Type of installation
Type of installation
Estimated consumption per month (30 days)
Estimated consumption per month (30 days)
LT Installation
LT Installation
a) (i) Bhagya Jyothi / Kuteer Jyothi * (ii)Domestic / Non-Domestic, Non Commercial lighting (iii)Non-commercial combined lighting, heating and power
(i) 16 units per installation (ii) & (iii)
45 Units per KW of sanctioned load.
b) Commercial Lighting
86 units per KW of sanctioned load.
c) Commercial heating and/or Motive power (LT
Industries)
48 units per KW of sanctioned load.
d) Irrigation Pump sets under LT category
100 units per HP of sanctioned load.
e) Public lighting
360 units per KW of sanctioned load.
f) Others such as water supply & Sewerage installations,
etc which are not covered above.
110 units per KW of sanctioned load.
HT Installation
HT Installation
g) All HT installations
100 units per KVA of contract demand.
* Note: The Security Deposit in respect of BJ/KJ installations shall be collected from the G.o.K as the G.o.K has undertaken to pay the full energy charges of these categories.
Note:
Section 5 • KERC (Security Deposit) Regulations, 2007
5. Initial Security Deposit (ISD).
kerc-security-deposit-regulations-2007-sec-5.json
•
Section 5
{
"act_title": "KERC (Security Deposit) Regulations, 2007",
"act_slug": "kerc-security-deposit-regulations-2007",
"section_label": "Section",
"section": {
"number": "5",
"title": "5. Initial Security Deposit (ISD).",
"chapter": null,
"content": "Type of installation\nType of installation\nEstimated consumption per month (30 days)\nEstimated consumption per month (30 days)\nLT Installation\nLT Installation\na) (i) Bhagya Jyothi / Kuteer Jyothi * (ii)Domestic / Non-Domestic, Non Commercial lighting (iii)Non-commercial combined lighting, heating and power\n(i) 16 units per installation (ii) & (iii)\n\t\t\t\t45 Units per KW of sanctioned load.\nb) Commercial Lighting\n86 units per KW of sanctioned load.\nc) Commercial heating and/or Motive power (LT\n\t\t\t\tIndustries)\n48 units per KW of sanctioned load.\nd) Irrigation Pump sets under LT category\n100 units per HP of sanctioned load.\ne) Public lighting\n360 units per KW of sanctioned load.\nf) Others such as water supply & Sewerage installations,\n\t\t\t\t etc which are not covered above.\n110 units per KW of sanctioned load.\nHT Installation\nHT Installation\ng) All HT installations\n100 units per KVA of contract demand.\n* Note: The Security Deposit in respect of BJ/KJ installations shall be collected from the G.o.K as the G.o.K has undertaken to pay the full energy charges of these categories.\nNote:",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
"prev_section": "4",
"next_section": "6"
}