\nSkilled\n\"\n113.00\n\"\n16.00\n129.00\n4.\nHighly Skilled\n\"\n138.00\n\"\n19.00\n157.00\n5.\nClerical/Supervisory\n\"\n2553.00\nPer month\n359.00\n2912.00\nPiecework\n(a)\nPlucking of leaves per 50,000 leaves or 60 paise per 50\n\t\t\t\t\tleaves.\n\"\n327.00\n46.00\n373.00\n(b)\nPacking of Bags\nPer small bags-\n\"\n05.00\n01.00\n06.00\nPer big bags-\n\"\n10.00\n01.00\n11.00\n(c)\nGrading and bundling per bind of 5 Kg\n\"\n10.00\n01.00\n11.00\nThe 29th September, 2009",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "6",
"title": "6. S.O. 212 dated 1st October, 2009.",
"chapter": null,
"content": "Schedule-I(A)\nMonth and Year\nIndex No. Base Year. (2001-100)\nLink Factor Change for base year.\nChanged Index No. for base year. (1960-100)\n1\n2\n3\n4\nJanuary, 2009\n148\n4.63 x 4.93\n3378.23\nFebruary, 2009\n148\n4.63 x 4.93\n3378.23\nMarch, 2009\n148\n4.63 x 4.93\n3378.23\nApril, 2009\n150\n4.63 x 4.93\n3423.88\nMay, 2009\n151\n4.63 x 4.93\n3446.71\nJune, 2009\n153\n4.63 x 4.93\n3492.36\nTotal\n-\n-\n20497.64\nAverage\n-\n-\n3416.27\nSchedule-1(B)\nName of employment\nName of employment\nNotification No\nNotification No\nTotal\nTotal\n(1) 62-General Work\n1.3323 dated 1-07-08\n69, Employment\n(2) 07- General Work\n2.4993 dated 1-10-08\nSchedule -II\nSl. No.\nCategories of Workers\nBasic Minimum Wage + V.D.A. Date 1.4.09 (In.\n\t\t\t\tRs.)\nV.D.A. Effective date 1.10.09\nTotal wage from 1.10.09 (3+4)\nRemarks\n1.\nUnskilled\n89.00 + 13.00 = 102.00 per day.\n02.00\n104.00\n2.\nSemi skilled\n92.00 + 13.00 = 105.00 Per day\n02.00\n107.00\n3.\nSkilled\n113.00 + 16.00 = 129.00 Per day\n03.00\n132.00\n4.\nHighly Skilled\n138.00 + 19.00 = 157.00 per day\n04.00\n161.00\n5.\nSupervisory/ Clerical\n2553.00 + 359.00 = 2912.00 Per month\n69.00\n2981.00",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "7",
"title": "7. Notification. No. 5/M-W-402/09 L&R-3523, dated 29.9.2009.",
"chapter": null,
"content": "Schedule-1 (A)\nMonth and Year\nIndex No. Base Year. (2001-100)\nLink Factor Change for base year.\nChanged Index No. for base year. (1960-100)\n1\n2\n3\n4\nJanuary, 2008\n188\n4.63 x 4.93\n3378.23\nFebruary, 2008\n148\n4.63 x 4.93\n3378.23\nMarch, 2008\n148\n4.63 x 4.93\n3378.23\nApril, 2008\n150\n4.63 x 4.93\n3423.88\nMay, 2008\n151\n4.63 x 4.93\n3446.71\nJune, 2008\n153\n4.63 x 4.93\n3492.36\nTotal\n-\n-\n20497.64\nAverage\n-\n-\n3416.27\nSchedule-I(B)\nAgriculture Operations- 3325 dated 1.7.08\nSchedule-II\nSl. No.\nCategories of Worker\nBasic Minimum Wage + V.D.A. Effective date\n\t\t\t\t01.04.2009 (In. Rs.)\nV. D.A. Effective date 1.10.2009\nTotal wage from 1.10.09 (3+4)\nRemarks\n1\n2\n3\n4\n5\n6\n1.\nAll other agricultural operations except harvesting\n85.00 + 12.00 = 97.00 P. day\n02.00\n99.00\n2.\nTractor Driver and Pump operator\n3066.00 + 431.00 = 3497.00 per month\n83.00\n3580.00\n3.\nTractor Khalasi / Pump Khalasi / Choukidar/\n\t\t\t\tSipahi\n2386.00 + 335.00 = 2721.00 per Month\n65.00\n2786.00\nThe 29th September, 2009",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "8",
"title": "8. S.O. 214, dated 1st October, 2009.",
"chapter": null,
"content": "Schedule-1 (A)\nMonth and Year\nIndex No. Base Year. (2001-100)\nLink Factor Change for base year.\nChanged Index No. for base year. (1960-100)\n1\n2\n3\n4\nJanuary, 2009\n148\n4.63 x 4.93\n3378.23\nFebruary, 2009\n148\n4.63 x 4.93\n3378.23\nMarch, 2009\n148\n4.63 x 4.93\n3378.23\nApril, 2009\n150\n4.63 x 4.93\n3423.88\nMay, 2009\n151\n4.63 x 4.93\n3446.71\nJune, 2009\n153\n4.63 x 4.93\n3492.36\nTotal\n-\n-\n20497.64\nAverage\n-\n20497-64/6=\n3416.27\nSchedule-I(B)\nName of employment.\nSchedule-II\nSl. No.\nCategories of Workers\nBasic Minimum Wage (In. Rs.)\nV.D.A. Effective date 1.10.09\nTotal wage from 1.10.09 (3+4)\n1\n2\n3\n4\n5\n1\nUnskilled\n89.00 Per day\n11.00\n100.00\n2\nSemi skilled\n92.00 Per day\n11.00\n103.00\n3\nSkilled\n113.00 Per day\n14.00\n127.00\n4\nHighly Skilled\n138 .00 Per day\n17.00\n155.00\n5\nSupervisory/ Clerical\n2553.00 Per month\n312.00\n2865.00\nThe 29th September, 2009",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "9",
"title": "9. S.O. 208, dated 1st October, 2009.",
"chapter": null,
"content": "Schedule-1 (A)\nMonth and Year\nIndex No. Base Year. (2001-100)\nLink Factor Change for base year.\nChanged Index No. for base year. (1960-100)\n1\n2\n3\n4\nJanuary, 2009\n148\n4.63 x 4.93\n3378.23\nFebruary, 2009\n148\n4.63 x 4.93\n3378.23\nMarch, 2009\n148\n4.63 x 4.93\n3378.23\nApril, 2009\n150\n4.63 x 4.93\n3423.88\nMay, 2009\n151\n4.63 x 4.93\n3446.71\nJune, 2009\n153\n4.63 x 4.93\n3492.36\nTotal\n-\n-\n20497.64\nAverage\n-\n-\n3416.27\nSchedule 1(A)",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "1",
"title": "1. Name of Employment.-Domestic Workers Notification No:-4444, date 5th December, 2007.",
"chapter": null,
"content": "Schedule -II\nSl. No.\nCategories of Worker\nBasic Minimum Wage + V.D.A 1.4.2009 (In Rs.)\nV.D.A Effective date 1.10.2009\nTotal wage from 1.10.09 (3+4)\nRemarks\n1\n2\n3\n4\n5\n6\n1\nWashing the utensils (One hours)\n244.00+59.00 = 303.00 per month\n07.00\n310.00\n2\nWashing the clothes/ washing the Utensil (One\n\t\t\t\thours)\n244.00+59.00 = 303.00 per month\n07.00\n310.00\n3\nWashing the clothes/ washing the utensil house\n\t\t\t\tkeeping (A. House of 1000 Sq. ft.) (One hours)\n244.00+59.00 = 303.00 per month\n07.00\n310.00\n4\nWashing the clothes/ washing the utensils House\n\t\t\t\tKeeping and looking after the children (Eight hours)\n1950.00+471.00 = 2421.00 Per month\n57.00\n2478.00\n5\nWashing the clothes/ washing the utensils House\n\t\t\t\tKeeping and looking after the children/ and taking to school and\n\t\t\t\tback other miscellaneous domestic works. (Eight hours)\n1950.00+471.00 = 2421.00 Per month\n57.00\n2478.00\nThe 29th September, 2009",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "10",
"title": "10. S.O. 206 dated 1st October, 2009.",
"chapter": null,
