(a) The information provided in the form above is true to my knowledge.
(b) I/We have read the Madhya Pradesh Electricity Supply Code and agree to abide by the condition mentioned therein.
(c) I/We will deposit electricity dues, every month, as per the applicable electricity tariff and other charges.
(d) I/We will own the responsibility of security and safety of the meter, cut-out and the installation thereafter.
(e) I/We enclose all necessary documents as per list with the application form. (If 'No', please provide details with reasons).
Signature of the Consumer/Authorized Signatory
Note. - Following documents may be attached with the application form :-
Note.
For domestic and non-domestic connections in urban area.
For domestic and non-domestic connections in rural area.
Annexure -2
Annexure -2
Application Form -For Extra High Tension/high Tension/Other Low Tension Service Connection
Application Form -For Extra High Tension/high Tension/Other Low Tension Service Connection
New Connection/Shifting of Premises/Change in Contract
New Connection/Shifting of Premises/Change in Contract
Demand/Change of Tariff Category/Change of Name of Consumer etc.
Demand/Change of Tariff Category/Change of Name of Consumer etc.
(Please strike-off the purpose that is not applicable)
-----------------------
Affix Pass Port
Size Photo .
Affix Pass Port
Size Photo
.
-----------------------
-----------------------
Section 11 • Madhya Pradesh Electricity Supply Code, 2013
11. I/We hereby declare that -
madhya-pradesh-electricity-supply-code-2013-sec-11.json
•
Section 11
{
"act_title": "Madhya Pradesh Electricity Supply Code, 2013",
"act_slug": "madhya-pradesh-electricity-supply-code-2013",
"section_label": "Section",
"section": {
"number": "11",
"title": "11. I/We hereby declare that -",
"chapter": null,
"content": "(a) The information provided in the form above is true to my knowledge.\n(b) I/We have read the Madhya Pradesh Electricity Supply Code and agree to abide by the condition mentioned therein.\n(c) I/We will deposit electricity dues, every month, as per the applicable electricity tariff and other charges.\n(d) I/We will own the responsibility of security and safety of the meter, cut-out and the installation thereafter.\n(e) I/We enclose all necessary documents as per list with the application form. (If 'No', please provide details with reasons).\nSignature of the Consumer/Authorized Signatory\nNote. - Following documents may be attached with the application form :-\nNote.\nFor domestic and non-domestic connections in urban area.\nFor domestic and non-domestic connections in rural area.\nAnnexure -2\nAnnexure -2\nApplication Form -For Extra High Tension/high Tension/Other Low Tension Service Connection\nApplication Form -For Extra High Tension/high Tension/Other Low Tension Service Connection\nNew Connection/Shifting of Premises/Change in Contract\nNew Connection/Shifting of Premises/Change in Contract\nDemand/Change of Tariff Category/Change of Name of Consumer etc.\nDemand/Change of Tariff Category/Change of Name of Consumer etc.\n(Please strike-off the purpose that is not applicable)\n-----------------------\nAffix Pass Port\n\t\t\t\t\t\t\t\tSize Photo .\nAffix Pass Port\n\t\t\t\t\t\t\t\tSize Photo\n.\n-----------------------\n-----------------------",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
"prev_section": "10",
"next_section": "1"
}