General Principles: Scheduling
(a) State Load Despatch Centre shall check that the resulting power flows do not give rise to any Transmission constraint. In case of any constraints, State Load Despatch Centre shall moderate the Schedule to the required extent by intimation to concerned Discoms; and
(b) State Load Despatch Centre shall check that Schedules are operationally reasonable particularly in terms of ramping-up/ ramping-down rates and ratio between minimum and maximum generation levels. State Load Despatch Centre shall moderate the Schedule to the required extent by intimation to concerned Discoms. The ramping up/ ramping down rates in respect of different categories of Stations would be based on the technical data as substantiated by Electricity Generating Stations and as mutually agreed by Discoms or Madhya Pradesh Power Management Company Limited on behalf of Discoms with due consent of State Load Despatch Centre.
(a) State Transmission loss for a given Week = (Total net injection into the State Grid in a week) - (Total net Drawls from the State Grid in a Week);
(b) Loss of nth Week shall be computed by the 5th day of the (n+1)th Week;
(c) This loss figure shall then be used in the Scheduling process from the beginning of the (n+2)th Week;
(d) State Load Despatch Centre shall round-off actual loss of nth Week to nearest 0.01% for the purpose of Scheduling for the (n+2)th Week (e.g. 4.705% is rounded-off to 4.71%, 3.442% is rounded off to 3.44% and so on);
(e) Events in the Grid of an exceptional nature could result in abnormally high or low losses in any Week. This could be either a Load crash in the State due to a Weather disturbance or closure of any Major Hydro Power Station during the monsoon for flushing of silt/debris froM the Reservoir or Outage of any major Transmission Lines etc. The losses for these abnormal weeks shall generally be ignored as far as the Scheduling process is concerned. State Load Despatch Centre decision in this regard will be final.
General Principles: Revision of Schedules
Implemented Schedules
Timelines and responsibility matrix (Madhya Pradesh Balancing and Settlement Code)
Timelines and responsibility matrix (Madhya Pradesh Balancing and Settlement Code)
Time (Furnish by)
Time (Furnish by)
Primary Activity
Primary Activity
Responsibility
Responsibility
10:00 hours
(i) Western Regional
Load Despatch Centre intimates MegaWatt and MegaWatt hours
entitlements of Madhya Pradesh in each Inter State Generating
Station to State Load Despatch Centre for the next day i.e.
between 00.00 hrs to 24.00 hrs of the following day, in each
15-minute time block;
(ii) Madhya Pradesh
Power Generating Company Limited* shall advise State Load
Despatch Centre the Station wise ex-Power Plant Mega Watt and
Mega Watt hour Capabilities foreseen for the next day i.e.
between 00.00 hrs to 24.00 hrs of the following day, in each
15-minute Time Block;
(iii) Independent
Power Producer and eligible Renewable Energy Generators shall
advise State Load Despatch Centre the Station wise ex-Power Plant
MegaWatt and MegaWatt hour Injections for the next day i.e.
between 00.00 hours to 24.00 hours of the following day,
Independent Power Producers /Renewable Energy Generators in each
15-minute Time block;
(iv) Indira Sagar Project, Omkareshwar
Hydro-Electric Project, Shared Stations and any other Stations
not covered under above Serial. Number (i),(ii) and (iii) shall
advise State Load Despatch Centre the Station wise ex-Power Plant
Respective MegaWatt and MegaWatt hour Capabilities foreseen for
the next day i.e. between 00.00 Station hours to 24.00 hours of
the following day, in each 15-minute Time Block.
Western Regional Load
Despatch Centre
Madhya Pradesh Power
Generating Company Limited/ GCC
Independent Power
Producers/Renewable Energy Generators
Respective Station
10.30 hours
(i) State Load
Despatch Centre shall compile total ex- Power Plant MegaWatt. and
MegaWatt hour availability from all the Generating Stations;
(ii) State Load
Despatch Centre shall compute Station wise and total MegaWatt and
MegaWatt hour Entitlement of each Discom for the next day in each
15-minute Time Block and shall intimate to Madhya Pradesh Power
Management Company Limited;
(iii) Each Discom shall intimate to Madhya
Pradesh Power Management Company Limited its total MegaWatt
demand in each 15-minute Time Block for the next day based on
day-ahead demand forecasts grossed up for actual State
Transmission Losses.