"content": "Schedule-1 (A)\nMonth and Year\nIndex No. Base Year. (2001-100)\nLink Factor Change for base year.\nChanged Index No. for base year. (1960-100)\n1\n2\n3\n4\nJanuary, 2009\n148\n4.63 x 4.93\n3378.23\nFebruary, 2009\n148\n4.63 x 4.93\n3378.23\nMarch, 2009\n148\n4.63 x 4.93\n3378.23\nApril, 2009\n150\n4.63 x 4.93\n3423.88\nMay, 2009\n151\n4.63 x 4.93\n3446.71\nJune, 2009\n153\n4.63 x 4.93\n3492.36\nTotal\n-\n-\n20497.64\nAverage\n-\n-\n3416.27\nSchedule-1 (B)\n1- Name of Employment. - Sales promotion of medicine Notification No:-3289, date:-30-06-2008.\nSchedule -II\nSl. No.\nCategories of Workers\nBasic Minimum Wage + V.D.A. Date 1.4.09\nV.D.A. Effective date 11.02.09\nTotal wage from 1.10.09 (3+4)\nRemarks\n1.\nUnskilled\n85.00 + 8.00 = 93.00 per day.\n02.00\n95.00\n2.\nSemi skilled\n88.00 + 8.00 = 96.00 Per day\n03.00\n99.00\n3.\nSkilled\n108.00 + 10.00 = 118.00 Per day\n03.00\n121.00\n4.\nHighly Skilled\n132.00 + 13.00 = 145.00 per day\n03.00\n148.00\n5.\nSupervisory/ Clerical\n2454.00 + 236.00 = 2690.00 Per month\n64.00\n2754.00\nThe 29th September, 2009",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "11",
"title": "11. S.O. 204, dated 1st October, 2009.",
"chapter": null,
"content": "Schedule-1 (A)\nMonth and Year\nIndex No. Base Year. (2001-100)\nLink Factor Change for base year.\nChanged Index No. for base year. (1960-100)\n1\n2\n3\n4\nJanuary, 2009\n148\n4.63 x 4.93\n3378.23\nFebruary, 2009\n148\n4.63 x 4.93\n3378.23\nMarch, 2009\n148\n4.63 x 4.93\n3378.23\nApril, 2009\n150\n4.63 x 4.93\n3423.88\nMay, 2009\n151\n4.63 x 4.93\n3446.71\nJune, 2009\n153\n4.63 x 4.93\n3492.36\nTotal\n-\n-\n20497.64\nAverage\n-\n-\n3416.27\nSchedule-I (B)\nName of employment and Notification No. 3327, dated 1st July, 2008 (12 Employment)\nSchedule-II\nSl No.\nCategories of Workers and Piecework\nBasic Minimum Wage + V.D.A FROM-1.04.09 (Rs)\nV.D.A. Effective from 1.10.09\nTotal Wage (3+4)\nRemarks\n1\n2\n3\n4\n5\n6\n1.\n1.\nStone Breaking & Stone Crushing Operations General\n\t\t\t\t\tWork\nStone Breaking & Stone Crushing Operations General\n\t\t\t\t\tWork\n1.\nUnskilled\n89.00+13.00=102.00 Per day\n02.00\n104.00\n2.\nSemi-skilled\n92.00+13.00=105.00 Per day\n02.00\n107.00\n3.\nSkilled\n113.00+16.00=129.00 Per day\n03.00\n132.00\n4.\nHighly Skilled\n138.00+19.00=157.00 Per day\n04.00\n161.00\n5.\nClerical /Supervisory\n2553.00+359.00=2912.00 P. month\n69.00\n2981.00\nPiecework-\nPiecework-\nI.\nI.\nMining & Carrying by Bullock Cart.\n(a)\nWithin up to quarter mile per 100 Cft-\n193.00+27.00=220.00\n05.00\n225.00\n(b)\nFor every above quarter mile of carrying per 100/-Cft\n45.00+06.00=51.00\n02.00\n53.00\nII.\nII.\nMining chelly breaking and transport by trolley per tub-of\n\t\t\t\t\t25ft-\n48.00+07.00=55.00\n01.00\n56.00\nIII.\nIII.\nChelly breaker from boulder per 100/-Cft-\n48.00+07.00=55.00\n01.00\n56.00\nIV.\nIV.\nBallast Breaker from boulder per 100/-Cft-\nBallast Breaker from boulder per 100/-Cft-\n(a)\n2\"x3\"\n101.00+14.00=115.00\n03.00\n118.00\n(b)\n2\"x2-50\"\n125.00+18.00=143.00\n03.00\n146.00\n(c)\n1 -50\"x2\"\n150.00+21.00=171.00\n04.00\n175.00\n(d)\n1\"\n248.00+35.00=283.00\n07.00\n290.00\nV.\nV.\nBreaking Ballast from telai-Per Box of 5ft-\n16.00+02.00=18.00\n01.00\n19.00\nVI.\nVI.\nChips Breaker-\nChips Breaker-\n(a)\nHand made chips of ¾\" Dn-per Cft-\n08.00+01.00=09.00\n00.00\n09.00\n(b)\nHand made chips of 1\" Dn- per Cft-\n08.00+01.00=09.00\n00.00\n09.00\nVII.\nVII.\nEarth Cutting -\nEarth Cutting -\n(a)\nFor soft earth-per 90 Cft-\n89.00+13.00=102.00\n02.00\n104.00\n(b)\nFor hard earth per 75 Cft.\n89.00+13.00=102.00\n02.00\n104.00\n(c)\nFor highly hand earth- per 60 Cft-\n89.00+13.00=102.00\n02.00\n104.00\nNote:-Decision of 15% less earth cutting for women worker,\n\t\t\t\t\tbut will gate equal wage.\nNote:-Decision of 15% less earth cutting for women worker,\n\t\t\t\t\tbut will gate equal wage.\nVIII.\nVIII.\nBorers and Drollers per ft.\n12.00+02.00=14.00\n00.00\n14.00\nIX.\nIX.\nMines (Including boulders carrying Head load within a quarter\n\t\t\t\t\tmile-) per 25 Cft.\n58.00+08.00= 66.00\n02.00\n68.00\nX.\nX.\nWagon Loaders full head of Broad gauges wagon (500 cubic ft.)\n\t\t\t\t\tper Wagon load.\n160.00+22.00=182.00\n05.00\n187.00\nXI.\nXI.\nStone Set (Stone Bricks) Per 100 Pcs.\n(a)\nBreaking Size(9\"x6\"x4\")\n195.00+27.00= 222.00\n06.00\n228.00\n(b)\nStone Set (Stone Bricks Polishing)\n110.00+15.00=125.00\n03.00\n128.00\n(c)\nStone Set (Stone Bricks Cutting & Transporting) for 3 to\n\t\t\t\t\t4 mile.\n89.00+13.00=102.00\n02.00\n104.00\n2.\n2.\nBidi Making Manufacture\nBidi Making Manufacture\nGeneral Work-\nGeneral Work-\n1\nUnskilled\n89.00+13.00=102.00 Per day\n02.00\n104.00\n2\nSemi-skilled\n92.00+13.00=105.00 Per day\n02.00\n107.00\n3\nSkilled\n113.00+16.00=129.00 Per day\n03.00\n132.00\n4\nHighly Skilled\n138.00+19.00=157.00 Per day\n04.00\n161.00\n5\nClerical /Supervisory\n2553.00+359.00= 2912.00 P. month\n69.00\n2981.00\nPiecework-\nPiecework-\nI.\nPer thousand bidi provided that Where employers\n\t\t\t\t\tearning at this rate is less than Rs. 43.00 per day he shall be\n\t\t\t\t\tpaid at least Rs-43-00 per that day subject to the condition\n\t\t\t\t\tspecified in the annexure here to.\n86.00+12.00= 98.00\n02.00\n100.00\n(a)\nLabelling (Single)\n110.00+15.00= 125.00 per lakh\n03.00\n128.00\n(b)\nLabelling (double) per lakh.\n114.00+16.00=130.00\n03.00\n133.00\nII.\nII.\nSekai Work-\nSekai Work-\n(a)\nEmployees employed in Sekai by any process Bidi Other\n\t\t\t\t\tthan Tandoor . Per Lakh Bidi . other than\n\t\t\t\t\ttandoor-per lakh.\n53.00+07.00= 60.00\n02.00\n62.00\n(b)\nSekai by Tandoor per lakh Bidi\n54.00+08.00= 62.00\n01.00\n63.00\n(c)\nPacking (Basket packing) per lakh\n55.00+08.00= 63.00\n01.00\n64.00\n3.\n3.\nBrick Manufactory.\nBrick Manufactory.\nI.\nI.\nGeneral Work-\nGeneral Work-\n1\nUnskilled\n89.00+13.00=102.00 P.day\n02.00\n104.00\n2\nSemi-skilled\n92.00+13.00=105.00 P.day\n02.00\n107.00\n3\nSkilled\n113.00+16.00=129.00 P.day\n03.00\n132.00\n4\nHighly Skilled\n138.00+19.00=157.00 P.day\n04.00\n161.00\n5\nClerical /Supervisory\n2553.00+359.00=2912.00 P. month\n69.00\n2981.00\nII.\nII.\nPiecework-\nPiecework-\n(i)\nBrick modulers (inclusive of cutting earth, kneading earth,\n\t\t\t\t\twatering earth carrying earth to parria) per thousand bricks\n131.00+18.00=149.00\n04.00\n153.00\n(ii)\nLoading & unloading of Bricks in Bhattha) per 1000 bricks\n\t\t\t\t\t& unskilled Labour per day.\n89.00+13.00=102.00\n02.00\n104.00\n(iii)\nMistri\n2792.00+392.00= 3184.00 p. month\n76.00\n3260.00\nIn Chimneys-\nIn Chimneys-\n(i)\nBrick moulder (inclusive of cutting earth, kneading earth,\n\t\t\t\t\twatering earth, and carrying earth to pariah & Pug mill. Per\n\t\t\t\t\t1000 bricks.