{
    "act_title": "M.P. Farmers' Organisation Rules, 1999",
    "act_slug": "m-p-farmers-organisation-rules-1999",
    "section_label": "Section",
    "section": {
        "number": "15",
        "title": "15. Functions of Competent Authority.",
        "chapter": null,
        "content": "(a) attend the meeting convened by the Managing Committee, and participate in the discussions but he has no voting right;\n[(b) prepare the maintenance plan;]\n(c) prepare estimates for works identified for execution; the estimate shall be prepared as per the norms and the rules prescribed by the Water Resources Department in this regard;\n(d) accord technical clearance to the maintenance works, as per the powers delegated. The technical clearance shall be limited to the administrative sanctions for the work;\n(e) ensure that no alteration or change is made in the irrigation system, with reference to the approved hydraulic particulars;\n(f) bring to the notice of Water Resources Department any tampering or changes made in the system, by any Farmers' Organisation in contravention of the hydraulic particulars. He shall ensure that action is taken in accordance with the Act;\n(g) provide technical details of the system to the member of the Managing Committee;\n(h) assist the Managing Committee in the preparation and approval of operational plan;\n(i) advise and assist on water regulation, based on the water supplies and seasonal condition;\n(j) prepare water budgeting for the Farmers' Organisation;\n(k) help in assessment of areas irrigated;\n(l) help in training any helper appointed by the Farmers' Organisation in discharging their duties;\n[(m) maintain the various registers, documents and accounts work; and]\n(n) record measurement for the work done and pass the bills for payments by Farmers' Organisation based on the approval of the works Sub-Committee.\nForm I\nForm I\n[ See Rule 7 (5) and 12 (5) (i)]\nRegister of Technical Sanction (T.S.)/Administrative Sanction (A.S.)\nRegister of Technical Sanction (T.S.)/Administrative Sanction (A.S.)\nName of the WUA/FO..................\nWAS/DAS/PAS/WTS/DTS/PTS Sanction No. and year\nSanctioned by\nHead of Account\nName of work\nAmount of Estimate\nDate of Sanction\nInitial\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\nNote . - WAS. - WUA's Administrative Sanction.\nNote .\nWTS. - WUA's Technical Sanction by Competent Authority (Technical).\nDAS. - Distributory Committee's Administrative Sanction.\nDTS. - Distributory Committee's Technical Sanction by Competent Technical Authority.\nPAS. - Project Committee's Administrative Sanction.\nPTS. - Project Committee's Technical Sanction by Competent Technical Authority.\nForm 2\nForm 2\n[ See Rule 12 (1) (i)]\nRegister of Component Works\nRegister of Component Works\nName of the WUA/FO...........................\nSl. No.\nDistance from head\nPosition Right (R), Left (L), Across (X)\nName and description of work\nReduced levels (m) or ft.\nDimensions (m) or ft.\nSlopes of bank number of vents openings\nAreas chargeable catchment or drainage (ha/km. 2 )\nDischarge capacity [Million m or (Mcft)]\nRemarks\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\nCanals Channels, aqueducts or super passages\nBed (a) canal (b) drain\n(a) FSI of canal (b) MEL of drain\n(a) Top of lining (b) Bank/ parapet (c) Flood bank\n(a) Canal BW/Bed fall (b) Drain BW/bed fall\nDepth or height (a) canal (b) side wall\nTop width of bank R/I (a) canal (b) flood bank\nFront Rear & slopes (a) canal (b) flood bank\n(a) Ayacut below (b) drainage area\nAt (a) ESI of canal (b) MFL of drain",
        "footnote": "",
        "is_definition": false,
        "sort_order": 14
    },
    "prev_section": "14",
    "next_section": "1"
}