State Load Despatch
Centre
State Load Despatch
Centre
Madhya Pradesh Power Management Company Limited/
Respective Discom
11.00 hours
(i) Madhya Pradesh
Power Management Company Limited shall compute the shortage and
surplus of power for State as a whole in consultation with
Discoms;
(ii) Madhya Pradesh Power Management Company
Limited shall take decisions for transaction of power through
power exchanges on day ahead/term ahead basis
Madhya Pradesh Power Management Company Limited.
13.30 hours
(i) Madhya Pradesh
Power Management Company Limited on receipt of Provisional
Transaction Report of power through power exchanges shall run
Merit Order Dispatch for State as a whole for all power plants
including power plants allocated to Madhya Pradesh Power
Management Company Limited.
(ii) For each Discom,
Madhya Pradesh Power Management Company Limited shall compare
(for each time block) :-
(a) Total ex-power plant MegaWatt entitlement of a given Discom
(b) Total ex-power plant MegaWatt demand for a given Discom
(iii) Madhya Pradesh Power Management Company
Limited shall allocate the power from Madhya Pradesh Power
Management Company Limited allocation to each Discom as per their
power requirement for each 15 minutes time block.
Madhya Pradesh Power Management Company Limited
in consultation with discoms.
14.00 hours
Madhya Pradesh Power Management Company Limited
shall intimate to State Load Despatch Centre, the Discom wise
ex-Power Plant MegaWatt requisition in each of the Generating
Stations along with Long-term Bilateral transactions, Medium Term
Transactions, approved Short term Bilateral transactions and
collective transactions through power exchanges.
Madhya Pradesh Power Management Company Limited.
15.00 hours
State Load Despatch Centre shall intimate to
Western Regional Load Despatch Centre, Madhya Pradesh composite
requisition in each of the Inter State Generating Station /
Independent Power Producers along with other Long-term Bilateral
transactions, Medium Term Transactions
State Load Despatch Centre.
17.00 hours
Western Regional Load Despatch Centre intimates
to State Load Despatch Centre, Madhya Pradesh Drawls Schedule at
Ex-power plant basis and at Central Transmission Unit- State
Transmission Unit Interface in each 15-minute Time Block for the
next day.
Western Regional Load Despatch Centre.
17.30 hours
(i) Madhya Pradesh
Power Management Company Limited on receipt of Final Transaction
Report of power State Load Despatch Centre Western Regional Load
Despatch Centre Madhya 1 Pradesh Power through power exchanges
shall run Merit Order Dispatch for State as a whole for all power
plants including power plants allocated to Madhya Pradesh Power
Management Company Limited.
(ii) For each Discom,
Madhya Pradesh Power Management Company Limited shall compare
(for each time block)
a. Total ex-power plant MegaWatt entitlement of a given Discom
b. Total ex-power plant MegaWatt demand for a given Discom
(iii) Madhya Pradesh Power Management Company
Limited shall allocate the power from Madhya Pradesh Power
Management Company Limited allocation to each Discom as per their
power requirement for each 15 minutes time block.
Madhya Pradesh Power Management Company Limited
in consultation with discoms.
18.00 hours
(i) State Load
Despatch Centre shall finalize ex-Power Plant MegaWatt Generation
Schedules of each seller and MegaWatt Drawls Schedules (at
ex-Power Plant and State Transmission Unit-Buyer Interface) of
each Buyer
(ii) State Load
Despatch Centre shall intimate Generation Schedules to respective
Seller
(iii) State Load Despatch Centre shall intimate
Drawal Schedules to Madhya Pradesh Power Management Company
Limited / respective Buyer.