\n115.00+16.00=131.00\n03.00\n134.00\n(ii)\nBricks Loading and Unloading of per 1000 & Unskilled\n\t\t\t\t\tLabour per day.\n89.00+13.00=102.00 p. day\n02.00\n104.00\n(iii)\nFireman\n2738.00+385.00= 3123.00 p. month\n74.00\n3197.00\n(iv)\nCoalman/ Chowkidar/ Fire Khalalsi & Rubishman.\n2310.00+325.00=2635.00 p. month\n62.00\n2697.00\n(v)\nMate/Over Supervisor & Mistry .\n2646.00+372.00= 3018.00 p. month\n72.00\n3090.00\n(vi)\nMunshi\n2793.00+392.00= 3185.00 p. month\n76.00\n3261.00\n4.\n4.\nHair Cutting Saloon\nHair Cutting Saloon\nGeneral Work-\nGeneral Work-\n1\nUnskilled\n89.00+13.00=102.00 p. day\n02.00\n104.00\n2\nSemi-skilled\n92.00+13.00=105.00 p. day\n02.00\n107.00\n3\nSkilled\n113.00+16.00=129.00 p. day\n03.00\n132.00\n4\nHighly Skilled\n138.00+19.00=157.00 p. day\n04.00\n161.00\n5\nClerical /Supervisory\n2553.00+359.00=2912.00 P.Month\n69.00\n2981.00\nPiecework-\nPiecework-\n(i)\nPer Hair Cutting.\n08.00+01.00= 09.00\n00.00\n09.00\n(ii)\nPer shaving.\n03.00+00.00=03.00\n01.00\n04.00\n(iii)\nPer hair cutting & shaving.\n09.00+01.00=10.00\n01.00\n11.00\n(iv)\nPer Sar Mundan\n07.00+01.00= 08.00\n00.00\n08.00\n(v)\nPer Hair Cutting of Children.\n07.00+01.00=08.00\n00.00\n08.00\n(vi)\nPer Sar Malish.\n03.00+00.00= 03.00\n01.00\n04.00\n(vii)\nPer Shampoo.\n07.00+01.00= 08.00\n00.00\n08.00\n(viii)\nPer hair Dyeing.\n31.00+04.00= 35.00\n01.00\n36.00\n5.\n5.\nLoading & Unloading Operation-\nLoading & Unloading Operation-\nGeneral Work-\nGeneral Work-\n1\nUnskilled\n89.00+13.00=102.00 p. day\n02.00\n104.00\n2\nSemi-skilled\n92.00+13.00=105.00 p. day\n02.00\n107.00\n3\nSkilled\n113.00+16.00=129.00 p. day\n03.00\n132.00\n4\nHighly Skilled\n38.00+19.00= 157.00 p. day\n04.00\n161.00\n5\nClerical /Supervisory\n2553.00+359.00=2912.00 P/month\n69.00\n2981.00\nPiecework-\nPiecework-\nI.\nLoading and Unloading of Bags, Gur Chakkies ,\n\t\t\t\t\tFertilizer bales of cloths, Jute, Cotton etc- tin or drum of\n\t\t\t\t\tKerosene Oil, Mustered Oil, Coconut Oil and other oil, Dalda\n\t\t\t\t\tMolases, Paints tar etc- or any other load, not specified in\n\t\t\t\t\tthis schedule from Godown or Shop or storage place to railways\n\t\t\t\t\twagon, truck, Bullock cart, etc. or from one place to another\n\t\t\t\t\tplace and vice-versa for carrying of loads every 200\n\t\t\t\t\tmeters or parts thereof per load of.\n89.00+13.00=102.00 Per day\n02.00\n104.00\n(a)\nLess than 20 kg.\n01.00+NIL=01.00\nNil\n01.00\n(b)\nFrom 20 to 65 Kg.\n01.00+NIL=01.00\nNil\n01.00\n(c)\nFrom 66 Kg. to 100 Kg.\n03.00+NIL=03.00\n01.00\n04.00\n(d)\nFrom 101 Kg. and above Rupees for every Two Kg. load over 101\n\t\t\t\t\tkg.\n04.00+01.00=05.00\nNIL\n05.00\n(i)\nFilling or weighing or welding of this and drums or arranging\n\t\t\t\t\tof Bags, tins, drums and other\n89.00+13.00=102.00 per day\n02.00\n104.00\n(ii)\nFilling or refilling or arranging of Bags, tins and other\n\t\t\t\t\tload (per load of)\n89.00+13.00=102.00 per day\n02.00\n104.00\n(a)\n40 Kg- to 65 Kg-\n01.00+NIL=01.00\n00.00\n01.00\n(b)\nFrom 66 Kg- to 100 Kg-\n03.00+NIL= 03.00\n01.00\n04.00\n(c)\n101 Kg- and above(Rupees for every two Kg-load over 101 Kg-)\n06.00+01.00= 07.00\nNIL\n07.00\n(iii)\nSewing of Bags of welding of tins or weighing of load above\n\t\t\t\t\t10Kg- on scale -\n01.00+NIL=01.00\nNil\n01.00\n(3)\nLoading and Unloading of Bamboo, wooden poles, Wooden logs,\n\t\t\t\t\tfuel wood and sugar cane.\n89.00+13.00=102.00 p. day\n02.00\n104.00\n(i)\n(i)\nLoading of Bamboo and Wooden Poles-\nLoading of Bamboo and Wooden Poles-\n(a)\nPer Railway wagon\n180.00+25.00= 205.00\n05.00\n210.00\n(b)\nPer Truck\n85.00+12.00= 97.00\n02.00\n99.00\n(c)\nPer Tyre cart\n25.00+04.00= 29.00\nNIL\n29.00\n(d)\nPer bullock cart\n17.00+02.00=19.00\n01.00\n20.00\n(ii)\n(ii)\nLoading of wooden logs and fuel woods -\nLoading of wooden logs and fuel woods -\n(a)\nPer railways wagon\n180.00+25.00=205.00\n05.00\n210.00\n(b)\nPer truck\n85.00+12.00= 97.00\n02.00\n99.00\n(c)\nPer tyre cart\n25.00+04.00= 29.00\nNIL\n29.00\n(d)\nPer bullock cart\n17.00+02.00=19.00\n01.00\n20.00\n(iii)\n(iii)\nUnloading of Bamboo Wooden poles, wooden logs and wood-\nUnloading of Bamboo Wooden poles, wooden logs and wood-\n(a)\nPer railways wagon\n58.00+08.00= 66.00\n02.00\n68.00\n(b)\nPer truck\n25.00+04= 29.00\nNIL\n29.00\n(c)\nPer tyre cart\n08.00+01 = 09.00\nNIL\n09.00\n(d)\nPer bullock cart\n05.00+01.00= 06.00\nNIL\n06.00\n(iv)\nLoading and Unloading of Sugar Cane Per quintal.\n03.00+NIL= 03.00\n01.00\n04.00\n(4)\nLoading and Unloading of Bricks, Fire Bricks, tiles, Fragile\n\t\t\t\t\twares made of cement or clay or glass, Boulders Ballast, chelly\n\t\t\t\t\tand coal.\n89.00+13.00=102.00 per day\n02.00\n104.00\n(i)\n(i)\nLoading and Unloading of Fire Bricks, tiles, fragile,\n\t\t\t\t\twares made of cement or clay or Glass-\nLoading and Unloading of Fire Bricks, tiles, fragile,\n\t\t\t\t\twares made of cement or clay or Glass-\n(a)\nPer railways wagon\n491.00+69.00= 560.00\n13.00\n573.00\n(b)\nPer truck\n213.00+30.00= 243.00\n06.00\n249.00\n(c)\nPer tyre cart\n62.00 +09.00=71.00\n01.00\n72.00\n(d)\nPer bullock cart\n43.00 +06.00=49.00\n01.00\n50.00\n(ii)\nLoading of Bricks-\nLoading of Bricks-\n(a)\nPer railways wagon\n382.00+54.00= 436.00\n10.00\n446.00\n(b)\nPer truck\n180.00+25.00= 205.00\n05.00\n210.00\n(c)\nPer tyre cart\n52.00+07.00= 59.00\n02.00\n61.00\n(d)\nPer bullock cart\n38.00+05.00= 43.00\n01.00\n44.00\n(iii)\n(iii)\nUnloading of Brick-\nUnloading of Brick-\n(a)\nPer railways wagon\n252.0 +35.00= 287.00\n07.00\n294.00\n(b)\nPer truck\n122.00+17.00= 139.00\n03.00\n142.00\n(c)\nPer tyre cart\n38.00+05.00=43.00\n01.00\n44.00\n(d)\nPer bullock cart\n25.00+04.00=29.00\nNIL\n29.00\n(iv)\n(iv)\nLoading & Unloading of Stone chips & Challi-\nLoading & Unloading of Stone chips & Challi-\n(a)\nLoading per 100 cft\n31.00+04.00= 35.00\n01.00\n36.00\n(b)\nUnloading per 100 cft\n21.00+03.00= 24.00\n01.00\n25.00\n(v)\n(v)\nLoading & Unloading of Ballast & Boulders-\nLoading & Unloading of Ballast & Boulders-\n(a)\nLoading per 100 cft\n34.00+05.00= 39.00\n01.00\n40.00\n(b)\nUnloading per 100 cft\n21.00+03.00=24.00\n01.00\n25.00\n(5)\nLoading, Unloading of iron rods, Gl. sheet, Iron Pipes,\n\t\t\t\t\thumepipe, Machineries equipments and other hard wires:-\n89.00+13.00=102.00 per day\n02.00\n104.00\n(i)\n(i)\nLoading-\nLoading-\n(a)\nPer railways wagon\n430.00+60.00=490.00\n12.00\n502.00\n(b)\nPer truck\n199.00+28.00=227.00\n05.00\n232.00\n(c)\nPer tyre cart\n58.00+08.00=66.00\n02.00\n68.00\n(d)\nPer bullock cart\n49.00+07.00= 56.00\n01.00\n57.00\n(ii)\n(ii)\nUnloading-\nUnloading-\n(a)\nPer railways wagon\n290.00+41.00= 331.00\n08.00\n339.00\n(b)\nPer truck\n146.00+21.00=167.00\n03.00\n170.00\n(c)\nPer tyre cart\n45.00+06.00= 51.00\n02.00\n53.00\n(d)\nPer bullock cart\n30.00+04.00= 34.00\n01.00\n35.00\n(6)\nLoading and Unloading of coal.