Section 31- Pressure plant

Degree in Chemical or Electrical or Metallurgical
or Mechanical Engineering or its equivalent.
i. A minimum experience
of 10 years in-
a. design or erection
or maintenance, or
b. testing, examination
and inspection of pressure plants.
ii. He shall be-
a. conversant with the
relevant codes of practices and test procedures relating to
pressure vessels ;
b. conversant with
statutory requirements concerning the safety of unfired pressure
vessels and equipment operating under pressure ;
c. conversant with
non-destructive testing techniques as are applicable to pressure
vessels ;
d. able to identify defects and arrive at a
reliable conclusion with regard to the safety of pressure
plants.
Facilities for carrying out hydraulic test,
non- destructive test, gauges/equipment/ gadgets for measurement
and any other equipment or gauges to determine the safety in the
use of pressure vessels
6
i. Section 36-
precautions against dangerous fumes.
ii. Rules made under
sections 41 and 112 concerning ship building and ship repairs.
Masters degree in Chemistry, or a degree in
Chemical Engineering
i. A minimum of 7 years
experience in collection and analysis of environmental samples
and calibration of monitoring equipment;
ii. He shall-
a. be conversant with
the hazardous properties of chemicals and their permissible
limit values;
b. be conversant with
the current techniques of sampling and analysis of the
environmental contaminants and
c. be able to arrive at a reliable conclusion as
regards the safety in respects of entering and carrying out hot
work
Meters, instruments and devices duly calibrated
and certified for carrying out the tests and certification of
safety for working in confined spaces.
7.
Ventilation systems as
required under various Schedules framed under section 87, such
as Schedules on-
i. Grinding of glazing
of metals and processes incidental thereto
ii. Cleaning or
smoothing etc. of articles, by a jet of sand, metal shot or
grit, or other abrasive propelled by a blast of
compressed air or
steam.
iii. Handling and
processing of asbestos.
iv. Manufacture of
Rayon by viscose process.
v. Foundry operations
Degree in Mechanical or Electrical Engineering or
Equivalent.
i. A minimum of 7 years
in the design fabrication, installation, testing of ventilation
system and systems used for extraction and collection of dusts,
fumes and vapours and other ancillary equipment
ii. He shall be conversant with relevant codes of
practice and tests procedures that are current in respect of
ventilation and a traction system for fumes and shall be able to
arrive at a reliable conclusion with regard to effectiveness of
the system
Facilities for testing the ventilation system
instruments and gauges for testing the effectiveness of the
extraction systems for dusts, vapours and fumes and any other
equipment needed for determining the efficiency and adequacy of
these systems. He shall have the assistance of a suitable
qualified technical person who can come to a reasonable
conclusion as to the adequacy of the system.
[3. Approval of site, construction or extension of a factory.
(a) A flow chart of the manufacturing process supplemented with a brief description of the process in its various stages.
(b) Plans in triplicate drawn to scale showing :
(i) the site of the factory and immediate surroundings including adjacent buildings and other structures, roads, drains, etc.
(ii) the plan, elevation and necessary cross-sections of the various buildings, indicating all relevant details relating to natural lighting, ventilation and means of escape in case of fire.
(iii) The plans of layout machinery clearly indicating the position of the plant and machinery, aisles and passageways. These shall be a minimum clearance of 50cm. between machines and fixed structures.
(c) In the case of hazardous and polluting industries, a certificate of approval of location of the factory obtained from the Chief Town planner to Government and a no objection certificate from the Kerala State Pollution Control Board.
(d) A Chalan receipt evidencing payment or scrutiny Fee as prescribed in Appendix II.
(e) Such other particulars as the Chief Inspector or the Deputy Chief Inspector may require.
(i) Educational Institution
25 metres
(ii) Hospitals
30 metres
(iii) Religious-cum-worship building
25 metres
(iv) Tank and Canals
10 metres
(b) The certificate of stability referred to in clause (a) shall be readily available in the factory for inspection by the Inspectors and Additional Inspectors.
(b) No machinery or prime mover or a permanent fixture not shown in the plans approved shall be installed, fixed or used in any factory except in replacement provided its capacity is not different and it is not occupying more floor area than that already shown in the approved plans.