State Load Despatch Centre
21.30 hours
State Area Generating Station / Independent
Power Producers /Discoms may inform the modifications to be made,
if any, in the above Schedules to State Load Despatch
Centre/Discoms
State Area Generating Station /Discoms.
22.00 hour
State Load Despatch Centre shall intimate to
Western Regional Load Despatch Centre, all the modifications
pertaining to Inter State Generating Station / Independent Power
Producers Schedules and Inter-State transactions (if any).
State Load Despatch Centre
23.30 hours
After receipt of final Drawls Schedule of Madhya
Pradesh from Western Regional Load Despatch Centre at 23.00 hours
and taking into account all the modifications indicated by
Disdoms, State Load Despatch Centre shall issue the final
Generation Schedules to respective Seller and final Drawls
Schedules to Madhya Pradesh Power Management Company Limited /
respective Buyer.
State Load Despatch Centre
During the day of operation
As per the
requisition submitted by the Discoms or Madhya Pradesh Power
Management Company Limited on behalf of Discoms or the. revised
DC submitted by the generators State Load Despatch Centre shall
revise the Drawls Schedule / Injection Schedule as per provisions
of this Seller/Buyer Code.
The injection schedule of eligible renewable
generators shall be revised by State Load Despatch Centre on
receipt of requisition from such generators or coordinating
agency as per provisions of Indian Electricity Grid Code and
other Central Electricity Regulatory Commission / Madhya Pradesh
Electricity Regulatory Commission regulations/orders on renewable
generation as amended from time to time.
Madhya Pradesh Power
Management Company Limited/Discom/seller/buyer/state load
Despatch Centre.
Renewable Energy Generating / State Load
Despatch Centre
Within 3 days
State Load Despatch Centre shall prepare
implemented State Load Schedules and final ex-power plant
capabilities of State Despatch Area Generating Station /
Independent Power Producers Centre within 3 days or on receipt of
implemented Schedule from Western Regional Load Despatch Centre.
State Load Despatch Centre.
*AII Hydro Power Stations of Madhya Pradesh Power Generating Company Limited shall furnish day ahead Declared Capacity (DC) as per Madhya Pradesh Electricity Regulatory Commission (Terms and conditions for determination of Generation Tariff) Regulations, 2012 and amendment from time to time.
Section 5 • Madhya Pradesh Electricity Balancing and Settlement Code, 2015
5. Scheduling and Despatch.
madhya-pradesh-electricity-balancing-and-settlement-code-2015-sec-5.json
•
Section 5
{
"act_title": "Madhya Pradesh Electricity Balancing and Settlement Code, 2015",
"act_slug": "madhya-pradesh-electricity-balancing-and-settlement-code-2015",
"section_label": "Section",
"section": {
"number": "5",
"title": "5. Scheduling and Despatch.",
"chapter": null,
"content": "General Principles: Scheduling\n(a) State Load Despatch Centre shall check that the resulting power flows do not give rise to any Transmission constraint. In case of any constraints, State Load Despatch Centre shall moderate the Schedule to the required extent by intimation to concerned Discoms; and\n(b) State Load Despatch Centre shall check that Schedules are operationally reasonable particularly in terms of ramping-up/ ramping-down rates and ratio between minimum and maximum generation levels. State Load Despatch Centre shall moderate the Schedule to the required extent by intimation to concerned Discoms. The ramping up/ ramping down rates in respect of different categories of Stations would be based on the technical data as substantiated by Electricity Generating Stations and as mutually agreed by Discoms or Madhya Pradesh Power Management Company Limited on behalf of Discoms with due consent of State Load Despatch Centre.