\n89.00+13.00=102.00 p. day\n02.00\n104.00\n(i)\n(i)\nLoading-\nLoading-\n(a)\nPer railways wagon 4 wheel (Wagon of 22 tones capacity).\n173.00+24.00=197.00\n05.00\n202.00\n(b)\nPer truck 200 cft-\n108.00+15.00=123.00\n03.00\n126.00\n(c)\nPer tyre cart\n30.00+04.00= 34.00\n01.00\n35.00\n(d)\nPer bullock cart\n25.00+04.00= 29.00\nNIL\n29.00\n(ii)\n(ii)\nUnloading-\nUnloading-\n(a)\nPer railways wagon (Wagon of 22 tones capacity)\n117.00+16.00=133.00\n04.00\n137.00\n(b)\nPer truck 200 cft-\n68.00+10.00=78.00\n01.00\n79.00\n(c)\nPer tyre cart\n16.00+02.00=18.00\n01.00\n19.00\n(d)\nPer bullock cart\n10.00+01.00=11.00\n01.00\n12.00\n(7)\nLoading and Unloading of lime and clay and earth etc.\n89.00+13.00=102.00 p. day\n02.00\n104.00\n(i)\n(i)\nLoading-\nLoading-\n(a)\nPer railways wagon (Wagon of 22 tones capacity)\n135.00+19.00=154.00\n04.00\n158.00\n(b)\nPer truck 200 cft-\n79.00+11.00=90.00\n02.00\n92.00\n(c)\nPer tyre cart\n39.00+05=44.00\n02.00\n46.00\n(d)\nPer bullock cart\n30.00+04.00= 34.00\n01.00\n35.00\n(ii)\n(ii)\nUnloading\nUnloading\n(a)\nPer railways wagon (4 wheel (Wagon of 22 tones capacity)\n96.00+13.00=109.00\n03.00\n112.00\n(b)\nPer truck 200 cft-\n42.00+06.00= 48.00\n01.00\n49.00\n(c)\nPer tyre cart\n21.00+03= 24.00\n01.00\n25.00\n(d)\nPer bullock cart\n16.00+02.00=18.00\n01.00\n19.00\n(8)\nLoading and Unloading of cement per bag-\n02.00+NIL= 02.00\nNil\n02.00\n6\n6\nForestry and Timbering Operation-\nForestry and Timbering Operation-\nGeneral Work-\nGeneral Work-\n1\nUnskilled\n89.00+13.00=102.00 P. day\n02.00\n104.00\n2\nSemi-skilled\n92.00+13.00=105.00 P. day\n02.00\n107.00\n3\nSkilled\n113.00+16.00=129.00 P. day\n03.00\n132.00\n4\nHighly Skilled\n138.00+19.00=157.00 P. day\n04.00\n161.00\n5\nClerical /Supervisory\n2553.00+359.00=2912.00 P. Month\n69.00\n2981.00\nPiecework\nPiecework\n(a)\nLog cutter of various sizes felling, demarking and stocking\n\t\t\t\t\tat loading sites at copies forest, pole-(4\" x5\") Per\n\t\t\t\t\tcubic meter.\n02.00+NIL= 02.00\nNil\n02.00\n(b)\nConversion of tram line And fencing post per piece\n03.00+NIL= 03.00\n01.00\n04.00\n(c)\nCutting conversion including Stacking at site of fire wood\n\t\t\t\t\t(size per cubic meter)\n26.00+04.00= 30.00\nNIL\n30.00\n(d)\nCutting and Collecting of bamboo(including siding) Per 100\n\t\t\t\t\tpiece-\n(i)\nLoggas - Per 100 Pcs.\n76.00+11.00= 87.00\n02.00\n89.00\n(ii)\nTonnas - Per 100 Pcs\n62.00+08.00= 70.00\n02.00\n72.00\n(iii)\nSorahi - Per 100 Pcs\n26.00+04.00=30.00\nNIL\n30.00\n(e)\nCharcoal Manufactory per bag (35Kg)\n20.00+03.00= 23.00\nNIL\n23.00\n(f)\nFodder Grass, or thatch grass or sewai grass (per K g.)\n20.00+03.00=23.00\nNIL\n23.00\n(g)\nSal seed & Bonhimia leaves collection (Per kg)\n05.00+01 = 06.00\nNIL\n06.00\n7.\n7.\nSilk Industry including Manufacturer from pure silk,\n\t\t\t\t\tartificial silk and other staple yarn.\nSilk Industry including Manufacturer from pure silk,\n\t\t\t\t\tartificial silk and other staple yarn.\nGeneral Work-\nGeneral Work-\n1\nUnskilled\n89.00+13.00=102.00 P. day\n02.00\n104.00\n2\nSemi-skilled\n92.00+13.00=105.00 P. day\n02.00\n107.00\n3\nSkilled\n113.00+16.00=129.00 P. day\n03.00\n132.00\n4\nHighly Skilled\n138.00+19.00=157.00 P. day\n04.00\n161.00\n5\nClerical /Supervisory\n2553.00+359.00=2912.00 P. Month\n69.00\n2981.00\nPiece Work-\nPiece Work-\n(a)\nPower loom weaver Per meter for plain cloth\n05.00+01.00= 06.00\nNIL\n06.00\nand per meter for Erimchek & other fine cloth\n04.00+01.00= 05.00\nNIL\n05.00\n(b)\nHandloom Weaver Per meter for Plain cloth -\n07.00+01.00= 08.00\nNIL\n08.00\nPer Meter for erimchek\n09.00+01.00=10.00\n01.00\n11.00\nPer Meter Tusser mulberry and munga cloth-\n10.00+01.00=11.00\n01.00\n12.00\n(c)\nPin Wider\n(i)\nPower loom if prepared for cloth Per Kg- Hank\n05.00+01.00= 06.00\nNIL\n06.00\nprepared from care cloth\n04.00+01.00= 05.00\nNIL\n05.00\n(ii)\nHandloom per Kg\n08.00+01.00= 09.00\nNIL\n09.00\n(d)\nBobbin Winder\n(i)\nPower loom Per kg if prepared hand cloth-\n04.00+01.00= 05.00\nNIL\n05.00\n(ii)\nHandloom per Kg\n08.00+01 = 09.00\nNIL\n09.00\n(e)\nCutting & Shaping-\n(i)\nStaple per than of 12 meter- Silk\n04.00+01.00=05.00\nNIL\n05.00\n8.\n8.\nEarth Cutting Operation-\nEarth Cutting Operation-\n(a)\nFor every 90 cubic ft- of soft earth-\n89.00+13.00=102.00\n02.00\n104.00\n(b)\nFor every 75 cubic ft- of hard earth-\n89.00+13.00=102.00\n02.00\n104.00\n(c)\nFor every 60 cubic ft- of highly hard earth-\n89.00+13.00=102.00\n02.00\n104.00\nNote:- Decision of 15% less earth cutting for women\n\t\t\t\t\tworker, but will gate equal wage-\nNote:- Decision of 15% less earth cutting for women\n\t\t\t\t\tworker, but will gate equal wage-\n9\n9\nTea Plantation -\nTea Plantation -\nGeneral Work\nGeneral Work\n1\nUnskilled\n89.00+13.00=102.00 Per day\n02.00\n104.00\n2\nSemi-skilled\n92.00+13.00=105.00 Per day\n02.00\n107.00\n3\nSkilled\n113.00+16.00=129.00 Per day\n03.00\n132.00\n4\nHighly Skilled\n138.00+19.00=157.00 Per day\n04.00\n161.00\n5\nClerical /Supervisory\n2553.00+359.00=2912.00 Per Month\n69.00\n2981.00\nPiecework-\nPiecework-\n(a)\nPlucker per plucking of one Kg. of green Leaves\n04.00+01.00= 05.00\nNIL\n05.00\n(b)\nPerson engaged in hacking for preparing 40 nails in a land\n\t\t\t\t\tmeasuring 0-133 acre-\n13.00+02.00=15.00\nNIL\n15.00\n(c)\nPerson engaged in weeding and forking per 100 tea bush-\n13.00+02.00=15.00\nNIL\n15.00\n10.\n10.\nLac Manufactory-\nLac Manufactory-\nGeneral Work-\nGeneral Work-\n1\nUnskilled\n89.00+13.00=102.00 P. day\n02.00\n104.00\n2\nSemi-skilled\n92.00+13.00=105.00 P. day\n02.00\n107.00\n3\nSkilled\n113.00+16.00=129.00 P. day\n03.00\n132.00\n4\nHighly Skilled\n138.00+19.00=157.00 P. day\n04.00\n161.00\n5\nClerical /Supervisory\n2553.00+359.00=2912.00 Per Month\n69.00\n2981.00\nPiecework-\nPiecework-\n(a)\nKarigar- for melting 40Kg- of seed lac.