15. Functions of Competent Authority.

(a) attend the meeting convened by the Managing Committee, and participate in the discussions but he has no voting right;
[(b) prepare the maintenance plan;]
(c) prepare estimates for works identified for execution; the estimate shall be prepared as per the norms and the rules prescribed by the Water Resources Department in this regard;
(d) accord technical clearance to the maintenance works, as per the powers delegated. The technical clearance shall be limited to the administrative sanctions for the work;
(e) ensure that no alteration or change is made in the irrigation system, with reference to the approved hydraulic particulars;
(f) bring to the notice of Water Resources Department any tampering or changes made in the system, by any Farmers' Organisation in contravention of the hydraulic particulars. He shall ensure that action is taken in accordance with the Act;
(g) provide technical details of the system to the member of the Managing Committee;
(h) assist the Managing Committee in the preparation and approval of operational plan;
(i) advise and assist on water regulation, based on the water supplies and seasonal condition;
(j) prepare water budgeting for the Farmers' Organisation;
(k) help in assessment of areas irrigated;
(l) help in training any helper appointed by the Farmers' Organisation in discharging their duties;
[(m) maintain the various registers, documents and accounts work; and]
(n) record measurement for the work done and pass the bills for payments by Farmers' Organisation based on the approval of the works Sub-Committee.
Form I
Form I
[ See Rule 7 (5) and 12 (5) (i)]
Register of Technical Sanction (T.S.)/Administrative Sanction (A.S.)
Register of Technical Sanction (T.S.)/Administrative Sanction (A.S.)
Name of the WUA/FO..................
WAS/DAS/PAS/WTS/DTS/PTS Sanction No. and year
Sanctioned by
Head of Account
Name of work
Amount of Estimate
Date of Sanction
Initial
(1)
(2)
(3)
(4)
(5)
(6)
(7)
Note . - WAS. - WUA's Administrative Sanction.
Note .
WTS. - WUA's Technical Sanction by Competent Authority (Technical).
DAS. - Distributory Committee's Administrative Sanction.
DTS. - Distributory Committee's Technical Sanction by Competent Technical Authority.
PAS. - Project Committee's Administrative Sanction.
PTS. - Project Committee's Technical Sanction by Competent Technical Authority.
Form 2
Form 2
[ See Rule 12 (1) (i)]
Register of Component Works
Register of Component Works
Name of the WUA/FO...........................
Sl. No.
Distance from head
Position Right (R), Left (L), Across (X)
Name and description of work
Reduced levels (m) or ft.
Dimensions (m) or ft.
Slopes of bank number of vents openings
Areas chargeable catchment or drainage (ha/km. 2 )
Discharge capacity [Million m or (Mcft)]
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
Canals Channels, aqueducts or super passages
Bed (a) canal (b) drain
(a) FSI of canal (b) MEL of drain
(a) Top of lining (b) Bank/ parapet (c) Flood bank
(a) Canal BW/Bed fall (b) Drain BW/bed fall
Depth or height (a) canal (b) side wall
Top width of bank R/I (a) canal (b) flood bank
Front Rear & slopes (a) canal (b) flood bank
(a) Ayacut below (b) drainage area
At (a) ESI of canal (b) MFL of drain