\n(a) State Transmission loss for a given Week = (Total net injection into the State Grid in a week) - (Total net Drawls from the State Grid in a Week);\n(b) Loss of nth Week shall be computed by the 5th day of the (n+1)th Week;\n(c) This loss figure shall then be used in the Scheduling process from the beginning of the (n+2)th Week;\n(d) State Load Despatch Centre shall round-off actual loss of nth Week to nearest 0.01% for the purpose of Scheduling for the (n+2)th Week (e.g. 4.705% is rounded-off to 4.71%, 3.442% is rounded off to 3.44% and so on);\n(e) Events in the Grid of an exceptional nature could result in abnormally high or low losses in any Week. This could be either a Load crash in the State due to a Weather disturbance or closure of any Major Hydro Power Station during the monsoon for flushing of silt/debris froM the Reservoir or Outage of any major Transmission Lines etc. The losses for these abnormal weeks shall generally be ignored as far as the Scheduling process is concerned. State Load Despatch Centre decision in this regard will be final.\nGeneral Principles: Revision of Schedules\nImplemented Schedules\nTimelines and responsibility matrix (Madhya Pradesh Balancing and Settlement Code)\nTimelines and responsibility matrix (Madhya Pradesh Balancing and Settlement Code)\nTime (Furnish by)\nTime (Furnish by)\nPrimary Activity\nPrimary Activity\nResponsibility\nResponsibility\n10:00 hours\n(i) Western Regional\n\t\t\t\tLoad Despatch Centre intimates MegaWatt and MegaWatt hours\n\t\t\t\tentitlements of Madhya Pradesh in each Inter State Generating\n\t\t\t\tStation to State Load Despatch Centre for the next day i.e.\n\t\t\t\tbetween 00.00 hrs to 24.00 hrs of the following day, in each\n\t\t\t\t15-minute time block;\n(ii) Madhya Pradesh\n\t\t\t\tPower Generating Company Limited* shall advise State Load\n\t\t\t\tDespatch Centre the Station wise ex-Power Plant Mega Watt and\n\t\t\t\tMega Watt hour Capabilities foreseen for the next day i.e.\n\t\t\t\tbetween 00.00 hrs to 24.00 hrs of the following day, in each\n\t\t\t\t15-minute Time Block;\n(iii) Independent\n\t\t\t\tPower Producer and eligible Renewable Energy Generators shall\n\t\t\t\tadvise State Load Despatch Centre the Station wise ex-Power Plant\n\t\t\t\tMegaWatt and MegaWatt hour Injections for the next day i.e.\n\t\t\t\tbetween 00.00 hours to 24.00 hours of the following day,\n\t\t\t\tIndependent Power Producers /Renewable Energy Generators in each\n\t\t\t\t15-minute Time block;\n(iv) Indira Sagar Project, Omkareshwar\n\t\t\t\tHydro-Electric Project, Shared Stations and any other Stations\n\t\t\t\tnot covered under above Serial. Number (i),(ii) and (iii) shall\n\t\t\t\tadvise State Load Despatch Centre the Station wise ex-Power Plant\n\t\t\t\tRespective MegaWatt and MegaWatt hour Capabilities foreseen for\n\t\t\t\tthe next day i.e. between 00.00 Station hours to 24.00 hours of\n\t\t\t\tthe following day, in each 15-minute Time Block.\nWestern Regional Load\n\t\t\t\tDespatch Centre\nMadhya Pradesh Power\n\t\t\t\tGenerating Company Limited/ GCC\nIndependent Power\n\t\t\t\tProducers/Renewable Energy Generators\nRespective Station\n10.30 hours\n(i) State Load\n\t\t\t\tDespatch Centre shall compile total ex- Power Plant MegaWatt. and\n\t\t\t\tMegaWatt hour availability from all the Generating Stations;\n(ii) State Load\n\t\t\t\tDespatch Centre shall compute Station wise and total MegaWatt and\n\t\t\t\tMegaWatt hour Entitlement of each Discom for the next day in each\n\t\t\t\t15-minute Time Block and shall intimate to Madhya Pradesh Power\n\t\t\t\tManagement Company Limited;\n(iii) Each Discom shall intimate to Madhya\n\t\t\t\tPradesh Power Management Company Limited its total MegaWatt\n\t\t\t\tdemand in each 15-minute Time Block for the next day based on\n\t\t\t\tday-ahead demand forecasts grossed up for actual State\n\t\t\t\tTransmission Losses.