\n56.00+08.00= 64.00\n01.00\n65.00\n(b)\nBelwaia - for melting 40Kg- of seed lac.\n46.00+06.00= 52.00\n02.00\n54.00\n(c)\nPherwaia - for melting 40Kg-of seed lac.\n28.00+04.00=32.00\n01.00\n33.00\n(d)\nKamin & Ghogiahin - for washing and separating\n\t\t\t\t\t40Kg- of seed lac from bhushi, Mullama sand.\n14.00+02.00=16.00\nNIL\n16.00\n(e)\nKarahia and Rang Kharhiya ghasander and Mazandar - for washing of\n\t\t\t\t\t40 Kg of seed lac through washing Machine.\n13.00+02.00=15.00\nNIL\n15.00\n(f)\nTailor (Khalifa)\n(i)\nwhen using own machine- (per Bhatta).\n08.00+01.00=09.00\nNIL\n09.00\n(ii)\nwhen using employer's machine- (per Bhatta).\n04.00+01.00= 05.00\nNIL\n05.00\n(g)\nCrusher-per 40 Kg. of Stick lac-\n09.00+01.00= 10.00\n01.00\n11.00\n(h)\nBreaker-per Kg-of stick lac-\n40 08.00+01.00= 09.00\nNIL\n09.00\n11.\n11.\nPower loom Industry.\nPower loom Industry.\nGeneral Work-\nGeneral Work-\n1\nUnskilled\n89.00+13.00=102.00 P. day\n02.00\n104.00\n2\nSemi-skilled\n92.00+13.00=105.00 P. day\n02.00\n107.00\n3\nSkilled\n113.00+16.00=129.00 P. day\n03.00\n132.00\n4\nHighly Skilled\n138.00+19.00=157.00 P. day\n04.00\n161.00\n5\nClerical /Supervisory\n2553.00+359.00=2912.00 Per Month\n69.00\n2981.00\nPiecework-\nPiecework-\npick\n26\n05.00 +01.00= 06.00\nNIL\n06.00\n28-\n05.00 +01.00= 06.00\nNIL\n06.00\n30\n05.00 +01.00= 06.00\nNIL\n06.00\n32\n05.00 +01.00= 06.00\nNIL\n06.00\n34\n05.00 +01.00= 06.00\nNIL\n06.00\n36\n06.00+01.00= 07.00\nNIL\n07.00\n40\n07.00+01.00= 08.00\nNIL\n08.00\n42\n07.00+01.00= 08.00\nNIL\n08.00\n44\n08.00+01.00= 09.00\nNIL\n09.00\n46\n08.00+01.00= 09.00\nNIL\n09.00\n48\n08.00+01.00= 09.00\nNIL\n09.00\n50\n08.00+01.00= 09.00\nNIL\n09.00\n52\n09.00+01.00=10.00\n01.00\n11.00\n12.\n12.\nPlucking and Processing- Kendu leaves.\nPlucking and Processing- Kendu leaves.\nGeneral Work-\nGeneral Work-\n1\nUnskilled\n89.00+13.00=102.00 P. day\n02.00\n104.00\n2\nSemi-skilled\n92.00+13.00=105.00 P. day\n02.00\n107.00\n3\nSkilled\n113.00+16.00=129.00 P. day\n03.00\n132.00\n4\nHighly Skilled\n138.00+19.00=157.00 P. day\n04.00\n161.00\n5\nClerical /Supervisory\n2553.00+359.00=2912.00 P. Month\n69.00\n2981.00\nPiecework-\nPiecework-\n(a)\nPlucking of leaves per 50,000 leaves or 60 paise per 50\n\t\t\t\t\tleaves.\n327.00+46.00= 373.00\n09.00\n382.00\n(b)\nPacking of Bags Per small bags. Per big bags.\n05.00+01.00=06.00 10.00+01.00=11.00\nNIL\n01.00 06.00 12.00\n(c)\nGrading and bundling per bind of 5 Kg.\n10.00+01.00=11.00\n01.00\n12.00\nThe 18th March, 2010",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "12",
"title": "12. S.O. 55, dated 19th March, 2010.",
"chapter": null,
"content": "Schedule- 1(A)\nMonth & Year\nIndex No. Base Year (2001-100)\nLink Factor Change for base year\nChanged Index No. for base year (1960-100)\n1\n2\n3\n4\nJuly 2009\n160\n4.63x4.93\n3652.15\nAugust 2009\n162\n4.63x4.93\n3697.80\nSeptember 2009\n163\n4.63x4.93\n3720.63\nOctober 2009\n165\n4.63x4.93\n3766.28\nNovember 2009\n168\n4.63x4.93\n3834.75\nDecember 2009\n169\n4.63x4.93\n3857.58\nTotal-\n22529.19\nAverage\n22529.19/6=\n3754.87\nSchedule-1 (B)\nAgriculture Operations 3325, dated 1st July 2008\nSchedule-II\nSl.\nCategory of Workers\nBasic Minimum Wages + V.D.A. 1-04-09 &\n\t\t\t\t01.10.09 (In. Rs.)\nV.D.A Effective Date 01-04-2010\nTotal Wage (3 + 4)\n1\n2\n3\n4\n5\n1\nAll other agricultural operations except harvesting\n85.00 + 12.00 + 02.00 = 99.00 Per day\n10.00\n109.00 Per day\n2\nTractor Driver and Pump operator\n3066.00+431.00+83.00 = 3580.00 Per month\n355.00\n3935.00 Per month\n3\nTractor Khalasi / Pump Khalasi/ Choukidar/ Sipahi\n2386.00+335.00+65.00= 2786.00 Per Month\n276.00\n3062.00 Per month\n4\nHarvesting\n-\n-\nOne bundle in 10 bundle of harvested crops.\nThe 18th March, 2010",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
{
"number": "13",
"title": "13. S.O. 57, dated the 19th March, 2010.",
"chapter": null,
"content": "Schedule-1 (A)\nMonth & Year\nIndex No. Base Year (2001-100)\nLink Factor Change for base year\nChanged Index No. for base year (1960-100)\n1\n2\n3\n4\nJuly 2009\n160\n4.63x4.93\n3652.15\nAugust 2009\n162\n4.63x4.93\n3697.80\nSeptember 2009\n163\n4.63x4.93\n3720.63\nOctober 2009\n165\n4.63x4.93\n3766.28\nNovember 2009\n168\n4.63x4.93\n3834.75\nDecember 2009\n169\n4.63x4.93\n3857.58\nTotal-\n22529.19\nAverage\n22529.19/6=\n3754.87\nSchedule-I(B)\nSchedule -II\nSl. No.\nCategories of Workers\nBasic Minimum Wage + V.D.A. 01-04-2010 (In. Rs.)\nV.D.A. Effective date 1-04-2010\nTotal wage (3+4) 01.04.2010\n1\nUnskilled\n89.00 +11.00= 100.00 per day\n10.00\n110.00 per day\n2\nSemi skilled\n92.00+11.00= 103.00 per day\n11.00\n114.00 per day\n3\nSkilled\n113.00+14.00= 127.00 per day\n12.00\n139.00 per day\n4\nHighly Skilled\n138.00+ 17.00= 155.00 per day\n15.00\n170.00 per day\n5\nSupervisory/ Clerical\n2553.00+312.00= 2865.00 Per month\n285.00\n3150.00 Per month\nThe 18th March, 2010",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "14",
"title": "14. S.O. 59, dated 19th March, 2010.",
"chapter": null,
"content": "Schedule-1 (A)\nMonth & Year\nIndex No. Base Year (2001-100)\nLink Factor Change for base year\nChanged Index No. for base year (1960-100)\n1\n2\n3\n4\nJuly 2009\n160\n4.63x4.93\n3652.15\nAugust 2009\n162\n4.63x4.93\n3697.80\nSeptember 2009\n163\n4.63x4.93\n3720.63\nOctober 2009\n165\n4.63x4.93\n3766.28\nNovember 2009\n168\n4.63x4.93\n3834.75\nDecember 2009\n169\n4.63x4.93\n3857.58\nTotal-\n22529.19\nAverage\n22529.19/6=\n3754.87\nSchedule-I(B)\nName of employment\nNotification No\nTotal\n1. 62-General Work\n1. 3323 dated 1-07-08\n69, Employment\n2. 07- General Work\n2. 4993 dated 1-10-08\nSchedule -II\nSl. No.\nCategories of Workers\nBasic Minimum Wage + V.D.A. date 1-04-09 &\n\t\t\t\t01.10.09 (In. Rs.)\nV.D.A. Effective date 01.04.2010 (In Rs.)\nTotal wage (3 + 4) 01-04-10\n1\nUnskilled\n89.00 + 13.00 + 02.00 = 104.00 per day\n10.00\n114.00 P.day\n2\nSemi skilled\n92.00 + 1 3.00 + 02.00 = 107.00 Per day\n11.00\n118.00 P.day\n3\nSkilled\n113.00 + 16.00+03.00 = 132.00 Per day\n13.00\n145.00 P.day\n4\nHighly Skilled\n138.00+19.00+04.00 = 161.00 per day\n16.00\n177.00 P.day\n5\nSupervisory/ Clerical\n2553.00+359.00 + 69.00 = 2981.00 Per month\n296.00\n3277.00 P.month\nThe 18th March, 2010",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
{
"number": "15",
"title": "15. S.O. 61, dated the 19th March, 2010.",
"chapter": null,
