{
    "act_title": "KERC (Security Deposit) Regulations, 2007",
    "act_slug": "kerc-security-deposit-regulations-2007",
    "section_label": "Section",
    "section": {
        "number": "5",
        "title": "5. Initial Security Deposit (ISD).",
        "chapter": null,
        "content": "Type of installation\nType of installation\nEstimated consumption per month (30 days)\nEstimated consumption per month (30 days)\nLT Installation\nLT Installation\na) (i) Bhagya Jyothi / Kuteer Jyothi * (ii)Domestic / Non-Domestic, Non Commercial lighting (iii)Non-commercial combined lighting, heating and power\n(i) 16 units per installation (ii) & (iii)\n\t\t\t\t45 Units per KW of sanctioned load.\nb) Commercial Lighting\n86 units per KW of sanctioned load.\nc) Commercial heating and/or Motive power (LT\n\t\t\t\tIndustries)\n48 units per KW of sanctioned load.\nd) Irrigation Pump sets under LT category\n100 units per HP of sanctioned load.\ne) Public lighting\n360 units per KW of sanctioned load.\nf) Others such as water supply & Sewerage installations,\n\t\t\t\t etc which are not covered above.\n110 units per KW of sanctioned load.\nHT Installation\nHT Installation\ng) All HT installations\n100 units per KVA of contract demand.\n* Note: The Security Deposit in respect of BJ/KJ installations shall be collected from the G.o.K as the G.o.K has undertaken to pay the full energy charges of these categories.\nNote:",
        "footnote": "",
        "is_definition": false,
        "sort_order": 4
    },
    "prev_section": "4",
    "next_section": "6"
}