\nState Load Despatch\n\t\t\t\tCentre\nState Load Despatch\n\t\t\t\tCentre\nMadhya Pradesh Power Management Company Limited/\n\t\t\t\tRespective Discom\n11.00 hours\n(i) Madhya Pradesh\n\t\t\t\tPower Management Company Limited shall compute the shortage and\n\t\t\t\tsurplus of power for State as a whole in consultation with\n\t\t\t\tDiscoms;\n(ii) Madhya Pradesh Power Management Company\n\t\t\t\tLimited shall take decisions for transaction of power through\n\t\t\t\tpower exchanges on day ahead/term ahead basis\nMadhya Pradesh Power Management Company Limited.\n13.30 hours\n(i) Madhya Pradesh\n\t\t\t\tPower Management Company Limited on receipt of Provisional\n\t\t\t\tTransaction Report of power through power exchanges shall run\n\t\t\t\tMerit Order Dispatch for State as a whole for all power plants\n\t\t\t\tincluding power plants allocated to Madhya Pradesh Power\n\t\t\t\tManagement Company Limited.\n(ii) For each Discom,\n\t\t\t\tMadhya Pradesh Power Management Company Limited shall compare\n\t\t\t\t(for each time block) :-\n(a) Total ex-power plant MegaWatt entitlement of a given Discom\n(b) Total ex-power plant MegaWatt demand for a given Discom\n(iii) Madhya Pradesh Power Management Company\n\t\t\t\tLimited shall allocate the power from Madhya Pradesh Power\n\t\t\t\tManagement Company Limited allocation to each Discom as per their\n\t\t\t\tpower requirement for each 15 minutes time block.\nMadhya Pradesh Power Management Company Limited\n\t\t\t\tin consultation with discoms.\n14.00 hours\nMadhya Pradesh Power Management Company Limited\n\t\t\t\tshall intimate to State Load Despatch Centre, the Discom wise\n\t\t\t\tex-Power Plant MegaWatt requisition in each of the Generating\n\t\t\t\tStations along with Long-term Bilateral transactions, Medium Term\n\t\t\t\tTransactions, approved Short term Bilateral transactions and\n\t\t\t\tcollective transactions through power exchanges.\nMadhya Pradesh Power Management Company Limited.\n15.00 hours\nState Load Despatch Centre shall intimate to\n\t\t\t\tWestern Regional Load Despatch Centre, Madhya Pradesh composite\n\t\t\t\trequisition in each of the Inter State Generating Station /\n\t\t\t\tIndependent Power Producers along with other Long-term Bilateral\n\t\t\t\ttransactions, Medium Term Transactions\nState Load Despatch Centre.\n17.00 hours\nWestern Regional Load Despatch Centre intimates\n\t\t\t\tto State Load Despatch Centre, Madhya Pradesh Drawls Schedule at\n\t\t\t\tEx-power plant basis and at Central Transmission Unit- State\n\t\t\t\tTransmission Unit Interface in each 15-minute Time Block for the\n\t\t\t\tnext day.\nWestern Regional Load Despatch Centre.\n17.30 hours\n(i) Madhya Pradesh\n\t\t\t\tPower Management Company Limited on receipt of Final Transaction\n\t\t\t\tReport of power State Load Despatch Centre Western Regional Load\n\t\t\t\tDespatch Centre Madhya 1 Pradesh Power through power exchanges\n\t\t\t\tshall run Merit Order Dispatch for State as a whole for all power\n\t\t\t\tplants including power plants allocated to Madhya Pradesh Power\n\t\t\t\tManagement Company Limited.