"content": "Schedule-1 (A)\nMonth & Year\nIndex No. Base Year (2001-100)\nLink Factor Change for base year\nChanged Index No. for base year (1960-100)\n1\n2\n3\n4\nJuly 2009\n160\n4.63x4.93\n3652.15\nAugust 2009\n162\n4.63x4.93\n3697.80\nSeptember 2009\n163\n4.63x4.93\n3720.63\nOctober 2009\n165\n4.63x4.93\n3766.28\nNovember 2009\n168\n4.63x4.93\n3834.75\nDecember 2009\n169\n4.63x4.93\n3857.58\nTotal-\n22529.19\nAverage\n22529.19/6=\n3754.87\nSchedule-I (B)\nName of employment & Notification No-3327 dated 1st July, 2008 (12 Employment)\nSchedule-II\nSl. No.\nCategories of Workers & Piece Work\nBasic Minimum Wage + V.D.A FROM-01.04.09 &\n 01.10.09 (In Rs.)\nV.D.A. Effective from 01.04.10\nTotal Wage from 01-04-10 (3+4)\nRemarks\n1\n2\n3\n4\n5\n6\n1\n1\nStone Breaking & Stone Crushing Operations\nStone Breaking & Stone Crushing Operations\nGeneral Work\n1.\nUnskilled\n89+13+02=104.00 P. day\n10.00\n114.00\n2.\nSemi-skilled\n92+13+02=107.00 P. day\n11.00\n118.00\n3.\nSkilled\n113+16+03=132.00 P. day\n13.00\n145.00\n4.\nHighly Skilled\n138+19+04=161.00 P. day\n16.00\n177.00\n5.\nClerical /Supervisory\n2553+359+69=2981.00 P. month\n296.00\n3277.00\nPiece Work\nI.\nMining & Carrying by Bullock Cart-\n(a)\nWithin up to quarter mile per 100 Cft-\n193+27+05=225.00\n23.00\n248.00\n(b)\nFor every above quarter mile of carrying per 100/- Cft-\n45+06+02=53.00\n05.00\n58.00\nII\nMining chelly breaking and transport by trolley per tub- of\n 25ft-\n48+07+01=56.00\n06.00\n62.00\nIII\nChelly breaker from boulder per 100/-Cft-\n48+07+01=56.00\n06.00\n62.00\nIV\nBallast Breaker from boulder- per 100/-Cft-\n(a)\n2\"x3\"\n101+14+03=118.00\n12.00\n130.00\n(b)\n2MX2-50\"\n125+18+03=146.00\n14.00\n160.00\n(c)\n1 -50\"X2\"\n150+21+04=175.00\n18.00\n193.00\n(d)\n1\"\n248+35+07=290.00\n28.00\n318.00\nV\nBreaking Ballast from telai-Per Box of 5ft-\n16+02+01=19.00\n02.00\n21.00\nVI\nChips Breaker-\n(a)\nHand made chips of ¾\"Dn- per Cft- -\n08+01+00=09.00\n01.00\n10.00\n(b)\nHand made chips of 1\" Dn- per Cft- -\n08+01+00=09.00\n01.00\n10.00\nVII\nEarth Cutting -\n(a)\nFor soft earth- per 90Cft-\n89+13+02=104.00\n10.00\n114.00\n(b)\nFor hard earth per 75 Cft-\n89+13+02=104.00\n10.00\n114.00\n(c)\nFor highly hard earth-per 60 Cft-\n89+13+02=104.00\n10.00\n114.00\nNote:- Decision of 15% less earth cutting for women worker,\n but will gate equal wage-\nNote:- Decision of 15% less earth cutting for women worker,\n but will gate equal wage-\nVIII\nBorers and Drollers per ft-\n12+02+00=14.00\n01.00\n15.00\nIX\nMines (Including boulders carrying Head load within a quarter\n mile-) per 25 Cft\n58+08+02=68.00\n06.00\n74.00\nX\nWagon Loaders full head of Broad gauges wagon(500 cubic ft-)\n per Wagon load-\n160+22+05=187.00\n18.00\n205.00\nXI\nStone Set (Stone Bricks) Per 100 Pcs.\n(a)\nBreaking Size(9\"x6\"x4\")\n195+27+06=228.00\n22.00\n250.00\n(b)\nStone Set (Stone Bricks Polishing)\n110+15+03=128.00\n13.00\n141.00\n(c)\nStone Set (Stone Bricks Cutting & Transporting) for 3 to 4\n mile-\n89+13+02=104.00\n10.00\n114.00\n2.\n2.\nBidi Making Manufacture\nBidi Making Manufacture\nGeneral Work\n1\nUnskilled\n89+13+02=104.00 Per day\n10.00\n114.00\n2\nSemi-skilled\n92+13+02=107.00 Per day\n11.00\n118.00\n3\nSkilled\n113+16+03=132.00 Per day\n13.00\n145.00\n4\nHighly Skilled\n138+19+04=161.00 Per day\n16.00\n177.00\n5\nClerical /Supervisory P. month\n2553+359+69=2981.00\n296.00\n3277.00\nPiece Work\nI\nPer thousand bidi provided that Where employees earning\n at this rate is less than Rs- 43-00 per day he shall be paid at\n least Rs-43-00 per that day subject to the condition specified in\n the annexure here to.\n86+12+02=100.00\n10.00\n110.00\n(a)\nLabelling ( Single) per lakh\n110+15+03=128.00\n13.00\n141.00\n(b)\nLabelling (double) per lakh\n114+16+03=133.00\n13.00\n146.00\nII\nSekai Work-\n(a)\nEmployees employed in Sekai by any process Bidi Other\n than Tandoor.\n53+07+02=62.00\n06.00\n68.00\n(b)\nSekai by Tandoor per lakh Bidi\nSekai\n54+08+01=63.00\n06.00\n69.00\n(c)\nPacking (Basket packing) per lakh\n55+08+01=64.00\n07.00\n71.00\n3.\n3.\nBrick Manufactory-\nBrick Manufactory-\nI\nGeneral Work-\n1\nUnskilled\n89+13+02=104 00 P. day\n10.00\n114.00\n2\nSemi-skilled\n92+13+02=107.00 P. day\n11.00\n118.00\n3\nSkilled\n113+16+03=132.00 P. day\n13.00\n145.00\n4\nHighly Skilled\n138+19+04=161.00 P. day\n16.00\n177.00\n5\nClerical /Supervisory P. month\n2553+359+69=2981.00\n296.00\n3277.00\nII\nPiece Work\n(i)\nBrick moulders (inclusive of cutting earth, kneading earth,\n watering earth, carrying earth to parria) per thousand bricks-\n131+18+04=153.00\n15.00\n168.00\n(ii)\nLoading & unloading of Bricks in Bhattha) per 1000 bricks\n & unskilled Labour per day.\n89+13+02=104.00\n10.00\n114.00\n(iii)\nMistri p. month\n2792+392+76=3260.00\n324.00\n3584.00\nIn Chimneys\n(i)\nBrick moulder (inclusive of cutting earth, kneading earth,\n watering earth, and carrying earth to pariah & Pug mill. Per\n 1000 bricks.\n115+16+03=134.00\n14.00\n148.00\n(ii)\nBricks Loading and Unloading of per 1000 & Unskilled\n Labour per day.\n89+13+02=104.00 p. day\n10.00\n114.00\n(iii)\nFireman\n2738+385+74=3197.00 p. month\n317.00\n3514.00\n(iv)\nCoalman /Chowkidar / Fire Khalalsi & Rubbishman.\n2310+325+62=2697.00 p. month\n268.00\n2965.00\n(v)\nMate / Over Supervisor & Mistry.\n2646+372+72=3090.00 p. month\n306.00\n3396.00\n(vi)\nMunshi\n2793+392+76=3261.00 p. month\n324.00\n3585.00\n4.\n4.\nHair Cutting Saloon -\nHair Cutting Saloon -\nGeneral Work -\n1\nUnskilled\n89+13+02=104.00 p. day\n10.00\n114.00\n2\nSemi-skilled\n92+13+02=107.00 p. day\n11.00\n118.00\n3\nSkilled\n113+16+03=132.00 p. day\n13.00\n145.00\n4\nHighly Skilled\n138+19+04=161.00 p. day\n16.00\n177.00\n5\nClerical /Supervisory\n2553+359+69=2981.00 P.Month\n296.00\n3277.00\nPiece Work\nI-\nPer Hair Cutting.\n08+01+00=09.00\n01.00\n10.00\nII-\nPer shaving.\n03+00+01 =04.00\nNIL\n04.00\nIII-\nPer hair cutting & shaving.\n09+01+01=11.00\n01.00\n12.00\nIV-\nPer Sar Mundan\n07+01+00=08.00\n01.00\n09.00\nV-\nPer Hair Cutting of Children.\n07+01+00=08.00\n01.00\n09.00\nVI-\nPer Sar Malish.\n03+00+01=04.00\nNIL\n04.00\nVII-\nPer Shampoo.\n07+01+00=08.00\n01.00\n09.00\nVIII-\nPer hair Dyeing.\n31+04+01=36.00\n04.00\n40.00\n5.\n5.\nLoading & Unloading Operation-\nLoading & Unloading Operation-\nGeneral Work-\n1\nUnskilled\n89+13+02=104.00 p. day\n10.00\n114.00\n2\nSemi-skilled\n92+13+02=107.00 p. day\n11.00\n118.00\n3\nSkilled\n113+16+03=132.00 p. day\n13.00\n145.00\n4\nHighly Skilled\n38+19+04=161.00 p. day\n16.00\n177.00\n5\nClerical /Supervisory\n2553+359+69=2981.00 P. month\n296.00\n3277.00\nPiece Work\nI-\nLoading & Unloading of Bags, Gur Chakkies ,\n Fertilizers, bales of clothes, Jute, Cotton etc. tin or drum of\n Kerosene Oil, Mustard Oil, Coconut Oil and other oil, Dalda\n Molases, Paints tar etc. or any other load, not specified in this\n schedule from Godown or Shop or storage place to railways wagon,\n truck, Bullock cart, etc or from one place to another place and vice-versa for carrying loads every 200 meters or parts\n thereto per load of.\n89+13+02=104.00 P. day\n10.00\n114.00\n(a)\nLess than 20 kg-\n01+NIL+NIL=01.00\nNIL\n01.00\n(b)\nFrom 20 to 65 Kg-\n01+NIL+NIL=01.00\nNIL\n01.00\n(c)\nFrom 66Kg- to 100Kg-\n03+NIL+01 =04.00\nNIL\n04.00\n(e)\nFrom 101 Kg- and above Rupees for every Two Kg load over 101\n kg.\n04+01+Nil =05.00\nNIL\n05.00\n(2)\nFilling or weighing or\n(i)\nwelding of tins and drums or arranging of Bags, tins, drums\n and other\n89+13+02=104.00 p. day\n10.00\n114.00\n(ii)\nFilling or refilling or arranging of Bags, tins and other load\n (per load of)\n89 +13+02=104.00 p. day\n10.00\n114.00\n(a)\n40 Kg- to 65 Kg-\n01+NIL+00=01.00\nNIL\n01.00\n(b)\nFrom 66 Kg- to 100Kg-\n03+NIL+01 =04.00\nNIL\n04.00\n(c)\n101 Kg- and above (Rupees for every two Kg-load over101 Kg-)\n06+01+Nil =07.00\n01.00\n08.00\n(iii)\nSewing of Bags or welding of tins or weighing of load above\n 10Kg- on scale -\n01+NIL+NIL=01.00\nNIL\n01.00\n(3)\nLoading and Unloading of Bamboo, wooden poles,Wooden logs,\n fuel wood and sugar cane.\n89+13+02=104.00 p. day\n10.00\n114.00\n(i)\nLoading of Bamboo and Wooden Poles:-\n(a)\nPer Railway wagon\n180+25+05=210.00\n21.00\n231.00\n(b)\nPer Truck\n85+12+02=99.00\n10.00\n109.00\n(c)\nPer Tyre cart\n25+04+NIL=29.00\n03.00\n32.00\n(d)\nPer bullock cart\n17+02+01 =20.00\n02.00\n22.00\n(ii)\nLoading of wooden logs and fuel woods\n(a)\nPer railways wagon\n180+25+05=210.00\n21.00\n231.00\n(b)\nPer truck\n85+12+02=99.00\n10.00\n109.00\n(c)\nPer tyre cart\n25+04+NIL=29.00\n03.00\n32.00\n(d)\nPer bullock cart\n17+02+01 =20.00\n02.00\n22.00\n(iii)\nUnloading of Bamboo Wooden poles, wooden logs and wood\n(a)\nPer railways wagon\n58+08+02=68.00\n06.00\n74.00\n(b)\nPer truck\n25+04+NIL=29.00\n03.00\n32.00\n(c)\nPer tyre cart\n08+01+Nil =09.00\n01.00\n10.00\n(d)\nPer bullock cart\n05+01+Nil =06.00\nNIL\n06.00\n(iv)\nLoading and Unloading of Sugar Cane Per quintal\n03+NIL+01 =04.00\nNIL\n04.00\n(4)\nLoading and Unloading of Bricks, Fire Bricks , tiles, Fragile\n wares made of cement or clay or glass, Boulders Ballast, chelly\n and coal-\n89+13+02=104.00 p. day\n10.00\n114.00\n(i)\nLoading and Unloading of Fire Bricks, tiles, fragiles ware\n made of cement or clay or Glass-\n(a)\nPer railways wagon\n491+69+13=573.00\n57.00\n630.00\n(b)\nPer truck\n213+30+06=249.00\n24.00\n273.00\n(c)\nPer tyre cart\n62+09+01=72.00\n08.00\n80.00\n(d)\nPer bullock cart\n43+06+01=50.00\n05.00\n55.00\n(ii)\nLoading of Bricks:-\n(a)\nPer railways wagon\n382+54+10=446.00\n44.00\n490.00\n(b)\nPer truck\n180+25+05=210.00\n21.00\n231.00\n(c)\nPer tyre cart\n52+07+02=61.00\n06.00\n67.00\n(d)\nPer bullock cart\n38+05+01=44.00\n05.00\n49.00\n(iii)\nUnloading of Bricks-\n(a)\nPer railways wagon\n252+35+07=294.00\n29.00\n323.00\n(b)\nPer truck\n122+17+03=142.00\n15.00\n157.00\n(c)\nPer tyre cart\n38+05+01 =44.00\n05.00\n49.00\n(d)\nPer bullock cart\n25+04+NIL=29.00\n03.00\n32.00\n(iv)\nLoading & Unloading of Stone chips & Challi-\n(a)\nLoading per 100 cft -\n31+04+01=36.00\n04.00\n40.00\n(b)\nUnloading per 100 cft\n21+03+01 =25.00\n02.00\n27.00\n(v)\nLoading & Unloading of Ballast & Boulders -\n(a)\nLoading per 100 cft\n34+05+01=40.00\n04.00\n44.00\n(b)\nUnloading per 100 cft\n21+03+01=25.00\n02.00\n27.00\n(5)\nLoading, Unloading of iron rods, G.l. sheets, Iron Pipes, hume\n pipes, Machineries equipments and other hard wares:-\n89+13+02=104.00 p. day\n10.00\n114.00\n(i)\nLoading-\n(a)\nPer railways wagon\n430+60+12=502.00\n50.00\n552.00\n(b)\nPer truck\n199+28+05=232.00\n23.00\n255.00\n(c)\nPer tyre cart\n58+08+02=68.00\n06.00\n74.00\n(d)\nPer bullock cart\n49+07+01=57.00\n06.00\n63.00\n(ii)\nUnloading\n(a)\nPer railways wagon\n290+41+08=339.00\n33.00\n372.00\n(b)\nPer truck\n146+21+03=170.00\n17.00\n187.00\n(c)\nPer tyre cart\n45+06+02=53.00\n05.00\n58.00\n(d)\nPer bullock cart\n30+04+01=35.00\n04.00\n39.00\n(6)\nLoading and Unloading of coal.\n89+13+02=104.00 p. day\n10.00\n114.00\n(i)\nLoading-\n(a)\nPer railways wagon 4 wheel (Wagon of 22 tones capacity).\n173+24+05=202.00\n20.00\n222.00\n(b)\nPer truck 200 Cft-\n108+15+03=126.00\n13.00\n139.00\n(c)\nPer tyre cart\n30+04+01 =35.00\n04.00\n39.00\n(d)\nPer bullock cart\n25+04+NIL=29.00\n03.00\n32.00\n(ii)\nUnloading\n(a)\nPer railways wagon (Wagon of 22 tones capacity)\n117+16+04=137.00\n13.00\n150.00\n(b)\nPer truck 200Cft-\n68+10+01=79.00\n08.00\n87.00\n(c)\nPer tyre cart\n16+02+01=19.00\n02.00\n21.00\n(d)\nPer bullock cart\n10+01+01=12.00\n01.00\n13.00\n(7)\nLoading and Unloading of lime and clay and earth etc-\n89+13+02=104.00 p. day\n10.00\n114.00\n(i)\nLoading\n(a)\nPer railways wagon (Wagon of 22 tones capacity)\n135+19+04=158.00\n15.00\n173.00\n(b)\nPer truck 200 Cft-\n79+11+02=92.00\n09.00\n101.00\n(c)\nPer tyre cart\n39+05+02=46.00\n04.00\n50.00\n(d)\nPer bullock cart\n30+04+01=35.00\n03.00\n38.00\n(ii)\nUnloading\n(a)\nPer railways wagon (4 wheel (Wagon of 22 tones capacity)\n96+13+03=112.00\n11.00\n123.00\n(b)\nPer truck 200 Cft-\n42+06+01 =49.00\n05.00\n54.00\n(c)\nPer tyre cart\n21+03+01=25.00\n02.00\n27.00\n(d)\nPer bullock cart\n16+02+01=19.00\n02.00\n21.00\n(8)\nLoading and Unloading of cement per bag-\n02.00+NIL+NIL=02.00\nNIL\n02.00\n6\n6\nForestry and Timbering Operation-\nForestry and Timbering Operation-\nGeneral Work\n1\nUnskilled\n89+13+02=104.00 P. day\n10.00\n114.00\n2\nSemi-skilled\n92+13+02=107.00 P. day\n11.00\n118.00\n3\nSkilled\n113+16+03=132.00 P. day\n13.00\n145.00\n4\nHighly Skilled\n138+19+04=161.00 P. day\n16.00\n177.00\n5\nClerical /Supervisory\n2553+359+69=2981.00 P. Month\n296.00\n3277.00\nPiece Work\n(a)\nLog cutter of various sizes falling demarking and stocking at\n loading sits at copies forest, pole-(4\" x5\") Per cubic\n meter.