\n(ii) For each Discom,\n\t\t\t\tMadhya Pradesh Power Management Company Limited shall compare\n\t\t\t\t(for each time block)\na. Total ex-power plant MegaWatt entitlement of a given Discom\nb. Total ex-power plant MegaWatt demand for a given Discom\n(iii) Madhya Pradesh Power Management Company\n\t\t\t\tLimited shall allocate the power from Madhya Pradesh Power\n\t\t\t\tManagement Company Limited allocation to each Discom as per their\n\t\t\t\tpower requirement for each 15 minutes time block.\nMadhya Pradesh Power Management Company Limited\n\t\t\t\tin consultation with discoms.\n18.00 hours\n(i) State Load\n\t\t\t\tDespatch Centre shall finalize ex-Power Plant MegaWatt Generation\n\t\t\t\tSchedules of each seller and MegaWatt Drawls Schedules (at\n\t\t\t\tex-Power Plant and State Transmission Unit-Buyer Interface) of\n\t\t\t\teach Buyer\n(ii) State Load\n\t\t\t\tDespatch Centre shall intimate Generation Schedules to respective\n\t\t\t\tSeller\n(iii) State Load Despatch Centre shall intimate\n\t\t\t\tDrawal Schedules to Madhya Pradesh Power Management Company\n\t\t\t\tLimited / respective Buyer.\nState Load Despatch Centre\n21.30 hours\nState Area Generating Station / Independent\n\t\t\t\tPower Producers /Discoms may inform the modifications to be made,\n\t\t\t\tif any, in the above Schedules to State Load Despatch\n\t\t\t\tCentre/Discoms\nState Area Generating Station /Discoms.\n22.00 hour\nState Load Despatch Centre shall intimate to\n\t\t\t\tWestern Regional Load Despatch Centre, all the modifications\n\t\t\t\tpertaining to Inter State Generating Station / Independent Power\n\t\t\t\tProducers Schedules and Inter-State transactions (if any).\nState Load Despatch Centre\n23.30 hours\nAfter receipt of final Drawls Schedule of Madhya\n\t\t\t\tPradesh from Western Regional Load Despatch Centre at 23.00 hours\n\t\t\t\tand taking into account all the modifications indicated by\n\t\t\t\tDisdoms, State Load Despatch Centre shall issue the final\n\t\t\t\tGeneration Schedules to respective Seller and final Drawls\n\t\t\t\tSchedules to Madhya Pradesh Power Management Company Limited /\n\t\t\t\trespective Buyer.\nState Load Despatch Centre\nDuring the day of operation\nAs per the\n\t\t\t\trequisition submitted by the Discoms or Madhya Pradesh Power\n\t\t\t\tManagement Company Limited on behalf of Discoms or the. revised\n\t\t\t\tDC submitted by the generators State Load Despatch Centre shall\n\t\t\t\trevise the Drawls Schedule / Injection Schedule as per provisions\n\t\t\t\tof this Seller/Buyer Code.\nThe injection schedule of eligible renewable\n\t\t\t\tgenerators shall be revised by State Load Despatch Centre on\n\t\t\t\treceipt of requisition from such generators or coordinating\n\t\t\t\tagency as per provisions of Indian Electricity Grid Code and\n\t\t\t\tother Central Electricity Regulatory Commission / Madhya Pradesh\n\t\t\t\tElectricity Regulatory Commission regulations/orders on renewable\n\t\t\t\tgeneration as amended from time to time.\nMadhya Pradesh Power\n\t\t\t\tManagement Company Limited/Discom/seller/buyer/state load\n\t\t\t\tDespatch Centre.\nRenewable Energy Generating / State Load\n\t\t\t\tDespatch Centre\nWithin 3 days\nState Load Despatch Centre shall prepare\n\t\t\t\timplemented State Load Schedules and final ex-power plant\n\t\t\t\tcapabilities of State Despatch Area Generating Station /\n\t\t\t\tIndependent Power Producers Centre within 3 days or on receipt of\n\t\t\t\timplemented Schedule from Western Regional Load Despatch Centre.\nState Load Despatch Centre.\n*AII Hydro Power Stations of Madhya Pradesh Power Generating Company Limited shall furnish day ahead Declared Capacity (DC) as per Madhya Pradesh Electricity Regulatory Commission (Terms and conditions for determination of Generation Tariff) Regulations, 2012 and amendment from time to time.",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
"prev_section": "4",
"next_section": "6"
}