\n02+NIL+NIL=02.00\nNIL\n02.00\n(b)\nConversion of tram line And fencing post per piece\n03+NIL+01 =04.00\nNIL\n04.00\n(c)\nCutting conversion including Stacking at site of fire wood\n (size per cubic meter)\n26+04+NIL=30.00\n03.00\n33.00\n(d)\nCutting and Collecting of bamboo(including siding) Per 100\n piece-\n(i)\nLoggas - Per 100 Pcs.\n76+11+02=89.00\n09.00\n98.00\n(ii)\nTonnas - Per 100 Pcs\n62+08+02=72.00\n08.00\n80.00\n(iii)\nSorahi - Per 100 Pcs\n26+04+NIL=30.00\n03.00\n33.00\n(e)\nCharcoal Manufactory per bag (35Kg)\n20+03+NIL=23.00\n03.00\n26.00\n(f)\nFodder Grass, or thatch grass or sewai grass (per Kg)\n20+03+NIL=23.00\n03.00\n26.00\n(g)\nSal seed & Bonhimi a leaves collection (Per kg)\n05+01+Nil =06.00\nNIL\n6.00\n(7)\n(7)\nSilk Industry including Manufacturer from pure silk,\n artificial silk and other staple yarn-\nSilk Industry including Manufacturer from pure silk,\n artificial silk and other staple yarn-\nGeneral Work-\n1\nUnskilled\n89+13+02=104.00 P. day\n10.00\n114.00\n2\nSemi-skilled\n92+13+02=107.00 P. day\n11.00\n118.00\n3\nSkilled\n113+16+03=132.00 P. day\n13.00\n145.00\n4\nHighly Skilled\n138+19+04=161.00 P. day\n16.00\n177.00\n5\nClerical /Supervisory\n2553+359+69=2981.00 P. Month\n296.00\n3277.00\nPiece Work-\n(a)\nPower loom weaver Per meter for plain cloth\n05+01+Nil =06.00\nNIL\n06.00\nand per meter for Erimchek & other fine cloth\n04+01+Nil =05.00\nNIL\n05.00\n(b)\nHandloom Weaver Per meter for Plain cloth -\n07+01+Nil =08.00\n01.00\n09.00\nPer Meter for erimchek\n09+01+01=11.00\n01.00\n12.00\nPer Meter Tusser mulberry and munga cloth-\n10+01+01=12.00\n01.00\n13.00\n(c)\nPin Wider\n(i)\nPower loom if prepared for cloth Per Kg- Hank\n05+01+Nil =06.00\nNIL\n06.00\nprepared from care cloth\n04+01+Nil =05.00\nNIL\n05.00\n(ii)\nHandloom per Kg\n08+01+Nil =09.00\n01.00\n10.00\n(d)\nBobbin Winder\n(i)\nPower loom Per kg if prepaired hand cloth-\n04+01+Nil =05.00\nNIL\n05.00\n(ii)\nHandloom per Kg\n08+01+Nil =09.00\n01.00\n10.00\n(e)\nCutting & Shaping-\n(i)\nStable per than of 12 meter- Silk\n04+01+Nil =05.00\nNIL\n05.00\n8.\n8.\nEarth Cutting Operation-\nEarth Cutting Operation-\n(a)\nFor every 90 cubic ft- of soft earth-\n89+13+02=104.00\n10.00\n114.00\n(b)\nFor every 75 cubic ft- of hard earth-\n89+13+02=104.00\n10.00\n114.00\n(c)\nFor every 60 cubic ft-of highly hard earth\n89+13+02=104.00\n10.00\n114.00\nNote:- Decision of 15% less earth cutting for women worker,\n but will get equal wage-\nNote:- Decision of 15% less earth cutting for women worker,\n but will get equal wage-\n9.\n9.\nTea Plantation -\nTea Plantation -\nGeneral Work\n1\nUnskilled\n89+13+02=104.00 P. day\n10.00\n114.00\n2\nSemi-skilled\n92+13+02=107.00 P. day\n11.00\n118.00\n3\nSkilled\n113+16+03=132.00 P. day\n13.00\n145.00\n4\nHighly Skilled\n138+19+04=161.00 P. day\n16.00\n177.00\n5\nClerical /Supervisory\n2553+359+69=2981.00 P. Month\n296.00\n3277.00\nPiece Work\n(a)\nPlucker per plucking of one Kg- of green Leaves\n04+01+NIL =05.00\nNIL\n05.00\n(b)\nPerson engaged in hacking for preparing 40 nails in a land\n measuring 0-133 acore-\n13+02+NIL =15.00\n02.00\n17.00\n(c)\nPerson engaged in weeding and forking per 100 tea bush-\n13+02+NIL=15.00\n02.00\n17.00\n10.\n10.\nLac Manufactory-\nLac Manufactory-\nGeneral Work-\n1\nUnskilled\n89+13+02=104.00 P. day\n10.00\n114.00\n2\nSemi-skilled\n92+13+02=107.00 P. day\n11.00\n118.00\n3\nSkilled\n113+16+03=132.00 P. day\n13.00\n145.00\n4\nHighly Skilled\n138+19+04=161.00 P. day\n16.00\n177.00\n5\nClerical /Supervisory\n2553+359+69=2981.00 P. Month\n296.00\n3277.00\nPiece Work\n(a)\nKarigar - for melting 40Kgof seed lac--\n56+08+01=65.00\n07.00\n72.00\n(b)\nBelwaia - for melting 40Kg of seed lac-\n46+06+02=54.00\n05.00\n59.00\n(c)\nPherwaia - for melting 40Kg of seed lac-\n28+04+01=33.00\n03.00\n36.00\n(d)\nKamin & Ghogiahi n - for washing &\n separating 40Kg of seed lac from bhushi, Mullama sand -\n14+02+NIL=16.00\n02.00\n18.00\n(e)\nKarahia and Rang Kharhiya ghasander and Mazandar - for washing of 40 Kg of seed lac through washing Machine--\n13+02+NIL=15.00\n02.00\n17.00\n(f)\nTailor (Khalifa)\n(i)\nwhen using own machine- (per Bhatta)-\n08+01+NIL =09.00\n01.00\n10.00\n(ii)\nwhen using employer's machine- (per Bhatta)-\n04+01+NIL =05.00\nNIL\n05.00\n(g)\nCrusher - per 40Kg- of Stick lac-\n09+01+01=11.00\n01.00\n10.00\n(h)\nBreaker - per 40 Kg-of stick lac-\n08+01+NIL =09.00\n01.00\n10.00\n11.\n11.\nPower loom Industry-\nPower loom Industry-\nGeneral Work-\n1\nUnskilled\n89+13+02=104.00 P. day\n10.00\n114.00\n2\nSemi-skilled\n92+13+02=107.00 P. day\n11.00\n118.00\n3\nSkilled\n113+16+03=132.00 P. day\n13.00\n145.00\n4\nHighly Skilled\n138+19+04=161.00 P. day\n16.00\n177.00\n5\nClerical /Supervisory\n2553+359+69=2981.00 P. Month\n296.00\n3277.00\nPiece Work\npick\n26\n05+01+NIL =06.00\nNIL\n06.00\n28-\n05+01+NIL =06.00\nNIL\n06.00\n30\n05+01+NIL =06.00\nNIL\n06.00\n32\n05+01+NIL =06.00\nNIL\n06.00\n34\n05+01+NIL =06.00\nNIL\n06.00\n36\n06+01+NIL =07.00\n1.00\n08.00\n40\n07+01+NIL=08.00\n1.00\n09.00\n42\n07+01+NIL =08.00\n1.00\n09.00\n44\n08+01+NIL =09.00\n1.00\n10.00\n46\n08+01+NIL =09.00\n1.00\n10.00\n48\n08+01+NIL =09.00\n1.00\n10.00\n50\n08+01+NIL =09.00\n1.00\n10.00\n52\n09+01+01=11.00 0\n1.00\n12.00\n12.\n12.\nPlucking and Processing- Kendu leaves\nPlucking and Processing- Kendu leaves\nGeneral Work-\n1\nUnskilled\n89+13+02=104.00 P. day\n10.00\n114.00\n2\nSemi-skilled\n92+13+02=107.00 P. day\n11.00\n118.00\n3\nSkilled\n113+16+03=132.00 P. day\n13.00\n145.00\n4\nHighly Skilled\n138+19+04=161.00 P. day\n16.00\n177.00\n5\nClerical /Supervisory\n2553+359+69=2981.00 P. Month\n296.00\n3277.00\nPiece Work\n(a)\nPlucking of leaves per 50,000 leaves or 60 paise per 50\n leaves-\n327+46+09=382.00\n38.00\n420.00\n(b)\nPacking of Bags Per small bags-\n05+01+NIL =06.00\nNIL\n06.00\nPer big bags-\n10+01+01=12.00\n01.00\n13.00\n(C)\nGrading and bundling per bind of 5 Kg-\n10+01+01=12.00\n01.00\n13.00",
"footnote": "",
"is_definition": false,
"sort_order": 14
}
],
"metadata": {
"Act ID": "bh449",
"Act Number": "Notification NO.5/MW-401/09 L&E 1659, dated 1.6.2009",
"Enactment Date": "",
"Act Year": "2009",
"Short Title": "Minimum Rates of Wages in Scheduled Employments, 2009",
"Type": "STATE",
"Location": "Bihar"
},
"updated_at": "2026-09-29 21:55:19"
}